This document is a solicitation for a federal contract opportunity issued by the U.S. Army Corps of Engineers, Engineering District Wilmington. The solicitation is for the replacement of two mooring clusters at the New River Operations Area with two steel pipe pilings. The magnitude of construction is between $100,000 and $250,000, and the contract will be awarded to the lowest priced, technically acceptable quote. This is a 100% small business set-aside. The solicitation includes a site visit on June 27, 2024, and the deadline for submitting quotes is July 17, 2024 at 2:00 PM EST. The period of performance is 60 calendar days after contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A23 - Site Visit Sign In Sheet - New River - W912PM24Q0034 - 27 June - 900 a.m..pdf | ||
| W912PM24Q0034 - New River - Questions and Responses.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION W912PM24Q0034 - NEW RIVER REPLACEMENT OF MOORING CLUSTERS
THIS SOLICITATION IS A REQUEST FOR QUOTE UNDER FAR PART 13 - SIMPLIFIED ACQUISITION PROCEDURES.
THE MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000.00 and $250,000.00
------------------- 100% SMALL BUSINESS SET-ASIDE ------------------------
AWARD WILL BE MADE TO THE LOWEST PRICED, TECHNICALLY ACCEPTABLE QUOTE.
NOTICE: SECTION 00 45 00 - PROVISION 52.204-8, ANNUAL REPRESENTATIONS AND CERTIFICATIONS TO BE SUBMITTED VIA EMAIL WITH QUOTE.
REQUESTS FOR INFORMATION OR ANY QUESTIONS, MUST BE SUBMITTED BY 28 JUNE 2024, 2:00 PM EST. REQUESTS FOR INFORMATION OR QUESTIONS WILL NOT BE ACCEPTED AFTER 2:00 PM, EST. ALL REQUESTS, QUESTIONS, AND QUOTE SUBMISSIONS SHALL BE VIA EMAIL DIRECTED TO DIANA.D.CURL@USACE.ARMY.MIL AND ROSALIND.M.SHOEMAKER@USACE.ARMY.MIL. INQUIRIES AND REQUESTS THAT ARE DIRECTED TO ANY OTHER PERSON MAY NOT BE RELAYED TO THE PROPER PERSON AND, THEREFORE, MAY NOT BE ANSWERED.
QUOTES ARE DUE BY 2:00 PM, EST, JULY 17, 2024. SUBMIT YOUR QUOTES ELECTRONICALLY TO: DIANA.D.CURL@USACE.ARMY.MIL
AND ROSALIND.M.SHOEMAKER@USACE.ARMY.MIL
DIANA D CURL (910) 251-4804
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
17-Jun-2024
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________60 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________SOW
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________17 Jul 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM
PAGE OF PAGES
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
910-251-4454FAX:TEL: 910-251-4711 TEL: FAX:
W912PM24Q0034 1 OF 50
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Develop Engineering Plan -FFP
Develop Engineering plan for piling install.
In accordance with the plans and specifications.
FOB: Destination
PSC CD: F021
NET AMT
0002 2 Each Remove Mooring Clusters -FFP
Remove (2) existing Mooring Clusters and dispose of off-site
0003 2 Each Install Mooring Pipes -FFP
Install (2) Steel Mooring Pipes - to include marine coating and complete Fender Systems and Cleats, and filling and capping.
STATEMENT OF WORK
SCOPE OF WORK
REMOVAL & REPLACEMENT OF (2) MOORING CLUSTERS WITH (2) TO STEEL PIPE PILINGS
U.S. Army Corps of Engineers, Wilmington District
New River Operations Area
June 17, 2024
1. GENERAL:
The Contractor shall furnish all labor, equipment, materials, and services necessary to remove (2) 7 wooden piling clusters and install (2) Steel Pipe pilings in place of the current mooring clusters at the New River Area for the U.S. Army Corps of Engineers, Wilmington District
1.1. EM 385-1-1, Safety and Health Requirements Manual (Revision 30-Nov-2014)
• Download from the U.S. Army Corps of Engineers, Publications website:
https://www.publications.usace.army.mil/portals/76/publications/engineermanuals/em 85-1-1.pdf
• Install App from the Google Play Store online:
https://play.google.com/store/apps
* Search for “EM 385-1-1 Safety Manual”
1.2. Federal & State Transportation Laws & Regulations
1.3. Travel Per Diem Lookup - https://www.gsa.gov/travel/plan-book/per-diem-rates
2. SPECIFICATIONS: The Contractor shall remove (2) 7 wooden piling clusters and install (2) Steel Pipe pilings in place of the current mooring clusters at the New River Area. The pilings shall be installed IAW the following requirements:
2.1. REQUIREMENTS:
2.1.1. Remove and dispose of off-site the (2) existing mooring clusters. Disposal of materials shall follow state and local solid waste disposal regulations.
2.1.2. Provide and Install (2) 30” Diameter x .750” Wall x 40’ Steel Pilings
2.1.3. Top 30’ Coated with 16 mil Coal Tar Epoxy
2.1.4. Provide and Install (2) 24” Cleats per Piling
2.1.5. Fill 2/3 of upper portion of piling with sand, then 1/3 with concrete
2.1.6. Provide and install (1) Donut Fender per Piling, 6’ 6” Diameter x 7’ Long Marine Guard Foam Filled
Monopile Donut Fender, with Flat Heigh Freeboard – 4.0 Feet, Marine Grade Epoxy Painted Steel Core, color to be Black.
https://www.publications.usace.army.mil/portals/76/publications/engineermanuals/em%2085-1-1.pdf https://play.google.com/store/apps https://www.gsa.gov/travel/plan-book/per-diem-rates
Figure 1
Figure 2 Figure 3 Figure 4
3. DELIVERY/WORKSITE LOCATION: 102 James St, Sneads Ferry, NC 28460 https://maps.app.goo.gl/TqZs8vEVDiXiZrg47?g_st=i
4. NO PICKUPS, DELIVERIES, OR WORK SHALL BE SCHEDULED ON THE FOLLOWING FEDERAL
HOLIDAYS:
New Year’s Day Monday, January 1, 2024 Martin Luther King Jr’s Birthday Monday, January 15, 2024 Washington’s Birthday Monday, February 19, 2024 Memorial Day Monday, May 27, 2024 Juneteenth National Independence Day Wednesday, June 19, 2024 Independence Day Thursday, July 4, 2024 Labor Day Monday, September 2, 2024 Columbus Day Monday, October 14, 2024 Veterans Day Monday, November 11, 2024 Thanksgiving Day Thursday, November 28, 2024 Christmas Day Wednesday, December 25, 2024
5. EQUIPMENT AND SUPPLIES:
The Contractor shall furnish all labor, equipment, materials, and services necessary to accomplish the work. The Contractor shall be responsible for transporting all materials to the site and making Government staff aware of deliveries as necessary.
6. WORK LOCATION AND HOURS:
All work shall occur at 102 James St, Sneads Ferry, NC 28460. Materials may be stored at facility as needed.
Hours of operation will be governed by local ordinances.
7. SECURITY:
The work area shall be secured at the end of each working day and left in a safe condition. The facility gate shall remain locked except for times of use.
8. WORK REQUIREMENTS:
Work shall be in accordance with best practices for marine construction. At any time during below inspections work can be stopped if U.S. Army Corps of Engineers inspector deems work practices unacceptable.
9. INSPECTIONS OF WORK:
Work will be randomly inspected on a daily basis to ensure compliance with this scope of work, and with EM- 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual. A final inspection will be conducted upon completion of the work. Work must be completed as specified prior to payment by the government.
10. SAFETY REQUIREMENTS:
10.1 References.
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ANSI/ASSP A10.34 (2021) Protection of the Public on or Adjacent to Construction Sites https://maps.app.goo.gl/TqZs8vEVDiXiZrg47?g_st=i
ANSI/ASSP A10.44 (2020) Control of Energy Sources (Lockout/Tagout) for Construction and Demolition Operations
ANSI/ASSP Z490.1 (2016) Criteria for Accepted Practices in Safety, Health, and Environmental Training
INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)
ANSI/ISEA Z89.1 (2014; R 2019) American National Standard for Industrial Head Protection
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 51B (2024) Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
NFPA 70 (2023; ERTA 7 2023; TIA 23-15) National Electrical Code
NFPA 70E (2024) Standard for Electrical Safety in the Workplace
NFPA 241 (2022) Standard for Safeguarding Construction, Alteration, and Demolition Operations
NFPA 306 (2024) Standard for the Control of Gas Hazards on Vessels
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2024) Safety -- Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINSTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1915 Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment
29 CFR 1919 Gear Certification
29 CFR 1926 Safety and Health Regulations for Construction
10.2. Definitions.
10.2.1. Site Safety and Health Officer (SSHO)
A Contractor Employee that is responsible for overseeing and ensuring implementation of the prime Contractor's Safety and Occupational Health (SOH) program according to the Contract, EM 385-1-1, applicable federal, state, and local requirements.
10.2.1.1. Level One SSHO
A designated employee with full-time SOH responsibility that meets and follows the requirements of EM 385-1-1.
10.2.1.2. Alternate SSHO
An employee that meets the definition of the contract-required level SSHO, but is not the primary SSHO.
10.2.2. Competent Person (CP)
The CP is a person designated in writing, who, through training, knowledge and experience, is capable of identifying, evaluating, and addressing existing and predictable hazards in the working environment or working conditions that are unsanitary, hazardous, or dangerous to personnel, and who has authorization to take prompt corrective measures to eliminate them.
10.2.3. Qualified Person (QP)
The QP is a person designated in writing, who, by possession of a recognized degree, certificate, or professional standing, or extensive knowledge, training, and experience, has successfully demonstrated their ability to solve or resolve problems related to the subject matter, the work, or the project.
10.3. Submittals
Government acceptance is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
SD-01 Preconstruction Submittals
Accident Prevention Plan (APP); G
Dive Operations Plan (if required); G
SD-06 Test Reports
Accident Reports; G
LHE Inspection Reports
Monthly Exposure Reports; G
SD-07 Certificates
Crane Operators/Riggers
Activity Hazard Analysis (AHA); G Certificate of
Compliance
Hot Work Permit
Standard Lift Plan; G
Critical Lift Plan; G
Third Party Certification of Floating Cranes and Barge-Mounted Mobile Cranes
10.4. Public Health Emergencies
In the event of a declared public health emergency, follow safety precautions as required by the Occupational Safety and Health Administration (OSHA) www.osha.gov, the Centers for Disease Control and Prevention (CDC) www.cdc.gov, and as required by federal, state and local requirements.
10.5. Monthly Exposure Reports
Provide a Monthly Exposure Report by the fifth of each month for the previous month. This report is a compilation of employee-hours worked each month for all site workers, both Prime and subcontractor. Failure to submit the report may result in retention of up to 10 percent of the progress payment.
10.6. Regulatory Requirements
http://www.osha.gov/ http://www.cdc.gov/
In addition to the detailed requirements included in the provisions of this Contract, comply with the most recent edition of USACE EM 385-1-1, and applicable federal, state, and local laws, ordinances, criteria, rules and regulations at the date of the Solicitation for this Contract. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern.
10.7. Personnel Qualifications, Duties, and Meetings.
10.7.1. Site Safety and Health Officer (SSHO)
10.7.1.1. Qualifications of the SSHO
All SSHOs will have met the training, experience requirements identified in the EM 385-1-1 and this Contract.
10.7.1.2. Duties of the SSHO
All SSHOs will carry out the roles and responsibilities as identified in this Contract and the EM 385-1-1. All SSHOs will be designated on an ENG Form 6282, provided by the Contracting Officer. Superintendent, QC Manager, and SSHO are subject to dismissal if their required duties are not being effectively carried out. If either the Superintendent, QC Manager, or SSHO are dismissed, project work will be stopped and will not be allowed to resume until a suitable replacement is approved and the above duties are again being effectively carried out.
10.7.1.2. Safety Meetings
Conduct daily safety meetings to review past activities, plan for new or changed operations, review pertinent aspects of appropriate AHA (by trade), establish safe working procedures for anticipated hazards, and provide pertinent Safety and Occupational Health (SOH) training and motivation. Conduct meetings at least once a month for all supervisors, to include the prime contractor and all subcontractors, at the project location. The SSHO, supervisors, or foremen must conduct meetings at least once a week for the trade workers. Document meeting minutes to include the date, persons in attendance, subjects discussed, and names of individual(s) who conducted the meeting. Maintain documentation on-site for all prime and subcontractor conducted meetings and furnish copies to the Contracting Officer on request. Notify the Contracting Officer of all scheduled meetings 7 calendar days in advance.
10.7.2. Roles and Responsibilities of Prime Contractor and the SSHO
The Prime Contractor and SSHO must ensure that the requirements of all applicable OSHA and EM 385-1-1 are met for the project. The Prime Contractor must ensure an SSHO or an equally qualified Alternate SSHO(s) is at the worksite at all times to implement and administer the Contractor's safety program and Government accepted Accident Prevention Plan. If the required SSHO has to temporarily (that is, up to 24 hours / 1 day) leave the site of work due to unforeseen or emergency situations, a Level One, Two, or Three SSHO may be used in the interim and must be on the site of work at all times when work is being performed.
If the SSHO must be off-site for a period longer than 24 hours / 1 day, a qualified alternate that meets the contract requirements must be onsite.
Prime contractor must ensure all SSHOs will:
1. Are designated on an ENG Form 6282.
2. Meet minimum training and experience requirements identified in EM 385-1-1.
3. Execute roles and responsibilities identified in EM 385-1-1.
10.7.3. Contract Site Safety and Health Officer(s) Minimum Requirements
Provide a minimum of one Level One SSHO that meets the requirements of EM 385-1-1 for this project.
10.7.4. Preconstruction Conference
a. Contractor representatives who have a responsibility or significant role in accident prevention on the project must attend the preconstruction conference. This includes the project superintendent, Site Safety and Occupational Health Officer, quality control manager, or any other assigned safety and health professionals who participated in the development of the APP (including the Activity Hazard Analyses (AHAs) and special plans, program and procedures associated with it).
b. Discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHAs that will be developed and implemented during the performance of the Contract. This list of proposed AHAs will be reviewed and an agreement will be reached between the Contractor and the Contracting Officer as to which phases will require an analysis. In addition, establish a schedule for the preparation, submittal, and Government review of AHAs to preclude project delays. The creation of the APP and Schedule will be created after being given Notice to Proceed.
c. Deficiencies in the submitted APP, identified during the Contracting Officer's review, must be corrected, and the APP re-submitted for review prior to the start of construction. Work is not permitted to begin until an APP is established that is acceptable to the Contracting Officer.
10.8. Accident Prevention Plan (APP)
Submit the Accident Prevention Plan (APP) for review and acceptance by the Government at least 15 calendar days prior to the start, after being given Notice to Proceed. A competent person must prepare the written site-specific APP. Prepare the APP in accordance with the format and requirements of EM 385-1-1, ENG Form 6293, and herein. The APP must be job-specific and address any unusual or unique aspects of the project or activity for which it is written. The APP must interface with the Contractor's overall safety and occupational health program referenced in the APP in the applicable APP element and made site-specific. Describe the methods to evaluate past safety performance of potential subcontractors in the selection process. Also, describe innovative methods used to ensure and monitor safe work practices of subcontractors. The Government considers the Prime Contractor to be the "controlling employer" for all worksite safety and health of the subcontractors.
Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the Contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The APP must be signed in accordance with the APP and ENG Form 6293 Accident Prevention Plan Worksheet. The SSHO must provide and maintain the APP and a log of signatures by each subcontractor foreman, attesting that they have read and understand the APP, and make the APP and log available on-site to the Contracting Officer. If English is not the foreman's primary language, the Prime Contractor must provide an interpreter.
Submit the APP to the Contracting Officer 15 calendar days prior to the date of the preconstruction conference for acceptance. Work cannot proceed without an accepted APP. Once reviewed and accepted by the Contracting Officer, the APP and attachments will be enforced as part of the Contract. Disregarding the provisions of this Contract or the accepted APP is cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified. Continuously review and amend the APP, as necessary, throughout the life of the Contract. Changes to the accepted APP must be made with the knowledge and concurrence of the Contracting Officer, project superintendent, SSHO and Quality Control Manager. Incorporate unusual or high-hazard activities not identified in the original APP as they are discovered. Should any severe hazard exposure (i.e., imminent danger) become evident, stop work in the area, secure the area, and develop a plan to remove the exposure and control the hazard.
Notify the Contracting Officer within 24 hours of discovery. Eliminate and remove the hazard. In the interim, take all necessary action to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public (as defined by ANSI/ASSP A10.34), and the environment.
10.8.1. Names and Qualifications
Provide plans in accordance with the requirements outlined in EM 385-1-1, including the following:
a. Names and qualifications (resumes including education, training, experience and certifications) of site safety and health personnel designated to perform work on this project to include the designated Site Safety and Health Officer and other competent and qualified personnel to be used. Specify the duties of each position.
b. As a minimum, designate and submit qualifications of Competent Persons (CP) for each of the following major areas: fall protection; hazardous energy; health hazard recognition, evaluation and control of chemical, physical and biological agents; and personal protective equipment and clothing to include selection, use and maintenance. Designate and submit qualifications for additional CPs as applicable to the work performed under this Contract.
10.8.2. Plans
Provide plans in the APP in accordance with the requirements outlined in EM 385-1-1.
10.9. Activity Hazard Analysis
Before beginning each activity, task or Definable Feature of Work (DFOW) involving a type of work presenting hazards not experienced in previous project operations, or where a new work crew or subcontractor is to perform the work, the Contractor(s) performing that work activity must prepare an AHA. AHAs must be developed by the Prime Contractor, subcontractor, or supplier performing the work, and provided for Prime Contractor review and approval before submitting to the Contracting Officer. AHAs must be signed by the SSHO, Superintendent, QC Manager and the subcontractor Foreman performing the work. Format the AHA in accordance with EM 385-1-1. Submit the AHA for review at least 15 working days prior to the start of each activity task, or DFOW. The Government reserves the right to require the Contractor to revise and resubmit the AHA if it fails to effectively identify the work sequences, specific anticipated hazards, site conditions, equipment, materials, personnel and the control measures to be implemented.
10.9.1. AHA Management
Review the AHA list periodically (at least monthly) at the Contractor supervisory safety meeting, and update as necessary when procedures, scheduling, or hazards change. Use the AHA during daily inspections by the SSHO to ensure the implementation and effectiveness of the required safety and health controls for that work activity.
10.9.2. AHA Signature Log
Each employee performing work as part of an activity, task or DFOW must review the AHA for that work and sign a signature log specifically maintained for that AHA prior to starting work on that activity. The SSHO must maintain a signature log on site for every AHA. Provide employees whose primary language is other than English, with an interpreter to ensure a clear understanding of the AHA and its contents.
10.10. Site Safety Reference Materials
Maintain safety-related references applicable to the project, including those listed in paragraph REFERENCES.
Maintain applicable equipment manufacturer's manuals.
10.11. Emergency Medical Treatment
Contractors must arrange for their own emergency medical treatment in accordance with EM 385-1-1. The Government has no responsibility to provide emergency medical treatment.
10.12. Notifications and Reports
10.12.1. Accident Notification
Notify the Contracting Officer in accordance with the EM 385-1-1 Accident Reporting Timeline.
Table Accident Reporting Required Timeline
Accident Type Notify KO or COR Complete Final Accident Report on ENG 3394 and provide to KO or COR
Fatality, in-patient hospitalization, amputation, eye loss, or property damage over $600,000.
Immediately, no later than (NLT) 8 Hours
Within 7 Days
All other accidents and near misses
Immediately, no later than (NLT) 24 Hours
Within 7 Days
Within notification include Contractor name; Contract title; type of Contract; name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (for example, type of construction equipment used and PPE used). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted. Assist and cooperate fully with the Government's investigation(s) of any accident or near miss.
10.12.2. Accident Reports
a. Conduct an accident investigation for all injuries and illnesses, property damage, and near misses as defined in EM 385-1-1, to establish the root cause(s) of the accident. All accidents are reportable, regardless of whether or not it is recordable. Complete the applicable USACE Accident Report, ENG Form 3394, and provide the report to the Contracting Officer within 7 calendar days of the accident.
The Contracting Officer will provide copies of any required or special forms.
b. Near Misses: Report all "Near Misses" to the Contracting Officer using local accident reporting procedures, within 24 hours. The Contracting Officer will provide the Contractor the required forms.
Near miss reports are considered positive and proactive Contractor safety management actions.
10.12.3. LHE Inspection Reports
Submit LHE inspection reports required in accordance with EM 385-1-1 and as specified herein with Daily Reports of Inspections.
10.12.4. Certificates of Compliance and Pre-Lift Plan/Checklist for LHE and Rigging
Provide a Certificate of Compliance for LHE entering an activity under this Contract and in accordance with EM 385-1-1. Post certifications on the crane.
Develop a Standard Lift Plan (SLP) in accordance with EM 385-1-1 and using Standard Pre-Lift Crane Plan/Checklist for each lift planned. Submit SLP to the Contracting Officer for approval within 15 calendar days in advance of planned lift.
10.13. Hot Work Permit
10.13.1. Permit and Personnel Requirement
Obtain a written permit prior to performing "Hot Work" (i.e., welding or cutting) or operating other flame-producing/spark producing devices, from the USCG and submit to the Contracting Officer. If the USCG does not require a permit, prepare a permit and submit it to the Contracting Officer for acceptance. Contractors are required to meet all criteria before hot work is allowed. Provide at least two 20-pound 4A:20 BC rated extinguishers for normal "Hot Work". The extinguishers must be current inspection tagged and contain an approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "Hot Work" done at this activity. The Fire Watch must be trained in accordance with NFPA 51B and remain on-site for a minimum of 1 hour after completion of the task or as specified on the hot work permit.
When starting work in the facility, require personnel to familiarize themselves with the location of the nearest fire alarm boxes and place in memory the emergency phone number for the Fire Department. Report any fire, no matter how small, to the responsible Fire Department and the Contracting Officer.
10.13.2. Work Around Flammable Materials
Obtain permit approval from a NFPA Certified Marine Chemist, or Certified Industrial Hygienist for "Hot Work" within or around flammable materials (such as fuel systems or welding/cutting on fuel pipes) or confined spaces (such as sewer wet wells, manholes, or vaults) that have the potential for flammable or explosive atmospheres.
Whenever these materials, except beryllium and chromium (VI), are encountered in indoor operations, local mechanical exhaust ventilation systems that are sufficient to reduce and maintain personal exposures to within acceptable limits must be used and maintained in accordance with manufacturer's instruction and supplemented by exceptions noted in EM 385-1-1.
10.14. Dive Safety Requirements (if required)
Develop a Dive Operations Plan, AHA, emergency management plan, and personnel list that includes qualifications, for each separate diving operation. Submit these documents to the District Dive Coordinator (DDC) via the Contracting Officer, for review and approval at least 15 working days prior to commencement of diving operations. These documents must be at the diving location at all times. Provide each of these documents as a part of the project file.
10.15. Severe Weather Plan for Marine Activities
In the event of a severe storm warning, the Contractor must comply with the applicable Storm Plan and:
a. Secure outside equipment and materials and place materials that could be damaged in protected areas.
b. Check surrounding area for loose material, equipment, debris, and other objects that could be blown away or against existing facilities.
c. Ensure that temporary erosion controls are adequate.
EXECUTION.
10.16. Construction and Other Work
Comply with EM 385-1-1, NFPA 70, NFPA 70E, NFPA 241, the APP, the AHA, Federal and State OSHA regulations, and other related submittals and activity fire and safety regulations. The most stringent standard prevails.
PPE is governed in all areas by the nature of the work the employee is performing. Use personal hearing protection at all times in designated noise hazardous areas or when performing noise hazardous tasks. Safety glasses must be worn or carried/available on each person. Mandatory PPE includes:
a. Head Protection that meets ANSI/ISEA Z89.1
b. Long Pants
c. Appropriate Safety Footwear
d. Personal Flotation Device USCG Type III or better when working within 6-ft of the water’s edge
e. Appropriate Class Reflective Vests
10.16.1. Worksite Communication
Employees working alone in a remote location or away from other workers must be provided an effective means of emergency communications (i.e., cellular phone, two-way radios, land-line telephones or other acceptable means). The selected communication must be readily available (easily within the immediate reach) of the employee and must be tested prior to the start of work to verify that it effectively operates in the area/environment. Develop an employee check-in/check-out communication procedure to ensure employee safety.
10.16.2. Hazardous Material Exclusions
Notwithstanding any other hazardous material used in this Contract, radioactive materials or instruments capable of producing ionizing/non-ionizing radiation (with the exception of radioactive material and devices used in accordance with EM 385-1-1 such as nuclear density meters for compaction testing and laboratory equipment with radioactive sources) as well as materials which contain asbestos, mercury or polychlorinated biphenyls, di-isocyanates, lead-based paint, and hexavalent chromium, are prohibited. The Contracting Officer, upon written request by the Contractor, may consider exceptions to the use of any of the above excluded materials. Low mercury lamps used within fluorescent lighting fixtures are allowed as an exception without further Contracting Officer approval. Notify the Radiation Safety Officer (RSO) prior to excepted items of radioactive material and devices being brought on base.
10.16.3. Unforeseen Hazardous Material
Contract documents identify materials such as PCB, lead paint, and friable and non-friable asbestos and other OSHA regulated chemicals (i.e., 29 CFR Part 1910.1000). If material(s) that may be hazardous to human health upon disturbance are encountered during demolition, repair, renovation, or construction operations. Stop that portion of work and notify the Contracting Officer immediately. Within 14 calendar days the Government will determine if the material is hazardous. If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a modification.
10.16.4. Control of Hazardous Energy (Lockout/Tagout
Provide and operate a Hazardous Energy Control Program (HECP) in accordance with EM 385-1-1, 29 CFR
1910, 29 CFR 1915, ANSI/ASSP A10.44, NFPA 70E.
10.17. Fall Protection Program
Establish a fall protection program, for the protection of all employees exposed to fall hazards. Within the program include company policy, identify roles and responsibilities, education and training requirements, fall hazard identification, prevention and control measures, inspection, storage, care and maintenance of fall protection equipment and rescue and evacuation procedures in accordance with EM 385-1-1.
10.17.1. Fall Protection Equipment and Systems
Enforce use of personal fall protection equipment and systems designated (to include fall arrest, restraint, and positioning) for each specific work activity in the Site-Specific Fall Protection and Prevention Plan and AHA at all times when an employee is exposed to a fall hazard. Protect employees from fall hazards as specified in EM 385-1-1.
Provide personal fall protection equipment, systems, subsystems, and components that comply with EM 385-1-1 and
29 CFR 1926.
10.17.1.1. Additional Personal Fall Protection Measures
In addition to the required fall protection systems, other protective measures such as safety skiffs, personal floatation devices, and life rings, are required when working above or next to water in accordance with EM 385- 1-1. Personal fall protection systems and equipment are required when working from an articulating or extendible boom, swing stages, or suspended platform. In addition, personal fall protection systems are required when operating other equipment such as scissor lifts. The need for tying-off in such equipment is to prevent ejection of the employee from the equipment during raising, lowering, travel, or while performing work.
10.17.1.2. Personal Fall Protection Equipment
Only a full-body harness with a shock-absorbing lanyard or self-retracting lanyard is an acceptable personal fall arrest body support device. The use of body belts is not acceptable. Harnesses must have a fall arrest attachment affixed to the body support (usually a Dorsal D-ring) and specifically designated for attachment to the rest of the system. Snap hooks and carabineers must be self-closing and self-locking, capable of being opened only by at least two consecutive deliberate actions and have a minimum gate strength of 1633 kg 3,600 lbs in all directions. Use webbing, straps, and ropes made of synthetic fiber. The maximum free fall distance when using fall arrest equipment must not exceed 1.8 m 6 feet, unless the proper energy absorbing lanyard is used. Always take into consideration the total fall distance and any swinging of the worker (pendulum-like motion), that can occur during a fall, when attaching a person to a fall arrest system. Equip all full body harnesses with Suspension Trauma Preventers such as stirrups, relief steps, or similar in order to provide short-term relief from the effects of orthostatic intolerance in accordance with EM 385-1-1.
10.18. Use of Explosives
Explosives shall not be brought onto the project site.
W912PM24Q0034
11. CLEANUP:
All debris shall be removed from Government property. Disposal of materials shall be in compliance with state and local solid waste disposal regulations.
12. TECHNICAL POINT of CONTACT (TPOC)/Contracting Officer Representative (COR):
U.S. Army Corps of Engineers Wilmington District TPOC: Donald Wiggins 69 Darlington Avenue Wilmington, NC 28403-1343 910-251-4835 Donald.o.wiggins@usace.army.mil
13. PERIOD of PERFORMANCE (POP): 60 days after contract award.
14. INVOICING: INVOICE(S) SHALL BE SUBMITTED TO THE TPOC (section 15) through the United
States Postal Service (USPS) or via email (preferred), upon completion of services and/or delivery of items purchased.
14.1. THE FOLLOWING INFORMATION IS REQUIRED ON ALL INVOICES & MUST BE
EXACTLY AS IT APPEARS ON THE CONTRACT DOCUMENT.
14.2. CONTRACT # W912PM24P---- (exactly as it appears on the Contract)
14.3. INVOICE # ___________________
14.4. COMPANY NAME and ADDRESS (exactly as it appears on the Contract)
14.5. INVOICED CONTRACT LINE ITEM NUMBERS (CLINs) (e.g., 0001, 0002, etc.) (exactly as it appears on the Contract)
14.6. Description, quantity, unit of measure, unit price and extended price of the items delivered
14.7. SMALL BUSINESS, VETERAN OWNED, OR 8A (if applicable, Indicate on invoice)
14.8. The DATE on the INVOICE must be the day that the invoice is “SENT” to the COR.
15. OPSEC REFERENCE:
1. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of mailto:Donald.o.wiggins@usace.army.mil
Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures -- this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
3. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the
RA.
14. Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/ eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
Section 00 21 00 - Instructions
INSTRUCTIONS
NOTE 1: AWARD WILL BE MADE TO THE LOWEST PRICED, TECHNICALLY ACCEPTABLE OFFER.
NOTE 2: IN ORDER TO BE CONSIDERED TECHNICALLY ACCEPTABLE, THE CONTRACTOR MUST
SUBMIT THE FOLLOWING WITH THEIR QUOTE: PAST EXPERIENCE
PAST EXPERIENCE:
a) Offerors are required to submit prior experience of recent and relevant contracts/projects.
Contracts/Projects can be performed with Federal, State, local or private companies. Government contracts are preferred but not required.
b) Contracts/Projects that are relevant are defined as those that are similar to the requirements of the Statement of Work (SOW). Contracts/Projects that are recent are defined as those that have been completed within the last five (5) years.
c) A minimum of two (2) contracts/projects shall be provided to include: contract number, title of project, detailed description of work performed, and Point of Contact. Please do not submit more than five (5) contracts/projects.
d) In order for an Offeror to be determined technically acceptable, the offeror must show previous experience with the type of work described in the SOW. Offerors must show previous experience on a minimum of two (2) contracts/projects.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-22 Alternative Line Item Proposal JAN 2017 52.211-6 Brand Name or Equal AUG 1999 52.232-13 Notice Of Progress Payments APR 1984 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation
DEC 2019
252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation
MAY 2021
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2023
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a FIRM FIXED PRICE contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
23.5% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Onslow County, North Carolina
52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)
ALTERNATE I (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign…