A21 - W912P820R0016.pdf
PDF 6 MB Posted
- Attached to
- AUTOMATED REVETMENT SURVEYS ON THE MISSISSIPPI, ATCHAFALAYA AND RED RIVERS, AND OLD RIVER CONTROL CHANNELS
- Solicitation number
- W912P820R0016
About this file
This solicitation is for automated revetment surveys on the Mississippi, Atchafalaya, and Red Rivers, and Old River Control Channels. The U.S. Army Corps of Engineers Engineering District New Orleans seeks a contractor to perform all necessary services to produce multibeam and conventional hydrographic survey data required to monitor existing conditions of revetments. The contractor must have the ability to deploy two 2-person hydrographic survey parties and use professional judgment to determine required personnel, equipment, and supplies. Surveys are required annually from September 2020 through August 2025. The contractor must submit data and deliverables to the Contracting Officer's Representative by specified deadlines.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 18 May 2020
X
A X B X C
D
EX
X G F 56 - 65
66 - 84 H 85 karen.d.hargrave@usace.army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 85
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912P8 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
KAREN D HARGRAVE 504-862-1561
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 12
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
13 - 29 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
31-32 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 33 - 39 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
40 - 51
PART II - CONTRACT CLAUSES
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
52 - 55
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
17 Apr 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912P820R0016
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
MISSISSIPPI RIVER LEVEE REVETMENTS
FFP
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AA 1 Job
BASE YEAR
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AB 1 Job
OPTION PERIOD 1
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AC 1 Job
OPTION PERIOD 2
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AD 1 Job
OPTION PERIOD 3
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AE 1
OPTION PERIOD 4
FFP
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
MISSISSIPPI RIVER NON-LEVEE REVETMENTS
FFP
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AA 1 Job
BASE YEAR
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AB 1 Job
OPTION PERIOD 1
FFP
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AC 1 Job
OPTION PERIOD 2
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AD 1 Job
OPTION PERIOD 3
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AE 1 Job
OPTION PERIOD 4
FFP
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
LOW SILL - AUXILLARY CONTROL INFLOW/
FFP
OUTFLOW CHANNELS AND OUTFLOW BAFFLE AREAS
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003AA 1 Job
BASE YEAR
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003AB 1 Job
OPTION PERIOD 1
FFP
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003AC 1 Job
OPTION PERIOD 2
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003AD 1 Job
OPTION PERIOD 3
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003AE 1 Job
OPTION YEAR 4
FFP
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
ATCHAFALAYA RIVER REVETMENTS
FFP
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004AA 1 Job
BASE YEAR
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004AB 1 Job
OPTION YEAR 1
FFP
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004AC 1 Job
OPTION YEAR 2
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004AD 1 Job
OPTION YEAR 3
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004AE 1 Job
OPTION YEAR 4
FFP
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
RED RIVER REVETMENTS
FFP
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005AA 1 Job
BASE YEAR
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005AB 1 Job
OPTION PERIOD 1
FFP
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005AC 1 Job
OPTION PERIOD 2
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005AD 1 Job
OPTION PERIOD 3
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005AE 1 Job
OPTION PERIOD 4
FFP
FOB: Destination
SECTION B
Automated Revetment Surveys on the Mississippi, Atchafalaya, and Red Rivers and Old River Control Channels
Solicitation No. W912P8-20-R-0016
Section B
CLIN DESCRIPTION UNIT Base Year
Option Period 1
Option Period 2
Option Period 3
Option Period 4
0001 Mississippi River Levee Revetments
Job
0002 Mississippi River Non-Levee Revetments
Job
0003 Low Sill - Auxiliary Control Inflow/Outflow Channels and Outflow Baffle Areas
Job
0004 Atchafalaya River Revetments Job
0005 Red River Revetments Job
SECTION C
DESCRIPTION AND SPECIFICATIONS
C-1 GENERAL
Mississippi, Atchafalaya, and Red Rivers and Old River Control Channels Revetment Maintenance Surveys
A. Revetment Maintenance Surveys: The Contractor shall perform all services necessary to produce multibeam and conventional hydrographic survey data required to monitor existing conditions of revetments on the Mississippi, Atchafalaya, and Red Rivers and Old River Control Channels. The limits of the revetment maintenance surveys required under this contract are shown in Attachment J (Revetment Maintenance Sites and Survey Area Boundary Limits).
B. Obstructed Areas: The survey area boundaries are considered the minimally acceptable survey footprint of revetment sites.
Obstructed areas that are found within the footprints as a result of obstacles such as docks, piers, pile clusters, moored ships, and moored barges shall be surveyed via multibeam, single beam or conventional methods.
C. Survey Area Boundaries: The survey area boundaries include the subaqueous river bed protected by the revetment, 200 feet channelward from the toe of the revetment, 500 feet upstream and downstream of the revetment, and the area between the water’s edge and the top of the revetment.
C-2 TECHNICAL PROVISIONS
A. Compliance
All surveys shall be performed in accordance with the special provisions contained herein and comply with procedures outlined in the "U. S. Army Corps of Engineer Manuals”, EM-1110-2-1003, Hydrographic Surveying, and EM-1110-1-1005, Engineering and Design: Control and Topographic Surveying; and the current USACE New Orleans District Minimum Survey Standards, Ed. 4 and subsequent editions. The measurement, alignment, calibration tests, and quality assurance procedures and criteria standards shown in the manuals shall be followed. The manuals can be downloaded and viewed at the following website:
http://www.usace.army.mil/inet/usace-docs/eng-manuals The New Orleans District Minimum Survey Standards, Ed. 4 can be downloaded and viewed at the following website:
W912P820R0016 http://www.usace.army.mil/inet/usace-docs/eng-manuals http://www.mvn.usace.army.mil/Missions/Engineering/SurveySection /SurveyingGuidelines.aspx.
b. Horizontal Control
1. The horizontal coordinates of the existing revetment area boundaries, LMS baseline and revetment range lines will be furnished by the Government, and will be referenced to the North American Datum 1983 (NAD83), U.S. Survey Feet, Louisiana South Zone 1702 State Plane Coordinate System. The data furnished will show the revetment survey boundaries and/or the baseline and revetment range layout. The data will be delivered by the electronic file transfer system specified by the Government.
2. All surveys shall be referenced to the most recent National Geodetic Survey (NGS) horizontal datum and epoch, U.S. Survey Feet, and State Plane Coordinate System Louisiana South Zone 1702.
3. Hydrographic Survey Positioning: An automated positioning system utilizing a minimum of Differential Global Positioning system (DGPS) shall be used in making the hydrographic surveys.
Control to be used shall be the Coast Guard navigational beacon broadcast signal. The Contractor shall have a beacon receiver on board for positioning of the survey vessel(s).
C. Vertical Control
All survey data shall be converted and/or reduced to the North American Vertical Datum of 1988 (NAVD88), epoch 2004.65 or other vertical datum and epoch as specified by the Government. The water surface elevation at the range line will be determined from the nearest automatic gage or by prorating from the gage upstream and downstream from the revetment site.
D. Survey Data
1. The Contractor shall store all raw data files of all single beam and multibeam hydrographic surveys. The raw data files shall contain all original, uncorrected, time-tagged observations, included but not limited to, separate time-tagged data files for all multibeam depths, QC indicators, sound velocity, tides, drafts, roll, pitch, yaw, heave, daily sound velocity profile casts, patch test data, performance test data and statistics, etc.
2. The Contractor shall reduce, edit, and correct all hydrographic survey data. Each revetment site shall be in its own directory. The Contractor shall compress the data using Win-Zip or other file compression software and transfer data on an electronic file transfer system specified by the Government.
After the file has been transferred, the Contractor will notify the COR by E-mail that the transfer is complete.
C-3 SPECIFIC TECHNICAL PROVISIONS
A. Multibeam Surveys of Mississippi, Atchafalaya, and Red Rivers and Old River Control Channels Revetment Maintenance Sites
1. General. All survey area boundaries shall be surveyed using a multibeam system. Single beam profiles will be collected over the multibeam areas and maybe collected concurrently with the multibeam data. This will be done as a quality control check of the multibeam data. If the single beam is collected concurrently with the multibeam, it will need to be one of the following: 1) a frequency difference of more than 25% from the multibeam, or 2) if a different frequency isn’t possible, then the single beam transducer must be physically located on the boat at a distance such that there is no overlap between the single beam’s footprint and the multibeam’s footprints. These procedures will ensure that there is no “cross-talk” between the two systems. The contractor shall perform 100% full bottom coverage surveys of all the revetment survey sites. Prior to performing the survey, the Contractor shall inspect each survey site to determine where waterway obstructions prevent the use of automated positioning and sounding equipment for portions of the survey. The Contractor must notify the COR of any observed obstructed areas and receive concurrence before completing or negating surveys of the obstructed site. Any surveys of obstructed areas acquired without concurrence of the COR will be surveyed at the Contractor's risk.
If negated without concurrence of the COR, the Contractor will survey the area if the COR deems it a viable survey site. The Contractor shall place a note on the Quality Control Report indicating why the survey was terminated at the riverside of an obstruction. If possible, in areas where obstructions prevent making automated positioning surveys possible, the Contractor shall make adjustments to the survey equipment (i.e. angling the multibeam transducer head) to acquire the maximum hydrographic survey data possible under surface obstructions.
2. Maximum Beam or Swath Width Angle. Beam or swath width should not exceed the indicated values, unless independent QA performance test results indicate depth accuracies can be achieved with wider arrays. Excessive footprint size should be avoided by reducing the beam or swath width. The recommended beam or swath width angle is 120 degrees with 90 degrees utilized. The outer 15 degrees of data is used as overlap. If the multibeam transducer head is tilted to obtain the maximum coverage of the areas to be surveyed, the maximum allowable beam or swath width angle will be 75 degrees from nadir (most vertical beam), and will only be allowed on the data file that is collected closest to the bank line. No overlap will be required on these most extreme outer beams.
3. Beam Overlap. All multibeam data shall be collected with a 50% side overlap (i.e., 200% bottom coverage).
4. Sound Velocity and Bar Check Calibrations. Sound Velocity Profile casts should be taken at the start and end of every survey day. They shall be taken directly in the work area at a density such that the water column is adequately modeled. A QC Bar Check should be made under the center beam, if feasible. Bar check procedures should follow those prescribed for single and multiple-transducer systems.
5. System Alignment and Patch Test Calibrations. Multibeam system alignment checks and patch tests will be performed as indicated within the Hydrographic Surveying EM-1110-2-1003. If the contractor believes that a change to the multibeam system alignments has occurred, or when mandatory QA Performance Tests indicate that the data is not meeting standards, the alignment checks and patch tests will be performed more often.
6. QA Performance Tests. Performance tests on multibeam data are essential and mandatory. They shall be performed at the start of each new project and periodically during a project. The time interval needed between QA performance tests will depend on the consistency of test results. The maximum mean bias computed between two data sets should not exceed the indicated tolerances.
The allowable standard deviation is a function of the project depth, as indicated in Table 3-1 of EM 1110-2-1003, 30 Nov 13.
7. Maximum Survey Speed. Recommended maximum velocities are prescribed to ensure data integrity. Further limitations may be required for multibeam systems to ensure 100% or greater forward (along-track) coverage or object detection. The speed shall be such that it results in a data set from which a 2x2-ft. grid extract will not require interpolated points between grid nodes.
8. Water Surface Elevations. Water surface elevations shall be determined to the nearest tenth of a foot at the start, middle, and end of each day.
B. Single Beam/Conventional Hydrographic Surveys of Mississippi, Atchafalaya Rivers and Old River Control Channels Revetment Maintenance Sites
1. General. In the obstructed areas where multibeam surveys are not possible, single beam or conventional hydrographic surveys may be required. The contractor shall use a distance wheel (or substitute device) and a fathometer or lead line to collect soundings at a minimum of twenty (20) feet along established revetment range lines. If single beam is viable, the Contractor shall use a depth sounder capable of taking not less than five
(5) soundings per second making a permanent record on a scroll or digital recording with a vertical scale approved by the COR. The transducer shall have a beam width of not more than five (5) degrees. The contractor shall make bar check readings daily. Once in the morning before sounding operations begin and once at mid-day (12:00+) to adjust the depth sounder for water temperature, salinity, and draft variations. Readings will be taken at 10-foot intervals until the maximum project depth for the area being surveyed is reached.
2. Water Surface Elevations. Water surface elevations shall be determined to the nearest tenth of a foot at the beginning, middle, and end of each day.
C-4 PERSONNEL AND EQUIPMENT
A. The Contractor shall use professional judgment in determining what personnel, equipment and supplies are needed. The Contractor must maintain the ability to deploy two 2-person hydrographic survey parties at any given time.
B. All equipment that is used in this contract shall comply with the provisions of the latest issue of U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) available from the website:
http://www.usace.army.mil/inet/usacedocs/eng.manuals). Any equipment which the COR considers unsatisfactory for accurately performing the services shall be replaced by the Contractor immediately upon notification by the Contracting Officer. The Contractor shall provide all Documentation Disks Model#SKTB-1- 31/2D and the Survey Field books necessary to accomplish the work assignments.
C. Each work unit will consist of personnel qualified and experienced to perform the type of required services in a manner satisfactory to the COR. The COR reserves the right to require the replacement of any work unit immediately upon determining that the unit is not performing the required services in accordance with recognized standards of surveying, safety procedures and competency. Payment for services of the released work unit will cease immediately upon such determination. The
W912P820R0016 http://www.usace.army.mil/inet/usacedocs/eng.manuals)
Contractor shall make a satisfactory replacement for the released work unit. Payment for the replacement will begin upon the date that such replacement reports for work. No payment will be made for travel in connection with the replacement.
D. All Contractor costs in connection with supervision, outfitting and resupplying of employees, equipment, safety apparel and supplies will be included in the contract unit prices listed in the schedule B.
1. 2-Person Multibeam Hydrographic Survey Party - This payment item shall include two survey technicians (filling the roles of party chief and boat operator), one vehicle, a complete multibeam bathymetric system capable of performing GPS real time Kinematic positioning, and one enclosed cabin boat. These individuals will be used to establish control and sounding for hydrographic surveying activities whenever related orders of work call for these procedures. Equipment used for this procedure will be subject to approval by the COR. The Contractor shall follow the operating procedures in the "U. S. Army Corps of Engineers Manual," EM 1110-2-1003, Hydrographic Surveying and the New Orleans District Minimum Survey Standards.
2. 3-Person Conventional Survey Party - This payment item shall include three survey technicians (filling the roles of party chief, instrument person, and rod person), one vehicle, and one Jon Boat. A total station, data collector, and automatic or digital level will be used to obtain survey data in accordance with the technical specification of the contract unless specifically waived by the COR in writing. The Contractor shall follow the operating procedures in "US Army Corps of Engineers Manual," EM 1110-1-1005, Topographic Surveying and the most current New Orleans District Minimum Survey Standards when performing field topographic surveys.
3. 2-Person Single Beam Hydrographic Survey Party - This payment item shall include two survey technicians (filling the roles of party chief and boat operator), one vehicle, a complete single beam hydrographic survey system, and one enclosed cabin class one boat. The Contractor shall follow USACE EM 1110-2-1003, Hydrographic Surveying operating procedures and the New Orleans District Minimum Survey Standards.
Equipment: The equipment shall be complete in all respects, in a good state of repair and installed on a Contractor- furnished boat.
(a) Multibeam System Control to be used shall be the navigational beacon broadcast signal. The Contractor shall have a beacon receiver on board for positioning of the survey vessel(s).
(b) Real-time Differential Global Positioning System (DGPS).
Control to be used shall be the navigational beacon broadcast signal. The Contractor shall have a beacon receiver on board for positioning of the survey vessel(s).
(c) Depth Sounder. The depth sounder shall be capable of taking not less than five (5) soundings per second making a permanent record of a vertical scale approved by the COR. The transducer shall have a beam width of not more than five (5) degrees.
(d) Automated Data Collection System. The automated data collection system shall consist of a computer, interfaced to the positioning system and depth sounder. The system shall have the necessary hardware and software to calculate XY positions on the State Plane Coordinate System, and to provide continuous steering guidance to the helmsman.
C-5 SUPERVISION, ADMINISTRATION, AND INSPECTION
A. The Contractor will furnish all supervision, administration and inspection necessary for the satisfactory performance of services under this contract.
B. The Contractor will designate in writing an individual to act as his authorized representative. This representative will be authorized to receive all necessary work assignments issued by the COR.
C. If the Contractor's work is found to be unsatisfactory before or after an assignment is complete, and it is determined that fault or negligence of the Contractor or management personnel caused the condition, the Contractor will be liable for all costs to correct the unsatisfactory condition. This includes all costs associated with the use of Government forces or Contractor forces at the direction of the Contracting Officer or the authorized representative (COR) in accordance with C-7, “Inspection of Services”, to correct the unsatisfactory condition.
D. The Contracting Officer or representative (COR) may require the Contractor to dismiss from work such employees as the Contracting Officer deems incompetent, careless, insubordinate, or whose continued employment is deemed by the Contracting Officer or representative inimical to the public interest. The Contractor will replace any employees dismissed under the above conditions at no additional costs to the Government.
E. All costs in connection with supervision, administration, and inspection shall be included in the contract unit prices listed in Schedule B.
C-6 PER DIEM
Per diem is only applicable for work assignments more than fifty
(50) road miles by the most direct route from the Contractor's project office and when the applicable employee spends the night away from his/her domicile. Per Diem will not be paid for either the project manager or other office support employees. An exception shall only be granted toward the field supervisor.
C-7 INSPECTION OF SERVICES
A. Definition. “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
B. The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during the contract performance and for as long afterwards as the contract requires.
C. The Government has the right to inspect and test all services required by the contract to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
D. If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require the subcontractor to furnish, without additional charge, all reasonable facilities and assistance for the safe and convenient performance of these duties.
E. If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with the contract requirements at no additional costs to the Government. When the defects in services cannot be corrected by performance, the Government may require the Contractor to take necessary action to ensure that future performance conforms to contract requirements, and reduces the contract price to reflect the reduced value of the services performed.
F. If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with the contact requirements, the Government may perform the services charging the Contractor any costs incurred by the Government directly related to the performance of such service, or terminate the contract for default.
C-8 PROPERTY DAMAGE
A. Right-of-Entry permits through the property upon which work is to be accomplished are to be acquired by the Federal Government unless the Contractor is authorized by the COR in writing to acquire Right-of-Entry permits.
B. The Contractor will be responsible for any damage to public or private property, caused by or due to, the negligence of the Contractor, agents, or employees. The Contractor will be responsible for notifying the appropriate property owners before work begins.
C-9 MISPLACED MATERIAL
Should the Contractor lose, dump, throw overboard, sink, or misplace any material, plant, machinery, or appliance during the progress of work, which in the opinion of the Contracting Officer may be dangerous to or obstruct navigation, the Contractor shall recover and remove the same with the utmost dispatch. The Contractor shall give immediate notice along with a description and location of such obstruction to the Contracting Officer or inspector. When required, the Contractor shall mark or buoy such obstructions until they are removed. Should the Contractor refuse, neglect, or delay compliance with the above requirements, such obstruction may be removed using any money due or to become due to the Contractor. The liability of the Contractor for the removal of a vessel wrecked or sunk without his fault or negligence shall be limited to that provided in Section 15, 19, and 20 of the River and Harbor Act of March 3, 1899.
C-10 MOBILIZATION AND DEMOBILIZATION
All costs connected with the mobilization and demobilization of the Contractor's crews and equipment will be paid for per contract line item and based upon distance from the A-E’s local office, access to hotels and boat ramps, and per diem rates.
C-11 CONTRACTOR BUSINESS INTEGRITY AND ETHICS
Bidders are hereby notified that the apparently successful bidder(s), as a condition for award of any contract resulting from this solicitation, may be required to execute a certificate related to business integrity.
C-12 INSURANCE
A. Requirement. The Contractor and Subcontractor shall procure and maintain during the entire contract performance period the following minimum insurance:
1. Worker’s Compensation. The Contractor is required to comply with applicable Federal and State Worker’s Compensation statutes.
Employer's Liability Coverage of at least $100,000 is required.
2. General Liability. Bodily injury liability insurance is in coverage written on the comprehensive form of policy requiring $500,000 per occurrence.
3. Automobile Liability. Automobile Liability insurance written on the comprehensive form of policy is required. The policy shall provide for the bodily injury and property damage liability covering the operation of all automobiles used in connection with performance of the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.
B. Notice of Cancellation or Change. The policy shall contain an endorsement that any cancellation or material change in the coverage, adversely affecting the Government interest, shall not be effective unless the insurer or the Contractor gives written notice of cancellation or change as required by the Contracting Officer.
C-13 SPECIAL REQUIREMENTS FOR DELIVERY AND PERFORMANCE
A. PERIOD OF PERFORMANCE. The Contractor shall start work under this contract within five (5) calendar days after receipt of a Notice To Proceed (NTP). A Notice to Proceed will be issued on or about September of each year for the performance of maintenance surveys during the period of September 2020 – August 2025, five year period of performance.
B. ORDER OF WORK. The Contractor will submit his proposed order of work to the COR for approval. The Contractor must have prior approval from the COR before making any changes to this order of work. The Contracting Officer reserves the right to order the Contractor to commence surveys at any site. Such direction will not result in any increase in the unit price(s) shown in schedule B, or an increase in the performance period.
The schedule to perform the survey field work is as follows:
Base Year Period of Performance: September 2020 – June 2021 All 2021 deliverables are due on or before 01 July 2021 st P e r i o d o f P e r f o rm a n ce : September 2021 – June 2022 All 2022 deliverables are due on or before 01 July 2022 nd P e r i o d o f P e r f o rm a n ce : September 2022 – June 2023 All 2023 deliverables are due on or before 01 July 2023 rd P e r i o d o f P e r f o rm a n ce : September 2023 – June 2024 All 2024 deliverables are due on or before 01 July 2024
4th Period of Performance: September 2024 – June 2025 All 2025 deliverables are due on or before 01 July 2025
C-14 DELIVERABLES
A. The Contractor shall deliver all raw and edited multibeam, single beam, LiDAR and topographic data by an electronic file transfer system specified by the Government to the Contracting Officer's Representative for approval. Raw data shall be delivered separately from edited data. The final edited ASCII XYZ data sets for each revetment site shall be delivered separated into their respective subdirectories.
B. After completion and acceptance of data for all revetment sites, the Contractor shall deliver all survey notes for required horizontal and vertical control monuments to the COR along with complete monument descriptions.
C-15 HARBOR MAINTENANCE FEE
A. Bidder’s contemplating use of U. S. ports in the performance of contract work are subject to paying a harbor maintenance fee as authorized under Section 1402 of the Water Resource Development Act of 1986 (Public Law 99-662). The fee imposed by the act is equal to a percentage (as set forth by the Act and amendments thereto) of the value of the commercial cargo involved. Firms performing work under U. S. Government contracts are not exempt from the act. Bidders are responsible for ensuring that the applicable fee and associated costs are taken into consideration in the preparation of their bid.
B. Information pertaining to the Act and a list of United States ports which subject the cargo to the harbor maintenance fee may be obtained from local United States Customs Service offices or by writing to the Director, User Fee Task Force, Division of Inspection and Control, Room 4132, United States Customs Service, 1301 Constitution Avenue, N.W., Washington, D.C. 20229.(EAL 88-1)
C-16 FEDERAL HOLIDAYS
The New Orleans District observes the following ten (10) Federal holidays:
New Year’s Day 1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans’ Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
C-17 SAFETY PROVISIONS
A. GENERAL SAFETY REQUIREMENTS. "U. S. Army Corps of Engineers Safety and Health Requirements Manual" EM385-1-1, the latest edition is a part of these specifications.
B. OCCUPATIONAL SAFETY AND HEALTH ACT. This contract is subject to the provisions of the Safety Health Regulations for Construction and Occupational Safety and Health Standards, published by the Department of Labor under authority of Public Laws 91-54 and 91-596.
C. ACCIDENT PREVENTION PROGRAM. Within three (3) days after receipt of the Notice of Award, and at least seven (7) days prior to the pre-work conference, the Contractor shall submit the Accident Prevention Program Plan to the COR for review and approval. The program shall be prepared in the following format:
1. LMV Form 385-7-R, Checklist Administrative Section
2. An executed LMV Form 385-43R, Administrative Plan
3. An executed LMV Form 385-6-R, Job Hazard Analysis
4. A copy of the company policy statement regarding accident prevention.
The Contractor shall not commence physical work at the site until the Contracting Officer or authorized representative has approved the program. Also refer to EM 385-1-1, Table 1-1.
D. DAILY INSPECTIONS. The Contractor shall institute a daily inspection program to assure that safety requirements are being fulfilled. Report of daily inspections shall be maintained at the jobsite. The report shall be records of the daily inspections and resulting actions. Each report will include, as a minimum, the following:
1. Phase(s) of work underway during the inspection.
2. Locations of areas inspected.
3. Description of topics discussed at weekly safety meeting and the number of people attending such meeting.
4. List of Government personnel visiting the work site.
5. Results of inspection, including nature of deficiencies and corrective actions taken or to be taken, date, and signature of the person responsible for its contents.
E. ACCIDENT REPORTING AND RECORD KEEPING. Reference the latest edition of EM 385-1-1, Table 1. Accidents shall be investigated by the immediate supervisor of the employee(s) involved and reported to the Contracting Officer or representative within one
(1) working day after the accident occurs.
C-18 CONTRACTOR FURNISHED EQUIPMENT LIST
The Contractor shall furnish with his proposal a list of equipment that he plans to use during the performance of this contract. The list shall identify the type of equipment, manufacturer, model, acquisition date, and a statement identifying whether the equipment is owned or rented.
C-19 INSPECTION AND ACCEPTANCE
A. Inspection During Progress. During the progress of work, all work and all the A-E’s or subcontractor’s plant and equipment engaged in the work, shall be subject to and available for inspection by the COR during normal office hours.
B. Inspection of Delivered Work. As soon as practical after delivery of work in any installment, the COR will spot check for serious errors or an undue number of minor errors indicating mistakes or carelessness on the part of the A-E. The COR may forego a thorough inspection returning the entire submittal for checking and correcting by the A-E.
C. Re-submittal. If the COR deems the documents submitted for review are deficient or incomplete for a particular stage of completion, the A-E shall correct the deficiencies and re-submit the data. The data submitted shall consist of the quantity of submittal documents as originally required. The A-E shall bear the cost of reproducing the submitted data.
D. Acceptance. The COR’s tentative acceptance of work delivered in any installment will be the basis for estimating partial payments for completed work, but shall not be construed as final acceptance. Work tentatively accepted by the COR, but proven by subsequent inspection not to be acceptable shall be corrected by the A-E. The COR shall not finally accept the work until the A-E delivers all the work under the contract and the COR finds it acceptable.
C-20 WAGE DETERMINATION, SERVICES CONTRACT ACT
The U. S. Department of Labor Wages Determination 2005-2231, issued pursuant to the requirements of the McNamara- O'Hara Service Contract Act of 1965, amended by Public Law 92- 473 , approved 9 October 1972, and the regulations of the Secretary of Labor (29CFR Part 4), identifies the classes of service employees expected to be employed under the contract, and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 USC 5341 or 5332.
C-21 DATA SUBMITTALS
A. Multibeam Survey Data. All raw data shall be edited by the Contractor within fourteen (14) days of completing the multibeam survey of the individual revetment site. For each revetment location, the final edited multibeam data shall be delivered as two files. The first file will have all edited points reported in an ASCII XYZ (Easting-Northing-Elevation) space delimited format.
The second file will be “thinned” using the “shot depth” or “elevation point closest to the 2x2-foot grid” in an ASCII XYZ (Easting-Northing-Elevation) space delimited format. These two files shall be posted on an electronic file transfer system specified by the Government within two (2) days after the completion of the editing process. The Contractor shall compress the data using Win-Zip or another file compression software specified by the Government. The COR will be notified by e-mail when the files are posted. The Contractor shall submit five (5) revetment sites per week or as directed by the COR.
B. Single Beam Survey Data. All raw data shall be edited by the Contractor within two (2) days after completing the field work. The Contractor shall compress the data using Win-Zip or another file compression software specified by the Government. The final edited single beam data shall be delivered in LMN830 format. The COR will be notified by e-mail when the file(s) is posted.
C-22 QUALITY CONTROL PLAN
The Contractor shall submit a quality control (QC) plan to the COR within seven (7) days after contract award. An acceptable QC plan must be on file with the Government prior to starting work.
This plan shall include:
A. A description of the Contractor's QC organization. The description shall include a chart showing lines of authority and acknowledgement that the QC administrator shall report to the project manager or someone higher in the Contractor's organization.
B. The name, qualifications, duties, responsibilities, and authority of each person with a QC function.
C. The company's quality control policy statement to employees.
D. Minimum qualifications standard for each category of technical and field personnel within the Contractor's organizational structure established for the performance of services under this contract.
E. Description of data review, routine checks, checklists, etc., which will be used by the Contractor to ensure compliance with the provisions of this contract.
F. Methods for fool-proofing specific tasks.
G. Procedures for scheduling and managing submittals of contract deliverables.
H. Procedures for correcting data returned by the COR.
C-23 ANTI-TERRORISM AND OPERATIONAL SECURITY (AT/OPSEC)
A. Suspicious Activity Reporting Training. The Contractor and all associated Sub-contractors shall receive training (provided by the RA) on the local suspicious activity reporting program (e.g. iWATCH CorpsWatch, or See Something Say Something). This locally developed training will be used to inform employees of the types of behavior to watch for, and to instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within thirty (30) calendar days of the contract award and within thirty (30) calendar days of new employees commencing performance. The results shall be reported to the COR no later than five (5) calendar days after the completion of the training.
B. Pre-screen candidates using E-Verify Program. The Contractor must pre-screen candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The vendor must ensure that the candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified and eligible candidates must be provided to the COR no later than three (3) business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative.
This Form will be provided to the Contracting Officer and shall become part of the official contract file.
C-24 INVOICING
A. ACCRUAL ESTIMATE SUBMITTALS. The Contractor shall be responsible for submitting an accrual estimate form to the COR on a monthly basis. This estimate shall quantify the dollar value of the work anticipated to be incurred during the next month. The estimate shall be as accurate as feasible. The estimate shall be submitted by e‐mail to A‐E‐Office@usace.army.mil not later than the 15th of each month to estimate billing expenses for the following month.
B. PAYMENT SCHEDULE. On a monthly basis, the Contractor shall submit an invoice with a status report documenting work that has been completed. The invoice amount shall be based on the percentage of work completed. Invoices and description of work accomplished for the invoiced period are to be submitted by e‐ mail to A‐E‐Office@usace.army.mil. A final invoice shall not be submitted until after all deliverables have been accepted by the Government. A Release of Claims (ROC) shall be submitted with the final invoice.
C-25 QUALITY ASSURANCE SURVEILLANCE PLAN
A. The purpose of a Quality Assurance Surveillance Plan (QASP), is for the COR to administer this A-E contract, in a systematic manner to ensure the level of service and quality received by the Government is appropriate. Each individual line item issued under the subject contract will be monitored in accordance with the Federal Acquisition Regulation (FAR) 37.102, Performance Based Acquisitions.
W912P820R0016 http://www.uscis.gov/e-verify)
B. The COR will monitor this Firm-Fixed Price Contract through several surveillance activities designed to ensure the Contractor is performing work to the required quality standards.
The methods of surveillance are, 1) the development of the Independent Government Estimate (IGE) by Survey Section’s Field Inspection Unit prior to contract award, 2) unscheduled and scheduled inspections by Survey Section’s Field Inspection Unit and the COR 3) quality assurance review of submitted survey data by Survey Section’s Precise Unit, and 4) post contract evaluation completed by the COR.
END OF SECTION C
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A N/A 0001AA N/A N/A N/A Government 0001AB N/A N/A N/A Government 0001AC N/A N/A N/A Government 0001AD N/A N/A N/A Government 0001AE N/A N/A N/A Government 0002 N/A N/A N/A N/A 0002AA N/A N/A N/A Government 0002AB N/A N/A N/A Government 0002AC N/A N/A N/A Government 0002AD N/A N/A N/A Government 0002AE N/A N/A N/A Government 0003 N/A N/A N/A N/A 0003AA N/A N/A N/A Government 0003AB N/A N/A N/A Government 0003AC N/A N/A N/A Government 0003AD N/A N/A N/A Government 0003AE N/A N/A N/A Government 0004 N/A N/A N/A N/A 0004AA N/A N/A N/A Government 0004AB N/A N/A N/A Government 0004AC N/A N/A N/A Government 0004AD N/A N/A N/A Government 0004AE N/A N/A N/A Government 0005 N/A N/A N/A N/A 0005AA N/A N/A N/A Government 0005AB N/A N/A N/A Government 0005AC N/A N/A N/A Government 0005AD N/A N/A N/A Government 0005AE N/A N/A N/A Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0001AA N/A N/A N/A N/A
0001AB N/A N/A N/A N/A
0001AC N/A N/A N/A N/A
0001AD N/A N/A N/A N/A
0001AE N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0002AA N/A N/A N/A N/A
0002AB N/A N/A N/A N/A
0002AC N/A N/A N/A N/A
0002AD N/A N/A N/A N/A
0002AE N/A N/A N/A N/A
0003 N/A N/A N/A N/A
0003AA N/A N/A N/A N/A
0003AB N/A N/A N/A N/A
0003AC N/A N/A N/A N/A
0003AD N/A N/A N/A N/A
0003AE N/A N/A N/A N/A
0004 N/A N/A N/A N/A
0004AA N/A N/A N/A N/A
0004AB N/A N/A N/A N/A
0004AC N/A N/A N/A N/A
0004AD N/A N/A N/A N/A
0004AE N/A N/A N/A N/A
0005 N/A N/A N/A N/A
0005AA N/A N/A N/A N/A
0005AB N/A N/A N/A N/A
0005AC N/A N/A N/A N/A
0005AD N/A N/A N/A N/A
0005AE N/A N/A N/A N/A
Section G - Contract Administration Data
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.232-10 Payments under Fixed-Price Architect-Engineer Contracts APR 2010 252.201-7000 Contracting Officer's Representative DEC 1991 252.204-7006 Billing Instructions OCT 2005 252.234-7003 Notice of Cost and Software Data Reporting System--Basic NOV 2014
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2020)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
XX (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
XX (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109-
282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.
C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.
L. 111-117, section 743 of Div. C).
XX (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
____ (10) [Reserved]
____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
____ (ii) Alternate I (NOV 2011) of 52.219-3.
____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (ii) Alternate I (JAN 2011) of 52.219-4.
____ (13) [Reserved]
XX (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
____ (ii) Alternate I (NOV 2011).
____ (iii) Alternate II (NOV 2011).
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
____ (ii) Alternate I (Oct 1995) of 52.219-7.
____ (iii) Alternate II (Mar 2004) of 52.219-7.
X…
This is the start of the file's text. The full file is on GovTribe.