A21 - LeithCreek_RTA_Plans.pdf
PDF 43 MB Posted
- Attached to
- Leith Creek Channel Repair Federal contract opportunity
- Solicitation number
- W912PM22B0009
About this file
This document provides details for a federal contract solicitation for Leith Creek Channel Repair work in Sampson County, North Carolina. The U.S. Army Corps of Engineers, Wilmington District is seeking a contractor to perform work including removing trees from the channel and banks, replacing three small culverts, excavating sediment, grading and placing rip rap for bank stabilization. The solicitation will be issued on or around March 9th as a 100% small business set-aside with a contract value between $500,000 to $1,000,000 using firm fixed price terms. Interested contractors must register in the System for Award Management and check the provided website for the solicitation and any amendments. An optional site visit is scheduled for March 23rd for contractors to meet at an intersection in Laurinburg, North Carolina.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B1 - Bid Abstract Signed.pdf | ||
| B18 - Bid Opening Sign In Sheet.pdf | ||
| A21 - W912PM22B0009-0002 Conformed Copy.pdf | ||
| A21 - W912PM22B0009-0002_Letih Creek. Amendment 2.pdf | ||
| A21 - W912PM22B0009-0001_Letih Creek. Amendment 1.pdf | ||
| A21 - W912PM22B0009-0001 Conformed Copy.pdf | ||
| A22 - Site Visit Sign In Sheet_signed.pdf | ||
| A21 - W912PM22B0009- Leith Creek Channel Repair Solicitation.pdf | ||
| A21 - RTA-SPECS-W912PM22B0009-Leith-Creek.pdf | ||
| A21 - LeithCreek_RTA_Plans_unlocked.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
VE
R
S H
EE
T
ISSUE DATE: FEBRUARY 2022
US Army Corps of Engineers ®
Wilmington District
Approval Recommended: *
Approved: *
DATE
DATECHIEF, ENGINEERING BRANCH
* THIS PROJECT WAS DESIGNED BY THE U.S. ARMY CORPS OF ENGINEERS,
WILMINGTON DISTRICT. INDIVIDUALS WHOSE SIGNATURES AND REGISTRATION
DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE OPERATING WITHIN THE
SCOPE OF THEIR EMPLOYMENT. SIGNATURES ARE REQUIRED BY ER 1110-1-8152.
CHIEF, DESIGN and GENERAL ENGINEERING SECTION
LEITH CREEK CHANNEL REPAIR
SCOTLAND COUNTY, NORTH CAROLINA
G-001
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION
AND APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED ON SHEET GI01.
AMENDMENTS:
IFB NO.: W912PM22B0009
CONTRACT NO.:
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
"X
S.
ST
EL
LO
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TA
G -0
.d w g
23 FEB 2022
25 FEB 2022
GI01
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TA
VI
C
IN
IT
Y
AN
D L
O C
AT
IO
N M
AP
S
IN
D
EX
O
F D
R
AW
IN
G
S, P
R O
JE
C
T
Le ith
C re ek _G
I0 1.
dw g
PROJECT LOCATION
FALLS
LAKE
ONSLOW
DUPLIN
JONES
PENDER
HA
NO
VE
R
NE
W
BRUNSWICK
COLUMBUS
BLADEN
ROBESON
HOKE
CUMBERLAND
SAMPSON
WAYNE
LENOIR
GREENE
PITT
CRAVEN
NORTHAMPTON
HALIFAX
NASH
WILSON
JOHNSTON
WAKE
FRANKLIN
VANCE
G R
AN
VI
LL
E
WARREN
GREENSVILLE
HENRYPATRICK
STOKES ROCKINGHAM CASWELL PERSON
ORANGE
AL
AM
AN
C
E
DURHAM
CHATHAM
MOORE
MONTGOMERY
RANDOLPH
DAVIDSON
FORSYTH
SURRY
ALLEGHANY
ASHE
WATAUGA WILKES
CALDWELL
AVERY
MITCHELL
YANCY
BURKE
CATAWBA
ALEXANDER
IREDELL
LINCOLN
GASTON
M
EC
KL
EN
BU
R
G
CABARRUS
STANLY
UNION
ANSON
RICHMOND
RUTHERFORD
McDOWELL
MADISON
BUNCOMBE
HENDERSON
TRANSYLVANIA
HAYWOOD
JACKSON
SWAIN
GRAHAM
CHEROKEE
CLAY
MACON
YADKIN
ROWAN
CLEVELANDPOLK
Georgia
Tennessee
South Carolina
FEAR
C
APE
RIVER
N E
U S
E
RIVER
R O
A N
O K
E
RIVER
Virginia North Carolina
WM. O. HUSKE
LOCK & DAMSC
OTL
AN
D
EDGECOMBEDAVIE
GUILFORD
Cape Fear
HARNETT
LEE
SCALE IN MILES
W. KERR
SCOTT DAM
& RESERVOIR
JOHN H. KERR DAM & RESERVOIR
B. EVERETT
JORDAN DAM
& LAKE
LOCK & DAM
NO. 2
LOCK & DAM
NO. 1
Raleigh
20 40 60 80 100 12040 20
TITLE
INDEX OF DRAWINGS
GI01
SITE PLAN STA. 105+50 TO STA. 115+50
SITE PLAN STA. 138+50 TO STA. 150+00
SITE PLAN STA. 150+00 TO STA. 161+00
SCALE IN FEET
SCALE: 1" = 400'
400 400 800
SITE PLAN STA. 115+50 TO STA. 127+50
SITE PLAN STA. 127+50 TO STA. 138+50
INDEX OF DRAWINGS, LOCATION AND VICINITY MAPS
NOTE: PHOTOGRAPHY DATED: JANUARY 2021. COPYRIGHT 2021 NC ONE MAP.
C101
C102
SHEET No.
END OF PROJECT
E CHURCH ST
McKAY ST
COMMONWEALTH ST
S CALEDONIA RD
BEGIN PROJECT
OLD LUMBERTON RD
JA
M
ES
S
T N
M
AI
N
ST
CARVER ST
N C
AL
ED
O N
IA
R
D
N G
IL
L
ST
McGIRTS BRIDGE RD
SHEET C101
SHEET C102
SHEET C103
SHEET C104
SHEET C105
SHEET C106
LEITH CREEK CHANNEL (TYP.)
C103
C104
C105
C301
C302
C500
TYPICAL SECTIONS
TYPICAL PIPE INSTALLATION DETAILS
BANK STABILIZATION CROSS SECTIONS
SITE PLAN STA. 161+00 TO STA. 168+85C106
REFERENCE DRAWINGS
R1
R2 - R16
R17
R18
R19
R20
R21
R22
TOPOGRAPHIC SURVEY OF LEITH CREEK OVERALL DRAWING
TOPOGRAPHIC SURVEY OF LEITH CREEK SHEET 2 THRU 16 OF 16
RECORD DRAWING PLATE E-1: GENERAL PLAN & INDEX MAP
RECORD DRAWING PLATE E-3: PLAN, PROFILE & CROSS SECTIONS
RECORD DRAWING PLATE E-2: PLAN, PROFILE & CROSS SECTIONS
RECORD DRAWING PLATE E-4: SURVEYED CROSS SECTIONS
RECORD DRAWING PLATE E-5: FLOOD PROFILES
RECORD DRAWING PLATE E-6: FLOOD PROFILES
R23 RECORD DRAWING PLATE E-7: BRIDGE SECTIONS
R24 RECORD DRAWING PLATE E-8: BRIDGE SECTIONS
R25 RECORD DRAWING PLATE E-9: CHANNEL TRANSITION COMMONWEALTH AVENUE
R26 RECORD DRAWING PLATE E-10: RECREATION PLAN
R27 RECORD DRAWING PLATE E-11: FLOODWAY BOUNDARIES
R28 RECORD DRAWING PLATE E-12: FLOODWAY BOUNDARIES
C501 EROSION & SEDIMENT CONTROL DETAILS
C502 TEMPORARY STOCKPILE DETAIL
R29 - R43 NC DHEC SWPPP PERMIT DRAWINGS
AutoCAD SHX Text N
AutoCAD SHX Text N
SAN
SAN
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
X
X
X
X
X
X
X
X
G
G
G
G
G
C/F
C/F
C/F
C/F
C/F
W
W
W
W
W
W
W
W
W
W
W
190190
X
X
X
X
X
X
X
X
X
X
X
.8
8.2'11 .8
'8.1'
.8
12.8'10 .8
'12.8'
105+50 106+00
107+00 108+00 109+00
110+00 111+00 111+67.78
5 6 7
105+50 106+00
107+00 108+00 109+00
110+00 111+00 112+00
113+00
114+00
115+00
116+00
PO
B:
+5 0.
PI
: 1
+5 1.
PI
: 1
+8 9.
PI
: 1
+9
6.
PI
: 1
+2
1.
PI
: 1
+6
1.
PI
: 1
+6
0.
PI
: 1
+6
2.
PI
: 1
+5
8.
PI
: 1
+4
9.
PI
: 1
+5
7.
PI
: 1
+9
0.
PI
: 1
+2
1.
PI
: 1
+3
1.
PI
: 1
+4
2.
PI
: 1
+4
9.
PI
: 1
+5
5.
PI
: 1
+6
4.
PI
: 1
+6
7.
PI
: 1
+0
4.
PI
: 1
+0
8.
PI
: 1
+1
5.
PI
: 1
+1
9.
PI: 1
+37 .43
PI
: 1
+4
8.
PI
: 1
+6
1.
PI
: 1
+7
5.
PI
: 1
+9
9.
PI
: 1
+2
8.
PI: 1
13+63.84
PI: 1
+6 6.8
PI
: 1
+7
3.9
PI
: 1
+0
2.
PI
: 1
+4
1.
PI
: 1
+4
0.
PI
: 1
+1
3.
PI
: 1
+1
9.
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TAC101
SI
TE
P
LA
N
ST
A.
+5
TO
S
TA
. 1
+5
Le ith
C re ek _p la n_ sh ee ts .d w g
SCALE IN FEET
SCALE: 1" = 40'
40 40 80
E.
C
HU
RC
H
ST
RE
ET
U.
S.
H W
Y
B
US
IN
ES
S
M cK
AY
S
TR
EE
T
LA
URIN
BURG AND SOUTHERN R
AILR
OAD
NOTES:
1. LAND SURVEY COMPLETED 23 NOVEMBER 2020 TO 19 JANUARY 2021. FOR SURVEY CONTROL POINTS
AND EXISTING CONDITIONS SEE REFERENCE DRAWINGS R1 - R16.
2. HORIZONTAL DATUM: NAD83 (2011) NORTH CAROLINA STATE PLANE SURVEY FEET.
3. VERTICAL DATUM: NAVD88 SURVEY FEET.
4. CONTRACTOR SHALL REMOVE ANY VEGETATION, SEDIMENT, AND/OR DEBRIS LOCATED IN THE BOTTOM OF THE CHANNEL BETWEEN THE TOE OF THE BANKS, ABOVE THE DESIGN ELEVATION AS SHOWN.
DESIGN ELEVATIONS ARE SHOWN IN THE TABLE ON EACH SHEET AND INCLUDE MAJOR STATIONS AND INDEX STATIONS WITH ELEVATIONS AS SHOWN IN THE RECORD DRAWINGS. FOR RECORD DRAWINGS
SEE SHEETS R17 - R24.
5. CONTRACTOR SHALL REMOVE ALL FALLEN AND LEANING TREES LOCATED WITHIN THE
PROJECT LIMITS. APPROXIMATE LOCATIONS OF FALLEN AND LEANING TREES ARE SHOWN
BASED ON CONDITIONS AS OF 15 OCTOBER 2021.
6. CONTRACTOR SHALL REPLACE DAMAGED AND/OR FAILING CULVERTS AS SHOWN. THE EXISTING
CULVERT REPLACEMENT AREAS ARE SHOWN BASED ON CONDITIONS AS OF 15 OCTOBER 2021.
CONDITIONS ARE SUBJECT TO CHANGE. CONTRACTOR SHALL VERIFY CONDITIONS PRIOR TO
START OF WORK.
7. CONTRACTOR SHALL INSTALL STREAM CHANNEL SLOPE STABILIZATION AS SHOWN. THE
EXISTING SLOPE STABILIZATION AREAS ARE SHOWN BASED ON CONDITIONS AS OF 15 OCTOBER
2021. CONTRACTOR SHALL VERIFY CONDITIONS PRIOR TO START OF WORK.
8. STOCKPILE AND LAY DOWN AREAS SHALL BE WITHIN THE MAINTENANCE EASEMENTS AS SHOWN.
9. VEGETATION, SEDIMENT, AND DEBRIS TO BE DISPOSED OF OFFSITE AT AUTHORIZED LANDFILL OR
DEBRIS DISPOSAL LOCATIONS.
10. DESIGN CHANNEL IS DEFINED AS TOP OF BANK TO TOP OF BANK.
11. FOR HAND AUGER REPORTS SEE APPENDIX B OF THE SPECIFICATIONS.
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C
LEITH CREEK CHANNEL (TYP.)
CHANNEL CENTERLINE (TYP.)
CHANNEL BOTTOM
DESIGN ELEVATION
STA. 105+50
ELEV: 186.40' NAVD88
MAINTENANCE EASEMENT
MAINTENANCE EASEMENT
REPAIR 24" CMP
PIPE SEE
SHEET C500
FOR DETAILS
REPAIR 12" CMP
PIPE SEE SHEET
C500 FOR DETAILS
TREE TO BE REMOVED
(APPROX. LOCATION)
APPROX. TOE OF BANK (TYP.)
LEITH CREEK CHANNEL DESIGN ELEVATIONS
STATION ELEVATION (NAVD 1988)
POB 105+50* 186.40'
106+00 186.48' 107+00 186.63' 108+00 186.78' 109+00 186.93' 110+00 187.08' 111+00 187.23' 112+00 187.38' 112+15* 187.40' 113+00 187.51' 114+00 187.64' 115+00 187.77' 116+00 187.90'
* DENOTES DESIGN ELEVATIONS DERIVED
FROM RECORD DRAWINGS R18 & R19.
PHOTOGRAPH LOCATION
SEE APPENDIX A
LEGEND
EXISTING OVERHEAD POWERLINE
CONTACTOR TO VERIFY LOW POINT
ELEVATION
EXISTING NATURAL GAS PIPELINE
PROTECT IN PLACE
HAND AUGER # LC-21-HA-06
SEE NOTE 11 THIS SHEET
CONSTRUCTION LIMITS(TYP.)
CONSTRUCTION LIMITS(TYP.)
CONSTRUCTION ENTRANCE
SEE SHEET C502
SILT FENCE
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
WATER LEVEL MONITOR
AutoCAD SHX Text
SSMH RIM 198.89 INV IN 6 INCH CLAY 197.07 INV OUT 10 INCH CLAY 196.33
AutoCAD SHX Text
CONC PAD 199.2
AutoCAD SHX Text
CONC PAD 199.9
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
E CHURCH STREET
AutoCAD SHX Text McKAY STREET
AutoCAD SHX Text
RIP-RAP
AutoCAD SHX Text BOX CULVERT INV 187.41 W 6.0 x H 4.4
AutoCAD SHX Text BOX CULVERT INV 187.52 W 6.0 x H 4.4
AutoCAD SHX Text BOX CULVERT INV 187.35 W 8.1 x H 4.25
AutoCAD SHX Text BOX CULVERT INV 187.38 W 8.1 x H 4.35
AutoCAD SHX Text
PUMP STATION BUILDING
AutoCAD SHX Text
PUMP STATION BUILDING
AutoCAD SHX Text
RIP-RAP
AutoCAD SHX Text BOX CULVERT INV 187.51 W 8.1 x H 4.25
AutoCAD SHX Text BOX CULVERT INV 187.57 W 8.1 x H 4.35
AutoCAD SHX Text W 10.23 x H 7.9FT CMP INV 186.08'
AutoCAD SHX Text W 10.4 x H 7.5FT CMP INV 187.21'
AutoCAD SHX Text
LAURINBURG AND SOUTHERN RAILROAD
AutoCAD SHX Text
LAURINBURG AND SOUTHERN RAILROAD
AutoCAD SHX Text
SS
AutoCAD SHX Text McKAY STREET
AutoCAD SHX Text AS PER CITY OF LAURINBURG, SEWER IS FORCEMAIN BETWEEN PUMP STATION AND MANHOLE LINE NOT LOCATED
4.7
CHK
TI
E
PT
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
X
X
X X
XXXXX
G
185185
185185190190
SD
SD
21.0'
.1
'18.6'
7.8'12.8'7.4'
9.6'
.6
19.8'
8.2'
.7
11.5'
.4
11.8'
C/E
C/E
C/E C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/EC/E
C/E
C/E
C/E
C/E
S32° 49' 05"E 382.36'
15 16
115+00
116+00
117+00
118+00 119+00
120+00
121+00
122+00 123+00
124+00 125+00
126+00 127+00 128+00
PI: 1
+4 1.3
PI: 1
+40 .30
PI: 1
16+13.66
PI: 1
16+19.25
PI
: 1
+8
8.
PI
: 1
+8
4.
PI
: 1
+7
8.
98 PI
: 1
+7
2.
PI
: 1
+8
1.
PI
: 1
+0
5.
PI
: 1
+4
5.4
PI: 1
+5 3.4
PI: 1
20+80.06
PI: 1
20+85.09
PI: 121+04.12
PI: 121+17.66
PI: 1
21+58.72
PI
: 1
+0
6.6
PI
: 1
+8
6.
PI
: 1
+8
5.
PI
: 1
+8
1.
PI
: 1
+7
6.
PI
: 1
+7
2.
PI
: 1
+7
4.
PI
: 1
+9
5.
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TAC102
SI
TE
P
LA
N
ST
A.
+5
TO
S
TA
. 1
+5
Le ith
C re ek _p la n_ sh ee ts .d w g
SCALE IN FEET
SCALE: 1" = 40'
40 40 80
LAURINBURG AND SOUTHERN RAILROAD
COMMONWEALTH STREET
M
AT
CH
LI
NE
S
EE
S
HE
ET
C
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C
REPAIR 12" CMP
PIPE SEE
SHEET C500
FOR DETAILS
REPAIR 24" CMP
SEE SHEET C500
FOR DETAILS
REMOVE AND REPLACE
24" CMP WITH NEW 24"
HDPE PIPE SEE SHEET
C500 FOR DETAILS
REMOVE AND REPLACE
12" CMP WITH NEW 12"
HDPE PIPE SEE SHEET
C500 FOR DETAILS
TREE TO BE REMOVED
(APPROX. LOCATION)
NOTES:
1. FOR NOTES SEE SHEET C101.
LEITH CREEK CHANNEL (TYP.)
MAINTENANCE EASEMENT
APPROX. TOE OF BANK (TYP.)
MAINTENANCE EASEMENT
CHANNEL CENTERLINE (TYP.)
LEITH CREEK CHANNEL DESIGN ELEVATIONS
STATION ELEVATION (NAVD 1988)
116+00 187.90' 117+00 188.03' 118+00 188.16' 119+00 188.29' 120+00 188.42' 121+00 188.55' 121+05* 188.60' 122+00 188.78' 123+00 188.97' 124+00 189.16' 125+00 189.35' 126+00 189.54' 127+00 189.73' 128+00 189.92'
* DENOTES DESIGN ELEVATIONS DERIVED
FROM RECORD DRAWINGS R18 & R19.
PHOTOGRAPH LOCATION
SEE APPENDIX A
EXISTING OVERHEAD POWERLINE
CONTACTOR TO VERIFY LOW POINT
ELEVATION
EXISTING SANITARY SEWER LINE
PROTECT IN PLACE
CONSTRUCTION LIMITS(TYP.)
CONSTRUCTION ENTRANCE
SEE SHEET C502
CONSTRUCTION LIMITS(TYP.)
LEGEND
SILT FENCE
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
SS
SS
SS
SS
ES
ES
G
G
G
G
G
G
SD
SD
SD
10.7'
.7
10.7'10 .7
W
W
W W
W
W
.7
11.5'
.4
11.8'
24 25
128+00
129+00 130+00 131+00
132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00
PI
: 1
+7
4.
PI
: 1
+9
5.
PI
: 1
+1
8.
PI
: 1
+2
5.
PI
: 1
+2
6.
PI
: 1
+8
5.
PI
: 1
+9
2.
PI
: 1
+0
8.
PI
: 1
+6
1.
PI
: 1
+5
4.
PI
: 1
+4
8.
PI
: 1
+4
9.
PI
: 1
+4
4.
PI
: 1
+4
3.
PI
: 1
+3
9.
PI
: 1
+3
2.
PI
: 1
+2
6.
PI
: 1
+2
4.
PI
: 1
+1
9.
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TAC103
SI
TE
P
LA
N
ST
A.
+5
TO
S
TA
. 1
+5
SCALE IN FEET
SCALE: 1" = 40'
40 40 80
N . C
AL
ED
O N
IA
R
O
AD
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C
REPAIR 24" CMP
SEE SHEET C500
FOR DETAILS
REMOVE 12" CMP AND REPLACE
WITH NEW 12" HDPE PIPE SEE
SHEET C500 FOR DETAILS
Le ith
C re ek _p la n_ sh ee ts .d w g
NOTES:
1. FOR NOTES SEE SHEET C101.
LEITH CREEK CHANNEL (TYP.)
APPROX. TOE OF BANK (TYP.)
MAINTENANCE EASEMENT
CHANNEL CENTERLINE (TYP.)
LEITH CREEK CHANNEL DESIGN ELEVATIONS
STATION ELEVATION (NAVD 1988)
128+00 189.92' 128+70* 190.02' 129+00 190.04' 130+00 190.14' 131+00 190.25' 132+00 190.36' 133+00 190.47' 134+00 190.58' 135+00 190.69' 136+00 190.80' 137+00 190.91' 138+00 191.02' 139+00 191.13'
* DENOTES DESIGN ELEVATIONS DERIVED
FROM RECORD DRAWINGS R18 & R19.
TREE TO BE REMOVED
(APPROX. LOCATION)
PHOTOGRAPH LOCATION
SEE APPENDIX A
EXISTING OVERHEAD POWERLINE
CONTACTOR TO VERIFY LOW POINT
ELEVATION
EXISTING OVERHEAD POWERLINE
CONTACTOR TO VERIFY LOW POINT
ELEVATION
EXISTING PUMP HOUSE
PROTECT IN PLACE
EXISTING UNDERGROUND SANITARY SEWER LINE
PROTECT IN PLACE
EXISTING UNDERGROUND MUNICIPAL WATER LINE
PROTECT IN PLACE
CONSTRUCTION LIMITS(TYP.)
CONSTRUCTION ENTRANCE
SEE SHEET C502
LEGEND
SILT FENCE
SAN
SAN
SAN
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
SD
E
E
E
E
SD
SD
SD
27 28 29 30
139+00 140+00 141+00 142+00
143+00 144+00 145+00
146+00
147+00
148+00 149+00 150+00
PI
: 1
+1
9.
PI
: 1
+1
3.
PI
: 1
+1
1.
PI
: 1
+0
4.
PI
: 1
+0
3.
PI
: 1
+0
1.
PI
: 1
+9
4.
PI
: 1
+8
7.
PI
: 1
+7
4.
PI
: 1
+0
3.
PI
: 1
+2
3.
PI
: 1
+2
4.
PI
: 1
+6
5.
PI
: 1
+9
4.
PI
: 1
+1
9.
PI
: 1
+4
6.
PI
: 1
+4
5.
PI
: 1
+3
8.
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TAC104
SI
TE
P
LA
N
ST
A.
+5
TO
S
TA
. 1
+0
SCALE IN FEET
SCALE: 1" = 40'
40 40 80
C
AR
VER
STR
EET
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C
Le ith
C re ek _p la n_ sh ee ts .d w g
NOTES:
1. FOR NOTES SEE SHEET C101.
LEITH CREEK CHANNEL (TYP.)
APPROX. TOE OF BANK (TYP.)
MAINTENANCE EASEMENT
CHANNEL CENTERLINE (TYP.)
MAINTENANCE EASEMENT (TYP.)
LEITH CREEK CHANNEL DESIGN ELEVATIONS
STATION ELEVATION (NAVD 1988)
139+00 191.13' 140+00 191.24' 141+00 191.35' 142+00 191.46' 143+00 191.57' 144+00 191.68' 145+00 191.79' 146+00 191.98' 147+00 191.00' 147+45* 192.00' 148+00 192.04' 149+00 192.13' 150+00 192.22' 151+00 192.31'
* DENOTES DESIGN ELEVATIONS DERIVED
FROM RECORD DRAWINGS R18 & R19.
TREE TO BE REMOVED
(APPROX. LOCATION)
PHOTOGRAPH LOCATION
SEE APPENDIX A
EXISTING OVERHEAD POWERLINE
CONTACTOR TO VERIFY LOW POINT
ELEVATION
HAND AUGER # LC-21-HA-04
SEE NOTE 11 SHEET C101
HAND AUGER # LC-21-HA-05
SEE NOTE 11 SHEET C101
CONSTRUCTION LIMITS(TYP.)
CONSTRUCTION ENTRANCE
SEE SHEET C502
LEGEND
SILT FENCE
ES
ES
ES
ES
ES
SD SD
SD
SD
SD
SD
G
G
31 32
34 35 36 37 38
39 40 41
42 43
150+00 151+00
152+00 153+00
154+00 155+00 156+00 157+00 158+00
159+00
160+00 161+00 162+00
PI
: 1
+3
8.
PI
: 1
+3
1.
PI
: 1
+3
0.
PI
: 1
+2
5.
PI
: 1
+2
1.
PI
: 1
+1
5.
PI
: 1
+1
1.
PI
: 1
+1
2.
PI
: 1
+0
7.
PI
: 1
+0
3.
PI
: 1
+3
9.
PI
: 1
+9
8.
PI
: 1
+9
4.
PI
: 1
+9
0.
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TAC105
SI
TE
P
LA
N
ST
A.
+0
TO
S
TA
. 1
+0
SCALE IN FEET
SCALE: 1" = 40'
40 40 80
M
ATC
H
LIN
E SEE SH
EET C
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C
INSTALL SLOPE PROTECTION
SEE SHEETS C301 AND C302 FOR DETAILS
Le ith
C re ek _p la n_ sh ee ts .d w g
NOTES:
1. FOR NOTES SEE SHEET C101.
LEITH CREEK CHANNEL (TYP.)
APPROX. TOE OF BANK (TYP.)
CHANNEL CENTERLINE (TYP.)
MAINTENANCE EASEMENT (TYP.)
LEITH CREEK CHANNEL DESIGN ELEVATIONS
STATION ELEVATION (NAVD 1988)
150+00 192.22' 151+00 192.31' 152+00 192.40' 153+00 192.49' 154+00 192.57' 155+00 192.66' 156+00 192.75' 157+00 192.84' 158+00 192.93' 159+00 193.02' 160+00 193.11' 161+00 193.20' 162+00 193.29'
TREE TO BE REMOVED
(APPROX. LOCATION)
PHOTOGRAPH LOCATION
SEE APPENDIX A
HAND AUGER # LC-21-HA-01
SEE NOTE 11 SHEET C101
HAND AUGER # LC-21-HA-02
SEE NOTE 11 SHEET C101
CONSTRUCTION LIMITS(TYP.)
LEGEND
SILT FENCE
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SANSANSANSANSAN
SAN
SAN
SAN
SAN
SD
SD
SD
SD
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
SD SD
SD
E
E
E
E
E
E
G
G
G
X
X
X X X
X
X
G
G
G
G
G
G
G
COMM
C/F
C/F
C/F
C/F
SD
SD
SD
SS
SS
SS
SS
SS
48 49 50
51162+00 163+00 164+00 165+00
166+00 167+00 168+00 169+00 169+49.85
PO
E:
+4 9.
PI
: 1
+0
3.
PI
: 1
+2
3.
PI
: 1
+5
2.
PI
: 1
+2
4.
PI
: 1
+3
2.
PI
: 1
+7
5.
PI
: 1
+2
1.
PI
: 1
+1
6.
PI
: 1
+1
2.
PI
: 1
+1
0.
PI
: 1
+0
4.
PI
: 1
+5
3.
PI
: 1
+4
8.
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TAC106
SI
TE
P
LA
N
ST
A.
+0
TO
S
TA
. 1
+8
SCALE IN FEET
SCALE: 1" = 40'
40 40 80
N. M
AIN STREET
N. G
ILL STREET
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C
INSTALL SLOPE PROTECTION
SEE SHEETS C301 AND
C302 FOR DETAILS
Le ith
C re ek _p la n_ sh ee ts .d w g
NOTES:
1. FOR NOTES SEE SHEET C101.
LEITH CREEK CHANNEL (TYP.)
CHANNEL BOTTOM
DESIGN ELEVATION
POE STA. 169+49.85
ELEV: 193.94' NAVD88
APPROX. TOE OF BANK (TYP.)
MAINTENANCE EASEMENT
LEITH CREEK CHANNEL DESIGN ELEVATIONS
STATION ELEVATION (NAVD 1988)
161+00 193.20' 162+00 193.29' 163+00 193.38' 163+50* 193.40' 164+00 193.45' 165+00 193.54' 166+00 193.63' 167+00 193.72' 168+00 193.81' 169+00 193.90'
POE 169+49.85 193.94'
* DENOTES DESIGN ELEVATIONS DERIVED
FROM RECORD DRAWINGS R18 & R19.
TREE TO BE REMOVED
(APPROX. LOCATION)
PHOTOGRAPH LOCATION
SEE APPENDIX A
EXISTING OVERHEAD POWERLINE
CONTACTOR TO VERIFY LOW POINT
ELEVATION
EXISTING UNDERGROUND NATURAL GAS LINE
PROTECT IN PLACE
HAND AUGER # LC-21-HA-03
SEE NOTE 11 SHEET C101
CONSTRUCTION LIMITS(TYP.)
CONSTRUCTION ENTRANCE
SEE SHEET C502
CONSTRUCTION ENTRANCE
SEE SHEET C502
LEGEND
SILT FENCE
DISTANCE VARIES
1.5
EXISTING
GROUNDGEOTEXTILE
C301
1'
TYPICAL SECTION
STREAMBANK SLOPE PROTECTION
NCDOT #57
STONE 1' THICK
MIN. (TYP.)
ELEV. VARIES
NCDOT CLASS 1
RIPRAP 27" THICK
(TYP.)
C301
TYPICAL SECTION
LEITH CREEK CHANNEL MAINTENANCE
NOT TO SCALE
NOT TO SCALE
DESIGN CHANNEL
(ELEVATION VARIES)
LEITH CREEK CHANNEL
EXISTING GROUND
SEDIMENT ABOVE DESIGN CHANNEL
BOTTOM ELEVATION TO BE REMOVED
BETWEEN THE TOE OF BOTH BANKS
SEE DESIGN CHANNEL ELEVATIONS
TABLE ON SHEETS C101-C106
WIDTH VARIES
NOTE: FOR REMOVAL OF DEBRIS AND FALLEN TREES WITHIN
THE CHANNEL SEE NOTES ON SHEET C101.
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TA
C301
TY
PI
C
AL
S
EC
TI
O
N S
Le ith
C re ek _C
1.
dw g
56+50
0 10 20 30 400-10-20-30-40-50-60
56+74.98
0 10 20 30 40 50 600-10-20-30-40-50
57+00
0 10 20 30 40 50 600-10-20-30-40-50-60
56+00
0 10 20 300-10-20-30-40-50
56+26.92
0 10 20 300-10-20-30-40-50
55+73.73
0 10 20 30 400-10-20-30-40-50
EXISTING GROUND (TYP.)
NCDOT #57
STONE 12" THICK
MIN. (TYP.)
NCDOT CLASS 1
RIPRAP 27" THICK
(TYP.)
GEOTEXTILE SEE
SHEET C301 (TYP.)
1.5
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TAC302
BA
N
K
PR
O
TE
C
TI
O N
C R
O
SS
-S
EC
TI
O
N S
STA. 160+76.92 STA. 161+03.19
STA. 161+30.11 STA. 161+53.19 STA. 161+78.17
STA. 162+03.19
POE AT BRIDGE
Le ith
C re ek _c ro ss
_s ec tio ns
.d w
8'
7' 4"1'
4'
4'6"
2' M
IN
C
O
VE
R
2' M
IN
C
O
VE
R
6" M
IN
6" M
IN
NEW OR EXISTING
24" PIPE
NEW OR EXISITNG
12" PIPE
CLASS B RIPRAP
BEDDING MATERIAL
4"
4"
CLASS B RIPRAP
BEDDING MATERIAL
24" PIPE OUTLET PROTECTION PLAN VIEW 24" PIPE OUTLET PROTECTION PROFILE VIEW CROSS-SECTION A-A
12" PIPE OUTLET PROTECTION PLAN VIEW 12" PIPE OUTLET PROTECTION PROFILE VIEW CROSS-SECTION B-B
12" OUTLET PROTECTION
24" OUTLET PROTECTION
1'
6"
B
B
A
A
SEED DISTURBED AREA
SEED DISTURBED AREA
2' M
IN
4'
SEED DISTURBED AREA
7' 4"
SEED DISTURBED AREA
2' M
IN
MEETS EXISTING GRADE MEETS EXISTING GRADE
MEETS EXISTING GRADE MEETS EXISTING GRADE
NOTES:
1. NEW PIPE SHALL BE 12" OR 24" PROFILE WALL HDPE AS SPECIFIED.
2. CUT AND REPAIR EXISTING PIPE ENDS THAT ARE DAMAGED, CORRODED OR BENT
3. ALL PIPE SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH ASTM D2321, "STANDARD PRACTICE FOR
UNDERGROUND INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND OTHER GRAVITY FLOW
APPLICATIONS", LATEST ADDITION
4. MEASURES SHOULD BE TAKEN TO PREVENT MIGRATION OF NATIVE FINES INTO BACKFILL MATERIAL, WHEN REQUIRED.
5. FOUNDATION: WHERE THE TRENCH BOTTOM IS UNSTABLE, THE CONTRACTOR SHALL EXCAVATE TO A DEPTH REQUIRED BY THE CONTRACTORS ON SITE TESTING REPRESENTATIVE AND REPLACE WITH SUITABLE MATERIAL. AS AN ALTERNATIVE AND AT THE DISCRETION OF THE CONTRACTORS ON SITE TESTING REPRESENTATIVE, THE TRENCH BOTTOM MAY BE STABILIZED USING A GEOTEXTILE MATERIAL.
6. MINIMUM COVER: MINIMUM COVER, H, IN NON-TRAFFIC APPLICATIONS (GRASS MATERIAL OR LANDSCAPE AREAS) IS 24" FROM THE TOP OF PIPE TO GROUND SURFACE ADDITIONAL COVER MAY BE REQUIRED
DURING CONSTRUCTION TO ACCOMMODATE CONSTRUCTION EQUIPMENT LOADING.
GEOTEXTILE
GEOTEXTILE
GEOTEXTILE
GEOTEXTILE
NOTES:
1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED
LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE
SUBGRADE TO THE DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW
AREAS IN THE SUBGRADE ON UNDISTURBED SOIL MAY ALSO BE FILLED BY INCREASING
THE RIPRAP THICKNESS.THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE
SPECIFIED GRADING LIMITS SHOWN ON THE PLANS.
2. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY
PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE
BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE
DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP SO THE TOP LAYER IS
ABOVE THE DOWNSTREAM LAYER A MINIMUM OF 1 FOOT. IF THE DAMAGE IS EXTENSIVE,
REPLACE THE ENTIRE FILTER CLOTH.
3. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE
FILTER.
4. THE RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD,
ANGULAR, HIGHLY WEATHER-RESISTANT AND WELL GRADED.
5. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFILL AT THE END. MAKE THE
TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR
SLIGHTLY BELOW IT.
6. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND
PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEEDED TO FIT SITE
CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE APRON.
7. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH
VEGETATION.
TRENCH WIDTH, O.D. + 3,'
M in
. 6
O.D. +1.5'
1'
2' M
IN
SELECT GRANULAR
MATERIAL PER PROJECT
SPECIFICATIONS
PROPOSED PIPE
SUITABLE
MATERIALS PER
PROJECT
SPECIFICATIONS
BEDDING MATERIAL
PER PROJECT
SPECIFICATIONS
PIPE BEDDING FOR NEW PIPE PLACEMENT
GROUND LINE
TOP OF FILL
SEED DISTURBED AREA
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TA
C500
TY
PI
C
AL
P
IP
E
IN
ST
AL
LA
TI
O N
D
ET
AI
LS
Le ith
C re ek _C
S5
.d w
TEMPORARY SILT FENCE (TSF) DETAIL
WIRE FABRIC
GROUND LINE
3' -0
" M
AX
2' -0
" M
IN
4"
8"
COMPACTED FILL
2' MIN' (TYP)
STEEL POST
MIN. 12.5 GA.
INTERMEDIATE
WIRES
MIN. 10 GA.
TOP & BOTTOM
WIRES
FILTER
FABRIC
" F
IL
TE
R
FA
BR
IC
36" MIN WIDTH
FILTER FABRIC
(8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE)
MIN. 12.5 GA.
VERTICAL WIRES
STEEL
POST
(TYP)
N.T.S.
VARIES AS DIRECTED BY THE CONTRACTING OFFICER
OR HIS/HER DESIGNATED REPRESENTATIVESOIL EROSION AND SEDIMENT CONTROL MEASURES
1. ALL EROSION AND SEDIMENTATION CONTROL MEASURES NOTED SHALL BE INSTALLED PRIOR TO START OF CONSTRUCTION AND
SHALL REMAIN IN EFFECT AND BE MAINTAINED THROUGHOUT THE PERIOD OF CONSTRUCTION.
2. SEDIMENTATION FROM WORK ON THIS SITE SHALL BE CONTAINED ON THE SITE AND SHALL NOT BE ALLOWED TO COLLECT ON ANY
OFFSITE AREA OR IN WATERWAYS.
3. CONTRACTOR SHALL APPLY TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THESE PLANS OR AS DIRECTED BY THE CONTRACTING OFFICER OR HIS/HER DESIGNATED REPRESENTATIVE. CONTRACTOR SHALL REMOVE TEMPORARY MEASURES AS SOON AS PERMANENT STABILIZATION OF SLOPES, DITCHES, AND OTHER EARTH CHANGES HAVE BEEN ACCOMPLISHED.
4. DAILY INSPECTION SHALL BE MADE BY THE CONTRACTOR TO DETERMINE THE EFFECTIVENESS OF EROSION CONTROL MEASURES, AND
ANY NECESSARY REPAIRS SHALL BE MADE WITHOUT DELAY.
5. PERMANENT SOIL EROSION CONTROL MEASURES FOR ANY DISTURBED LAND AREA SHALL BE STABLIZIED AS SOON AS POSSIBLE. WHEN IT IS NOT POSSIBLE TO PERMANENTLY STABILIZE A DISTURBED AREA IMMEDIATELY AFTER COMPLETION OF GRADING WORK, TEMPORARY SOIL EROSION CONTROL MEASURES SHALL BE IMPLEMENTED IMMEDIATELY. ALL TEMPORARY SOIL EROSION CONTROL MEASURES SHALL
BE MAINTAINED UNTIL PERMANENT SOIL EROSION CONTROL MEASURES ARE IMPLEMENTED.
6. CONTRACTOR SHALL PROVIDE PERMANENT GROUND COVER FOR ALL DISTURBED AREAS WITH 3H:1V SLOPES OR FLATTER WITHIN 14 CALENDAR DAYS FOLLOWING THE COMPLETION OF CONSTRUCTION AND ALL DISTURBED AREAS WITH SLOPES STEEPER THAN 3H:1V WITHIN 7 CALENDAR DAYS
AFTER COMPLETION OF CONSTRUCTION.
7. SEE SECTION 32 92 19 IN THE SPECIFICATIONS FOR DETAILS REGARDING MAINTENANCE AND APPLICATION OF SEEDING, SOIL CONDITIONERS, FERTILIZERS, AND MULCH.
TEMPORARY SILT FENCE NOTES:
1. THE CONTRACTOR SHALL COMPLETE ALL TEMPORARY SILT FENCE INSTALLATION PRIOR TO
COMMENCEMENT OF EXCAVATION OF DEBRIS AND SEDIMENT FROM THE CHANNEL.
2. WIRE FABRIC SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES
WITH 12" STAY SPACING.
3. FILTER FABRIC SHALL HAVE A MINIMUM OF 36" WIDTH. FILTER FABRIC SHALL BE FASTENED
ADEQUATELY TO THE FENCE FABRIC AS DIRECTED BY THE CONTRACTING OFFICER.
4. STEEL POSTS SHALL BE 5 FEET (MIN) IN HEIGHT AND SHALL BE OF THE SELF-FASTENER ANGLE
STEEL TYPE.
5. THE CONTRACTOR SHALL INSPECT TEMPORARY SILT FENCE AT LEAST ONCE EVERY 7 DAYS AND AFTER ANY SIGNIFICANT STORM THAT PRODUCES 0.5 INCHES OR MORE RAINFALL AT THE SITE
AND MAKE ANY REQUIRED REPAIRS IMMEDIATELY. REMOVE SEDIMENT DEPOSITS AS NECESSARY
TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON
THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.
6. THE CONTRACTOR SHALL PERFORM ALL WORK IN SUCH A MANNER THAT STATE WATER QUALITY
STANDARDS OUTSIDE OF THE CONSTRUCTION AREA ARE NOT VIOLATED. ALL EROSION AND
SEDIMENT CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION
AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
SEEDING SPECIFICATION
SEEDING MAINTENANCE1. APPLY FERTILIZER/LIME AT RATES AS DETERMINED BY LABORATORY SOIL ANALYSIS OF SOILS AT THE JOB SITE. IN THE
ABSENCE OF THE SOIL ANALYSIS, APPLY SOIL AMENDMENTS AT THE RATES INDICATED IN STEPS 2 AND 3.
2. AREA WILL BE TILLED TO 4" DEPTH
3. APPLY LIME AT 70 POUNDS PER 1000 SQUARE FEET, OR 1.5 TONS PER ACRE.
4. APPLY 10-20-20 FERTILIZER AT A RATE OF 850 POUNDS PER ACRE OR 20 POUNDS PER 1000 SQUARE FEET. THE FERTILIZER
SHOULD BE EITHER SLOW TIME RELEASE OR APPLIED IN TWO APPLICATIONS, HALF AT TIME OF PLANTING AND THE SECOND
HALF AFTER PERMANENT SEED GERMINATES.
5. THE LIME AND FERTILIZER WILL BE WORKED INTO THE TOP 2 TO 4 INCHES OF SOIL PRIOR TO SEEDING.
6. SEED MIX AND RATE:
PERMANENT SEEDING:
"COOL SEASON" - PLANTED BETWEEN 1 SEPTEMBER AND FEBRUARY 28
50 POUNDS PER ACRE WINTER WHEAT (TRITICUM SPELTA). NO RYE GRASS.
25 POUNDS PER ACRE COMMON BERMUDA (CYNODON DACTYLON), HULLED
25 POUNDS PER ACRE COMMON BERMUDA (CYNODON DACTYLON), UNHULLED
"WARM SEASON" - PLANTED BETWEEN 1 MARCH AND 31 AUGUST
50 POUNDS PER ACRE GERMAN (SETARIA ITALICA) , BROWN TOP (SETARIA ITALICA), OR FOX TAIL MILLET (BRACHIARIA RAMOSUM)
50 POUNDS PER ACRE COMMON BERMUDA (CYNODON DACTYLON), HULLED
TEMPORARY SEEDING:
“COOL SEASON” PLANTED BETWEEN 1 SEPTEMBER AND FEBRUARY 28
120 POUNDS PER ACRE WINTER WHEAT (TRITICUM SPELTA) :
“WARM SEASON” PLANTED BETWEEN 1 MARCH AND 31 AUGUST
65 POUNDS PER ACRE GERMAN (SETARIA ITALICA), BROWN TOP (SETARIA ITALICA), OR FOX TAIL MILLET (BRACHIARIA RAMOSUM)
STRAW MULCH: 4,000 POUNDS PER ACRE. THE GROUND SHOULD BE COMPLETELY COVERED WITH NO BARE SPOT LARGER THAN A QUARTER, THEN TACKED WITH EMULSIFIED ASPHALT. EMULSIFIED ASPHALT SHALL BE APPLIED AT A RATE HEAVY ENOUGH
THAT THE ENTIRE AREA APPEARS BLACK IN COLOR.
HYDROSEEDING: HYDROSEEDING SHALL ONLY BE ALLOWABLE ON SLOPES STEEPER THAN 1 HORIZONTAL TO 1 VERTICAL, STEPS 1 THROUGH 4 MUST BE COMPLETED PRIOR TO HYDROSEEDING. HYDROSEEDING SHOULD BE APPLIED IN TWO APPLICATIONS.
THE FIRST APPLICATION WILL CONSIST OF 1/3 OF THE MULCH AND 2/3 OF THE SEED AND THE SECOND APPLICATION WILL CONSIST OF 2/3 OF THE MULCH AND 1/3 OF THE SEED. THE MULCH WILL INCLUDE A TACKIFIER AND WILL BE APPLIED AT A RATE OF 2,000 POUNDS PER ACRE OR THE MANUFACTURER'S RECOMMENDATION, WHICHEVER IS HIGHER.
NOTE:
A. NO LAND-DISTURBING ACTIVITY SUBJECT TO THIS ARTICLE SHALL BE UNDERTAKEN EXCEPT IN ACCORDANCE WITH THE
FOLLOWING MANDATORY REQUIREMENTS:
B. THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION-CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN
EROSION.
C. ALL PERIMETER DIKES, DITCHES, SWALES, PERIMETER SLOPES OR SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN
ANY EVENT WITHIN 7 CALENDAR DAYS.
MAINTENANCE DURING ESTABLISHMENT PERIOD
MAINTENANCE OF THE SEEDED AREAS SHALL INCLUDE
PROTECTING EMBANKMENTS AND DITCHES FROM SURFACE
EROSION; MAINTAINING EROSION CONTROL MATERIALS AND
MULCH; PROTECTING INSTALLED AREAS FROM TRAFFIC;
MOWING; WATERING; AND POST-FERTILIZATION.
MOWING
A. TURF AREAS: TURF AREAS SHALL BE MOWED TO A
MINIMUM 3-INCH HEIGHT WHEN THE TURF IS A MAXIMUM
4 INCHES HIGH. CLIPPINGS SHALL BE REMOVED WHEN
THE AMOUNT CUT PREVENTS SUNLIGHT FROM
REACHING THE GROUND SURFACE.
B. EROSION CONTROL AREAS: EROSION CONTROL AREAS
SHALL BE MOWED TO A MINIMUM 4 INCH HEIGHT WHEN
THE PLANTS ARE A MAXIMUM 8 INCHES HIGH. CLIPPINGS
SHALL BE REMOVED WHEN THE AMOUNT CUT PREVENTS
SUNLIGHT FROM REACHING THE GROUND SURFACE.
POST-FERTILIZATION
AFTER THE PERMANENT GRASS HAS BEEN ACCEPTED, AND
BETWEEN THE DATES OF APRIL 15 AND OCTOBER 15, APPLY
425 POUNDS OF FERTILIZER PER ACRE.
REPAIR OR REINSTALL
UNSATISFACTORY STAND OF GRASS PLANTS AND MULCH
SHALL BE REPAIRED OR REINSTALLED, AND ERODED AREAS
SHALL BE REPAIRED UNTIL A SATISFACTORY STAND OF
GRASS RESULTS.
1. GROUND STABILIZATION*
7 DAYS
SITE AREA
DESCRIPTION
STABILIZATION
TIME FRAME
STABILIZATION TIME
FRAME EXCEPTIONS
PERIMETER DIKES,
SWALES, DITCHES,
AND SLOPES
HIGH QUALITY
WATER (HQW)
ZONES
NONE
7 DAYS NONE
SLOPES STEEPER
THAN 3:1 7 DAYS
IF SLOPES ARE 10' OR
LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1,
14 DAYS ARE ALLOWED.
SLOPES 3:1 OR
FLATTER 14 DAYS
7-DAYS FOR SLOPES
GREATER THAN 50 FEET
IN LENGTH
ALL OTHER AREAS
WITH SLOPES
FLATTER THAN 4:1
14 DAYS
NONE (EXCEPT FOR
PERIMETERS AND HQW
ZONES)
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
"X
S.
ST
EL
LO
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TA
ER
O
SI
O
N
S
ED
IM
EN
T C
O N
TR
O
L D
ET
AI
LS
C501
Le ith
C re ek _C
E5
_S
EC
P_ D et ai ls 1.
NTSC502
TEMPORARY STOCKPILE AREA
3:1
3:1
SOIL/SEDIMENT
STOCKPILE AREA
ORIGINAL GROUND SURFACE
10"
(TYP.) SILT FENCE
(SEE DETAIL ON
SHEET C501)
TEMPORARY STOCKPILE DETAIL
TEMPORARY STOCKPILE - GENERAL NOTES
1. SILT FENCE TO EXTEND AROUND ENTIRE PERIMETER OF STOCKPILE, OR IF STOCKPILE AREA IS LOCATED ON/NEAR A SLOPE THE SILT FENCE
IS TO EXTEND ALONG CONTOURS OF THE DOWN-GRADIENT AREA.
2. IF STOCKPILE IS TO REMAIN FOR MORE THAN 14 DAYS, TEMPORARY STABILIZATION MEASURES MUST BE IMPLEMENTED.
3. SILT FENCE SHALL BE MAINTAINED UNTIL STOCKPILE AREA HAS EITHER BEEN REMOVED OR PERMANENTLY STABILIZED.
4. THE KEY TO FUNCTIONAL TEMPORARY STOCKPILE AREAS IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT
REMOVAL.
NTSC502
2 CONSTRUCTION ENTRANCE DETAIL
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
"X
S.
ST
EL
LO
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TA
TE
M
PO
R
AR
Y
ST
O
C
KP
IL
E
D
ET
AI
L
C502
EI
_W ar rio rC re ek
_C E5
_S
EC
P_
D et ai ls
2.
K7TSEJAM
Text Box R1
R2
R3
R4
R5
R6
R7
R8
R9
R10
R11
R12
R13
R14
R15
R16
R17
R18
R19
R20
R21
R22
R23
R24
R25
R26
R27
R28
C O
VE
R
S H
EE
T
ISSUE DATE: FEBRUARY 2022
US Army Corps of Engineers ®
Wilmington District
Approval Recommended: *
Approved: *
DATE
DATECHIEF, ENGINEERING BRANCH
* THIS PROJECT WAS DESIGNED BY THE U.S. ARMY CORPS OF ENGINEERS,
WILMINGTON DISTRICT. INDIVIDUALS WHOSE SIGNATURES AND REGISTRATION
DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE OPERATING WITHIN THE
SCOPE OF THEIR EMPLOYMENT. SIGNATURES ARE REQUIRED BY ER 1110-1-8152.
CHIEF, DESIGN and GENERAL ENGINEERING SECTION
LEITH CREEK CHANNEL REPAIR
SCOTLAND COUNTY, NORTH CAROLINA
G-001
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION
AND APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED ON SHEET GI01.
AMENDMENTS:
IFB NO.: W912PM22B0009
CONTRACT NO.:
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
"X
S.
ST
EL
LO
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TA
G -0
.d w g
K7TSEJAM
R29
GI01
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TA
VI
C
IN
IT
Y
AN
D L
O C
AT
IO
N M
AP
S
IN
D
EX
O
F D
R
AW
IN
G
S, P
R O
JE
C
T
Le ith
C re ek _G
I0 1.
dw g
PROJECT LOCATION
FALLS
LAKE
ONSLOW
DUPLIN
JONES
PENDER
HA
NO
VE
R
NE
W
BRUNSWICK
COLUMBUS
BLADEN
ROBESON
HOKE
CUMBERLAND
SAMPSON
WAYNE
LENOIR
GREENE
PITT
CRAVEN
NORTHAMPTON
HALIFAX
NASH
WILSON
JOHNSTON
WAKE
FRANKLIN
VANCE
G R
AN
VI
LL
E
WARREN
GREENSVILLE
HENRYPATRICK
STOKES ROCKINGHAM CASWELL PERSON
ORANGE
AL
AM
AN
C
E
DURHAM
CHATHAM
MOORE
MONTGOMERY
RANDOLPH
DAVIDSON
FORSYTH
SURRY
ALLEGHANY
ASHE
WATAUGA WILKES
CALDWELL
AVERY
MITCHELL
YANCY
BURKE
CATAWBA
ALEXANDER
IREDELL
LINCOLN
GASTON
M
EC
KL
EN
BU
R
G
CABARRUS
STANLY
UNION
ANSON
RICHMOND
RUTHERFORD
McDOWELL
MADISON
BUNCOMBE
HENDERSON
TRANSYLVANIA
HAYWOOD
JACKSON
SWAIN
GRAHAM
CHEROKEE
CLAY
MACON
YADKIN
ROWAN
CLEVELANDPOLK
Georgia
Tennessee
South Carolina
FEAR
C
APE
RIVER
N E
U S
E
RIVER
R O
A N
O K
E
RIVER
Virginia North Carolina
WM. O. HUSKE
LOCK & DAMSC
OTL
AN
D
EDGECOMBEDAVIE
GUILFORD
Cape Fear
HARNETT
LEE
SCALE IN MILES
W. KERR
SCOTT DAM
& RESERVOIR
JOHN H. KERR DAM & RESERVOIR
B. EVERETT
JORDAN DAM
& LAKE
LOCK & DAM
NO. 2
LOCK & DAM
NO. 1
Raleigh
20 40 60 80 100 12040 20
TITLE
INDEX OF DRAWINGS
GI01
SITE PLAN STA. 105+50 TO STA. 115+50
SITE PLAN STA. 138+50 TO STA. 150+00
SITE PLAN STA. 150+00 TO STA. 161+00
SCALE IN FEET
SCALE: 1" = 400'
400 400 800
SITE PLAN STA. 115+50 TO STA. 127+50
SITE PLAN STA. 127+50 TO STA. 138+50
INDEX OF DRAWINGS, LOCATION AND VICINITY MAPS
NOTE: PHOTOGRAPHY DATED: JANUARY 2021. COPYRIGHT 2021 NC ONE MAP.
C101
C102
SHEET No.
END OF PROJECT
E CHURCH ST
McKAY ST
COMMONWEALTH ST
S CALEDONIA RD
BEGIN PROJECT
OLD LUMBERTON RD
JA
M
ES
S
T N
M
AI
N
ST
CARVER ST
N C
AL
ED
O N
IA
R
D
N G
IL
L
ST
McGIRTS BRIDGE RD
SHEET C101
SHEET C102
SHEET C103
SHEET C104
SHEET C105
SHEET C106
LEITH CREEK CHANNEL (TYP.)
C103
C104
C105
C301
C302
C500
TYPICAL SECTIONS
TYPICAL PIPE INSTALLATION DETAILS
BANK STABILIZATION CROSS SECTIONS
SITE PLAN STA. 161+00 TO STA. 168+85C106
REFERENCE DRAWINGS
R1
R2 - R16
R17
R18
R19
R20
R21
R22
TOPOGRAPHIC SURVEY OF LEITH CREEK OVERALL DRAWING
TOPOGRAPHIC SURVEY OF LEITH CREEK SHEET 2 THRU 16 OF 16
RECORD DRAWING PLATE E-1: GENERAL PLAN & INDEX MAP
RECORD DRAWING PLATE E-3: PLAN, PROFILE & CROSS SECTIONS
RECORD DRAWING PLATE E-2: PLAN, PROFILE & CROSS SECTIONS
RECORD DRAWING PLATE E-4: SURVEYED CROSS SECTIONS
RECORD DRAWING PLATE E-5: FLOOD PROFILES
RECORD DRAWING PLATE E-6: FLOOD PROFILES
R23 RECORD DRAWING PLATE E-7: BRIDGE SECTIONS
R24 RECORD DRAWING PLATE E-8: BRIDGE SECTIONS
R25 RECORD DRAWING PLATE E-9: CHANNEL TRANSITION COMMONWEALTH AVENUE
R26 RECORD DRAWING PLATE E-10: RECREATION PLAN
R27 RECORD DRAWING PLATE E-11: FLOODWAY BOUNDARIES
R28 RECORD DRAWING PLATE E-12: FLOODWAY BOUNDARIES
C501 EROSION & SEDIMENT CONTROL DETAILS
C502 TEMPORARY STOCKPILE DETAIL
R29 - R43 NC DHEC SWPPP PERMIT DRAWINGS
AutoCAD SHX Text N
SAN
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
X
X
X
X
X
X
X
X
G
G
G
G
G
C/F
C/F
C/F
C/F
C/F
W
W
W
W
W
W
W
W
W
W
W
190190
X
X
X
X
X
X
X
X
X
X
X
.8
8.2'11 .8
'8.1'
.8
12.8'10 .8
'12.8'
105+50 106+00
107+00 108+00 109+00
110+00 111+00 111+67.78
5 6 7
105+50 106+00
107+00 108+00 109+00
110+00 111+00 112+00
113+00
114+00
115+00
116+00
PO
B:
+5 0.
PI
: 1
+5 1.
PI
: 1
+8 9.
PI
: 1
+9
6.
PI
: 1
+2
1.
PI
: 1
+6
1.
PI
: 1
+6
0.
PI
: 1
+6
2.
PI
: 1
+5
8.
PI
: 1
+4
9.
PI
: 1
+5
7.
PI
: 1
+9
0.
PI
: 1
+2
1.
PI
: 1
+3
1.
PI
: 1
+4
2.
PI
: 1
+4
9.
PI
: 1
+5
5.
PI
: 1
+6
4.
PI
: 1
+6
7.
PI
: 1
+0
4.
PI
: 1
+0
8.
PI
: 1
+1
5.
PI
: 1
+1
9.
PI: 1
+37 .43
PI
: 1
+4
8.
PI
: 1
+6
1.
PI
: 1
+7
5.
PI
: 1
+9
9.
PI
: 1
+2
8.
PI: 1
13+63.84
PI: 1
+6 6.8
PI
: 1
+7
3.9
PI
: 1
+0
2.
PI
: 1
+4
1.
PI
: 1
+4
0.
PI
: 1
+1
3.
PI
: 1
+1
9.
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TAC101
SI
TE
P
LA
N
ST
A.
+5
TO
S
TA
. 1
+5
Le ith
C re ek _p la n_ sh ee ts .d w g
SCALE IN FEET
SCALE: 1" = 40'
40 40 80
E.
C
HU
RC
H
ST
RE
ET
U.
S.
H W
Y
B
US
IN
ES
S
M cK
AY
S
TR
EE
T
LA
URIN
BURG AND SOUTHERN R
AILR
OAD
NOTES:
1. LAND SURVEY COMPLETED 23 NOVEMBER 2020 TO 19 JANUARY 2021. FOR SURVEY CONTROL POINTS
AND EXISTING CONDITIONS SEE REFERENCE DRAWINGS R1 - R16.
2. HORIZONTAL DATUM: NAD83 (2011) NORTH CAROLINA STATE PLANE SURVEY FEET.
3. VERTICAL DATUM: NAVD88 SURVEY FEET.
4. CONTRACTOR SHALL REMOVE ANY VEGETATION, SEDIMENT, AND/OR DEBRIS LOCATED IN THE BOTTOM OF THE CHANNEL BETWEEN THE TOE OF THE BANKS, ABOVE THE DESIGN ELEVATION AS SHOWN.
DESIGN ELEVATIONS ARE SHOWN IN THE TABLE ON EACH SHEET AND INCLUDE MAJOR STATIONS AND INDEX STATIONS WITH ELEVATIONS AS SHOWN IN THE RECORD DRAWINGS. FOR RECORD DRAWINGS
SEE SHEETS R17 - R24.
5. CONTRACTOR SHALL REMOVE ALL FALLEN AND LEANING TREES LOCATED WITHIN THE
PROJECT LIMITS. APPROXIMATE LOCATIONS OF FALLEN AND LEANING TREES ARE SHOWN
BASED ON CONDITIONS AS OF 15 OCTOBER 2021.
6. CONTRACTOR SHALL REPLACE DAMAGED AND/OR FAILING CULVERTS AS SHOWN. THE EXISTING
CULVERT REPLACEMENT AREAS ARE SHOWN BASED ON CONDITIONS AS OF 15 OCTOBER 2021.
CONDITIONS ARE SUBJECT TO CHANGE. CONTRACTOR SHALL VERIFY CONDITIONS PRIOR TO
START OF WORK.
7. CONTRACTOR SHALL INSTALL STREAM CHANNEL SLOPE STABILIZATION AS SHOWN. THE
EXISTING SLOPE STABILIZATION AREAS ARE SHOWN BASED ON CONDITIONS AS OF 15 OCTOBER
2021. CONTRACTOR SHALL VERIFY CONDITIONS PRIOR TO START OF WORK.
8. STOCKPILE AND LAY DOWN AREAS SHALL BE WITHIN THE MAINTENANCE EASEMENTS AS SHOWN.
9. VEGETATION, SEDIMENT, AND DEBRIS TO BE DISPOSED OF OFFSITE AT AUTHORIZED LANDFILL OR
DEBRIS DISPOSAL LOCATIONS.
10. DESIGN CHANNEL IS DEFINED AS TOP OF BANK TO TOP OF BANK.
11. FOR HAND AUGER REPORTS SEE APPENDIX B OF THE SPECIFICATIONS.
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C
LEITH CREEK CHANNEL (TYP.)
CHANNEL CENTERLINE (TYP.)
CHANNEL BOTTOM
DESIGN ELEVATION
STA. 105+50
ELEV: 186.40' NAVD88
MAINTENANCE EASEMENT
MAINTENANCE EASEMENT
REPAIR 24" CMP
PIPE SEE
SHEET C500
FOR DETAILS
REPAIR 12" CMP
PIPE SEE SHEET
C500 FOR DETAILS
TREE TO BE REMOVED
(APPROX. LOCATION)
APPROX. TOE OF BANK (TYP.)
LEITH CREEK CHANNEL DESIGN ELEVATIONS
STATION ELEVATION (NAVD 1988)
POB 105+50* 186.40'
106+00 186.48' 107+00 186.63' 108+00 186.78' 109+00 186.93' 110+00 187.08' 111+00 187.23' 112+00 187.38' 112+15* 187.40' 113+00 187.51' 114+00 187.64' 115+00 187.77' 116+00 187.90'
* DENOTES DESIGN ELEVATIONS DERIVED
FROM RECORD DRAWINGS R18 & R19.
PHOTOGRAPH LOCATION
SEE APPENDIX A
LEGEND
EXISTING OVERHEAD POWERLINE
CONTACTOR TO VERIFY LOW POINT
ELEVATION
EXISTING NATURAL GAS PIPELINE
PROTECT IN PLACE
HAND AUGER # LC-21-HA-06
SEE NOTE 11 THIS SHEET
CONSTRUCTION LIMITS(TYP.)
CONSTRUCTION LIMITS(TYP.)
CONSTRUCTION ENTRANCE
SEE SHEET C502
SILT FENCE
R31
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
WATER LEVEL MONITOR
AutoCAD SHX Text
SSMH RIM 198.89 INV IN 6 INCH CLAY 197.07 INV OUT 10 INCH CLAY 196.33
AutoCAD SHX Text
CONC PAD 199.2
AutoCAD SHX Text
CONC PAD 199.9
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
E CHURCH STREET
AutoCAD SHX Text McKAY STREET
AutoCAD SHX Text
RIP-RAP
AutoCAD SHX Text BOX CULVERT INV 187.41 W 6.0 x H 4.4
AutoCAD SHX Text BOX CULVERT INV 187.52 W 6.0 x H 4.4
AutoCAD SHX Text BOX CULVERT INV 187.35 W 8.1 x H 4.25
AutoCAD SHX Text BOX CULVERT INV 187.38 W 8.1 x H 4.35
AutoCAD SHX Text
PUMP STATION BUILDING
AutoCAD SHX Text
PUMP STATION BUILDING
AutoCAD SHX Text
RIP-RAP
AutoCAD SHX Text BOX CULVERT INV 187.51 W 8.1 x H 4.25
AutoCAD SHX Text BOX CULVERT INV 187.57 W 8.1 x H 4.35
AutoCAD SHX Text W 10.23 x H 7.9FT CMP INV 186.08'
AutoCAD SHX Text W 10.4 x H 7.5FT CMP INV 187.21'
AutoCAD SHX Text
LAURINBURG AND SOUTHERN RAILROAD
AutoCAD SHX Text
LAURINBURG AND SOUTHERN RAILROAD
AutoCAD SHX Text
SS
AutoCAD SHX Text McKAY STREET
AutoCAD SHX Text AS PER CITY OF LAURINBURG, SEWER IS FORCEMAIN BETWEEN PUMP STATION AND MANHOLE LINE NOT LOCATED
4.7
CHK
TI
E
PT
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
X
X
X X
XXXXX
G
185185
185185190190
SD
SD
21.0'
.1
'18.6'
7.8'12.8'7.4'
9.6'
.6
19.8'
8.2'
.7
11.5'
.4
11.8'
C/E
C/E
C/E C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/EC/E
C/E
C/E
C/E
C/E
S32° 49' 05"E 382.36'
15 16
115+00
116+00
117+00
118+00 119+00
120+00
121+00
122+00 123+00
124+00 125+00
126+00 127+00 128+00
PI: 1
+4 1.3
PI: 1
+40 .30
PI: 1
16+13.66
PI: 1
16+19.25
PI
: 1
+8
8.
PI
: 1
+8
4.
PI
: 1
+7
8.
98 PI
: 1
+7
2.
PI
: 1
+8
1.
PI
: 1
+0
5.
PI
: 1
+4
5.4
PI: 1
+5 3.4
PI: 1
20+80.06
PI: 1
20+85.09
PI: 121+04.12
PI: 121+17.66
PI: 1
21+58.72
PI
: 1
+0
6.6
PI
: 1
+8
6.
PI
: 1
+8
5.
PI
: 1
+8
1.
PI
: 1
+7
6.
PI
: 1
+7
2.
PI
: 1
+7
4.
PI
: 1
+9
5.
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TAC102
SI
TE
P
LA
N
ST
A.
+5
TO
S
TA
. 1
+5
Le ith
C re ek _p la n_ sh ee ts .d w g
SCALE IN FEET
SCALE: 1" = 40'
40 40 80
LAURINBURG AND SOUTHERN RAILROAD
COMMONWEALTH STREET
M
AT
CH
LI
NE
S
EE
S
HE
ET
C
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C
REPAIR 12" CMP
PIPE SEE
SHEET C500
FOR DETAILS
REPAIR 24" CMP
SEE SHEET C500
FOR DETAILS
REMOVE AND REPLACE
24" CMP WITH NEW 24"
HDPE PIPE SEE SHEET
C500 FOR DETAILS
REMOVE AND REPLACE
12" CMP WITH NEW 12"
HDPE PIPE SEE SHEET
C500 FOR DETAILS
TREE TO BE REMOVED
(APPROX. LOCATION)
NOTES:
1. FOR NOTES SEE SHEET C101.
LEITH CREEK CHANNEL (TYP.)
MAINTENANCE EASEMENT
APPROX. TOE OF BANK (TYP.)
MAINTENANCE EASEMENT
CHANNEL CENTERLINE (TYP.)
LEITH CREEK CHANNEL DESIGN ELEVATIONS
STATION ELEVATION (NAVD 1988)
116+00 187.90' 117+00 188.03' 118+00 188.16' 119+00 188.29' 120+00 188.42' 121+00 188.55' 121+05* 188.60' 122+00 188.78' 123+00 188.97' 124+00 189.16' 125+00 189.35' 126+00 189.54' 127+00 189.73' 128+00 189.92'
* DENOTES DESIGN ELEVATIONS DERIVED
FROM RECORD DRAWINGS R18 & R19.
PHOTOGRAPH LOCATION
SEE APPENDIX A
EXISTING OVERHEAD POWERLINE
CONTACTOR TO VERIFY LOW POINT
ELEVATION
EXISTING SANITARY SEWER LINE
PROTECT IN PLACE
CONSTRUCTION LIMITS(TYP.)
CONSTRUCTION ENTRANCE
SEE SHEET C502
CONSTRUCTION LIMITS(TYP.)
LEGEND
SILT FENCE
R32
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
SS
SS
SS
SS
ES
ES
G
G
G
G
G
G
SD
SD
SD
10.7'
.7
10.7'10 .7
W
W
W W
W
W
.7
11.5'
.4
11.8'
24 25
128+00
129+00 130+00 131+00
132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00
PI
: 1
+7
4.
PI
: 1
+9
5.
PI
: 1
+1
8.
PI
: 1
+2
5.
PI
: 1
+2
6.
PI
: 1
+8
5.
PI
: 1
+9
2.
PI
: 1
+0
8.
PI
: 1
+6
1.
PI
: 1
+5
4.
PI
: 1
+4
8.
PI
: 1
+4
9.
PI
: 1
+4
4.
PI
: 1
+4
3.
PI
: 1
+3
9.
PI
: 1
+3
2.
PI
: 1
+2
6.
PI
: 1
+2
4.
PI
: 1
+1
9.
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TAC103
SI
TE
P
LA
N
ST
A.
+5
TO
S
TA
. 1
+5
SCALE IN FEET
SCALE: 1" = 40'
40 40 80
N . C
AL
ED
O N
IA
R
O
AD
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C
REPAIR 24" CMP
SEE SHEET C500
FOR DETAILS
REMOVE 12" CMP AND REPLACE
WITH NEW 12" HDPE PIPE SEE
SHEET C500 FOR DETAILS
Le ith
C re ek _p la n_ sh ee ts .d w g
NOTES:
1. FOR NOTES SEE SHEET C101.
LEITH CREEK CHANNEL (TYP.)
APPROX. TOE OF BANK (TYP.)
MAINTENANCE EASEMENT
CHANNEL CENTERLINE (TYP.)
LEITH CREEK CHANNEL DESIGN ELEVATIONS
STATION ELEVATION (NAVD 1988)
128+00 189.92' 128+70* 190.02' 129+00 190.04' 130+00 190.14' 131+00 190.25' 132+00 190.36' 133+00 190.47' 134+00 190.58' 135+00 190.69' 136+00 190.80' 137+00 190.91' 138+00 191.02' 139+00 191.13'
* DENOTES DESIGN ELEVATIONS DERIVED
FROM RECORD DRAWINGS R18 & R19.
TREE TO BE REMOVED
(APPROX. LOCATION)
PHOTOGRAPH LOCATION
SEE APPENDIX A
EXISTING OVERHEAD POWERLINE
CONTACTOR TO VERIFY LOW POINT
ELEVATION
EXISTING OVERHEAD POWERLINE
CONTACTOR TO VERIFY LOW POINT
ELEVATION
EXISTING PUMP HOUSE
PROTECT IN PLACE
EXISTING UNDERGROUND SANITARY SEWER LINE
PROTECT IN PLACE
EXISTING UNDERGROUND MUNICIPAL WATER LINE
PROTECT IN PLACE
CONSTRUCTION LIMITS(TYP.)
CONSTRUCTION ENTRANCE
SEE SHEET C502
LEGEND
SILT FENCE
R33
SAN
SAN
SAN
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
SD
E
E
E
E
SD
SD
SD
27 28 29 30
139+00 140+00 141+00 142+00
143+00 144+00 145+00
146+00
147+00
148+00 149+00 150+00
PI
: 1
+1
9.
PI
: 1
+1
3.
PI
: 1
+1
1.
PI
: 1
+0
4.
PI
: 1
+0
3.
PI
: 1
+0
1.
PI
: 1
+9
4.
PI
: 1
+8
7.
PI
: 1
+7
4.
PI
: 1
+0
3.
PI
: 1
+2
3.
PI
: 1
+2
4.
PI
: 1
+6
5.
PI
: 1
+9
4.
PI
: 1
+1
9.
PI
: 1
+4
6.
PI
: 1
+4
5.
PI
: 1
+3
8.
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TAC104
SI
TE
P
LA
N
ST
A.
+5
TO
S
TA
. 1
+0
SCALE IN FEET
SCALE: 1" = 40'
40 40 80
C
AR
VER
STR
EET
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C
Le ith
C re ek _p la n_ sh ee ts .d w g
NOTES:
1. FOR NOTES SEE SHEET C101.
LEITH CREEK CHANNEL (TYP.)
APPROX. TOE OF BANK (TYP.)
MAINTENANCE EASEMENT
CHANNEL CENTERLINE (TYP.)
MAINTENANCE EASEMENT (TYP.)
LEITH CREEK CHANNEL DESIGN ELEVATIONS
STATION ELEVATION (NAVD 1988)
139+00 191.13' 140+00 191.24' 141+00 191.35' 142+00 191.46' 143+00 191.57' 144+00 191.68' 145+00 191.79' 146+00 191.98' 147+00 191.00' 147+45* 192.00' 148+00 192.04' 149+00 192.13' 150+00 192.22' 151+00 192.31'
* DENOTES DESIGN ELEVATIONS DERIVED
FROM RECORD DRAWINGS R18 & R19.
TREE TO BE REMOVED
(APPROX. LOCATION)
PHOTOGRAPH LOCATION
SEE APPENDIX A
EXISTING OVERHEAD POWERLINE
CONTACTOR TO VERIFY LOW POINT
ELEVATION
HAND AUGER # LC-21-HA-04
SEE NOTE 11 SHEET C101
HAND AUGER # LC-21-HA-05
SEE NOTE 11 SHEET C101
CONSTRUCTION LIMITS(TYP.)
CONSTRUCTION ENTRANCE
SEE SHEET C502
LEGEND
SILT FENCE
R34
ES
ES
ES
ES
ES
SD SD
SD
SD
SD
SD
G
G
31 32
34 35 36 37 38
39 40 41
42 43
150+00 151+00
152+00 153+00
154+00 155+00 156+00 157+00 158+00
159+00
160+00 161+00 162+00
PI
: 1
+3
8.
PI
: 1
+3
1.
PI
: 1
+3
0.
PI
: 1
+2
5.
PI
: 1
+2
1.
PI
: 1
+1
5.
PI
: 1
+1
1.
PI
: 1
+1
2.
PI
: 1
+0
7.
PI
: 1
+0
3.
PI
: 1
+3
9.
PI
: 1
+9
8.
PI
: 1
+9
4.
PI
: 1
+9
0.
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
L
EI
TH
C
R
EE
K C
H
AN
N
EL
R
EP
AI
R
SC
O
TL
AN
D C
O U
N
TY
, N O
R
TH
C
AR
O
LI
N A
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
N U
E W
IL
M
IN
G
TO
N
, N O
R
TH
C
AR
O
LI
N A
3 22 "X
S.
S
TE
LL
O
J.
M
IT
C
H
EL
L
D R
AW
IN
G C
O D
E:
W
H
-0
7-
J.
M
AN
N
IN
G
FE
BR
U
AR
Y
W
2P M
B0
E.
D
U N
LO
P FI
LE
N
AM
E:
R
TAC105
SI
TE
P
LA
N
ST
A.
+0
TO
S
TA
. 1
+0
SCALE IN FEET
SCALE: 1" = 40'
40 40 80
M
ATC
H
LIN
E SEE SH
EET C
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C
INSTALL RIPRAP SLOPE PROTECTION
SEE SHEETS C301 AND C302 FOR DETAILS
Le ith
C re ek _p la n_ sh ee ts .d w g
NOTES:
1. FOR NOTES SEE SHEET C101.
LEITH CREEK CHANNEL (TYP.)
APPROX. TOE OF BANK (TYP.)
CHANNEL CENTERLINE (TYP.)
MAINTENANCE EASEMENT (TYP.)
LEITH CREEK CHANNEL DESIGN ELEVATIONS
STATION ELEVATION (NAVD 1988)
150+00 192.22' 151+00 192.31' 152+00 192.40' 153+00 192.49' 154+00 192.57' 155+00 192.66' 156+00 192.75' 157+00 192.84' 158+00 192.93' 159+00 193.02' 160+00 193.11' 161+00 193.20' 162+00 193.29'
TREE TO BE REMOVED
(APPROX. LOCATION)
PHOTOGRAPH LOCATION
SEE APPENDIX A
HAND AUGER # LC-21-HA-01
SEE NOTE 11 SHEET C101
HAND AUGER # LC-21-HA-02
SEE NOTE 11 SHEET C101
CONSTRUCTION LIMITS(TYP.)
LEGEND
SILT FENCE
R35
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SANSANSANSANSAN
SAN
SAN
SAN
SAN
SD
SD
SD
SD
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
SD SD
SD
E
E
E
E
E
E
G
G
G
X
X
X X X
X
X
G
G
G
G
G
G
G
COMM
C/F
C/F
C/F
C/F
SD
SD
SD
SS
SS
SS
SS
SS
48 49 50
51162+00 163+00 164+00…