A21. W912P923R0011 - SOLICITATION pdf.pdf

PDF 2 MB Posted

Attached to
Wappapello Lake Lands Management IDIQ
Solicitation number
W912P923R0011
Issued by

View the file

Other files

File Type Posted
A02. APPENDIX B accident prevention plan.docx DOCX document
A02. APPENDIX A.docx DOCX document
A02. Wappapello Map.gif GIF image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912P923R0011 07-Feb-2023

b. TELEPHONE NUMBER

314-331-8395

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 06 Mar 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912P99. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

LEIGH A THOMAS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIVISION

US ARMY ENGR DIST ST LOUIS

1222 SPRUCE STREET, RM 4.207

ST LOUIS MO 63103-2833

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 966439 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

WAPPAPELLO LAKE PROJECT

TIFANY PAGE

US ARMY ENGR DIST ST LOUIS

10992 HWY T

WAPPAPELLO MO 63966-8200

TEL: 573-222-8562 FAX: 573-222-8313

314 331-8746FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$8,500,000

NAICS:

115112

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF81

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

PRICE SCHEDULE

PRICE SCHEDULE

Lands Management IDIQ at Wappapello Lake

BASE YEAR

Line Item

Area

Qty Unit

Unit Price

Total

0001 Cut Disking 100 ACRE 0002 Finish Disking 80 ACRE 0003 Roller 80 ACRE 0004 Roller Crimper 180 ACRE 0005 Corn No Till Planting 20 ACRE 0006 Sunflower No Till Planting 20 ACRE 0007 Forage Soybean No Till Planting 40 ACRE 0008 Grain Sorghum (Milo) No Till Planting 20 ACRE 0009 Spring Millet No Till Planting 20 ACRE 0010 Summer Millet No Till Planting 20 ACRE 0011 Comb. Wheat/Oat/Winter Pea/Turnip No

Till Planting

1 ACRE

0012 Forage Soybean Broadcast Planting 1 ACRE 0013 Grain Sorghum (Milo) Broadcast Planting 1 ACRE 0014 Spring Millet Broadcast Planting 1 ACRE 0015 Summer Millet Broadcast Planting 1 ACRE 0016 Comb. Wheat/Oat/Winter Pea/Turnip

Broadcast Planting

80 ACRE

0017 General Broadcast Fertilizing 20 ACRE 0018 Corn Broadcast Fertilizing 20 ACRE 0019 Forage Soybean Fertilizing 40 ACRE 0020 Grain Sorghum (Milo) Broadcast

Fertilizing

20 ACRE

0021 Sunflower Broadcast Fertilizing 20 ACRE 0022 Winter Food Plot Broadcast Fertilizing 80 ACRE 0023 Lime Application 20 ACRE 0024 No Till Planting or Drilling Round-Up

Application

100 ACRE

0025 Round-Up Boom Spraying Application 100 ACRE 0026 Remedy Application 15 ACRE 0027 Mowing 400 ACRE 0028 Gate Maintenance (16-feet length) 56 Each 0029 Gate Maintenance (24-32 feet length) 35 Each 0030 Gate Spraying (16-feet length) 56 Each 0031 Gate Spraying (24-32 feet length) 35 Each 0032 Paint and Inspect Boundary Line 0 Miles 0033 Inspect Boundary Line 80

Miles

0034 New Boundary Line Creation 2 Miles 0035 Tree Planting (Up to 5-gallon container) 5 Each 0036 Tree Planting (5-gallon to 15-gallon container)

Each

0037 Seedling Planting 1 ACRE

Edge Feathering 10 ACRE

TSI Cut and Spray 100 ACRE

Nature Trail Mowing 14 Miles

0041 Nature/Interpretive Trail Maintenance 40 Miles

Lands Management at Wappapello Lake

OPTION YEAR 1

1001 Cut Disking 100 ACRE 1002 Finish Disking 80 ACRE 1003 Roller 80 ACRE 1004 Roller Crimper 180 ACRE 1005 Corn No Till Planting 20 ACRE 1006 Sunflower No Till Planting 20 ACRE 1007 Forage Soybean No Till Planting 40 ACRE 1008 Grain Sorghum (Milo) No Till Planting 20 ACRE 1009 Spring Millet No Till Planting 20 ACRE 1010 Summer Millet No Till Planting 20 ACRE 1011 Comb. Wheat/Oat/Winter Pea/Turnip No

Till Planting

1 ACRE

1012 Forage Soybean Broadcast Planting 1 ACRE 1013 Grain Sorghum (Milo) Broadcast Planting 1 ACRE 1014 Spring Millet Broadcast Planting 1 ACRE 1015 Summer Millet Broadcast Planting 1 ACRE 1016 Comb. Wheat/Oat/Winter Pea/Turnip

Broadcast Planting

80 ACRE

1017 General Broadcast Fertilizing 20 ACRE 1018 Corn Broadcast Fertilizing 20 ACRE 1019 Forage Soybean Fertilizing 40 ACRE 1020 Grain Sorghum (Milo) Broadcast

Fertilizing

20 ACRE

1021 Sunflower Broadcast Fertilizing 20 ACRE 1022 Winter Food Plot Broadcast Fertilizing 80 ACRE 1023 Lime Application 20 ACRE

1024 No Till Planting or Drilling Round-Up Application

100 ACRE

1025 Round-Up Boom Spraying Application 100 ACRE 1026 Remedy Application 15 ACRE 1027 Mowing 400 ACRE 1028 Gate Maintenance (16-feet length) 56 Each 1029 Gate Maintenance (24-32 feet length) 35 Each 1030 Gate Spraying (16-feet length) 56 Each 1031 Gate Spraying (24-32 feet length) 35 Each 1032 Paint and Inspect Boundary Line 0 Miles 1033 Inspect Boundary Line 80

1034 New Boundary Line Creation 2 Miles 1035 Tree Planting (Up to 5-gallon container) 5 Each 1036 Tree Planting (5-gallon to 15-gallon

1037 Seedling Planting 1 ACRE

1041 Nature/Interpretive Trail Maintenance 40 Miles

OPTION YEAR 2

2001 Cut Disking 100 ACRE 2002 Finish Disking 80 ACRE 2003 Roller 80 ACRE 2004 Roller Crimper 180 ACRE 2005 Corn No Till Planting 20 ACRE 2006 Sunflower No Till Planting 20 ACRE 2007 Forage Soybean No Till Planting 40 ACRE 2008 Grain Sorghum (Milo) No Till Planting 20 ACRE 2009 Spring Millet No Till Planting 20 ACRE 2010 Summer Millet No Till Planting 20 ACRE 2011 Comb. Wheat/Oat/Winter Pea/Turnip No

Till Planting

1 ACRE

2012 Forage Soybean Broadcast Planting 1 ACRE 2013 Grain Sorghum (Milo) Broadcast Planting 1 ACRE 2014 Spring Millet Broadcast Planting 1 ACRE

2015 Summer Millet Broadcast Planting 1 ACRE 2016 Comb. Wheat/Oat/Winter Pea/Turnip

Broadcast Planting

80 ACRE

2017 General Broadcast Fertilizing 20 ACRE 2018 Corn Broadcast Fertilizing 20 ACRE 2019 Forage Soybean Fertilizing 40 ACRE 2020 Grain Sorghum (Milo) Broadcast

Fertilizing

20 ACRE

2021 Sunflower Broadcast Fertilizing 20 ACRE 2022 Winter Food Plot Broadcast Fertilizing 80 ACRE 2023 Lime Application 20 ACRE 2024 No Till Planting or Drilling Round-Up

Application

100 ACRE

2025 Round-Up Boom Spraying Application 100 ACRE 2026 Remedy Application 15 ACRE 2027 Mowing 400 ACRE 2028 Gate Maintenance (16-feet length) 56 Each 2029 Gate Maintenance (24-32 feet length) 35 Each 2030 Gate Spraying (16-feet length) 56 Each 2031 Gate Spraying (24-32 feet length) 35 Each 2032 Paint and Inspect Boundary Line 80 Miles 2033 Inspect Boundary Line 0

2034 New Boundary Line Creation 2 Miles 2035 Tree Planting (Up to 5-gallon container) 5 Each 2036 Tree Planting (5-gallon to 15-gallon

2037 Seedling Planting 1 ACRE

2041 Nature/Interpretive Trail Maintenance 40 Miles

OPTION YEAR 3

3001 Cut Disking 100 ACRE 3002 Finish Disking 80 ACRE 3003 Roller 80 ACRE 3004 Roller Crimper 180 ACRE

3005 Corn No Till Planting 20 ACRE 3006 Sunflower No Till Planting 20 ACRE 3007 Forage Soybean No Till Planting 40 ACRE 3008 Grain Sorghum (Milo) No Till Planting 20 ACRE 3009 Spring Millet No Till Planting 20 ACRE 3010 Summer Millet No Till Planting 20 ACRE 3011 Comb. Wheat/Oat/Winter Pea/Turnip No

Till Planting

1 ACRE

3012 Forage Soybean Broadcast Planting 1 ACRE 3013 Grain Sorghum (Milo) Broadcast Planting 1 ACRE 3014 Spring Millet Broadcast Planting 1 ACRE 3015 Summer Millet Broadcast Planting 1 ACRE 3016 Comb. Wheat/Oat/Winter Pea/Turnip

Broadcast Planting

80 ACRE

3017 General Broadcast Fertilizing 20 ACRE 3018 Corn Broadcast Fertilizing 20 ACRE 3019 Forage Soybean Fertilizing 40 ACRE 3020 Grain Sorghum (Milo) Broadcast

Fertilizing

20 ACRE

3021 Sunflower Broadcast Fertilizing 20 ACRE 3022 Winter Food Plot Broadcast Fertilizing 80 ACRE 3023 Lime Application 20 ACRE 3024 No Till Planting or Drilling Round-Up

Application

100 ACRE

3025 Round-Up Boom Spraying Application 100 ACRE 3026 Remedy Application 15 ACRE 3027 Mowing 400 ACRE 3028 Gate Maintenance (16-feet length) 56 Each 3029 Gate Maintenance (24-32 feet length) 35 Each 3030 Gate Spraying (16-feet length) 56 Each 3031 Gate Spraying (24-32 feet length) 35 Each 3032 Paint and Inspect Boundary Line 80 Miles 3033 Inspect Boundary Line 0

3034 New Boundary Line Creation 2 Miles 3035 Tree Planting (Up to 5-gallon container) 5 Each 3036 Tree Planting (5-gallon to 15-gallon

3037 Seedling Planting 1 ACRE

3041 Nature/Interpretive Trail Maintenance 40 Miles

OPTION YEAR 4

4001 Cut Disking 100 ACRE 4002 Finish Disking 80 ACRE 4003 Roller 80 ACRE 4004 Roller Crimper 180 ACRE 4005 Corn No Till Planting 20 ACRE 4006 Sunflower No Till Planting 20 ACRE 4007 Forage Soybean No Till Planting 40 ACRE 4008 Grain Sorghum (Milo) No Till Planting 20 ACRE 4009 Spring Millet No Till Planting 20 ACRE 4010 Summer Millet No Till Planting 20 ACRE 4011 Comb. Wheat/Oat/Winter Pea/Turnip No

Till Planting

1 ACRE

4012 Forage Soybean Broadcast Planting 1 ACRE 4013 Grain Sorghum (Milo) Broadcast Planting 1 ACRE 4014 Spring Millet Broadcast Planting 1 ACRE 4015 Summer Millet Broadcast Planting 1 ACRE 4016 Comb. Wheat/Oat/Winter Pea/Turnip

Broadcast Planting

80 ACRE

4017 General Broadcast Fertilizing 20 ACRE 4018 Corn Broadcast Fertilizing 20 ACRE 4019 Forage Soybean Fertilizing 40 ACRE 4020 Grain Sorghum (Milo) Broadcast

Fertilizing

20 ACRE

4021 Sunflower Broadcast Fertilizing 20 ACRE 4022 Winter Food Plot Broadcast Fertilizing 80 ACRE 4023 Lime Application 20 ACRE 4024 No Till Planting or Drilling Round-Up

Application

100 ACRE

4025 Round-Up Boom Spraying Application 100 ACRE 4026 Remedy Application 15 ACRE 4027 Mowing 400 ACRE 4028 Gate Maintenance (16-feet length) 56 Each 4029 Gate Maintenance (24-32 feet length) 35 Each 4030 Gate Spraying (16-feet length) 56 Each 4031 Gate Spraying (24-32 feet length) 35 Each 4032 Paint and Inspect Boundary Line 80 Miles 4033 Inspect Boundary Line 0

4034 New Boundary Line Creation 2 Miles 4035 Tree Planting (Up to 5-gallon container) 5 Each 4036 Tree Planting (5-gallon to 15-gallon

4037 Seedling Planting 1 ACRE

4041 Nature/Interpretive Trail Maintenance 40 Miles

Base Year: CLIN 0001 ( Tasks 0001 –0041) $__________ Option year 1: CLIN 1001 (Tasks 1001 – 1041) $__________ Option year 2: CLIN 2001 (Tasks 2001 – 2041) $__________ Option year 3: CLIN 3001 (Tasks 3001 – 3041) $__________ Option year 4: CLIN 4001 (Tasks 4001 – 4041) $__________

Contract Total $__________

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

1. Scope:

The vendor shall provide all equipment, labor, supervision, materials, seed, fertilizer, chemical, and supplies to conduct lands management activities at Wappapello Lake, Wappapello, Missouri. Vendor will provide technical proposal detailing the ability to provide the necessary tools, labor, supervision, equipment (including list and photographs), supplies, and transportation to provide the necessary services outlined within this contract.

Method of quality assurance by the government will be 100% inspection of all completed work.

2. Applicable Documents:

All work shall be performed in accordance with safety requirements set forth in Corps of Engineers Manual, EM 385-1-1 entitled, “Safety and Health Requirements Manual”. EM 385-1-1 and its changes are available at: https://www.usace.army.mil/Missions/Safety-and-Occupational-Health/Safety-and-Health- Requirements-Manual/ The Contractor shall take any necessary precautions to protect and preserve all cultural/historic properties within his or her work areas.

The Contractor shall, without any additional expense to the Government, be responsible for obtaining any necessary licenses or permits, and shall comply with all applicable Federal, State, and Local Laws, codes, and regulations in connection with the performance of this contract.

The Contractor shall perform all work in accordance with applicable publications. They include but are not limited to:

MANUFACTURER’S RECOMMENDATIONS:

- For equipment and materials used by the Contractor

- Manuals supplied for Government Furnished Equipment

- Operating/Maintenance Manuals

INDUSTRIAL STANDARDS AND CODES (LATEST EDITIONS):

- American National Standards Institute

- EM 385-1-1, General Safety and Health Manual of the U.S. Army Corps of Engineers

- American Association of Nurserymen, Inc.

- OSHA Safety Standards

- Forestry Handbook, Second Edition

- American National Standard Institute, Standard 260.11973 “American Standard for Nursery Stock”

3. Performance Requirements/Tasks:

1. SPECIFICATIONS FOR LAND MANAGEMENT – WORK ITEMS

1.1 Cut Disking – Using a heavy cutting/bog-type disk, contractor will cut all soil and surface materials a minimum of 6” deep, thoroughly incorporating all materials. Cut disking may require contractor to cut fields with woody vegetation up to and including 3” in diameter. This may require multiple trips across the field to achieve the desired results. Each pass must overlap the previous pass to avoid unturned fallow strips of soil and surface materials.

1.2 Finish Disking – Using a finish disk, contractor will cut all soil adequately enough that all soil and surface materials are finely turned under and that no clods greater than 2” exist on the planting surface. This may require multiple trips across the field to achieve the necessary result of the soil surface prior to planting.

When finish disking is being used to accomplish seedbed preparation prior to planting, contractor must plant within 48 hours of final finish disking pass. If rain falls occurs prior to planting operations, another finish disking pass will be required. Each pass must overlap the previous pass in order to avoid unturned fallow strips of soil and surface materials.

1.3 Roller – Using a roller, pulverizer, or other finish-type implement (approved by COR), contractor will thoroughly cut all surface soil to minimum clod size of no greater that 1” in diameter to prepare seedbed prior to planting. When roller is being used to accomplish seedbed preparation prior to planting, contractor must plant within 48 hours of roller implement being used. If rain falls occurs prior to planting operations, another finish disking pass will be required. Each pass must overlap the previous pass in order to avoid unturned fallow strips of soil and surface materials.

1.4 Roller Crimper – Using a roller crimper, cover crop crimper, or other crop/vegetation termination implement (must be approved by COR), contractor will crimp all standing vegetation/crops.

Contractor will ensure that all standing vegetation will be crimped completely flat and be sure to overlap rows to leave no strips of vegetation standing. When crimper is being used for seedbed preparation with any no till planting work items, contractor must crimp planted areas within 10 days after the planting.

1.5 Corn No Till Planting - Using no till practices the contractor will plant Round-Up Ready (or an alternate approved by the COR) corn seeds in rows spaced no less than 30” and no more than 36” apart, at rates, depths, and soil conditions specified by and in accordance with the manufacturer’s recommendations.

The crops cannot be planted before April 1st and must be planted before June 30th.

1.6 Sunflower No Till Planting – Using no till practices the contractor will plant certified Peredovek sunflower seed in rows spaced no less than 30” and no more than 36” apart, at rates, depths, and soil conditions specified by and in accordance with the manufacturer’s recommendations. The crops cannot be planted before April 1st and must be planted before May 31st.

1.7 Forage Soybean No Till Planting – Using no till practices, contractor will plant Round-Up Ready (or an alternate approved by the COR) forage soybean seed in rows spaced no less than 6” and no more than 12” apart, at rates, depths, and soil conditions specified by and in accordance with the manufacturer’s recommendations. The crops cannot be planted before May 15th and must be planted before July 15th.

1.8 Grain Sorghum (Milo) No Till Planting – Using no till practices, contractor will plant certified grain sorghum (milo) seed in rows spaced no less than 6” and no more than 12” apart, at rates, depths, and soil conditions specified by and in accordance with the manufacturer’s recommendations.

The crops cannot be planted before May 15th and must be planted before July 15th.

1.9 Spring Millet No Till Planting – Using no till practices, contractor will plant a COR-approved millet seed in rows spaced no less than 6” and no more than 12” apart, at rates, depths, and soil conditions specified by and in accordance with the manufacturer’s recommendations. The crops cannot be planted before May 1st and must be planted before June 30th.

1.10 Summer Millet No Till Planting – Using no till practices, contractor will plant a COR-approved millet seed in rows spaced no less than 6” and no more than 12” apart, at rates, depths, and soil conditions specified by and in accordance with the manufacturer’s recommendations. The crops cannot be planted before July 15th and must be planted before August 15th.

1.11 Combination Wheat/Oat/Winter Pea/Barkant Turnip No Till Planting – Using no till practices, contractor will plant a combination of wheat/oat/winter peas, and Barkant turnip seeds in rows spaced no less than 3” and no more than 6” apart at depths and soil conditions specified by and in accordance with the manufacturer’s recommendations. Rates planted per acre will be 50 pounds of both wheat and oats, 25 pounds of winter peas, and 2 lbs of Barkant turnips. The crops cannot be planted before August 15th and must be planted before October 1st.

1.12 Forage Soybean Broadcast Planting – Using a broadcast hopper, buggy or other seeder

(approved by COR), contractor will evenly broadcast plant Round-Up Ready ( or an alternate approved by the COR) forage soybean seed at rates per acre, depths, and soil conditions specified by and in accordance with the manufacturer’s recommendations. The crops cannot be planted before May 15th and must be planted before July 15th.

1.13 Grain Sorghum (Milo) Broadcast Planting – Using a broadcast hopper, buggy or other seeder (approved by COR), contractor will evenly broadcast plant certified grain sorghum (milo) seed at rates per acre, depths, and soil conditions specified by and in accordance with the manufacturer’s recommendations. The crops cannot be planted before May 15th and must be planted before July 15th.

W912P923R0011

1.14 Spring Millet Broadcast Planting – Using a broadcast hopper, buggy or other seeder (approved by COR), contractor will evenly broadcast plant millet seed at rates per acre, depths, and soil conditions specified by and in accordance with the manufacturer’s recommendations. The crops cannot be planted before May 1st and must be planted before June 30th.

1.15 Summer Millet Broadcast Planting – Using a broadcast hopper, buggy or other seeder

(approved by COR), contractor will evenly broadcast plant millet seed at rates per acre, depths, and soil conditions specified by and in accordance with the manufacturer’s recommendations. The crops cannot be planted before July 15th and must be planted before August 15th.

1.16 Combination Wheat/Oat/Winter Pea/Barkant Turnip Broadcast Planting – Using a broadcast hopper, buggy or other seeder (approved by COR), contractor will evenly broadcast a combination of wheat/oat/winter peas, and Barkant turnips at depths and soil conditions specified by and in accordance with the manufacturer’s recommendations. Rates planted per acre will be 50 pounds of both wheat and oats, 25 pounds of winter peas, and 2 lbs of Barkant turnips. The crops cannot be planted before August 15th and must be planted before October 1st.

1.17 General Broadcast Fertilizing -- Using a hopper-type buggy that evenly broadcasts fertilizer, contractor will apply 90-40-40 actual pounds of fertilizer per acre. Nitrogen must be treated to stop volatilization.

1.18 Corn Broadcast Fertilizing – Using a hopper-type buggy that evenly broadcasts fertilizer, contractor will apply 90-40-40 actual pounds of fertilizer per acre. Nitrogen must be treated to stop volatilization. Fertilizer must be applied within ten days of the crop planting.

1.19 Forage Soybean Broadcast Fertilizing – Using a hopper-type buggy that evenly broadcasts fertilizer, contractor will apply 10-24-45 actual pounds of fertilizer per acre. Nitrogen must be treated to stop volatilization. Fertilizer must be applied within ten days of the crop planting.

1.20 Grain Sorghum (Milo) Broadcast Fertilizing – Using a hopper-type buggy that evenly broadcasts fertilizer, contractor will apply 80-40-20 actual pounds of fertilizer per acre. Nitrogen must be treated to stop volatilization. Fertilizer must be applied within ten days of crop planting.

1.21 Sunflower Broadcast Fertilizing – Using a hopper-type buggy that evenly broadcasts fertilizer, contractor will apply 80-40-40 actual pounds of fertilizer per acre. Nitrogen must be treated to stop

1.22 Winter Food Plot Broadcast Fertilizing – Using a hopper-type buggy that evenly broadcasts fertilizer, contractor will apply 100-50-50 actual pounds of fertilizer per acre. Nitrogen must be treated to stop

1.23 Lime Application – Using a proper mechanism to apply, contractor will supply and evenly broadcast the specified amount of crushed agricultural lime with minimum guaranteed ENM (effective neutralizing material) of 500 pounds per ton. Liming may be performed on both cultivated/tilled ground, as well as fallow ground. Fallow ground application may require the ability to spread through tall vegetation conditions.

1.24 No Till Planting or Drilling Round-Up (or approved alternate) Application

– Using a boom-type sprayer, contractor shall supply and evenly apply the required rate of Round-Up broad spectrum herbicide, or an approved alternate, to designated crop fields. Herbicide must be applied to crop fields at a maximum of 10 days prior of being planted. Contractor must have the proper pesticide applicator license as required by the Missouri Department of Agriculture and provide an up-to-date Safety Data Sheet (SDS) to the project office. Contractor must also maintain a copy of the SDS and share with personnel that are involved with application of chemical prior to unpacking or mixing.

1.25 Round-Up Boom Spraying (or approved alternate) Application - Using a boom-type sprayer, contractor shall supply and evenly apply the required rate of Round- Up broad spectrum herbicide, or a COR approved alternate, to designated areas. Herbicide must be applied within 10 days of the date designated by the COR. The Contractor must have the proper pesticide applicator license as required by the Missouri Department of Agriculture and provide an up-to-date Safety Data Sheet (SDS) to the project office. Contractor must also maintain a copy of SDS and share with personnel that are involved with application of chemical prior to unpacking or mixing.

1.26 Remedy (or approved alternate) Application - Using a boom-type sprayer, contractor shall supply and evenly apply the required rate of Remedy broad leaf herbicide, or an approved alternate, to designated areas of Sericea Lespedeza or other species designated by the COR. Herbicide must be applied within 10 days of the date designated by the COR. Contractor must have the proper pesticide applicator license as required by the Missouri Department of Agriculture and provide an up-to-date Safety Data Sheet (SDS) to the project office. Contractor must also maintain a copy of SDS and share with personnel that are involved with application of chemical.

1.27 Mowing – Using a bush-hog or other approved mowing mechanism, contractor will conduct succession mowing activities to cut all herbaceous and woody vegetation, up to and including 3 ½” in diameter and to a height not to exceed 10”. Each pass must overlap the previous pass in order to avoid leaving strips of vegetation.

1.28 Gate Maintenance (16-feet length) – Weed eat all grass and weeds around gates in a 40’ by 20’ area (20’ of depth on both sides of the gate) to encompass the gate arm, gate post, latch post and keeper post.

Grass and weeds should be no more than 2” high after weed eating. All overhanging limbs within the 40’ by 20’ area should be cut back to the main stem of the tree up to 12’ above the ground surface. Each grease fitting should be adequately serviced with #2 multipurpose lubricating-type grease into any hinges where the gate arm attaches to the gate post. Non-working grease fittings will be replaced by contractor.

1.29 Gate Maintenance (24-32 feet length) – Weed eat all grass and weeds around gate area in an approximate 40’ by 36’ area (20’ of depth on both sides of the gate) to encompass the gate arm, gate post, latch post and keeper post. Grass and weeds should be no more than 2” high after weed eating. All overhanging limbs within the 28’ by 16’ area should be cut back to the main stem of the tree up to 12’ above the ground surface. Each grease fitting should be adequately serviced with #2 multipurpose lubricating-type grease into any hinges where the gate arm attaches to the gate post. Non-working grease fittings will be replaced by contractor.

1.30 Spraying Gates (16-feet length) – Using a sprayer, contractor shall supply and evenly apply the required rate of Round-Up broad spectrum herbicide, or an approved alternate, 40’ by 20’ area (20’ of depth on both sides of the gate) to encompass the gate arm, gate post, latch post and keeper post. Contractor must have the proper pesticide applicator license as required by the Missouri Department of Agriculture and provide an up-to-date Safety Data Sheet (SDS) to the project office. Contractor must also maintain a copy of SDS and share with personnel that are involved with application of chemical.

1.31 Spraying Gates (24-32 feet length) – Using a sprayer, contractor shall supply and evenly apply the required rate of Round-Up broad spectrum herbicide, or an approved alternate, in an approximate 40’ by 36’ area (20’ of depth on both sides of the gate) to encompass the gate arm, gate post, latch post and keeper post. Contractor must have the proper pesticide applicator license as required by the Missouri Department of Agriculture and provide an up-to-date Safety Data Sheet (SDS) to the project office. Contractor must also maintain a copy of SDS and share with personnel that are involved with application of chemical.

1.32 Paint and Inspect Boundary Line – Contractor will furnish all labor, equipment, and transportation necessary to accomplish boundary line painting and inspection. Government will provide boundary paint, posts, signs, bolts, nuts, and washers, and inspection forms to perform tasks associated with painting and maintenance activities. Contractor will verify that there is a steel post driven into the ground that is level and has the appropriate sign double-bolted and installed on the uppermost portion of the post. The signs must run parallel to the boundary line. A post and sign must be placed a maximum of 200’ apart and 50’ apart on each side of every monument and at the monument. Any missing or vandalized signs will be replaced along the boundary line and at every monument. In areas where the boundary line crosses a public road, a sign and post should be placed in plain view just off the maintained right-of-way for easy visibility. Most monuments are located under small rock piles at boundary corners, which must be removed in order to be verified and recorded on the inspection forms. All rocks will be painted prior to placing back around the monument;

however care will be used to keep paint off the face of monuments. Each boundary post will also be painted to allow for easier visibility. Tree painting will consist of using draw knives to smooth the outer bark of trees by removing all loose bark, lichens, furrows, and any other imperfections to allow for a smooth painting surface.

However, care should be used to prevent damaging the inner bark of trees to be painted. A horizontal band will be painted 4’ from the ground around the diameter of each tree and shall be no less than 4” or no greater than 6” wide. A vertical band will be painted perpendicular to the horizontal bands indicating you are entering COE property and shall be no less than 4” or greater than 6” wide and no less than 12” tall. Paint will be applied in a uniform manner and in sufficient amounts to ensure complete coverage of the smoothed area of the bark, while also using care to prevent large paint runs down the bark of the tree. Only trees on the government side of the property line will be painted and they must be no more than 10’ away from boundary line and no more than 30’ can separate each painted tree. All trees painted must be living and shall be no less than 4” in diameter at 4’ high from ground level. Using the supplied inspection forms, contractor must note and report any missing boundary post or monuments, encroachments onto government property, unauthorized roads and trails, tree cutting, tree stands, any structures, trash piles, dig-sites, etc. and provide GPS coordinates of the encroachment area. Care must be exercised while performing work activities to not trespass onto private property.

1.33 Inspect Boundary Line – Contractor will furnish all labor, equipment, and transportation necessary to accomplish boundary line inspection. Government will provide boundary posts, signs, bolts, nuts, and washers, and inspection forms to perform tasks associated with painting and maintenance activities.

Contractor will verify that there is a steel post driven into the ground that is level and has the appropriate sign double-bolted and installed on the uppermost portion of the post. The signs must run parallel to the boundary line. A post and sign must be placed a maximum of 200’ apart and 50’ apart on each side of every monument and at the monument. Any missing or vandalized signs will be replaced along the boundary line and at every monument. In areas where the boundary line crosses a public road, a sign and post should be placed in plain view just off the maintained right-of-way for easy visibility. Most monuments are located under small rock piles at boundary corners, which must be removed in order to be verified and recorded on the inspection forms.

Using the supplied inspection forms, contractor must note and report any missing boundary post or monuments, encroachments onto government property, unauthorized roads and trails, tree cutting, tree stands, any structures, trash piles, dig-sites, etc. and provide GPS coordinates of the encroachment area. Care must be exercised while performing work activities to not trespass onto private property.

1.34 New Boundary Line Creation - Contractor will furnish all labor, equipment, and transportation necessary to accomplish new boundary line creation. Government will provide location maps, boundary paint, posts, signs, bolts, nuts, washers and inspection forms to perform tasks associated with painting and signing activities. Contractor will ensure that there is a steel post driven at each pre-established survey lathe that will be placed a maximum of 200’ apart along the boundary line and 50’ apart on each side of every monument and at the monument. The post must be driven level into the ground at a minimum depth of 1.’ The appropriate sign will be installed with two bolts on the uppermost portion of the of the driven boundary post. The signs must run parallel to the boundary line. In areas where the boundary line crosses a public road, a pre-established survey lathe will indicate where a sign and post should be placed in plain view just off the maintained right-of-way on both sides for easy visibility. Contractor will place rock piles with a minimum of 5 rocks that are a minimum of 5” in diameter at all monuments. All rocks will be painted prior to placing around monument ensuring care will be used to keep paint off of the face of monuments. Each boundary post will also be painted to allow for easier visibility. Tree painting will consist of using draw knives to smooth the outer bark of trees by removing all loose bark, lichens, furrows, and any other imperfections to allow for a smooth painting surface. However, care should be used to prevent damaging the inner bark of trees to be painted. A horizontal band will be painted 4’ from the ground around the diameter of each tree and shall be no less than 4” or no greater than 6” wide. A vertical band will be painted perpendicular to the horizontal bands indicating you are entering COE property and shall be no less than 4” or greater than 6” wide and no less than 12” tall.

Paint will be applied in a uniform manner and in sufficient amounts to ensure complete coverage of the smoothed area of the bark, while also using care to prevent large paint runs down the bark of the tree. Only trees on the government side of the property line will be painted and they must be no more than 10’ away from boundary line and no more than 30’ can separate each painted tree. All trees painted must be living and shall be no less than 4” in diameter at 4’ high from ground level.

1.35 Tree Planting (up to 5-gallon container) – Trees will be planted in accordance with standard nursery procedures or via approved tree planting equipment. Holes dug for tree planting must be of adequate size and consist of a flat bottom and non- glazed sides. If glazing of the sides occurs, a scarification process must be conducted prior to tree planting. Soil must be placed back around tree to fill all void spaces and must be tamped down with foot or other tamping equipment. Care will be used to not plant trees too deep or too shallow and only one tree will be planted per hole dug. Any obstructions at or below ground surface that is encountered will be removed, if at all practicable. If the obstruction cannot be removed an alternate planting location may be selected with approval of the COR. All plastic identifying tags or flagging must be removed from the tree upon completion of planting. A wooden stake will be driven within 1’ of each tree. The stake must be a minimum dimension of 1” by 2” and must be driven in the ground a minimum of 12” and have a minimum of 4’ above the ground. The top 6” of the stake will be painted with a highly visible neon orange paint to identifying tree locations. Trees will need to be planted in linear rows at specified distances as directed by the government for ease of maintenance. The government will provide the trees.

1.36 Tree Planting (5-gallon to 15-gallon container) – Trees will be planted in accordance with standard nursery procedures or via approved tree planting equipment. Holes dug for tree planting must be of adequate size and consist of a flat bottom and non- glazed sides. If glazing of the sides occurs, a scarification process must be conducted prior to tree planting. Soil must be placed back around tree to fill all void spaces and must be tamped down with foot or other tamping equipment. Care will be used to not plant trees too deep or too shallow and only one tree will be planted per hole dug. Any obstructions at or below ground surface that is encountered will be removed, if at all practicable. If the obstruction cannot be removed an alternate planting location may be selected with approval of the COR. All plastic identifying tags or flagging must be removed from the tree upon completion of planting. A wooden stake will be driven within 1’ of each tree. The stake must be a minimum dimension of 1” by 2” and must be driven in the ground a minimum of 12” and have a minimum of 4’ above the ground. The top 6” of the stake will be painted with a highly visible neon orange paint to identifying tree locations. Trees will need to be planted in linear rows at specified distances as directed by the government for ease of maintenance. The government will provide the trees.

1.37 Seedling Planting – Bare root seedlings will be planted according to standard spacing and nursery procedures unless otherwise directed by COR. Seedlings may be planted via hand-planting (dibble bar or other hand tool) or via approved tree planting equipment. Trees will need to be planted in linear rows at specified distances as directed by the government for ease of maintenance. The government will provide the trees and may provide dibble bars.

1.38 Edge Feathering – All woody stems within designated areas such as but not limited to wooded field edges, wooded islands, and/or field buffers will be felled. Designated area dimensions will vary in length and depths depending on the landscape conditions. All trees will be felled and placed back within the existing drip line, ensuring that all tree debris is removed from field edges. Contractor will fell trees to prevent damage to any adjacent structures, facilities or property. Stumps shall be cut no higher than 12” from ground level. The contractor shall be required to treat stumps with an approved stump and brush killer within 60 minutes of felling the tree and in accordance with manufacturer’s label. Herbicide solution must contain spray indicator dye added at the manufacturers recommended rate to verify application. No lodged trees will be left and trees that are dead will NOT be cut down. No wood products will be removed from Government land. Contractor must have the proper pesticide applicator license as required by the Missouri Department of Agriculture and provide an up-to-date Safety Data Sheet (SDS) to the project office. Contractor must also maintain a copy of SDS and share with personnel that are involved with application of chemical. Edge feathering activities must be completed between November 1st to March 31st.

1.39 TSI Cut and Spray – All tree/shrub species with a minimum diameter of 1” to a maximum of 9” at 4’ from ground level will be cut no higher than 12” from the ground. All stumps, except for any oak species, will be treated with a forestry-grade stump and brush killer (approved by the COR) immediately upon cutting in accordance with the manufacturer’s label. Herbicide will be generously sprayed or brushed along the entire outer cambium areas to ensure proper and adequate uptake into the plant. Herbicide solution must contain spray indicator dye added at the manufacturers recommended rate to verify application. Trees will not be left lodged against other trees and care to prevent damage to surrounding trees will be used. No wood products will be removed from Government land. Contractor must have the proper pesticide applicator license as required by the Missouri Department of Agriculture and provide an up-to-date Safety Data Sheet (SDS) to the project office. Contractor must also maintain a copy of SDS and share with personnel that are involved with application of chemical. TSI activities must be completed between November 1st and March 31st.

1.40 Nature Trail Mowing – In areas specified by the government, mow trail to a minimum width of

4’ and a maximum width of 6’ and to a maximum height of 6”. Contractor will use extra caution in wet areas and repair trail if damaged during mowing. Contractor will remove and replace carsonite post with proper plaques where damaged or missing to ensure that trails are clearly navigable. Carsonite posts, plaques and other signage will be supplied by the government.

1.41 Nature/Interpretive Trail Maintenance - Remove all parcels of litter on and along the trail and within 10’ of trail edge. Inspect and ensure proper signage along the trail to include directional and/or designated signs and plaques are visible every 100 yards. Plaques that are damaged or worn will be replaced.

Reflective trail plaques will be nailed to trees utilizing 2” aluminum nails at a height of 5’ from the ground and driven only deep enough to hold the plaque to allow for tree growth. Any plaques that have grown into the tree should be removed and replaced with minimal damage to the tree. Inspect any interpretive signage or bulletin boards for damage, wear, graffiti or displacement. Ensure all exhibits are in place and have not been taken or removed. Contractor will replace carsonite post and associated signage where damaged or missing.

Using an approved wasp killer remove all wasp’s nests from bulletin boards, benches, tunnels and signs.

Inspections sheets, carsonite posts, plaques, nails and other signage will be supplied by the government. Trees that have fallen over the trail will be removed from the trail at a minimum width of 6’. Tree branches protruding into the trail will be cut back to a minimum width of 6’ wide and 10’ tall. Inspect trail base to include wood chips, gravel, and/or chat to ensure they provide a sufficient covering tread for the trail. Note areas that require additional material. Inspect all water bars for adequate footing, adequate surface materials, and rotten or damaged wood products. Report areas that require additional materials. Provide inspection reports to COR within 7 days of completion of trail maintenance.

4. Required Insurance:

As required by the Contract Clause entitled “Insurance-Work on a Government Installation”, the Contractor shall furnish to the Contracting Officer, prior to the commencement of work, a certificate or written statement as evidence of the minimum insurance listed below. The Contractor shall procure and maintain such types and amounts of insurance during the entire period of his/her performance under this contract. The Contractor shall assure that the certificate or written statement is in aforementioned Contract Clause.

(1) Workmen’s Compensation – Amounts required by applicable jurisdictional statutes.

(2) Employer’s Liability Insurance - $1,000,000

(3) Comprehensive General Liability Insurance – (No property damage liability insurance is required).

Bodily Injury - $500,000 per occurrence

(4) Comprehensive Automobile Insurance Bodily Injury - $200,000 each person $500,000 each accident Property Damage - $20,000 each accident

Certificates of insurance should be submitted to the following address:

Department of the Army St. Louis District, Corps of Engineers Wappapello Lake Management Office 10992 Hwy T Wappapello Mo. 63966-9603

5. Quality Control:

The Contractor shall provide a written description of the quality control system to include identification of the commercial practices and procedures to be used. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-performance and continual repeat of defective service does not occur. The Contractor shall submit a written quality control plan to the COR for approval. The Contractor shall submit the plan no later than the post-award conference. The plan shall specifically address the Contractor’s strategy to provide quality workmanship, continual process improvement and for correcting deficiencies as required.

6. Measurement for Payment

6.1 The COR may require that all work which fails to provide the desired results as specified in the Performance Work Statement be redone.

6.2 If the contractor fails to correct work that does not meet the specifications in the Performance Work Statement, payment may not be rendered for said work.

7. Invoice Requirements Upon completion of work activities, the Vendor shall supply an invoice for payment of rendered services. The invoice shall include the following: 1) Date, 2) Contract Number, 3) Contractor Name, 4) Contractor Address and Phone Number, 5) Description of services provided to the Government-include line item used ie… disking, mowing, gate maintenance and units used ie…acres, miles, number of gates and unit price. 6) total price billed, 7) total contract price, 8) total to complete and 9) Contractor signature.

8. Period of Performance:

The work under this contract shall be performed during the contract/work period of 1 base year and 4 ordering periods from the date award.

9. Security Requirements The Contractor shall be responsible for maintaining recreation area security during the performance of this contract. The Contractor shall lock gates to recreation areas that are closed to the public while in areas and upon departure from areas.

9.1 Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

9.2 For contractors Not requiring Common Access Card (CAC). Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

9.3 Suspicious Activity Reporting Training. The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.

9.4 Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

WAGE RATE DETERMINATION

"REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 2015-5101 Daniel W. Simms Division of | Revision No.: 20 Director Wage Determinations| Date Of Last Revision: 12/27/2022

Note: Contracts subject to the Service Contract Act are generally required to pay at least the applicable minimum wage rate required under Executive Order

14026 or Executive Order 13658.

|If the contract is entered into on or |Executive Order 14026 generally applies to | |after January 30, 2022, or the |the contract. | |contract is renewed or extended (e.g., |The contractor must pay all covered workers | |an option is exercised) on or after |at least $16.20 per hour (or the applicable | |January 30, 2022: |wage rate listed on this wage…