A21 - (B) Contractor Quote Sheet.pdf

PDF 166 KB Posted

Attached to
Stilling Basin Stoplog Fabrication for B. Everett Jordan Dam and Lake
Solicitation number
W912PM23Q0016
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Quote Sheet for B. Everett Jordan Dam and Lake Stoplog Fabrication

Contractor/Offeror:

Total Price:

Discount Terms:

The Contractor is required to sign this document and return one (1) copy together with your quote and technical package, to the issuing Office. The Contractor agrees to furnish and deliver all items set forth or otherwise identified above and on any addition sheets subject to the Terms and Conditions specified herein.

Signature of Offeror/Contractor:

Name and Title of Signer (Type or Print)

Date Signed:

Contractor Quote Sheet for B. Everett Jordan Dam and Lake Stoplog Fabrication

ITEM SUPPLIES/SERVICES UNIT UNIT PRICE AMOUNT

B. Everett Jordan Dam and Lake Stoplog Fabrication, Chatham County, NC

The Contractor shall fabricate, assemble, paint, and deliver two hydraulic steel structures. The work will primarily consist of two tasks: 1) fabricating and assembling two (2) stoplog structures; and 2) shipment to B. Everett Jordan Dam. All work will be performed in accordance with the contract drawings and specifications. Work also involves preparing final “As-Built” documents.

In accordance with the Specifications and Drawings.

THIS ITEM IS NOT PRICED.

CLIN# DESCRIPTION QTY UNIT UNIT COST TOTAL COST

0001 Fabrication of Two (2) Stoplog Units 1 Job

Final “As-Built” Documents

1 Job

Shipment and Delivery

1 Job

TOTAL ESTIMATE =

File details come from the government source that posted it. Updated .