A21 - (B) Contractor Quote Sheet.pdf
PDF 166 KB Posted
- Solicitation number
- W912PM23Q0016
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Quote Sheet for B. Everett Jordan Dam and Lake Stoplog Fabrication
Contractor/Offeror:
Total Price:
Discount Terms:
The Contractor is required to sign this document and return one (1) copy together with your quote and technical package, to the issuing Office. The Contractor agrees to furnish and deliver all items set forth or otherwise identified above and on any addition sheets subject to the Terms and Conditions specified herein.
Signature of Offeror/Contractor:
Name and Title of Signer (Type or Print)
Date Signed:
Contractor Quote Sheet for B. Everett Jordan Dam and Lake Stoplog Fabrication
ITEM SUPPLIES/SERVICES UNIT UNIT PRICE AMOUNT
B. Everett Jordan Dam and Lake Stoplog Fabrication, Chatham County, NC
The Contractor shall fabricate, assemble, paint, and deliver two hydraulic steel structures. The work will primarily consist of two tasks: 1) fabricating and assembling two (2) stoplog structures; and 2) shipment to B. Everett Jordan Dam. All work will be performed in accordance with the contract drawings and specifications. Work also involves preparing final “As-Built” documents.
In accordance with the Specifications and Drawings.
THIS ITEM IS NOT PRICED.
CLIN# DESCRIPTION QTY UNIT UNIT COST TOTAL COST
0001 Fabrication of Two (2) Stoplog Units 1 Job
Final “As-Built” Documents
1 Job
Shipment and Delivery
1 Job
TOTAL ESTIMATE =
File details come from the government source that posted it. Updated .