A20_20200728_A1_Pre_Solicitation_Draft_Summary_of_Work.pdf
PDF 19 KB Posted
- Solicitation number
- HQ003420R0027
- Issued by
-
DOD Washington Headquarters Service
About this file
This document provides a pre-solicitation notice and draft statement of work for a firm-fixed-price construction contract to complete the third phase of asbestos abatement and facility repairs at Site R in Adams County, Pennsylvania. The work includes cavity debris removal, replacement of wild water drainage systems, installation of crossover bridges and guardrails, roof repairs, and optional tasks for lighting replacement and siding repairs. The contract value is estimated between $10-25 million. Offerors must have an active SECRET facility security clearance and be able to safeguard classified information at that level. The solicitation is expected to release in early August 2020 with proposals due 30 days later and award by 30 September 2020. A pre-proposal site visit is mandatory for offerors to obtain controlled unclassified technical documents necessary for proposal preparation. The work is to be completed within one year of notice to proceed with optional tasks allowable for concurrent performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A05_DD_254_FILS_III_7_8_2020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-solicitation Draft Summary of Work HQ003420R0027 Site R Facility Integrity and Life Safety (FILS Phase 3)
Crosswalk Table for the CLINS & Technical Requirements (Options are listed in order of priority)
Requirement Technical Requirements
BASE
(CLIN 0001)
Asbestos/HAZMAT Abatement:
1) Cavity Debris Removal including legally disposing of all wastes.
2) Remove and dispose of existing wild water pans (assumed to be asbestos contaminated).
Provide temporary wild water control until rock bolts are repaired and wild water pans are replaced (see related items below) .
3) Clean Asbestos from Roof, Cavity & Siding including disposal of contaminated cleaning materials.
4) Perform bulk (Excluding roofing and siding - reference repair siding & roofing sections) asbestos abatement of existing asbestos containing materials (ACMs), particularly plumbing thermal system insulation (Base Effort).
Rock Bolts:
1) Inspection, classification and mapping
2) Repair existing Rock Bolts and install approved geo-grid as recommended by the contractor's Mining Engineer
3) Drill and Replace Rock Bolts and install approved geo-grid as recommended by the contractor's Mining Engineer Wild Water Pans & Drain System:
1) Replace wild water pans, gutters, leaders and provide connections to main storm water conveyance system in accordance with Weston Wild Water Drainage System design for ‘buildings’ A & B dated 3/20/2018.
Note: The design may be amended to include additional drainage leaders/risers to the south of the north ‘corridor’ at additional cost if found necessary.
Cross Over Bridges:
1) Design & install four (4) permanent Cross-Over Bridges that are appropriate pedestrian cross-over structures for maintenance & emergency personnel. The structures shall be built of approved fire-resistant materials meeting smoke development & flame spread criteria.
Demolish the temporary cross-over bridges being replaced by permanent.
Option 1
(CLIN 1001)
Asbestos/HAZMAT Abatement:
1) Repair roof leaks and Encapsulate Roof with previously approved ‘polar roof’ coating.
Option 2
(CLIN 2001)
Lighting System:
1) Design and replace existing lighting system in accordance with previous design iterations
Option 3
(CLIN 3001)
Safety Guardrails:
1) Design & install guardrails at roof edges.
Option 4
(CLIN 4001)
Siding:
1) Repair or replace deteriorated siding (Unit priced not to exceed 2% of the total siding area) and components necessary.
2) This work may include building components immediately adjacent to the siding including drip-edge, flashing materials and any other building systems that have been adversely affected by wild-water deterioration or other factors.