A2 South Kawishiwi Pavilion Specificatios.pdf
PDF 17 MB Posted
- Solicitation number
- 12445522Q0070
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A3 S.Kaw PAVILION Plans.pdf | ||
| NRE_Construction_RFQ_S.Kawishiwi.docx | DOCX document | |
| A1 DBA Wage Determination MN83 Lake County (2).pdf | ||
| 12445522Q0070 (4).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPERIOR NF SOUTH KAWISHIWI PAVILION 4/10/2021
000101 - 1
Superior National Forest – South Kawishiwi Pavilion
SPECIFICATIONS
TABLE OF CONTENTS 4/10/2021
DIVISION 01 – GENERAL REQUIREMENTS PAGE
SECTION 011000 PROJECT SUMMARY 02
SECTION 012000 - PRICE AND PAYMENT PROCEDURES 03
SECTION 012500 - SUBSTITUTION PROCEDURES 05
SECTION 012600 - CONTRACT MODIFICATION PROCEDURES 06
SECTION 013000 - ADMINISTRATIVE REQUIREMENTS 07
SECTION 014000 - QUALITY REQUIREMENTS 10
SECTION 014200 – REFERENCES 11
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS 12
SECTION 017000 - EXECUTION AND CLOSEOUT REQUIREMENTS 14
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 20
DIVISION 02 – EXISTING CONDITIONS
SECTION 024119 - SELECTIVE DEMOLITION 21
DIVISION 06 – WOOD, PLASTICS & COMPOSITES
SECTION 061000 - ROUGH CARPENTRY 22
SECTION 062000 – MISC. ROUGH CARPENTRY 23
DIVISION 09 – FINISHES
SECTION 099113 - EXTERIOR STAINING 26-30
APPENDIX
000101 - 2
SECTION 011000
PART 1 - GENERAL -PROJECT SUMMARY
1.1 PROJECT INFORMATION
A. Project Identification: South Kawishiwi Pavilion ramp construction & log repair
1. Project Location: South Kawishiwi Campground, 11 miles South of Ely MN. Along state
HWY 1
B. Project Description: The project consists of the following major items:
1. SPECIAL NOTE; This is an historic log building and all work must preserve the historic character of the building and site. The log repairs must follow the preservation guidelines established by the National Park Service Preservation Briefs.
2. Careful demolition of the existing East side porch and construct a new ADA compliant accessible ramp to the side entrance of the pavilion.
3. Repair (2) deteriorated logs of the log pavilion. One 9’6” section of 12” log and a 22’6” section of 16” sill log. There is an option to replace the entire section of sill log.
4. Replace the log rails on one side of the front porch to match existing.
1.2 WORK RESTRICTIONS
A. Contractor's Use of Premises: During construction, Contractor will have use of area indicated.
Contractor's use of premises is limited only by The Government’s right to perform work or employ other contractors on portions of Project and as follows:
1. Owner will occupy premises during construction. Perform construction only during normal working hours (8 AM to 5 PM) Monday thru Friday, other than holidays), unless otherwise agreed to in advance by Owner. Clean up work areas and return to usable condition at the end of each work period.
2. Driveways, Walkways, and Entrances: Keep driveways and entrances serving premises clear and available to Owner, The Government’s employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 8 a.m. to 5 p.m., Monday through Friday, unless otherwise indicated.
C. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor-air intakes.
000101 - 3
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
SECTION 012000 - PRICE AND PAYMENT PROCEDURES
PART 4 - GENERAL
4.1 ALLOWANCES
A. Advise Contracting Officer or Representative of the date when selection and purchase of each product or system described by an allowance must be completed to avoid delaying the Work.
B. At Contracting Officer or Representative's request, obtain proposals for each allowance for use in making final selections. Include recommendations that are relevant to performing the Work.
C. Purchase products and systems selected by Contracting Officer or Representative from the designated supplier.
D. Submit invoices or delivery slips to show actual quantities of materials delivered to the site for use in fulfillment of each allowance.
E. Unless otherwise indicated, Contractor's costs for receiving and handling at Project site, labor, installation, overhead and profit, and similar costs related to products and materials under allowance shall be included as part of the Contract Sum and not part of the allowance.
4.2 UNIT PRICES
A. Unit price is a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.
B. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.
C. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.
000101 - 4
4.3 ALTERNATES
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the Base Bid amount if Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
1. Alternates described in this Section are part of the Work only if enumerated in the Agreement.
2. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.
B. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
C. Notification: Immediately following award of the Contract, notify each party involved, in writing, whether alternates have been accepted, rejected, or deferred for later consideration.
4.4 PAYMENT PROCEDURES
A. Submit a Schedule of Values at least seven days before the initial Application for Payment. Break down the Contract Sum into at least one line item for each Specification Section in the Project Manual table of contents. Coordinate the schedule of values with Contractor's construction schedule.
B. Application for Payment Forms: Use forms acceptable to Contracting Officer as form for Applications for Payment.
C. Submit three copies of each application for payment according to the schedule established in Owner/Contractor Agreement.
1. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor.
2. With each Application for Payment, submit waivers of mechanic's liens from subcontractors, sub-subcontractors, and suppliers for construction period covered by the previous application.
3. Submit final Application for Payment with or preceded by conditional final waivers from every entity involved with performance of the Work covered by the application who is lawfully entitled to a lien.
END OF SECTION 012000
000101 - 5
SECTION 012500 - SUBSTITUTION PROCEDURES
PART 5 - GENERAL
5.1 SUBSTITUTION PROCEDURES
A. Substitutions include changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.
B. Substitution Requests: Submit three copies of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.
1. Identify product to be replaced and show compliance with requirements for substitutions.
Include a detailed comparison of significant qualities of proposed substitution with those of the Work specified, a list of changes needed to other parts of the Work required to accommodate proposed substitution, and any proposed changes in the Contract Sum or the Contract Time should the substitution be accepted.
C. Contracting Officer or Representative will review proposed substitutions and notify Contractor of their acceptance or rejection. If necessary, Contracting Officer or Representative will request additional information or documentation for evaluation.
1. Contracting Officer or Representative will notify Contractor of acceptance or rejection of proposed substitution within 2 work days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.
D. Do not submit unapproved substitutions on Shop Drawings submittals.
PART 6 - PRODUCTS (Not Used)
PART 7 - EXECUTION (Not Used)
END OF SECTION 012500
SECTION 012600 - CONTRACT MODIFICATION PROCEDURES
PART 8 - GENERAL
8.1 CONTRACT MODIFICATION PROCEDURES
A. Contracting Officer or Representative will issue supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time.
000101 - 6
B. Owner-Initiated Proposal Requests: Contracting Officer or Representative will issue a detailed description of proposed changes in the Work.
1. Proposal Requests are not instructions either to stop work in progress or to execute the proposed change.
2. Within the time specified in Proposal Request after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time.
C. Contractor-Initiated Proposals: If latent or changed conditions require modifications to the Contract, Contractor may initiate a claim by submitting a request for a change to Contracting Officer or Representative.
D. On The Government’s approval of a Proposal Request, Contracting Officer or Representative will issue a Change Order for signatures of Owner and Contractor for all changes to the Contract Sum or the Contract Time.
E. Contracting Officer or Representative may issue a Construction Change Directive. Construction Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.
1. Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the Contract Time.
F. Documentation: Maintain detailed records on a time and material basis of work required by the Construction Change Directive. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.
PART 9 - PRODUCTS (Not Used)
PART 10 - EXECUTION (Not Used)
END OF SECTION 012600
SECTION 013000 - ADMINISTRATIVE REQUIREMENTS
PART 11 - GENERAL
11.1 PROJECT MANAGEMENT AND COORDINATION
A. Subcontract List: Submit a written summary identifying individuals or firms proposed for each portion of the Work.
B. Key Personnel Names: Within 15 days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site.
List e-mail addresses and telephone numbers.
000101 - 7
C. Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work.
D. Requests for Information (RFIs): On discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI. Use forms acceptable to Contracting Officer.
E. Schedule and conduct progress meetings at Project site at weekly intervals. Notify Owner and Contracting Officer or Representative of meeting dates and times. Require attendance of each subcontractor or other entity concerned with current progress or involved in planning, coordination, or performance of future activities.
1. Contracting Officer or Representative will record minutes and distribute to everyone concerned, including Owner and Contracting Officer or Representative.
11.2 SUBMITTAL ADMINISTRATIVE REQUIREMENTS
A. Contracting Officer or Representative's Digital Data Files: Electronic digital data files of the Contract Drawings will be provided by Contracting Officer or Representative for Contractor's use in preparing submittals.
1. Contracting Officer or Representative will furnish Contractor one set of digital data drawing files of the Contract Drawings for use in preparing Shop Drawings and Project record drawings.
B. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.
1. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.
2. Submit three copies of each action submittal. Contracting Officer or Representative will return one copy.
C. Paper Submittals: Place a permanent label or title block on each submittal for identification.
Provide a space approximately 6 by 8 inches (150 by 200 mm) on label or beside title block to record Contractor's review and approval markings and action taken by Contracting Officer or Representative. Include the following information on the label:
1. Project name.
2. Date.
3. Name and address of Contractor.
4. Name and address of subcontractor or supplier.
5. Number and title of appropriate Specification Section.
D. Electronic Submittals: Identify and incorporate information in each electronic submittal file as follows:
1. Assemble complete submittal package into a single indexed file incorporating submittal requirements of a single Specification Section and transmittal form with links enabling navigation to each item.
000101 - 8
2. Name file with unique identifier, including project identifier, Specification Section number, and revision identifier.
3. Provide means for insertion to permanently record Contractor's review and approval markings and action taken by Contracting Officer or Representative.
E. Identify options requiring selection by Contracting Officer or Representative.
F. Identify deviations from the Contract Documents on submittals.
G. Contractor's Construction Schedule Submittal Procedure:
1. Submit required submittals in the following format:
a. Working electronic copy of schedule file, where indicated.
b. PDF electronic file.
c. [Two] <Insert number> paper copies.
2. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction period.
a. Submit a working electronic copy of schedule, using software indicated, and labeled to comply with requirements for submittals. Include type of schedule (initial or updated) and date on label.
3. Coordinate Contractor's construction schedule with the schedule of values,[ list of subcontracts,] submittal schedule, progress reports, payment requests, and other required schedules and reports.
PART 12 - PRODUCTS
12.1 SUBMITTAL PROCEDURES
A. General Submittal Procedure Requirements: Prepare and submit submittals required by individual Specification Sections.
1. Post electronic submittals as PDF electronic files directly to [Project Web site] [Contracting Officer or Representative's FTP site] specifically established for Project.
a. Contracting Officer or Representative will return annotated file. Annotate and retain one copy of file as an electronic Project record document file.
2. Submit electronic submittals via email as PDF electronic files.
a. Contracting Officer or Representative will return annotated file. Annotate and retain one copy of file as an electronic Project record document file.
000101 - 9
12.2 ACTION SUBMITTALS
A. Submit three paper copies of each submittal unless otherwise indicated. Contracting Officer or Representative will return [two] <Insert number> copies.
B. Product Data: Mark each copy to show applicable products and options. Include the following:
1. Manufacturer's written recommendations, product specifications, and installation instructions.
2. Wiring diagrams showing factory-installed wiring.
3. Printed performance curves and operational range diagrams.
4. Testing by recognized testing agency.
5. Compliance with specified standards and requirements.
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data. Submit on sheets at least 8-1/2 by 11 inches, but no larger than 30 by 42 inches. Include the following:
1. Dimensions and identification of products.
2. Fabrication and installation drawings and roughing-in and setting diagrams.
3. Wiring diagrams showing field-installed wiring.
4. Notation of coordination requirements.
5. Notation of dimensions established by field measurement.
D. Samples: Submit Samples for review of kind, color, pattern, and texture and for a comparison of these characteristics between submittal and actual component as delivered and installed. Include name of manufacturer and product name on label.
12.3 INFORMATIONAL SUBMITTALS
A. Informational Submittals: Submit paper copies of each submittal unless otherwise indicated.
Contracting Officer or Representative will not return copies.
B. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.
12.4 DELEGATED DESIGN SERVICES
A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated.
1. If criteria indicated are not sufficient to perform services or certification required, submit a written request for additional information to Contracting Officer or Representative.
12.5 CONTRACTOR'S CONSTRUCTION SCHEDULE
A. Gantt-Chart Schedule: Submit a comprehensive, fully developed, horizontal Gantt-chart-type schedule within 15 days of date established by the Notice to Proceed.
000101 - 10
B. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line.
PART 13 - EXECUTION
13.1 SUBMITTAL REVIEW
A. Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Contracting Officer or Representative.
B. Contracting Officer or Representative will review each action submittal, make marks to indicate corrections or modifications required, will stamp each submittal with an action stamp, and will mark stamp appropriately to indicate action.
C. Informational Submittals: Contracting Officer or Representative will review each submittal and will not return it or will return it if it does not comply with requirements. Contracting Officer or Representative will forward each submittal to appropriate party.
D. Submittals not required by the Contract Documents may not be reviewed and may be discarded.
13.2 CONTRACTOR'S CONSTRUCTION SCHEDULE
A. Updating: At weekly intervals, update schedule to reflect actual construction progress and activities. Issue schedule at least 3 days before each regularly scheduled progress meeting.
1. As the Work progresses, indicate Actual Completion percentage for each activity.
B. Distribute copies of approved schedule to Owner, Contracting Officer or Representative, subcontractors, testing and inspecting agencies, and parties identified by Contractor with a need-to-know schedule responsibility. When revisions are made, distribute updated schedules to the same parties.
END OF SECTION 013000
SECTION 014000 - QUALITY REQUIREMENTS
PART 14 - GENERAL
14.1 SECTION REQUIREMENTS
A. Testing and inspecting services may be required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.
000101 - 11
B. Referenced Standards: If compliance with two or more standards is specified and the standards establish different or conflicting requirements, comply with the most stringent requirement. Refer uncertainties to Contracting Officer or Representative for a decision.
C. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum. The actual installation may exceed the minimum within reasonable limits.
Indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Contracting Officer or Representative for a decision.
D. The preservation log repair in this contract requires documented experience in performing this type of work. The contractor must supply this documentation of their experience or that of the subcontractor performing the work.
PART 15 - PRODUCTS (Not Used)
PART 16 - EXECUTION
16.1 REPAIR AND PROTECTION
A. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.
END OF SECTION 014000
SECTION 014200 - REFERENCES
PART 17 - GENERAL
17.1 GENERAL REQUIREMENTS
A. Publication Dates: Comply with standards in effect as of date of the Contract Documents unless otherwise indicated.
B. Abbreviations and Acronyms: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.
1. AITC - American Institute of Timber Construction; www.aitc-glulam.org.
2. ANSI - American National Standards Institute; www.ansi.org.
3. AOSA - Association of Official Seed Analysts, Inc.; www.aosaseed.com.
4. APA - APA - The Engineered Wood Association; www.apawood.org.
5. ASCE - American Society of Civil Engineers; www.asce.org.
6. ASCE/SEI - American Society of Civil Engineers/Structural Engineering Institute; (See
ASCE).
000101 - 12
7. AWPA - American Wood Protection Association; (Formerly: American Wood-Preservers' Association); www.awpa.com.
8. CSI - Construction Specifications Institute (The); www.csinet.org.
9. CWC - Composite Wood Council; (See CPA).
10. ICBO - International Conference of Building Officials; (See ICC).
11. ICC - International Code Council; www.iccsafe.org.
12. NHLA - National Hardwood Lumber Association; www.nhla.com.
13. NLGA - National Lumber Grades Authority; www.nlga.org.
14. NSPE - National Society of Professional Engineers; www.nspe.org.
15. SEI/ASCE - Structural Engineering Institute/American Society of Civil Engineers; (See
ASCE).
16. SPIB - Southern Pine Inspection Bureau; www.spib.org.
17. SSPC - SSPC: The Society for Protective Coatings; www.sspc.org.
18. UBC - Uniform Building Code; (See ICC).
19. WCLIB - West Coast Lumber Inspection Bureau; www.wclib.org.
20. WWPA - Western Wood Products Association; www.wwpa.org.
C. Code Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.
1. ICC - International Code Council; www.iccsafe.org.
PART 18 - PRODUCTS (Not Used)
PART 19 - EXECUTION (Not Used)
END OF SECTION 014200
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS
PART 20 - GENERAL
20.1 SECTION REQUIREMENTS
A. Electric Power will be Available from The Government’s existing system without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.
B. Erosion- and Sedimentation-Control Plan: Submit plan showing compliance with requirements of EPA Construction General Permit or authorities having jurisdiction, whichever is more stringent.
000101 - 13
PART 21 - PRODUCTS
21.1 TEMPORARY FACILITIES
A. Provide field offices, storage and fabrication sheds, and other support facilities as necessary for construction operations. Store combustible materials apart from building.
21.2 EQUIPMENT
A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.
PART 22 - EXECUTION
22.1 TEMPORARY UTILITY INSTALLATION
A. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking-water fixtures.
Comply with regulations and health codes for type, number, location, operation, and maintenance of fixtures and facilities.
22.2 SUPPORT FACILITIES INSTALLATION
A. Install project identification and other signs in locations approved by Owner to inform the public and persons seeking entrance to Project.
B. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction.
22.3 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Provide protection, operate temporary facilities, and conduct construction as required to comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
B. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.
C. Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion.
D. At Substantial Completion, repair, renovate, and clean permanent facilities used during construction period.
000101 - 14
END OF SECTION 015000
1. List of similar installations for completed projects, if requested.
2. Samples, if requested.
PART 23 - EXECUTION (Not Used)
END OF SECTION 016000
SECTION 017000 - EXECUTION AND CLOSEOUT REQUIREMENTS
PART 24 - GENERAL
24.1 EXECUTION REQUIREMENTS
A. Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written recommendations and instructions for installation of products and equipment.
24.2 CLOSEOUT SUBMITTALS
A. Contractor's List of Incomplete Items: Initial submittal at Substantial Completion.
B. Certified List of Incomplete Items: Final submittal at Final Completion.
C. Operation and Maintenance Data: Submit 2 copies of manual.
D. PDF Electronic File: Assemble manual into a composite electronically indexed file. Submit on digital media.
24.3 SUBSTANTIAL COMPLETION PROCEDURES
A. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.
B. Submittals Prior to Substantial Completion: Before requesting Substantial Completion inspection, complete the following:
1. Obtain and submit releases from authorities having jurisdiction permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.
2. Submit closeout submittals specified in other sections, including project record documents, operation and maintenance manuals, property surveys, similar final record information, warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.
000101 - 15
3. Submit maintenance material submittals specified in other sections, including tools, spare parts, extra materials, and similar items, and deliver to location designated by Contracting Officer or Representative.
4. Submit test/adjust/balance records.
5. Submit changeover information related to The Government’s occupancy, use, operation, and maintenance.
C. Procedures Prior to Substantial Completion: Before requesting Substantial Completion inspection, complete the following:
1. Participate with Owner in conducting inspection and walkthrough.
2. Remove temporary facilities and controls.
3. Complete final cleaning requirements, including touchup painting.
4. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
D. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, Contracting Officer or Representative will proceed with inspection or advise Contractor of unfulfilled requirements. Contracting Officer or Representative will prepare the Certificate of Substantial Completion after inspection or will advise Contractor of items that must be completed or corrected before certificate will be issued.
24.4 FINAL COMPLETION PROCEDURES
A. Submittals Prior to Final Completion: Before requesting inspection for determining final completion, complete the following:
1. Submit a final Application for Payment.
2. Submit certified copy of Contracting Officer or Representative's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Contracting Officer or Representative. Certified copy of the list shall state that each item has been completed or otherwise resolved.
B. Submit a written request for final inspection for acceptance. On receipt of request, Contracting Officer or Representative will either proceed with inspection or notify Contractor of unfulfilled requirements. Contracting Officer or Representative will prepare final Certificate for Payment after inspection or will advise Contractor of items that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
PART 25 - PRODUCTS
25.1 MATERIALS
A. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.
000101 - 16
25.2 RECORD DRAWINGS
A. Record Prints: Maintain a set of prints of the Contract Drawings and Shop Drawings, incorporating new and revised drawings as modifications are issued. Mark to show actual installation where installation varies from that shown originally. Accurately record information in an acceptable drawing technique.
PART 26 - EXECUTION
26.1 EXAMINATION AND PREPARATION
A. Existing Conditions: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities and other construction affecting the Work.
B. Before proceeding with each component of the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance.
1. Verify compatibility with and suitability of substrates.
2. Examine roughing-in for mechanical and electrical systems.
3. Examine walls, floors, and roofs for suitable conditions.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
D. Take field measurements as required to fit the Work properly. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication.
E. Verify space requirements and dimensions of items shown diagrammatically on Drawings.
F. Surface and Substrate Preparation: Comply with manufacturer's written recommendations for preparation of substrates to receive subsequent work.
26.2 CONSTRUCTION LAYOUT AND FIELD ENGINEERING
A. Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks.
26.3 INSTALLATION
A. Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
1. Make vertical work plumb and make horizontal work level.
000101 - 17
2. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated.
B. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.
C. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place. Where size and type of attachments are not indicated, verify size and type required for load conditions.
D. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.
26.4 CUTTING AND PATCHING
A. Provide temporary support of work to be cut.
B. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.
C. Cutting: Cut in-place construction using methods least likely to damage elements retained or adjoining construction.
1. Cut holes and slots neatly to minimum size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.
D. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other Sections.
1. Restore exposed finishes of patched areas and extend finish restoration into adjoining construction in a manner that will minimize evidence of patching and refinishing.
2. Where walls or partitions that are removed extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish, color, texture, and appearance.
26.5 Where patching occurs in a painted surface, prepare substrate and apply primer and intermediate paint coats appropriate for substrate over the patch, and apply final paint coat over entire unbroken surface containing the patch. Provide additional coats until patch blends with adjacent surfaces
26.6 CLEANING
A. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion:
1. Clean Project site, yard, and grounds, in areas disturbed by construction activities. Sweep paved areas; remove stains, spills, and foreign deposits. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.
2. Sweep paved areas broom clean. Remove spills, stains, and other foreign deposits.
3. Remove labels that are not permanent.
000101 - 18
4. Clean exposed finishes to a dust-free condition, free of stains, films, and foreign substances. Sweep concrete floors broom clean.
B. identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable.
1. Prepare supplementary text if manufacturers' standard printed data are unavailable and where the information is necessary for proper operation and maintenance of equipment or systems.
C. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams.
END OF SECTION 017000
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
26.7 SECTION REQUIREMENTS
A. Action Submittals:
1. Waste Management Plan: Submit plan within 14 days of date established for commencement of the Work.
PART 27 - EXECUTION
27.1 PLAN IMPLEMENTATION
A. General: Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.
27.2 SALVAGING DEMOLITION WASTE
A. Salvaged Items for Reuse in the Work: Clean salvaged items and install salvaged items to comply with installation requirements for new materials and equipment.
B. Salvaged Items not the Government’s use, shall be removed from the Project site.
C. Salvaged Items for The Government’s Use: Clean salvaged items and store in a secure area until delivery to Owner.
000101 - 19
27.3 RECYCLING WASTE
A. General: Recycle paper and beverage containers used by on-site workers.
B. Packaging:
1. Cardboard and Boxes: Break down packaging into flat sheets. Bundle and store in a dry location.
2. Polystyrene Packaging: Separate and bag materials.
3. Pallets: As much as possible, require deliveries using pallets to remove pallets from Project site. For pallets that remain on-site, break down pallets into component wood pieces and comply with requirements for recycling wood.
4. Crates: Break down crates into component wood pieces and comply with requirements for recycling wood.
C. Wood Materials:
1. Sort and stack reusable members according to size, type, and length. Separate lumber, engineered wood products, panel products, and treated wood materials.
D. Metals: Separate metals by type.
E. debris, trash, adhesive, and tack strips.
27.4 DISPOSAL OF WASTE
A. Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.
B. Do not burn waste materials.
END OF SECTION 017419
SECTION 024119 - SELECTIVE DEMOLITION
PART 28 - GENERAL
28.1 SECTION REQUIREMENTS
A. Items indicated to be removed and salvaged become the Contractor’s property. Carefully detach from existing construction, in a manner to prevent damage, and dispose of.
000101 - 20
B. It is not expected that hazardous materials will be encountered in the Work. If hazardous materials are encountered, do not disturb; immediately notify Contracting Officer or Representative and Owner. Hazardous materials will be removed by Owner under a separate contract.
PART 29 - PRODUCTS
29.1 PEFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with EPA regulations and with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.
PART 30 - EXECUTION
30.1 DEMOLITION
A. Items for demolition are: Existing wooden steps and stoop at the side entrance and portions of logs of the pavilion.
B. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
C. Care must be taken not to damage the pavilion or any historic features while removing the steps and stoop.
D. Neatly cut the deteriorated log portions using methods and techniques described in the preservation guideline for historic log buildings.
E. Remove demolition waste materials from Project site. Do not burn demolished materials.
END OF SECTION 024119
END OF SECTION 033000
SECTION 061000 - ROUGH CARPENTRY
PART 31 - GENERAL
31.1 SECTION REQUIREMENTS
A. Submittals: ICC-ES evaluation reports for wood-preservative treated wood and engineered wood products.
000101 - 21
PART 32 - PRODUCTS
32.1 WOOD PRODUCTS, GENERAL
A. Lumber: Provide dressed lumber, S4S, marked with grade stamp of inspection agency.
32.2 TREATED MATERIALS
A. Preservative-Treated Materials: AWPA U1; Use Category UC2 for interior construction not in contact with the ground, Use Category UC3b for exterior construction not in contact with the ground, and Use Category UC4a for items in contact with the ground.
1. Use treatment containing no arsenic or chromium
2. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent.
3. Mark lumber with treatment quality mark of an inspection agency approved by the ALSC
Board of Review.
B. Provide preservative-treated materials for the following:
1. Ramp decking. Framing, wood cants, nailers, curbs, blocking, stripping.
2. Wood sills, blocking and similar concealed members in contact with masonry or concrete.
C. Field treat all cut ends and other exposed cuts with commercially available treatment product for pressure treated lumber.
32.3 MISCELLANEOUS PRODUCTS
A. Fasteners: Size and type indicated. Where rough carpentry is exposed to weather, in ground contact, or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M.
PART 33 - EXECUTION
33.1 INSTALLATION
A. Construct the ADA compliant access ramp as shown in the drawings with ramps not exceeding 8% slope and approved handrails installed along rail logs.
B. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted.
Locate nailers, blocking, and similar supports to comply with requirements for attaching other construction.
C. Do not splice structural members between supports unless otherwise indicated.
END OF SECTION 061000
000101 - 22
SECTION 061053 - MISCELLANEOUS ROUGH CARPENTRY
PART 34 - GENERAL
34.1 SECTION REQUIREMENTS
A. Submittals: ICC-ES evaluation reports for treated wood.
PART 35 - PRODUCTS
35.1 WOOD PRODUCTS, GENERAL
A. 8” 6” & 4” pressure treated fir or Southern yellow pine logs of various lengths.
B. Red Pine or White pine log sections (untreated) of the same diameter as the pavilion logs needing repair.
35.2 TREATED MATERIALS
A. Preservative-Treated Materials: AWPA U1; Use Category UC2 for interior construction not in contact with the ground, Use Category UC3b for exterior construction not in contact with the ground, and Use Category UC4a for items in contact with the ground.
1. Use treatment containing no arsenic or chromium.
2. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent.
B. Provide preservative-treated materials for the following:
1. Wood cants, nailers, curbs, equipment support bases, blocking, stripping, and similar members in connection with roofing, flashing, vapor barriers, and waterproofing.
2. Wood sills, blocking and similar concealed members in contact with masonry or concrete.
3. Wood floor plates that are installed over concrete slabs-on-grade.
35.3 Logs
A. Exterior construction of posts and rails of ADA ramp.
B. Log sections for pavilion log repair.
C. Sill log section is 16” dia X 22’ 6” in length. Log section above sill is 12” dis. X 9’ 6” in length.
D. Exterior construction of posts and rails for front porch railing.
000101 - 23
37.4 EXECUTION
A. ADA Ramp: Install and integrate pressure treated logs in the construction of the ADA and ABAAS compliant ramps as shown in the drawings and as directed by the Contraction Officer or Representative. NOTE: all log to log joints are to be saddle notched.
Mechanically treat the log sections to give the appearance of hewn logs. The intent is to use dimensional lumber only where it can be hidden if possible, with the exception being the decking.
B. Repair of the pavilion logs:
Wood splicing can involve several types of techniques. Also referred to as "piecing-in" or "Dutchman" repair, it involves treating a localized area of deterioration by cutting out the decayed area of the log, and carefully carving and installing a matching, seasoned wood replacement plug or splice. The wood species, if available, and the direction and pattern of the grain should match that of adjacent original wood. The location and depth of decay should determine the splicing technique to be used. In a case where decay runs deep within a log, a full-depth segment containing the affected area can be cut out, severing the log completely, and a new segment of log spliced in, using angled "scarf" joints. Square cut joints are not allowed. Splicing should be performed using epoxy as an adhesive. A log with shallow decay on its outer face can be cut back to sound depth, and a half-log face spliced on, adhered with epoxy, screws or fiberglass rebar. The “facing and splicing” shall be done in such a way as to hide the joints in the saddle notch seams and existing log joints.
E. Use borate impregnated glass rods inside the repair area to prevent future moisture related decay.
F. Whole sill log replacement : This is an optional alternative and if performed, must be done by experienced professionals following the guidelines and necessary procedures to protect the structural and historic integrity of this building.
G. Replacement of front porch rails: Install and integrate pressure treated logs in the construction of the porch rails to match the existing and as shown in the photos (Appendix) and as directed by the Contraction Officer or Representative. NOTE: all log to log joints are to be saddle notched.
Mechanically treat the log sections to give the appearance of hewn logs.
H. ALL REPAIRS MUST FOLLOW PRESERVATION METHODS & TECHNIQUES
DESCRIBED IN THE US PARK SERVICE “PRESERVATION BRIEFS FOR HISTORIC
LOG BUILDINGS. Please refer to photos in the appendix for more information.
END SECTION 061053
000101 - 24
SECTION 099113 - EXTERIOR STAINING
PART 36 - GENERAL
36.1 SECTION REQUIREMENTS
A. Submittals:
1. Product Data
2. Samples.
B. Extra Materials: Deliver to Owner 1 gal. of each color and type of finish-coat stain used on Project, in containers, properly labeled and sealed.
PART 37 - PRODUCTS
37.1 STAIN
1. Oil based stain.
B. Material Compatibility: Provide materials that are compatible with one another and with substrates.
1. For each coat in a stain, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.
C. Colors: Match the exiting color.
PART 38 - EXECUTION
38.1 PREPARATION
A. Comply with recommendations in MPI's "MPI Painting Specification Manual" applicable to substrates indicated.
B. Remove hardware, lighting fixtures, and similar items that are not to be painted. Mask items that cannot be removed. Reinstall items in each area after painting is complete.
C. Clean and prepare surfaces in an area before beginning painting in that area. Schedule painting so cleaning operations will not damage newly painted surfaces.
000101 - 25
38.2 APPLICATION
A. Comply with recommendations in MPI's "MPI Painting Specification Manual" applicable to substrates indicated.
B. Paint exposed surfaces, unless otherwise indicated.
C. Apply stain according to manufacturer's written instructions.
D. Moisture content of the wood is critical for proper adhesion of the stain. If the moisture content is not the value recommended by the manufacturer, the contract must return within 1 year when conditions are suitable.
1. Use brushes only where the use of other applicators is not practical.
38.3 EXTERIOR PAINT APPLICATION SCHEDULE
A. Wood: Ramp and log repair sections.
1. Oil based stain: Two coats.
END OF SECTION 099113
Frank Text Box
EAST ELEVATION
SOUTH ELEVATION
showing deteriorated logs
FRONT PORCH
w/Existing and Missing Rails