A2. 1-161_Lodging PWS_DEC_FY27.pdf
PDF 264 KB Posted
- Attached to
- Lodging Spokane WA
- Solicitation number
- FY27-0012503534
- Issued by
-
Department of the Army National Guard
About this file
This is a Performance Work Statement (PWS) for lodging services to support the Washington National Guard's 1-161st Infantry Regiment drill weekend in Spokane, Washington.
The contractor shall provide lodging and parking accommodations for up to 318 personnel from December 4-6, 2026. The lodging facility must be located no further than 5 miles from 1626 N. Rebecca Street, Spokane, WA 99217 and no more than 8 miles from Geiger Field Facility. Room configuration requirements include 141 double occupancy rooms for enlisted personnel (E-1 to E-8) and junior officers (O-1 to O-3) to accommodate up to 281 male soldiers; 6 individual rooms for leadership officials ranking E-9, O-3 to O-5, and Warrant Officers; and 16 double occupancy rooms for 31 female soldiers. The contractor must provide parking for 10 vehicles at the facility, laundry facilities, utilities, and daily room cleaning upon soldier request. All rooms must be sanitary with washrooms, and cleaning shall be performed as needed or upon request. The contractor shall develop and submit a Quality Control plan to the Contracting Officer within 15 days of contract award addressing areas outlined in Attachment A. The contractor must also designate a contract manager and alternate within 15 days of award, who shall have full authority to act on all contract matters relating to daily operations. The Government anticipates awarding a Firm Fixed-Price contract and will evaluate performance in accordance with a Quality Assurance Surveillance Plan. Final headcount can be confirmed by November 30, 2026, and the Washington National Guard will not be charged for unused rooms.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
For
Lodging Services
TABLE OF CONTENTS
Paragraph
Number Description
Page
Number 1 General Information 3
2 Definitions & Acronyms 5
3 Contractor Furnished Items and Services 6
GENERAL INFORMATION
1.0 Description of Services/Introduction: The contractor shall provide up to 318 personnel with lodging and parking in SPOKANE WA from 4 December - 6 December 2026. Personnel count for double occupancy rooms may increase due to new attrition of Soldiers. This headcount can be confirmed by 30 November 2026 to inform the contracting officer/vendor. The lodging location must be no further than 5 miles away from 1626 N. Rebecca St, Spokane WA 99217 and no more than 8 miles from the Geiger Field Facility. Rooming list will be provided prior to the event. Soldiers can be assigned rooms for dual occupancy unless otherwise identified on the lodging roster. The Washington National Guard will not be charged for any unused rooms.
1.1 Background: The 1-161st Infantry Regiment will be conducting a drill weekend with training events taking place at the Spokane Readiness Center (SRC). All Soldiers outside of 50 miles from the SRC and support staff will need lodging and parking accommodations for 10 vehicles that are sanitary during this period to ensure safety standards for travel.
1.2 Scope: The Contractor shall provide lodging and parking services for up to 10 vehicles at one location in Spokane WA.
1.3 Objectives: The Contractor shall provide lodging services for up to 318 Soldiers and parking for up to 10 vehicles and includes:
1) Room 2) Parking 3) Laundry facilities and 4) Utilities.
1.4 Period of Performance: The period of performance shall be for a base period of 4 December - 6 December 2026.
1.4.1 Lodging Facility: The Contractor shall have the capacity to lodge up to 281 Males Soldiers in 141 double occupancy rooms for Soldiers ranking E-1 to E-8 or O-1 to O-3. Provide 6 Individual rooms for Leadership officials internally identified ranking E-9, O-3 to O-5, and Warrant Officers. Provide 16 double occupancy rooms for 31 Female Soldiers. It is requested that all rooms used that are that are cleaned as needed or upon request.
1.4.2 Parking: The Contractor shall provide parking at the facility for 10 vehicles.
1.4.3 Daily Clean: The Contractor shall provide daily room cleanings upon the request of the Soldier.
1.4.5 Sanitation: The Contractor shall provide a sanitary room with washroom per Soldier.
1.5 General Information
1.5.1 Quality Control (QC): The Contractor shall develop and maintain an effective QC program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QC program is the means by which the Contractor work complies with the requirements of the contract. As a minimum, the Contractor shall develop a QC plan that address the areas identified in Attachment A, “Performance Requirements Summary”. The Contractor shall submit a QC plan to the Contracting Officer within 15 days after contract award.
1.5.2 Quality Assurance (QA): The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It identifies the method of assessment, sample 3 size, and frequency of surveillance.
1.5.3 Type of Contract: The Government anticipates award of a Firm Fixed-Price contract.
1.5.4 COR: The COR will be identified upon award of the contract. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications;
monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of the facility, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is provided to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of this contract.
1.5.5 Contract Manager: The Contractor shall provide a contract manager at the site who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the Contracting Officer. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contractor shall submit the names of the contract manager and the designated alternate within 15 days of award of the contract.
DEFINITIONS & ACRONYMS
Clean - Free of dirt, dust, spots, streaks, graffiti, stains, smudges, smears, litter, bugs, debris, and other foreign residue.
COR - A representative from the requiring activity assigned by the Contracting Officer to perform surveillance and to act as liaison to the Contractor.
Healthy - Conducive to good health
PWS - Performance Work Statement
Quality Assurance - Those actions taken by the Government to assure services meet the requirements of the PWS.
Quality Assurance Surveillance Plan (QASP) - An organized, written document specifying the method of surveillance, sample size, and frequency of assessments of the Contractor’s performance.
Quality Control - Those actions taken by the Contractor to control the performance of services so that they meet the requirements of the PWS.
Sanitized - Items will be cleaned with bleach or equivalent of 99.9% bacteria killing solution.
Waste Removal - Removal of all waste.
CONTRACTOR FURNISHED ITEMS AND SERVICES
4.0 General: The Contractor shall furnish everything required to perform this PWS. The Contractor shall provide the following :
4.1 Up to Rooms with a washroom:
4.1.1 Parking Facility with up to 70 parking spots
4.1.2 Laundry facility
4.1.3 Cleaning services
File details come from the government source that posted it. Updated .