A19-150.pdf
PDF 46 KB Posted
- Solicitation number
- A19-150
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A19-150: Centralized Control Development for Environmental Chambers
PROJECTED CMMC LEVEL REQUIREMENT:
N/A
TECHNOLOGY AREAS:
Information Systems
MODERNIZATION PRIORITIES:
KEYWORDS:
environmental testing, chamber control, remote network access, real-time monitoring and control
ADDITIONAL INFORMATION
OBJECTIVE:
Develop a networked real-time test chamber monitoring and control system that interfaces with various environmental chamber controllers (e.g. Thermoton 8800, Watlow F4, Micristar, NI cRIO) and complies with Army Cyber requirements. Each ATEC test center has requirements to continuously (24hrs/7days) monitor and control chambers across large test ranges. Current methods are inefficient and in some cases less than effective leading to issues and increased operating costs. Real time chamber monitoring improves efficiency by reducing the labor required to monitor the chambers at multiple facilities. Real time monitoring also improves test safety and quality by supporting quick resolution of a chamber issue prior to damage of the test item (e.g. munitions and explosives).
DESCRIPTION:
Environmental testing replicates the warfighter’s operational life cycle environments in a laboratory setting that is controllable and repeatable. Environmental Chamber testing is performed to evaluate the performance, survivability, and vulnerability of military systems and personnel when they are exposed to the various simulated natural and induced environments. Each ATEC test facility has unique test chambers which incorporate wide variety of chamber controllers (e.g. Thermoton 8800, Watlow F4, Micristar, NI cRIO). There is a need at each test facility to have networked centralized control of the chambers to improve operational efficiency and test quality. A centralized chamber monitoring and control solution will provide: a. Remote Control (Start, Stop and Program the Controller). b. Alerts and Alarms (Text/Email). c. Support a wide variety of chamber controllers. d. Improved network security over existing solutions. e. Access to test and chamber parameters for monitoring and troubleshooting (10-30 channels typical).
PHASE I:
Develop a feasibility study that consist of a high level software and hardware concept that includes identification of necessary communication protocols, physical communication interfaces, network security solutions, and software architecture. Determine overall functionality of the centralized control and monitoring software and any limitations.
PHASE II:
Develop and demonstrate a prototype solution at an ATEC Test Center. Conduct testing to prove feasibility over extended operating conditions.
PHASE III DUAL USE APPLICATIONS:
This software platform could be used in a broad range of military and civilian applications where environmental chamber controller, or more broadly, industrial controllers are utilized. The ability of a common software/hardware infrastructure to provide a secure centralized interface with multiple makes/models of industrial controllers without an extensive programming effort would be a valuable tool in many industries. The secure interface may support cybersecurity development. In Phase III, the company could (1) be contracted by other Army, Navy and Air Force test facilities to provide the software and specialty hardware required for remote environmental chamber control, (2) be contracted by commercial test facilities to provide the same, and/or (3) convert the software and specialty hardware to support other industries (research laboratories, manufacturing, etc.).
REFERENCES:
MIL-STD-810G, “Department of Defense Test Method Standard, Environmental Engineering Considerations and Laboratory Tests,” dated 31 October 2008 (including Change Notice 1, dated 15 April 2014).
1.
Applicable IASE Security Technical Implementation Guides (STIGs):
https://iase.disa.mil/stigs/Pages/index.aspx
2.
NIST Special Publication 800-53 (Rev. 4.) “Security Controls and Assessment Procedures for Federal Information Systems and Organizations”
3.
TECHNICAL POINT OF CONTACT (TPOC):
None
File details come from the government source that posted it. Updated .