This document is a justification for other than full and open competition (JOFOC) for a sole source contract award. The United States Fish and Wildlife Service intends to award a firm-fixed price contract to the City of Marion, Illinois to provide potable water utility services and associated infrastructure at the Crab Orchard National Wildlife Refuge. The City of Marion would install approximately 21,300 feet of sanitary sewer pipeline, 10,400 feet of force main, and 64,700 feet of water supply line. The contract value is estimated at $20 million over a two-year period of performance from September 2021 through December 2023. As the regulated public water utility for the area and current provider of sewer services, the City of Marion is considered the only responsible source able to meet the requirement.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FWS Form 3-0051 (Rev. 5/12/2021) U.S. Fish and Wildlife Service
JUSTIFICATION AND APPROVAL FOR OTHER THAN
FULL AND OPEN COMPETITION (JOFOC) - OVER SAT
JOINT ADMINISTRATIVE OPERATIONS
Acquisitions Operations
1. Agency and Contracting Activity (FAR 6.303-2(b)(1)).
3. Description of Supplies/Services (FAR 6.303-2(b)(3)).
2. Nature/Description of Action (FAR 6.303-2(b)(2)).
In accordance with FAR 6.302, the proposed contractual action is pursuant to the statutory authority identified in section 4 of this document. This template is required for actions over the Simplified Acquisition Threshold (SAT) (unless the procurement is acquired as a limited source IAW FAR 8.405-6 or is an Exception to Fair Opportunity IAW FAR 16.505(b)(2)).
Instructions: The information in the text boxes are provided as sample language or to indicate a needed fill-in. Sample language should be removed from the final document. All text boxes require information and shall not be left blank.
4. Statutory Authority Permitting Other than Full and Open Competition (FAR 6.303-2(b)(4)).
(check one)
Authority FAR Coverage Application 41 U.S.C. 1901 FAR 13.501 Only one responsible source using
Simplified Acquisition Procedures (above SAT but below $7M)
41 U.S.C. 1903 FAR 13.501 Special emergency procurement authority
41 U.S.C. 3304(a)(1) FAR 6.302-1 Only one responsible source and no other supplies or services will satisfy agency requirements
41 U.S.C. 3304(a)(1) FAR 6.302-1(c) Application for brand-name descriptions
41 U.S.C. 3304(a)(2) FAR 6.302-2 Unusual and compelling urgency
41 U.S.C. 3304(a)(3) FAR 6.302-3 Industrial mobilization; engineering, developmental or research capability; or expert services
41 U.S.C. 3304(a)(4) FAR 6.302-4 International Agreement
41 U.S.C. 3304(a)(5) FAR 6.302-5 Authorized or required by statute
41 U.S.C. 3304(a)(6) FAR 6.302-6 National Security
41 U.S.C. 3304(a)(7) FAR 6.302-7 Public Interest
5. Demonstration of Contractor’s Unique Qualifications (FAR 6.303-2(b)(5)).
6. Description of Efforts Made to Maximize Competition (FAR 6.303-2(b)(6)).
7. Determination of Fair and Reasonable Cost (FAR 6.303-2(b)(7)).
8. Description of Market Research Conducted (FAR 6.303-2(b)(8)).
9. Any Other Supporting Facts (FAR 6.303-2(b)(9)).
Program / Project Officer
13. Contracting Officer Certification and Approval: (All Values) FAR 6.304(a)(1)
Based on the above justification, I hereby certify that the circumstances of this contract action deem only one source reasonably available and approve the use of sole source acquisition procedures for this purchase.
Contracting Officer
10. Listing of Interested Sources (FAR 6.303-2(b)(10)).
11. Actions Taken to Remove Barriers to Competition (FAR 6.303-2(b)(11)).
12. Technical/Requirements Certification: FAR 6.303-2(c)
I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.
14. Approval by Chief of Contracting Office (>SAT)
Based on the foregoing justification I hereby approve this procurement.
Chief of Contracting Office
15. Approval by Senior Chief of Contracting Office (>$700K)
Based on the foregoing justification I hereby approve this procurement.
Senior Chief of Contracting Office
16. Approval by Head of Contracting Activity (>$700K) FAR 6.304(a)(2)
Based on the foregoing justification I hereby approve this procurement.
17. Approval by Senior Procurement Executive (>$68M) FAR 6.304(a)(4)
Based on the foregoing justification I hereby approve this procurement.
Senior Procurement Executive
Head of Contracting Activity
| 2021-07-28T08:12:49-0500 | |
| JUSTIN SEXTON |
| 2021-07-28T14:44:17-0400 | |
| RYAN BOISVERT |
| 2021-07-29T07:56:32-0400 | |
| SHANNON BLACKBURN |
| 2021-07-29T13:37:52-0800 | |
| ALISSA VARRATI |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Yes |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Text3: The requirement is to provide potable water utility services and associated appurtenance at the Crab Orchard National Wildlife Refuge located at 6987 Headquarters Rd, Marion, Illinois 62959, at a total cost of $20,000,000 for a period of performance estimated from September 30, 2021 to December 31, 2023. |
Crab Orchard NWR is seeking a contract with the City of Marion, Il (the City), to supply water and sewer services to Refuge facilities and its tenants (General Dynamics and Marion Illinois Correctional Facility). To provide adequate water and sewer services, the City would need to install approximately 21,300 feet of sanitary sewer pipeline and 10,400 feet of force main and associated sewage system components, and 64,700 feet of water supply line and associated storage/ supply components. These utilities span externally from the Refuge buildings and facilities, General Dynamics, and Marion Illinois Correctional Facility to the Marion City Utilities Main Service Connections.
Text4: The City of Marion is uniquely qualified and is an authorized public utility to provide these services to Crab Orchard National Wildlife Refuge based upon the following:
-The City of Marion is a State of Illinois regulated public utility service.
-The Refuge is currently paying the City to take sewer waste.
-The Refuge is located in the City of Marion’s jurisdiction for water/ sewer. (Refuge has a Marion address).
-The Refuge is currently responsible for all associated maintenance and service of the water/sewer system. The City would agree to take over services in perpetuity if they were they were primary designer and installer of the water/sewer system. This contract would alleviate this responsibility.
| Text5: As a public utility regulated by the State of Illinois, and a provider of potable water utility and sewer services in the area, solicitation of alternative sources is not practicable as the City of Marion is the public utility provider of potable water and sewer for the Refuge. |
| Text6: The Contracting Officer determines that the anticipated price(s) will be fair and reasonable based on public regulation of utility service prices and cost estimates from previous design. Prior to award of the proposed contract/modification/order, cost or price information may be obtained from the contractor and a price/cost analysis may be performed and documented to sufficiently determine that the cost to the Government of the proposed acquisition will be fair and reasonable. |
| Text7: Market research was conducted to identify available sources and to evaluate the availability of the marketplace to meet the requirement as follows: |
Based on the results of market research, the government determined that a no other source is currently capable to provide these regulated utility services.
Text8: This contract is necessary as a critical mission requirement. The City of Marion possesses the statutory authority and expertise required to perform this requirement. This project is needed because the refuge does not currently meet state requirements for water treatment standards. The Refuge is unable to provide potable water to its tenants and visitors with the current system. The refuge does not have adequate water treatment to meet regulatory requirements. Public safety is an utmost priority to the Service, and we must ensure that visitors engaged in approved activities, including overnight camping, at a developed campground are doing so safely. In addition, the Refuge water system is necessary for fire suppression on the Refuge and for the Refuge tenants. This antiquated system has regular failures and leaks which can compromise the system’s ability to meet fire suppression needs. The updated system installed by the City of Marion will meet or exceed the fire suppression needs of the Refuge and its tenants. The Refuge also has a long-standing agreement with Marion Illinois Correctional Facility to provide a secondary water source for the prison. The new system would provide both primary and secondary water source for the prison. This would meet the Service’s required obligations as per our lease agreement.
The City would agree to take over services in perpetuity if they were they were primary designer and installer of the water/sewer system. The government would experience tremendous cost savings annually (25%-50% maintenance budget) if the City took over water/sewer. The City would be responsible for the O&M of the water/sewer line.
| Text9: No sources indicated an interest or would be able to provide this service by statute. | |
| Text10: The Government will continue to conduct thorough market research to gauge the marketplace capabilities for future requirements. The Government will seek competition of future acquisitions for these services, if allowable under statute or regulation. | |
| Text2: FWS APO intends to award a new contract to the City of Marion, Marion, Illinois DUNS 070998109. A firm-fixed price contract is contemplated for this award. | |
| Text1: The US Fish & Wildlife Service (FWS) GAOA Contracting Team proposes to enter into a contract on the basis of other than full and open competition in support of Crab Orchard National Wildlife Refuge (NWR), a unit of the US Fish & Wildlife Service, National Wildlife Refuge System. | |
| Signature5: | |
| 2021-08-11T14:17:16-0700 | |
| JOSHUA GORDON |
File details come from the government source that posted it. Updated .