This is a Statement of Work (SOW) for the procurement, fabrication, testing, and delivery of an Upstream Enclosure (USE) aluminum vacuum chamber to Thomas Jefferson National Accelerator Facility (TJNAF) in Newport News, Virginia. The USE is a welded vacuum chamber composed entirely of AL 6061 aluminum alloy designed to maintain a nominal vacuum of 1 x 10⁻³ Torr while supporting internal and external components, including the Toroidal Magnet 0 (TM0) and collimator elements. The primary deliverables consist of two assemblies: the TOP COVER ASSEMBLY (Revision A, Quantity 1) and the BASE PLATE FINAL MACHINING (Revision A, Quantity 1). The subcontractor must furnish all manufactured and commercial off-the-shelf (COTS) parts, perform assembly services including leak testing per specifications, and deliver complete assemblies with blank flanges and related hardware. TJNAF will provide O-rings and joining glue after receipt of order (ARO).

The subcontractor must deliver all assemblies within 26 weeks ARO or best delivery. Critical documentation deliverables include Quality Control System Manuals, Manufacturing Plans, NDE Procedures, Welding Procedures and Qualifications (within 4 weeks ARO), and Final & In-Process Cleaning Procedures, Traveler/Process Sheets, Procurement Plans, and Shipping Plans due at the Production Readiness Review. Inspections and testing requirements include leak tests (maximum rate of 1 x 10⁻⁷ atm·cm³/s), vacuum tests with pump-down results from 760 Torr to 10⁻⁴ Torr or lower, visual weld examination per PMAG0000-0001-S0005 Section 3.6, and dimensional inspection reports. Key milestones include a Kick-off Meeting within five weeks ARO, Production/Work Readiness Review no later than four weeks after kickoff, an in-progress hold point for leak test witnessing, and a Pre-Shipping Review. The Procurement Officer's Technical Representative is Joseph Lamont (jlamont@jlab.org, 602-370-3303 cell). All applicable documents referenced include ASME standards (Section VIII Division 1, B31.3), General Cleaning and Handling procedures (11141-S-0035 Rev A), MOLLER Bolt Torque Requirements (PMAG0000-0100-S0032), and Welding Specifications (PMAG0000-0001-S0005 Rev A). The subcontractor assumes all responsibilities for shipping costs, route planning, packaging, cleanliness procedures, nonconformance reporting, and monthly written updates to TJNAF.

View the file

Other files

File Type Posted
JSA-26-Q449836.pdf PDF
_Document_Package4592977140262871156.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PMAG0000-0100-S0088 Rev. - Page 1 of 10

Statement of Work for Upstream Enclosure Document Number: PMAG0000-0100-S0088 Revision Number: -

Author: Joseph Lamont Project: MOLLER

Date: 1/21/2026

Approved: 01/27/2026; E-Sign ID: 613799; Signed By: Checker: S. Gopinath; Approver 1: A. Riddle; Approver 2: M. Dion; DCG: J. Losik

PMAG0000-0100-S0088 Rev. - Page 2 of 10

Table of Contents 1 Acronyms 3

2 Introduction 3

3 Scope 4

4 Procurement Officer’s Technical Representative (TR) 4

5 Applicable Documents 5

6 Deliverables 7

6.1 Assemblies 7

6.2 Services 7

6.3 Deliverable Documentation 7

7 Government-Furnished Equipment and Material 8

8 Delivery Schedule 8

9 After Award of Contract 8

10 Meetings 8

10.1 Kick-Off Meeting/Technical Exchange Meeting 8

10.2 Production/Work Readiness Review 8

10.3 In-Progress Hold Point 8

10.4 Pre-Shipping Review 8

11 Inspection and Test Plan 8

11.1 Leak Test 8

11.2 Vacuum Test 8

11.3 Visual Examination of welds 8

11.4 Dimensional Inspection 8

11.5 Notification 9

12 Subcontractor Instructions 9

12.1 Cleanliness 9

12.2 Nonconformances 9

12.3 Reporting Requirements 9

13 Preparation for Delivery 9

13.1 Exterior Packaging 9

13.2 Individual Packaging 9

13.3 TJNAF Delivery Address 10

14 Release and Revision History 10

15 Approvals 10

Approved: 01/27/2026; E-Sign ID: 613799; Signed By: Checker: S. Gopinath; Approver 1: A. Riddle; Approver 2: M. Dion; DCG: J. Losik

PMAG0000-0100-S0088 Rev. - Page 3 of 10

1 Acronyms

• TJNAF – Thomas Jefferson National Accelerator Facility

• CEBAF – Continuous Electron Beam Accelerator Facility

• CM – Cryomodule

• TR – Procurement Officer’s Technical Representative

• PO – Procurement Officer

• RFQ – Request for Quote

• ARO – After Receipt of Order

• BPS – Braze Procedure Specification

• BPQR – Braze Procedure Qualification Record

• WPS – Welding Procedure Specification

• WPQR – Welding Procedure Qualification Record

• PO# - Purchase Order Number

• DS - Downstream

2 Introduction

TJNAF requires an aluminum vacuum chamber (i.e., Upstream Enclosure or USE) for use in one of the experimental halls at the laboratory, see Figure 1.

The USE is welded vacuum chamber entirely composed of AL 6061 aluminum alloy. Its main function is to maintain a nominal - 1 x 10 -3

Torr vacuum while supporting internal and external components. It houses Toroidal Magnet 0 (TM0) and various collimator elements. The enclosure has two primary mating components – the Top Hat and Baseplate, sealed with an O-ring.

The Top Hat is a welded assembly resembling a rectangular box with external ribs. The primary sealing surface shall be machined after the components are welded together to nullify the warping effect due to welding, ensuring necessary compression of the O-ring between Top Hat and Baseplate. Two flange assemblies are installed on the Top Hat, one on each end. The Baseplate is an aluminum weldment structure featuring a 2” thick main plate and 1” thick external ribs. It features several cut-outs for feedthroughs, an O-ring groove, and various hole patterns.

The vendor may recommend improvements to the design, for economy or ease of fabrication, if the specifications mentioned in this document can be met. Such changes shall be reviewed and approved by

TJNAF prior to fabrication.

Approved: 01/27/2026; E-Sign ID: 613799; Signed By: Checker: S. Gopinath; Approver 1: A. Riddle; Approver 2: M. Dion; DCG: J. Losik

PMAG0000-0100-S0088 Rev. - Page 4 of 10

Fig 1. US Enclosure (USE)

3 Scope

This specification establishes the requirements for the procurement, fabrication, testing, and delivery of the US Enclosure to TJNAF in Newport News, VA. The assemblies shall be delivered complete as described in this specification.

4 Procurement Officer’s Technical Representative (TR)

The TR is a TJNAF employee assigned to interface with the Subcontractor on technical matters after subcontract award. The TR is only authorized to provide technical direction within the scope of the subcontract. Any modification to the scope or terms of the subcontract must be approved in advance by the TJNAF Subcontracting Officer.

After subcontract award, the TR will assist the Subcontractor in the interpretation of technical requirements as outlined in the contract. Any clarification provided by the TR concerning the work to be performed shall not be construed as a change to the subcontract. Only the TJNAF PO is authorized to accept nonconforming work; waive any requirement of this subcontract; or modify any term or condition of this subcontract.

All direction from the TR and the Procurement Officer shall be provided in writing.

TR Name: Joseph Lamont

TR Phone: (602) 370-3303 (cell)

TR Email: jlamont@jlab.org

Approved: 01/27/2026; E-Sign ID: 613799; Signed By: Checker: S. Gopinath; Approver 1: A. Riddle; Approver 2: M. Dion; DCG: J. Losik

PMAG0000-0100-S0088 Rev. - Page 5 of 10

5 Applicable Documents

Table 1 and Table 2 lists all technical documents provided by TJNAF. If any apparent conflict between the requirements of the reference documents and the specification is found, it shall be brought to the attention of TJNAF.

Table 1: Applicable Documents

Document Name Document Number Rev

General Cleaning and Handling 11141-S-0035 A

ASME Boiler and Pressure Vessel Code ASME Section VIII, Division 1

2019 or later

Process Piping ASME B31.3 2018 or later

MOLLER Bolt Torque Requirements PMAG0000-0100-S0032 -

Welding Specification for Pressure Piping, Vacuum Piping, and Vacuum Vessels

PMAG0000-0001-S0005 A

Approved: 01/27/2026; E-Sign ID: 613799; Signed By: Checker: S. Gopinath; Approver 1: A. Riddle; Approver 2: M. Dion; DCG: J. Losik

PMAG0000-0100-S0088 Rev. - Page 6 of 10

Table 2: Drawings

Document Name Document Number Rev

BELLOWS 1 & 2 BLANK A09005-15-01-0016 C

BELLOWS 1 & 2 GASKET A09005-15-01-0018 -

CUSTOM BR .500-13 INSERT

[1]

BE-USS-B-0010

[1]

A

LEAD ANGLE WELD-ON PLATES BE-USS-C-0105 -

BASE ASSEMBLY TURNBUCKLE MOUNT BE-USS-C-0117 -

AL VAC TUBE-01 BE-USS-C-0118 -

LESKER 8 IN AL CF-BORED BE-USS-C-0120 -

BE-USS-C-0129

TUNGSTEN O-RING SHIELD PLATE BE-USS-D-0085 A

SIDE WALL RIB BE-USS-D-0100 -

SIDE WALL RIB – MIDDLE BE-USS-D-0101 -

LIFTING PLATE-01 BE-USS-D-0106 -

LIFTING PLATE-02 BE-USS-D-0107 -

L8 X 8 X .50 AL ANGLE-01 BE-USS-D-0109 -

LEAD WALL RESTRAINT BAR BE-USS-D-0111 -

BASE ASSEMBLY MOUNTING BLOCK BE-USS-D-0116 -

CFBI-1450-01-MOD BE-USS-D-0127 -

8 X 2.75 CF ADAPTER BE-USS-D-0128 -

LEAD RING WITH INSERTS ASSEMBLY

[1]

BE-USS-E-0012

[1]

A

OVERALL ASSEMBLY BE-USS-E-0086 -

TOP COVER ASSEMBLY BE-USS-E-0087 A

TOP COVER FINAL MACHINING BE-USS-E-0088 A

TOP COVER WELDMENT BE-USS-E-0089 A

TOP HAT FLANGE BE-USS-E-0090 A

DOWNSTREAM PANEL BE-USS-E-0091 A

UPSTREAM PANEL BE-USS-E-0092 A

DOWNSTREAM FLANGE TUBE BE-USS-E-0093 A

DOWNSTREAM ROTATABLE FLANGE BE-USS-E-0094 -

UPSTREAM FLANGE WELDMENT BE-USS-E-0095 A

14.5IN FLANGE TUBE BE-USS-E-0096 A

TOP PLATE BE-USS-E-0097 A

SIDE WALL PANEL – BL BE-USS-E-0098 A

SIDE WALL PANEL – BR BE-USS-E-0099 A

TOP PLATE RIB BE-USS-E-0102 -

TOP PLATE RIB – MIDDLE BE-USS-E-0103 -

AL LEAD WELDED RING BE-USS-E-0104 -

LEAD RING CLAMP PLATE BE-USS-E-0108 -

LEAD WALL-INSERT ASSEMBLY

[1]

BE-USS-E-0110

[1]

A

BASE PLATE FINAL MACHINING BE-USS-E-0112 A

BASE PLATE WEIGHT BE-USS-E-0113 A

BASE PLATE BE-USS-E-0114 A

BASE PLATE RIB BE-USS-E-0115 -

LEAD WALL HALF

[1]

BE-USS-E-0119

[1]

A

LEAD WALL – INSERT ASSEMBLY

[1]

BE-USS-E-0125

[1]

LEAD WALL HALF – MIR

[1]

BE-USS-E-0126

[1]

DS 32IN BLANK FLANGE BE-USS-E-0229 -

TABLE 2 - FOOTNOTES

[1] PROVIDED FOR INFORMATION ONLY – REFERENCE DRAWING

Approved: 01/27/2026; E-Sign ID: 613799; Signed By: Checker: S. Gopinath; Approver 1: A. Riddle; Approver 2: M. Dion; DCG: J. Losik

PMAG0000-0100-S0088 Rev. - Page 7 of 10

6 Deliverables

6.1 Assemblies

The following assemblies in Table 3 are to be delivered by the Subcontractor. Subcontractor shall furnish all parts needed to manufacture the listed assemblies – list includes manufactured parts and

COTS parts.

Table 3: List of Manufactured Assemblies to be delivered by Subcontractor

Part Name Drawing Number Rev Qty.

TOP COVER ASSEMBLY

[1]

BE-USS-E-0087

[1]

A 1 [1]

BASE PLATE FINAL MACHINING BE-USS-E-0112 A 1

TABLE 3 - FOOTNOTES

[1] ITEM 1 (BE-USS-E-0012, LEAD RING WITH INSERTS ASSSEMBLY), ITEM 2 (BE-USS-D-0085, TUNGSTEN O-RING SHIELD

PLATE), ITEM 6 (BE-USS-E-0110, LEAD WALL-INSERT ASSEMBLY), AND ITEM 15 (BE-USS-E-0125, LEAD WALL – INSERT

ASSEMBLY – MIR) SHALL NOT BE PROVIDED BY SUBCONTRACTOR. THIS IS A SEPARATE PROCUREMENT.

NOTE: As indicated by the footnote, Item 1, Item 2, Item 6, and Item 15 on BE-USS-E-0087 are not part of this order. Lead and tungsten assemblies (and their related items) are procured separately and are included herein as information only in order to help illustrate design intent.

6.2 Services

Assemble Table 3 deliverables and leak test per BE-USS-E-0086 and Section 11.1 and 11.2 herein. This will require the manufacture / procurement of blank flanges and related hardware as detailed on BE-USS-

E-0086.

6.3 Deliverable Documentation

Detailed specifications for all materials, components, fabrication and shop inspection and tests shall be provided to the Buyer in accordance with Table 4, which summarizes the required documents and their respective due date. Electronic files, .pdf or other agreed format, shall be furnished for each document.

Table 4: Documentation to be delivered to the Buyer

Document Due Date [1]

Quality Control System Manual and Quality Assurance

Plan

Within 4 weeks ARO

Manufacturing Plan/schedule Within 4 weeks ARO

NDE Procedures and Personnel Qualification Records Within 4 weeks ARO

Welding Procedures & Qualifications [1] Within 4 weeks ARO

Final & In-Process Cleaning, Purging, Sealing Procedures Production Readiness Review

Traveler / Process Sheet Production Readiness Review

Procurement Plan Production Readiness Review

Shipping and Handling Plan Production Readiness Review

Welding Examination Report Pre-Shipping Review

Certified Mill (Material) Test Reports Pre-Shipping Review

Certified Leak Test Reports Pre-Shipping Review

All Inspection Reports and Additional Documentation Pre-Shipping Review

1. All welding qualification documentation, including WPSs, PQRs, and WPQs.

Approved: 01/27/2026; E-Sign ID: 613799; Signed By: Checker: S. Gopinath; Approver 1: A. Riddle; Approver 2: M. Dion; DCG: J. Losik

PMAG0000-0100-S0088 Rev. - Page 8 of 10

7 Government-Furnished Equipment and Material

O-ring and joining glue will be provided by TJNAF ARO.

8 Delivery Schedule

The delivery date shall be no later than 26 weeks ARO or best delivery.

9 After Award of Contract

The Subcontractor shall provide all documents with a due date of “Within 4 weeks ARO” listed in Table

4 for TJNAF review within 4 weeks ARO.

10 Meetings

10.1 Kick-Off Meeting/Technical Exchange Meeting

The Kick-off Meeting shall occur within five weeks ARO. Prior to the Kick-off Meeting, the subcontractor shall have already submitted all of the documents defined in Section 9.

10.2 Production/Work Readiness Review

A pre-fabrication meeting shall be held no later than four weeks after the kickoff meeting. The

Subcontractor shall have submitted all documents in Table 4 with a due date of “Production Readiness

Review” before the meeting so that they may be discussed.

10.3 In-Progress Hold Point

TJNAF shall reserve the right to witness the leak test(s) in-progress at the subcontractor’s facility.

10.4 Pre-Shipping Review

All required documents as listed in Section 6.3 shall be submitted to TJNAF for approval before the assembly is shipped to TJNAF.

11 Inspection and Test Plan

11.1 Leak Test

The requirements are listed in Section 3.9 of PMAG0000-0001-S0005 except that the leak rate shall be no higher than 1 x 10 -7 atm·cm

/s. After delivery, the assemblies will be subjected to leak check tests by TJNAF. Any leak greater than 1 x 10 -7 atm·cm

/s helium must be repaired by the subcontractor at their expense.

11.2 Vacuum Test

The subcontractor shall provide pump-down test results—pressure vs time for pumping from 760 Torr to 10 -4

Torr or lower as well as the ultimate pressure and time to achieve this pressure. A Vacuum Test

Report shall be presented at the Pre-Shipment Review.

11.3 Visual Examination of welds

The requirements are listed in Section 3.6 of PMAG0000-0001-S0005. A Visual Examination Report shall be presented at the Pre-Shipment Review.

11.4 Dimensional Inspection

Approved: 01/27/2026; E-Sign ID: 613799; Signed By: Checker: S. Gopinath; Approver 1: A. Riddle; Approver 2: M. Dion; DCG: J. Losik

PMAG0000-0100-S0088 Rev. - Page 9 of 10

All fabricated part dimensions must be within drawing tolerances. The subcontractor shall perform dimensional checks throughout fabrication and assembly to ensure that final assembled USE Enclosure will meet specified tolerances. A final Dimensional Inspection Report shall be presented at the Pre-

Shipment Review. At a minimum, inspection dimensions as shown on BE-USS-E-0086 shall be reported.

11.5 Notification

The manufacturing plan shall provide the dates for the inspections, testing and shipment. The Seller shall notify the TJNAF TR 10 working days prior to any tests performed.

12 Subcontractor Instructions

12.1 Cleanliness

Pressure wash internal and external surfaces to remove bulk debris if present. Warm/hot water with or without a detergent may be used if the chamber is excessively dirty, greasy, or oily. Citranox detergent is preferred, other alternatives that do not leave a residue are acceptable.

Wipe down internal surfaces of the chamber with a clean quality solvent and lint-free cloths or wipes.

Technical, purified, pure, or practical grade cloths are recommended. Isopropyl solvent is recommended, other alternatives that do not leave a residue are acceptable.

After cleaning, allow to dry. It is recommended to cover or seal components to maintain the internal cleanliness.

12.2 Nonconformances

Nonconformances resulting in a Repair or Use As-Is disposition must be communicated to TJNAF.

12.3 Reporting Requirements

The subcontractor shall provide monthly written updates to TJNAF; an email is sufficient.

13 Preparation for Delivery

The subcontractor shall assume all responsibilities, risks, labor and other costs for shipment of assemblies to TJNAF. The subcontractor shall arrange for shipment routes considering weight, clearance, permits, and statutes and where necessary, arrange for escorts and the timing of shipments.

13.1 Exterior Packaging

The delivered assemblies shall be sufficiently packed to protect the finish and mechanical integrity and to protect against contamination from dirt, water or other foreign material during shipping.

13.2 Individual Packaging

Loose parts shall be sufficiently packed to protect the finish and mechanical integrity and to protect against contamination from dirt, water or other foreign material during shipping. Parts may be removed from the finished assemblies in order to protect them during shipping – removal of parts is at the discretion of the subcontractor. All like-items shall be packaged together and clearly labeled.

Approved: 01/27/2026; E-Sign ID: 613799; Signed By: Checker: S. Gopinath; Approver 1: A. Riddle; Approver 2: M. Dion; DCG: J. Losik

PMAG0000-0100-S0088 Rev. - Page 10 of 10

13.3 TJNAF Delivery Address

Use the following format for the delivery address labeling:

MOLLER - US Enclosure

Attention: Joseph Lamont (ext. 7260)

Jefferson Lab

12000 Jefferson Ave, Bldg 90 (EEL)

Newport News

VA, 23606, USA

14 Release and Revision History

Rev # Major Changes Approval Date:

- Initial version 1/21/2026

15 Approvals

This document is approved in Document Control.

Approved by: Name: Signature: Date:

Author Joseph Lamont In Document Control In Document

Control

Subject Matter

Expert Joseph Lamont In Document Control

In Document

Control

Quality Engineer Alex Riddle In Document Control In Document

Control

Project Lead Sandesh Gopinath In Document Control In Document

Control

CAM Michael Dion In Document Control In Document

Control

Approved: 01/27/2026; E-Sign ID: 613799; Signed By: Checker: S. Gopinath; Approver 1: A. Riddle; Approver 2: M. Dion; DCG: J. Losik