This is a Sources Sought Notice (SSN) issued by the National Park Service Denver Service Center for a design-build project to relocate the Hite Small Boat Launch in Glen Canyon National Recreation Area near Hite, Utah. The project involves constructing a new 1,300-linear-foot boat launch ramp, a 1-mile gravel access road, and associated parking infrastructure, with an estimated budget between $17M and $21M and a 550-calendar-day performance period.

The solicitation (140P2026R0011) is currently in market research phase, seeking information from both large and small businesses to determine potential small business set-aside opportunities. The project site is in a rural area 52 miles from the nearest lodging and 78 miles from suppliers, with construction to be conducted while keeping the park open. The NAICS code is 237990 with a $45M size standard, and bonding (bid, performance, and payment) is anticipated. Jacobs Engineering has already completed initial design work to 30% level, and the selected design-builder will be required to complete 70%, 95%, and 100% design deliverables for National Park Service review and approval.

View the file

Other files

File Type Posted
A14_SSN_Survey_Questionnaire_Attachment_1_RELEASED_v1_May2025_2.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

CONTRACTING SERVICES

1 DENVER FEDERAL CENTER, BUILDING 50

P.O. BOX 25287

DENVER, COLORADO 80225-0287

File Code: A14 Sources Sought Notice (SSN)

D5217 (DSC-CS)

GLCA 318878

140P2026R0011

Date:11/17/2025
Subject:Sources Sought Notice (SSN)
Reference:140P2026R0011 GLCA 318878 Hite Small Boat Launch DB

** This is a SSN for the purpose of conducting Market Research. Proposals are NOT being requested, nor accepted at this time. Responses are being requested from both Large and Small Businesses. **

1. Purpose:

a. The purpose of this SSN is to gain knowledge regarding the types of interested businesses and their qualifications. Information obtained through this SSN by the NPS will be utilized to develop the acquisition strategy. The amount of interest, or lack thereof, will determine the possibility of a Small Business or other Socio-Economic Set-Aside for solicitation and award purposes. Analysis of the quality of responses to this SSN will be considered in the Market Research being conducted and in the making of any set-aside determination for this requirement.;

b. The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a small business or other socio-economical small business set-aside for the solicitation. Analysis of the quality of responses to this source sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement; and

c. No solicitation, proposal package, specifications, or drawings are available with this SSN.

2. Cost Reimbursement: Response to this announcement is strictly voluntary. No reimbursement will be made for any costs associated with providing information in response to this SSN, nor any follow-up information requests.

3. Bonding: Bid, Performance, and Payment Bonds are anticipated to be required.

4. North American Industry Classification System (NAICS) code: 237990 and Size Standard: $45M

5. Project Description

a. The project is located near Hite Utah within the Glen Canyon National Recreation Area;

b. Estimated Cost: between $17M and $21M

c. The surrounding area is rural with limited staging located adjacent to the project work and throughout Glen Canyon National Recreation Area;

d. The construction site is 52 miles from nearest lodging facilities (Hanksville, UT) and 78 miles to suppliers (Blanding UT);

e. The Park will remain open during construction, thus contract activities and logistics must be structured and scheduled to minimize visitor impact;

f. The site requires protective measures to ensure the surrounding area remains undisturbed.

g. The anticipated period of performance of 550 calendar days includes potential weather delays.

Project Scope: The contract is a design-build project. The National Park Service (NPS) engaged Jacobs Engineering to assess existing conditions, perform topographic surveys, complete geotechnical testing, and initiate environmental permitting to identify feasible locations for a new launch ramp. Multiple alternatives were evaluated through a value engineering process, resulting in selection of a preferred site.

The preferred concept was advanced to a 30% design level to support this Request for Proposals (RFP). This level of design establishes a constructible concept that defines alignment, sizing, and key performance criteria, allowing prospective design-build teams to fully understand construction limits and constraints.

The selected Design-Builder will be required to follow the Denver Service Center (DSC) design review workflow and submit 70%, 95%, and 100% design deliverables for NPS review and approval. Upon successful acceptance of the 100% design package, NPS will issue a Notice to Proceed for Construction, authorizing commencement of physical work.

Project Description: This project will relocate the Hite Small Boat Launch/Retrieval Ramp upstream of the Colorado River between the existing ramp location and the Utah State Highway Route 95 Bridge crossing the Colorado River. The existing launch ramp is no longer viable due to receding water levels, and the tributary is expected to remain dry under future low-water conditions. The proposed project relocates the ramp upstream to avoid sedimentation deposits from the Dirty Devil to an elevation that ensures long-term functionality.

Associated infrastructure improvements (roadway and parking area) will also be required to support the relocated facilities. The following summarizes the preliminary concept currently under development for the RFP.

Hite Small Boat Access / Ramp – Key Features
Feature
Approximate Quantity
Details
New Roadway
1.0 mile
Gravel access road
New Boat Launch Ramp
1,300 linear feet
Designed to accommodate J-boats
New Parking Area
One area (<5 acres)
Gravel parking for vehicles and trailers (constructed using surplus excavated material)

Hite Small Boat Access / Ramp – Approximate Quantities

Feature
Minimum Approximate Quantity
Earthwork
675,000 CY
Rock Blasting
450,000 CY
Aggregate Base
7,000 CY
Reinforced Concrete (or similar)
40,000 SF

Solicitation: At this time, NPS DSC anticipates issuing a competitive Request for Proposals (RFP) around February 2026; and awarding a single Firm-Fixed-Price (FFP) contract.

1. Submittal Instructions: Responses shall be captured by filling out (in its entirety) the attached Sources Sought Survey Questionnaire. The interested Contractor shall respond no later than 12:00pm Mountain Time (MT) on December 1, 2025, by emailing the questionnaire to the Contracting Officer at zaira_lupidi@nps.gov.

A14 Page 1 of 2 v1 Mar2025 Sources Sought Notice (SSN) image1.jpeg

File details come from the government source that posted it. Updated .