This is a Sources Sought Notice (SSN) issued by the National Park Service Denver Service Center for market research purposes regarding a water and sewer infrastructure project at Yosemite National Park in California.
The project involves replacement of water distribution and sanitary sewer systems serving the Big Oak Flat Welcome Center, Hodgdon Meadow Campground, and staff housing areas located 127 miles from the nearest suppliers. The water distribution work includes construction of approximately 17,200 linear feet of water lines, demolition and replacement of a water storage tank (100,000 gallons to 210,000 gallons), a new water source well and pump, a water treatment building, 3,200 linear feet of electrical distribution, and 3,800 linear feet of communications service. The sanitary sewer work includes approximately 3,500 linear feet of 6-inch sewer line, 20 manholes, and 3 service laterals connecting Big Oak Flat to Hodgdon Meadow systems. The NAICS code is 237110 (Water and Sewer Line Construction) with a small business size standard of 45.M. The anticipated period of performance is 670 calendar days, with construction scheduled to complete by approximately February 2029. The Government anticipates issuing a competitive Request for Proposals around January 2027 and awarding a single Firm-Fixed-Price contract. Performance and Payment Bonds are anticipated to be required. Responses to this market research survey are due by November 2, 2026 at 11:00 a.m. Mountain Time to Linda_Melnick@ios.doi.gov. The survey questionnaire requests company information, federal contracting experience, bonding capacity, small business certifications, estimated self-performance percentage, and factors influencing proposal submission interest.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A14 Page 1 of 2 Sources Sought Notice (SSN)
United States Department of the Interior
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
CONTRACTING SERVICES
1 DENVER FEDERAL CENTER, BUILDING 50
P.O. BOX 25287
DENVER, COLORADO 80225-0287
File Code: A14 Sources Sought Notice (SSN)
D5217 (DSC-CS)
YOSE 228661/196755
Solicitation No. 140PP027R0009
Date: 10/19/2026
To: SAM.GOV From: Linda Melnick / CO Subject: Sources Sought Notice (SSN)
Reference: YOSE 22866 Rehabilitate Hodgdon Meadows Water System and YOSE 196755 Extend Hodgdon Meadow Campground Sewer at Yosemite National Park, Mather District, Tuolumne County, California.
** This is a SSN for the purpose of conducting Market Research. Proposals are NOT being requested, nor accepted at this time. Responses are being requested from both Large and Small Businesses. **
1. Purpose:
a. The purpose of this SSN is to gain knowledge regarding the types of interested businesses and their qualifications. Information obtained through this SSN by the NPS will be utilized to develop the acquisition strategy. The amount of interest, or lack thereof, will determine the possibility of a Small Business or other Socio-Economic Set-Aside for solicitation and award purposes. Analysis of the quality of responses to this SSN will be considered in the Market Research being conducted and in the making of any set-aside determination for this requirement.;
b. The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a small business or other socio-economical small business set-aside for the solicitation. Analysis of the quality of responses to this source sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement; and
c. No solicitation, proposal package, specifications, or drawings are available with this SSN.
2. Cost Reimbursement: Response to this announcement is strictly voluntary. No reimbursement will be made for any costs associated with providing information in response to this SSN, nor any follow-up information requests.
3. Bonding: Bid, Performance, and Payment Bonds are anticipated to be required.
4. North American Industry Classification System (NAICS) code: 237110 Water and Sewer Line and Related Structures Construction and Size Standard: 45.M.
5. Project Description: This project is for replacement of a water distribution system and sanitary sewer system.
a. This project (water distribution and sanitary sewer) is located in Yosemite National Park, CA in the vicinity of the Big Oak Flat Entrance (Information) Station and Hodgdon Meadow Campground following along Tuolumne Grove Road and is to replace the existing water source, supply, and distribution system. The surrounding area is rural with limited staging area located along the construction route;
b. The construction site is 127 miles from nearest suppliers and lodging is located within 55 miles of the site;
c. The Park will remain open during construction, thus contract activities and logistics must be structured and scheduled to minimize visitor impact;
d. The site requires protective measures to ensure the surrounding area remains undisturbed;
e. The anticipated period of performance is 670 calendar days including any potential weather shutdown;
A14 Page 2 of 2 Sources Sought Notice (SSN)
f. There are seasonal/other shutdowns mandated through the construction season including for owl nesting;
and
g. Winter construction is not anticipated.
6. Project Scope: This project includes replacement of a water distribution and sanitary sewer system. The scope of the water distribution portion of the contract includes construction of 1,200 LF raw water line, 7,900 LF water supply, and 8,100 LF water distribution system and related appurtenances serving the Big Oak Flat Welcome Center, Hodgdon Meadow Campground, and staff housing areas; demolition of the existing 100,000-gallon welded steel water storage tank and construction of a new 210,000-gallon steel water storage tank and access road; construction of a new water source well and pump; construction of a new water treatment and control building; construction of 3,200 LF of electrical distribution and service; and construction of 3,800 LF of communications service. The scope of the construction of the sanitary sewer portion of the contract is for connection of the Big Oak Flat sanitary sewer to the Hodgdon Meadow Campground wastewater system and includes construction of approximately 3,500 LF of 6” sanitary sewer line, 20 sanitary sewer manholes, and 3 service laterals.
7. Solicitation: At this time, NPS DSC anticipates issuing a competitive Request for Proposals (RFP) around the
January 2027 timeframe and awarding a single Firm-Fixed-Price (FFP) contract.
8. Submittal Instructions: Responses shall be captured by filling out (in its entirety) the attached Sources
Sought Survey Questionnaire. The interested Contractor shall respond no later than 11:00 am Mountain Time (MT) on November 2m 2026 by emailing the questionnaire to the Contracting Officer at :Linda_Melnick@ios.doi.gov
Attachment: Sources Sought Questionnaire Attachment 1
A14 Page 1 of 2 Sources Sought Survey Questionnaire Attachment 1
United States Department of the Interior
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
CONTRACTING SERVICES
1 DENVER FEDERAL CENTER, BUILDING 50
P.O. BOX 25287
DENVER, COLORADO 80225-0287
File Code: A14 Sources Sought Notice (SSN) Survey Questionnaire
D5217 (DSC-CS)
YOSE 228661/196755
Solicitation No. 140PP027R0009
Subject: SSN Survey Questionnaire (Attachment 1)
Submittal Due Date/Time: November 2, 2026 at 11:00am MT
Submit To: Linda_Melnick@ios.doi.gov
We are interested in knowing the depth of your company’s interest in this project to help us determine the appropriate solicitation method. Complete this survey in its entirety and submit to the CO/CS listed above on or before the due date, to be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement.
1. Provide Company Name, address, Name and email of Point-of-Contact, and UEI?
2. What is your experience as the Prime Contractor for Federal Government constructions contracts similar to the scope and magnitude of this project including construction of water distribution systems, water storage tanks, water source wells/treatment, and sanitary sewer systems?
3. This project will require Insurance and Performance and Payment Bonds. What is your company’s bonding capacity (no letters required)?
4. Under the above listed NAICS, Small Business Administration (SBA) is your company certified as the following, please check all applicable boxes:
a. ☐ Economically Disadvantaged Woman Owned Small Business (EDWOSB)
b. ☐ Historically Underutilized Business Zone (HUBZone)
c. ☐ Indian economic enterprise (IEE)
d. ☐ Indian Small Business Economic Enterprise (ISBEE)
e. ☐ Other Native American Owned Company
f. ☐ Service-Disabled Veteran-Owned Small Businesses (SDVOSB)
g. ☐ Veteran-Owned Small Businesses (VOSB)
A14 Page 2 of 2 Sources Sought Survey Questionnaire Attachment 1
h. ☐ SBA certified Woman Owned Small Business (WOSB)
i. ☐ Other:
What estimated percent of this work will your company self-perform?
What will influence your company’s commitment to submitting a proposal for this project? Please check all applicable boxes.
a. ☐ Solicitation posting (approximately January 2027)
b. ☐ Schedule completion date for all construction (by approximately February 2029)
c. ☐ Details of the Specifications and Drawings for the Request for Proposal?
d. ☐ Other commitments/contracts?
e. ☐ Other? (Explain):
Is your interest in being a Prime Contractor or Subcontractor: ☐ Prime ☐ Subcontractor
File details come from the government source that posted it. Updated .