This is a Pre-Solicitation Notice for a design-build bridge construction project issued by the Bureau of Land Management (BLM), Department of the Interior.

The BLM seeks a design-build contractor to furnish all labor, materials, equipment, and supervision for the GAOA Centennial Trail Bridge project located near Sturgis, South Dakota, in the BLM Fort Meade Recreation Area. The contractor must design and construct abutments with riprap abutment protection and install a steel or timber bridge in accordance with AASHTO LRFD Bridge Design Specifications and FHWA Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24). The project budget ranges from $250,000 to $500,000 with an estimated performance period of 290 calendar days after notice to proceed. This is a Total Small Business set-aside restricted to companies qualifying as small businesses under the $45.0 million size standard for NAICS code 237310 (Highway, Street, and Bridge Construction). The solicitation number is 140L0626R0016, with a formal Request for Proposals anticipated in August 2026 and a 30-day proposal submission deadline following RFP issuance. Prospective offerors must maintain an active System for Award Management (SAM) profile with a Unique Entity ID (UEI) and completed representations and certifications. A mandatory site visit is scheduled for approximately 1-2 weeks after RFP issuance. The point of contact is Quinndora Byrd, Contracting Specialist, at quinndora_byrd@ios.doi.gov.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

BUREAU OF LAND MANAGEMENT

National Operations Center Building 85, Denver Federal Center

P.O. Box 2547 https://www.blm.gov

GAOA Centennial Trail Bridge

SOLICITATION #140L0626R0016

Pre-Solicitation Notice

Solicitation Number: 140L0626R0016 Project Identification: GAOA Centennial Trail Bridge Point of Contact: Quinndora Byrd, Contracting Specialist, quinndora_byrd@ios.doi.gov Project Location: The proposed area located near Sturgis, South Dakota, in the BLM Fort Meade Recreation Area. Centennial Trail Bridge. Latitude & Longitude: 44.414823°, -103.481757° is the center of the bridge.

Magnitude of Construction: Between $250,000 - $500,000 Estimated Period of Performance: 290 calendar days after issuance of the notice to proceed.

North American Industry Classification System (NAICS) code: 237310 – Highway, Street, and Bridge Construction Produce Service Code: Y1LB – Construction of Highways, Roads, Streets, Bridges, and Railways Small Business Size Standard: $45.0M Solicitation Set-Aside: Total Small Business – Only companies that qualify as a small business under the applicable size standard will be considered.

Solicitation Issuance Date: The BLM anticipates issuing a subsequent request for proposals (RFP) in August 2026.

Proposal Submission Deadline: Exact date unknown at this time / 30-days after the issuance of the RFP.

Registration Requirements: Perspective offerors must have a Unique Entity ID (UEI) and an active System for Award Management (SAM) profile to included completed representations and certifications.

https://sam.gov/content/home Site Visit: Yes – Approximately 1-2 weeks after the issuance of the RFP. Refer to FAR provision 52.236-27 within the subsequent solicitation.

Project Description: The Bureau of Land Management (BLM) requires a design-build contractor to furnish all labor, materials, equipment, and supervision necessary to deliver fully integrated design and construction services for the GAOA Centennial Trail Bridge project near Sturgis, South Dakota. Furnishing labor, equipment, supplies, and materials to design and construct abutments, riprap abutment protection, and to install an appropriately designed steel or timber bridge, designed in accordance with AASHTO “LRFD Bridge Design Specifications.” Bridge construction shall follow the FHWA “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP‐24).”