A14_MRR_SourcesSought_ROMO_316133_3_16_2022_1.pdf

PDF 122 KB Posted

Attached to
ROMO 316133 Reconstruct Housing Destroyed by Fire
Solicitation number
140P2022R0109
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The National Park Service has a requirement for the following Design-Build project. If you are interested, please submit your detailed capabilities in WRITING to demonstrate same or similar experience. This is NOT a request for proposal or invitation to bid. No proposal package, solicitation, specification or drawings are available with this announcement. Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests. If you choose to submit a package, clearly identify the park and project on your package (Rocky Mountain National Park

ROMO - 316133 Reconstruct Housing) and identify your socioeconomic status (8(a), HUBZone, Service-

Disabled Veteran, WOSB, EDWOSB, and Small).

Your email capability information MUST be 6 pages or less and be SPECIFIC to the scope provided. You must also provide a letter from your bonding company verifying your bonding levels as well as your respective DUNS number.

Your response is due no later than 4:00 pm Mountain Time on March 31, 2022.

The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a competitive set-aside or full and open competition (the size of a small business firm includes all parents, subsidiaries, affiliates, etc.—see 13

CFR 121.108.) Misrepresentation of size status can result in penalties. All firms should be registered and certified in www.SAM.gov.

Please refer to the current SBA rules regarding HUBZone firms, effective October 1, 2011.

Qualifications statements shall be submitted via email to James Waller (Contracting Officer) james_waller@nps.gov and Edwin Berry (Contract Specialist) Edwin_berry@contractor.nps.gov, Analysis of the quality of responses to this sources sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement.

Rocky Mountain National Park

Reconstruct Housing and Infrastructure Destroyed by Fire

NAICS Code: 236117 – New Housing For-Sale Builders

Estimated Cost Range: $15 Million - $25 Million

Estimated Period of Performance: October 2022 – July 2024

Project Description

The Contractor will perform design-build, performance-based construction. The project will consist of replacing housing and RV sites lost to wildfire in 2020. A combination of dorm and one and two bedroom units will be constructed to replace the 22 beds lost and the five RV sites. A residential support http://www.sam.gov/ mailto:james_waller@nps.gov mailto:Edwin_berry@contractor.nps.gov facility will be constructed that provides laundry, showers, kitchen, and a gathering place for employees.

Infrastructure to support this project includes construction of roads, water, sewer, telecom, and electrical systems which will connect to the existing adjacent year-round systems.

The housing destroyed by the fire will be relocated next to existing permanent staff housing. The fire damaged seasonal infrastructure at the previous location will be removed.

Specifically, the contractor will perform design/build services to accomplish the following:

• Construction of modular housing or National Prototype residential units.

• A combination of dorm and one and two bedroom units will be constructed to replace the 22 beds lost and the five RV sites. 1 unit in each building shall be accessible.

• A residential support facility will be constructed that provides laundry, showers, kitchen, and a gathering place for employees.

• Infrastructure to support this project includes construction of roads, water, sewer, telecom, and electrical systems which will connect to the existing adjacent year-round systems. Re-use existing RV spaces and add new locations for a total of (13) VIP RV spaces.

• The housing destroyed by the fire will be relocated next to existing permanent staff housing.

• The fire damaged seasonal infrastructure at the previous location will be removed.

Firms interested in the project should possess the following specialized skills and experience and address these specialized skills and experience in their responses to this Notice.

1) Experience in the construction of similar complexity and size projects including construction of water, electrical and telecom utilities; and site civil work to include grading improvements.

2) Shall demonstrate working with Architect/Engineering firms on similar complexity and size projects.

3) Experience utilizing the design/build process for projects of similar complexity and size projects with A/E Firms.

4) Experience with multi-family housing construction projects of similar size and complexity.

5) Experience working in a similar environment, including:

a. Responsibility for the protection of cultural and natural resources

b. Experience working in coastal areas including work in areas prone to flooding and hurricanes.

c. Experience working in remote area where material deliveries and worker commutes are difficult.

Bonding Capability

Interested firms MUST provide a letter from their bonding company to confirm their bonding capacity.

File details come from the government source that posted it. Updated .