A14. JSA-25-P446017.pdf
PDF 5 MB Posted
- Attached to
- SNS 2KCB Cryo Control Valves
- Solicitation number
- JSA-25-R446017
- Issued by
-
Department of Energy
About this file
This is a Request for Proposal (RFP) from Thomas Jefferson National Accelerator Facility (TJNAF) for the design, fabrication, inspection, testing, and delivery of six SNS 2KCB Cryo Control Valves for the Spallation Neutron Source (SNS) 2.1 K Cold Box project. The solicitation (JSA-25-R446017) seeks cryogenic valves to maintain a bath of saturated liquid helium at 2.1 K inside the facility's cryomodules, with valves classified as suction isolation, discharge isolation, bypass, and backfill valves.
Key details include a proposal due date of October 25, 2025, with TJNAF intending to award a firm fixed-price subcontract by November 2025. The evaluation will use a Best Value/Trade-Off selection process, with technical factors weighted at 50% (including flow coefficient, heat leak, and general technical requirements), schedule at 30%, proposal completeness at 10%, and quality at 10%. Proposals must be submitted electronically, with delivery of all valves required within 26 weeks after contract award. Bidders must be on TJNAF's Approved Vendors List for welding fabrication and meet specific technical, quality, and documentation requirements outlined in the comprehensive statement of work.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
September 25, 2025
To: Interested Firms
Thomas Jefferson National Accelerator Facility (TJNAF) invites you to participate in the attached Request for Proposal (RFP) for the design, fabrication, inspection, testing, and delivery of six SNS 2KCB Cryo Control Valves. All documents listed on the RFP form PD 6 are contained within this email.
• All information has been posted on our Solicitation Bulletin Board – http://www1.jlab.org/ul/Bus_ops/ . All documents listed on the RFP form PD 6 can be viewed and downloaded from TJNAF’s solicitation bulletin board. In addition, this RFP will be posted on SAM.gov.
• If you are interested in submitting a proposal in response to this solicitation, be sure to register for this specific solicitation on the above website and let me know by a return email. Any amendments or other information associated with the requirement will be posted on the Solicitation Bulletin Board, and by registering, you will be automatically notified when postings occur.
• Also, please pay very close attention to the Instructions to Offerors and adhere to the proposal instructions to the letter. The format of your proposal is very important to facilitate an efficient and timely review process.
• Please reference Solicitation # JSA-25-R446017 on all communication to TJNAF related to this solicitation.
• If you are not interested in providing a proposal for this requirement, please send a “No Bid” notification to me via email.
Please note the following important dates:
• Questions regarding the solicitation must be submitted in writing to me not later than 4:30 PM (Eastern Standard Time) on October 15, 2025. TJNAF will need time to respond to the questions and in turn provide you the opportunity to incorporate any new information into your proposals
• Proposals are due no later than 4:30 PM (Eastern Standard Time) on October 25, 2025 It is TJNAF’s intent to award a subcontract for the SNS 2KCB Cryo Control Valves by November 2025.
Should you have any questions, please send an email to Jessie@jlab.org or call me at 757-269- 7061. If I am not available, you may contact Mitch Laney (laney@jlab.org) at (757) 269-5338.
Sincerely, Jessie Tenbusch Procurement Officer http://www1.jlab.org/ul/Bus_ops/ mailto:laney@jlab.org
Page 1 of 2 PD 6 (DEC 2022)
REQUEST FOR PROPOSAL (RFP)/REQUEST FOR QUOTE (RFQ)
SOLICITATION, OFFER AND AWARD
RFP/RFQ No.: JSA -______-_________ Date Issued:
Proposals/Quotes Are Due:
No later than _____ PM EST on ________
Site Visit:
☐ Will Be Held At ______ PM EST on ______ (See #4 Below) ☐ Will Not Be Held
Procurement Officer: Telephone: Email:
Alternate Contact: Telephone: Email:
1. PROPOSAL/QUOTE INSTRUCTIONS – SUBMIT ALL OF THE FOLLOWING WITH YOUR PROPOSAL:
a. Completed/Signed PD 6 Form
b. Proposal or Bid Schedule
c. Completed/Signed Representations and Certifications
d. Other Information as described in the attached Proposal/Quote Instructions
2. BASIS FOR AWARD – AWARD WILL BE MADE AS INDICATED BY BOX MARKED BELOW:
☐ Best Value – Tradeoff Process ☐ Best Value – Low Price Technical Acceptability ☐ Specific evaluation factors apply to this solicitation. See the Evaluation and Award criteria.
3. CONSTRUCTION MAGNITUDE (Minimum: $ , Maximum: $ , Not Applicable: )
4. SITE VISIT – ATTENDANCE AT A PRE-PROPOSAL SITE VISIT ☐ IS ☐ IS NOT REQUIRED
If required, offerors must attend a site visit to be eligible for award of any subcontract resulting from this solicitation. Attendees must report to the Support Service Center (SSC) building (Building No. 28), 628 Hofstadter Road, Newport News, VA, no later than the date and time specified above. Additional site visits / conferences will only be held if the Procurement Officer determines they are in the best interest of Jefferson Lab. The following are applicable if box is checked:
☐ Hard hats, safety shoes, and safety glasses are required.
☐ Attendees must pre-register for the site visit by sending an e-mail to the Procurement Officer with the company name and number of attendees. Registration deadline for the site visit is _______ on ________.
Non-U.S. citizens see International Visitors for additional requirements for international visitors.
☐ All attendees must have a valid picture ID.
5. ☐ QUESTIONS –
Any questions related to the RFP/RFQ must be in writing and should be sent by email or by fax to the attention of the Procurement Officer or mailed to the Procurement Office business address. For expediency, email is highly preferred. All inquiries regarding this solicitation must be received no later than to allow JSA sufficient time to respond. Please reference the solicitation number in your correspondence.
6. SHIPPING TERMS: FOB Destination unless otherwise specified
7. NOTICE OF TOTAL SMALL BUSINESS SET-A SIDE:
☐ If the box to the left is marked “ ” this solicitation is set aside to small business firms only. Offers/bids received from concerns that are not small business concerns shall be considered non-responsive and will be rejected. The North American Industry Classification System (NAICS) code for this requirement is: ________. The Small Business size standard in millions of dollars is _______, and the Small Business size standard in number of employees is ________.
8. STATE AND LOCAL TAXES –
Unless otherwise indicated below or elsewhere in the solicitation or purchase order, prices shall include all applicable Federal, State, and Local Taxes.
https://www.jlab.org/visiting/international-visitors https://www.jlab.org/visiting/international-visitors
Page 2 of 2 PD 6 (DEC 2022)
☐ This requirement is exempt from Commonwealth of Virginia Sales and Use Taxes. A Certificate of Exemption form will be provided at award.
☐ Any Virginia Sales and Use Tax shall be included in the total price, however, shall be detailed separately in the quote and invoice.
9. APPLICABLE TERMS AND CONDITIONS- The Sections marked below are applicable and attached to this solicitation.
☐ Fixed Price Supply- Form TC-1 Commercial ☐ Fixed Price Supply- Form TC-2 Non-Commercial ☐ Fixed Price Services- Form TC-3 Commercial ☐ Fixed Price Services- Form TC-4 Non-Commercial ☐ Fixed Price Construction - Form TC-5 Construction ☐ Environment, Safety and Health Requirements (included in Specification) ☐ Service Contract Act Age Determination ☐ Davis-Bacon Act Wage Determination
10. SPECIFICATIONS, DRAWINGS, AND/OR EXHIBITS LISTED BELOW ARE ATTACHED IF BOX MARKED Required Bonds (Sample Bonds – See SF24, SF25 and SF25A here: GSA Forms)
☐ Bid Bond ☐ Performance Bond ☐ Payment Bond
Attachments included in package ☐ Instruction to Offerors ☐ Proposal or Bid Schedule ☐ Combined Specification/ Drawings ☐ Terms and Conditions ☐ Terms and Conditions Certification ☐ Davis-Bacon Rates ☐ Representations and Certifications ☐ Amendments Issued under
OFFER (COMPLETE AND SIGN)
Acknowledgement of Amendments:
Amend. No. Amend. No. Amend. No. Amend. No. Amend. No.
Payment Terms: Indicate any prompt payment discounts; otherwise, payment terms shall be Net 30 days. _________
FIRM SUBMITTING OFFER INFORMATION:
Company Name: Phone Number: Email / Fax Number:
Address: City: State: Zip:
AUTHORIZED PERSONAL TO SIGN OFFER INFORMATION:
Name: Title:
Signature: Offer Date:
RFP/RFQ NUMBER:
https://www.gsa.gov/reference/forms https://www.gsa.gov/reference/forms
Instructions to Offerors & Evaluation Process Page 1
RFP JSA-25-R446017
INSTRUCTIONS TO OFFERORS & EVALUATION PROCESS
RFP JSA-25-R446017 SNS 2KCB Cryo Control Valves
I. PROPOSAL INSTRUCTIONS
A. GENERAL
Thomas Jefferson National Accelerator Facility (TJNAF) is looking to procure the design, fabrication, inspection, testing, and delivery of six Cryogenic Valves per the Technical Specification located in this RFP package. To be considered for award you must submit an offer and the requested information in this Request for Proposal (RFP) package demonstrating your capability and your understanding of TJNAF’s requirements. This RFP will be a full and open competition with a Best Value/Trade-Off supplier selection process. It is TJNAF’s intent to make the award by no later than November 2025. The result of this solicitation will be a firm fixed price subcontract.
1. Unless this RFP expressly authorizes alternate proposals with respect to specific terms or conditions of this RFP, your (1) failure or refusal to assent to any of the terms and conditions of this RFP, (2) proposal of additional terms or conditions, or (3) omission of any material information, will constitute a deficiency, which may make your offer unacceptable to TJNAF.
2. While TJNAF may work with the offeror through the discussion process to correct proposal omissions, errors or deficiencies, TJNAF reserves the right to award this subcontract based upon the initial offers received, without discussions. Therefore, TJNAF advises all offerors to consult with the procurement officer before submitting an offer that proposes a different design or product unless such alternate design or products are encouraged by the Technical Specifications. TJNAF also reserves the right to conduct discussions and to permit offerors to revise their proposals if it is in the best interest of the solicitation.
3. When evaluating your capability to perform the prospective subcontract (see Evaluation Factors for Award) TJNAF will consider how well a supplier complied with the outlined instructions to offerors. TJNAF will consider any significant failure to comply with these instructions to be indicative of what we could expect from you during subcontract performance. Please contact the procurement officer if you do not understand any part of the solicitation instructions.
4. Offerors must submit their proposals in an electronic format.
B. CONTENTS OF PROPOSALS
1. Business Proposal must include the following:
Instructions to Offerors & Evaluation Process Page 2
The completion and submission to TJNAF of the following items will constitute your offer to perform in accordance with the terms and conditions of the RFP, including attachments and documents incorporated by reference.
(a) Price Proposal - Completed RFP Bid Schedule and Milestone Payment Schedule
(a) RFP form PD 6 - “Solicitation, Offer and Award” - Complete “Offer” section and sign.
(b) RFP Reps/Certs-2 - “Representations/Certifications” – Complete and sign.
(c) Solicitation Amendments - Acknowledge all solicitation amendments (if applicable)
(d) Terms and Conditions Certification (PD 46 Form) - Complete and sign. Your offer must communicate your consent to the terms and conditions in this RFP, its attachments, and documents incorporated by reference. Complete the attached “Terms and Conditions” Certification, stating the degree to which you will meet the requirements of this solicitation. Document any discrepancies, conflicts, or exceptions taken to the Technical Specification or any solicitation clauses as follows:
(1) Explanation of any discrepancies,
(2) Explanation of any conflicts,
(3) Explanation of any exceptions taken, and
(4) Explanation of and supported advocacy rationale for any changes proposed to resolve discrepancies, conflicts, and/or exceptions.
2. Technical Proposal must include the following:
(a) Documentation on the Overall System Design Capability – TJNAF evaluation will consist of the supplier’s conformity to the required specifications, understanding of all technical requirements, and documentation of proven reliability on all system components.
(b) Documentation of Qualifications, Experience, and Past Performance- TJNAF evaluation will consist of the supplier’s previous experience with similar job scopes including a list of references (at least three), documentation that the supplier has adequate facilities and equipment to complete all required work, and that the supplier has all the necessary key personnel needed to complete all the required work (design, fabrication, test, inspection, and delivery) as identified in the Technical Specification.
Instructions to Offerors & Evaluation Process Page 3
(c) Documentation of Project Management – TJNAF evaluation will consist of the supplier’s quality assurance manual, specifically focusing on the testing and inspection portions, and a full milestone project plan stating all delivery dates.
Suppliers are to show that adequate project management and technical resources are available and are to describe that in the event of a loss to a key staff member, a subcontractor, or a technical support resource availability, those resources would be replaced to mitigate risk and maintain a successful, sustainable project effort.
II. EVALUATION FACTORS FOR AWARD
A. General
Jefferson Lab (TJNAF) will award a subcontract based on Best Value determined by (1) Capability and (2) Price. Capability will be assessed based on two categories: Responsible/Responsiveness and Technical, as outlined below:
1. Responsible/Responsiveness: TJNAF will consider an offer capable if it meets the terms and conditions of the RFP, including all attachments and documents incorporated by reference. Any exceptions to TJNAF specifications will be subject to review and approval before award. Exceptions, additional conditions, or omissions may render the offer ineligible. All exceptions must be documented on the PD 46 T&C Certification form.
If you (1) take exception to any of the terms and conditions of the RFP except as specifically authorized therein, (2) impose additional conditions, or (3) omit material information required by this RFP, then TJNAF may consider your offer to be unacceptable and you to be ineligible for subcontract award. All exceptions must be documented on the PD 46 T&C Certification form.
2. Technical: Offerors must demonstrate extensive capabilities and experience in fabricating Cryogenic Valves.
TJNAF will evaluate capability based on four factors: (a) Technical, (b) Schedule (c) Proposal and
(d) Quality. The subfactors listed below are part of the evaluation process:
(a) Factor 1: Technical (50% of Total Evaluation Rating)
Suppliers must demonstrate conformance to the required specifications, understanding of technical requirements, and proven reliability in delivering Cryogenic Valves. Documentation must include:
• Subfactor 1: Flow coefficient (30%). Flow coefficients of proposed valves are equal to or larger than the requirements obtained from the process design and listed in the specification
Instructions to Offerors & Evaluation Process Page 4
• Subfactor 2: Heat leak (30%). Stem heat leak of proposed valves are equal to or less than the requirements obtained from the process design and listed in the specification documents.
• Subfactor 3: General technical requirements (40%). Other technical requirements pertaining to the valves and actuators meet the project needs.
(b) Factor 2 Schedule Offeror’s proposed products and delivery schedule will not impede JLab’s ability to complete the project on schedule. (30% of Total Evaluation Rating)
• Subfactor 1: Delivery (40%). Offeror’s proposed delivery schedule is in line with overall project schedule and manufacturing timeline.
• Subfactor 2: Integration (60%). Size and shape of proposed product is in line with specifications, and will not require substantial rework of the preliminary design to incorporate.
(c) Factor 3: Proposal. Offeror’s proposal is complete with no substantial deviations from the requirements. (10% of Total Evaluation Rating)
• Subfactor 1: Completeness (50%). All of the requested information has been included with the proposal. Enough detail is included to judge whether the proposed product meets the project needs.
• Subfactor 2: Exceptions (50%). Any exceptions are clearly stated and will not substantially impact JLab’s ability to meet the end user’s technical and record-keeping requirements.
(d) Factor 4: Quality Offeror’s proposal documentation shows compliance with JLab’s quality requirements and welding program. (10% of Total Evaluation Rating)
• Subfactor 1: Quality Program (25%). Evidence of an effective Quality Assurance Program that reasonably conforms to industry standards for the product.
• Subfactor 2: Welding Program (75%). Vendor’s welding procedures and personnel are qualified according to JLab and ASME requirements.
3. Rating Plan – Suppliers will be rated on the above factors and subfactors as per the below rating plan:
SUPERIOR (Numeric Score 4.0 to 5.0) Offeror’s proposal demonstrates excellent understanding of requirements, and significantly exceeds TJNAF’s minimum capability and/or performance standards.
Proposal has exceptional strengths that provide a high degree of benefit to TJNAF and/or considerably less than average risk.
Instructions to Offerors & Evaluation Process Page 5
NOTABLY ABOVE AVERAGE (Numeric Score 3.0 to 4.0) Offeror’s proposal demonstrates good understanding of requirements and exceeds TJNAF’s minimum capability and/or performance standards. Proposal has one or more strengths that provide some degree of benefit to TJNAF and there are few, if any, minor deficiencies that result in less than average risk.
AVERAGE (Numeric Score 2.0 to 3.0) Offeror’s proposal demonstrates acceptable understanding of requirements and meets TJNAF’s minimum capability and/or performance standards. The proposal provides few or no strengths; and may have minor deficiencies that result in an average risk to satisfactory performance.
MARGINAL (Numeric Score 1.0 to 2.0) Offeror’s proposal demonstrates shallow understanding of requirements, and only marginally meets capability and/or performance standards. Proposal has a number of minor deficiencies, or one or more major deficiencies that could impact offeror’s capability to provide acceptable performance, and cause TJNAF to undertake considerable risk.
POOR (Numeric Score 0.0 to 1.0) Offeror’s proposal fails to meet capability and/or performance standards. Proposal has a gross deficiency or numerous other deficiencies which causes the Offeror’s proposal to be non-compliant in one or more area(s) and could cause TJNAF to undertake unreasonably high risks.
4. Remote Interview/On-Site Visitation (If Necessary)
TJNAF may invite a supplier for a remote interview or request an on-site visitation in order to further discuss the details of the technical proposal during the evaluation process. The Procurement Officer will be the one responsible for coordinating any meeting between the supplier and the TJNAF technical team. The supplier’s prospective Project Manager and members of the engineering team, and key personnel would be expected to participate in any interview or on-site visitation. Any additional information received from a remote interview/on-site visitation may increase or decrease a supplier’s technical evaluation rating.
Note: It is expected that the awarded supplier’s technical team will participate in routine virtual meetings with TJNAF team. Site visitations by the TJNAF team at various key points throughout the project to monitor progress will also occur.
5. Price and Price Related Factors
Instructions to Offerors & Evaluation Process Page 6
Cost and total price will be evaluated by the Procurement Officer. Price will not be numerically scored but will be weighed against the advantages of each supplier’s technical proposal to determine if the higher rated technical proposals merit the increased price differentials. If there are multiple suppliers that are technically rated equal, price can be a determining factor.
TJNAF, at their sole discretion, may use a competitive range determination to eliminate offers from further consideration after initial proposal receipt due to significant technical deficiencies or excessive or unrealistic pricing when compared to TJNAF estimates or all other offers received.
6. Source Selection Decision
A comparative assessment of technical proposals that are in the competitive range will be evaluated and ranked from first to last by the TJNAF Technical Evaluation Team based on the weighted technical criteria stated in the sections above. The supplier with the best overall Best Value/Trade-Off proposal will be awarded the subcontract.
III. OTHER INSTRUCTIONS AND PROPOSAL CONDITIONS
A. DEFINITIONS
As used in this provision –
1. Wherever the term “bid” or “bidder” appears, it is referring to the offer or offeror.
2. "Discussions" are negotiations that occur after establishment of the competitive range that may, at the Procurement Officer's discretion, result in the offeror being allowed to revise its proposal."
3. “Offer” means “proposal” in negotiations.
4. "Proposal modification" is a change made to a proposal before the solicitation's closing date and time, made in response to an amendment, or made to correct a mistake at any time before award.
5. "Proposal revision" is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Procurement Officer as the result of negotiations.
6. “Solicitation” means “Request for Proposal (RFP)” or “Request for Quotations (RFQ)” in negotiations.
Instructions to Offerors & Evaluation Process Page 7
7. "Time," if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
B. SUBCONTRACT AWARD NOTES
1. TJNAF will award a subcontract resulting from this solicitation after a Best Value determination is made in accordance with all factors outlined in the RFP package.
2. TJNAF may reject any or all offers if such action is in the public interest.
3. TJNAF may reject any offer that is deemed deficient in any critical capability area or an offer that is non-responsive to the Technical Requirements and Terms and Conditions to the extent that the deficiency in capability or the non-responsiveness cannot be remedied within the time allotted for evaluation of the offers.
4. TJNAF may award a subcontract on the basis of initial offers received, without discussions. Therefore, your initial offer should contain your best terms, from a cost or price and technical standpoint.
5. TJNAF may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may be submitted for quantities less than those specified. TJNAF reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specified otherwise in the offer.
6. Financial data neither submitted with an offer, nor representations concerning facilities or financing, will form a part of the resulting subcontract. However, if the resulting subcontract contains a clause providing for price reduction for defective cost or pricing data, the subcontract price will be subject to reduction if cost or pricing data furnished is incomplete, inaccurate, or not current.
C. AMENDMENTS TO SOLICITATIONS
1. If this solicitation is amended, then all terms and conditions that are not modified remain unchanged.
2. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified for receipt of offers.
D. SUBMISSION OF PROPOSALS
Instructions to Offerors & Evaluation Process Page 8
1. Offerors must submit their proposals in an electronic format as described in Section L below.
2. Proposals shall be submitted as specified in the solicitation, and shall show:
(a) The solicitation number;
(b) The name, address, telephone and e-mail contact address of the offeror ;
(c) Names, titles, telephone numbers, and e-mail contact addresses of persons authorized to negotiate on the offeror's behalf with TJNAF in connection with this solicitation; and
(d) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
3. Offerors are responsible for submitting proposals, and any modification, or revisions by the date and time specified in the solicitation.
4. Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.
5. Offerors shall submit proposals in response to this solicitation in English and in U.S.
dollars, unless otherwise permitted by the solicitation.
6. Item samples, if required, must be submitted within the time specified for receipt of offers. Unless otherwise specified in the solicitation, these samples shall be (1) submitted at no expense to TJNAF, and (2) returned at the sender's request and expense, unless they are destroyed during pre-award testing.
7. Offerors are expected to examine the drawings, technical specifications, and all instructions in the RFP package. Failure to do so will be at the offeror’s risk.
8. Offers for supplies or services other than those specified will not be considered unless authorized by the solicitation.
9. Offerors must state a definite time for delivery of supplies or for performance of services, unless otherwise specified in the solicitation.
E. LATE SUBMISSIONS
1. Any proposal, modification, or revision received by TJNAF after the designated time and date specified in the solicitation package is "late" and will not be considered unless the Procurement Officer determines that accepting the late offer would not unduly delay the acquisition.
Instructions to Offerors & Evaluation Process Page 9
2. A late modification of an otherwise successful proposal that makes its terms more favorable to TJNAF, will be considered at any time it is received and may be accepted.
3. If an emergency or unanticipated event interrupts normal TJNAF processes so that proposals cannot be received by the exact date and time specified in the solicitation, and urgent TJNAF requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal TJNAF processes resume.
F. WITHDRAWALS, MODIFICATIONS AND REVISIONS TO PROPOSALS
1. Proposals may be withdrawn by the offeror at any time before award. Withdrawals are effective upon receipt of notice by the Procurement Officer.
2. Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
3. Offerors may submit revised proposals only if requested or allowed by the
Procurement Officer.
G. OFFER EXPIRATION DATE
Proposals in response to this solicitation will be valid for ninety (90) days unless the offeror proposes a longer period.
H. RESTRICTION ON DISCLOSURE AND USE OF DATA
Offerors that include in their proposals data that they do not want disclosed to the public for any purpose or used by TJNAF or the United States Government except for evaluation purposes, shall—
1. Mark the title page with the following notation: "This proposal includes data that shall not be disclosed outside TJNAF or the United States Government and shall not be duplicated, used, or disclosed--in whole or in part--for any purpose other than to evaluate this proposal. If, however, a subcontract is awarded to this offeror as a result of--or in connection with--the submission of this data, TJNAF or the United States Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting subcontract. This restriction does not limit TJNAF's or the United States Government’s right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets ”, and
Instructions to Offerors & Evaluation Process Page 10
2. Mark each sheet of data it wishes to restrict with the following notation: "Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal."
I. UNNECESSARILY ELABORATE PROPOSALS OR QUOTATIONS
Unnecessarily elaborate proposals beyond those sufficient to present a complete and effective response to this solicitation are not desired and may be construed as an indication of the offeror's lack of cost consciousness.
J. EXPLANATION TO PROSPECTIVE OFFERORS
Any prospective offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it by the date provided in the Solicitation Form (PD 6) to allow a reply to reach all prospective offerors before the submission of their offers. Oral explanations or instructions given before the award of a subcontract will not be binding. Any information given a prospective offeror concerning a solicitation will be furnished promptly to all other prospective offerors as an amendment to the solicitation, if that information is necessary in submitting offers or if the lack of it would be prejudicial to other prospective offerors.
K. WEB POSTING AND ACCESSING SOLICITATION DOCUMENTS
This requirement will be posted on the System for Award Management (SAM) website at SAM.gov and on the TJNAF solicitation portal at http://www1.jlab.org/ul/Bus_ops/ It is the offeror's responsibility to register and monitor the solicitation portal for amendments or revisions to the solicitation.
L. ELECTRONIC PROPOSALS
1. Electronic as used in this provision, means a proposal, revision or modification of a proposal, or withdrawal of a proposal that is transmitted to and received by TJNAF via electronic means.
2. Offers must be submitted via electronic means.
3. If any portion of the electronic submission is received by the Procurement Officer and is unreadable to the degree that conformance to the essential requirements of the solicitation cannot be ascertained from the document –
(a) The Procurement Officer shall immediately notify the offeror and permit the offeror to resubmit the proposal;
http://www1.jlab.org/ul/Bus_ops/
Instructions to Offerors & Evaluation Process Page 11
(b) Time for resubmission shall be prescribed by the Procurement Officer after consultation with the offeror; and
(c) The resubmissions shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timeliness, provided the offeror complies with the time and format requirements for resubmission prescribed by the Procurement Officer.
Item No. Description Quantity Unit Unit Price
Extended Amount (Firm Price in US
Dollars)
001 Suction Isolation Valve per 79220-S003-SOW and 79220-S003-01 2 EA $ - $ -
002 Discharge Isolation Valve per 79220-S003-SOW and 79220-S003-02 2 Ea $ - $ -
003 Bypass Valve per 79220-S003-SOW and 79220-S003-03 1 Ea $ - $ -
004 Backfill Valve per 79220-S003-SOW and 79220-S003-04 1 Ea $ - $ -
005 Documentation incl. MTR, test reports, etc. per 79220-S003-SOW 1 LOT $ - $ -
$0.00
THE BID SCHEDULE IS PROVIDED IN EXCEL FORMAT FOR CONVENIENCE IN COMPLETING PRICING. OFFEROR SHOULD CONFIRM ACCURACY OF INPUT. PLEASE DO NOT MAKE ANY CHANGES IN FORMAT OR TEXT. DEVIATIONS SHOULD BE NOTED WITHIN THE PROPOSAL. THANK YOU.
TOTAL FOR ALL
ITEMS 001-005
BID SCHEDULE
RFP JSA-25-R446017 - SNS 2KCB Cryo Control Valves Decsription: Subcontractor shall provide all labor, materials, facilities, equipment, and supervision to fabricate, test, inspect, and deliver 6 SNS 2KCB Cryo Control Valves per the technical specification located in this RFP. This shall be a firm fixed price subcontract for these items. Award will be based on a Best Value technical evaluation.
Technical evaluation criteria is located in the Instruction to Offerors section of this RFP. Please ensure to hold pricing for (90) days after RFP Submittal.
Date:
Supplier Name:
Note 1: Shipment shall be in accordance with the Required Delivery Schedule as noted in Clause JSA-200 of the Terms and Conditions. Supplier shall provide best delivery date. Delivery date will be part of the evaluation process as per the Instructions to Offerors located in this RFP Package
Note 2: Milestone Payments: Due to the length of the project it is expected that the subcontractor will propose a milestone payment schedule. Please submit the milestone payment schedule only in accordance with Clause JSA-120 of the Terms and Conditions. Milestone Payment Schedules shall be formatted in accordance with the attached Milestone and Payment Schedule Request.
Note 3: Shipment of equipment will be made to JLab. The Buy American Act requires that for evaluation purposes that Customs and Duties be evaluated when determining an award to a foreign source over a Domestic offer. Therefore, provide a total amount below for Customs and Duties that would apply should Duty Free Entry not be approved by the Department of Energy - $_____________
Note 5: Reference clause JSA 217 entitled FOB DESTINATION – INCOTERMS DELIVERED AT PLACE (DAP) (MAY 2020). Please note that paragraphs A and B are no longer applicable as Duty Free Entry is not applicable. As such the Seller will bear all costs and risks required to bring the goods to the Destination country, up to and including the Buyer’s premises. Further, You may use your own broker and carrier but if you do not have one, the JLab Broker is A. N Deringer. However if you use Deringer, your company shall be liable for all costs with Deringer.
Note 4: You must be on the TJNAF Approved Vendors List for welding fabrication or be able to use an existing approved welding fabrication vendor from this list. In order to qualify to be put on the Jefferson Lab approved vendors list for welding fabrication see attached documents (Vendor Survey and Vendor Documentation Request) in Attachment 7. Existing approved vendors or newly added vendors will still be required to submit with their proposal, the job specific welding fabrication documents as required within the Request for Proposal (RFP) specifically Attachment 1 – Instructions to Offerors and Evaluation Process.
MILESTONE AND PAYMENT SCHEDULE REQUEST
Line Item
# Description of Event (Include milestone events and/or delivery of product) Estimated
Completion
(ARO)
Estimated Completion
Date Quantity Milestone Requested $
Amount Total Price
TC-2 Non-Commercial Supply (JUL 2025)
JSA-25-R446017
SNS 2KCB Cryo Control Valves Page 1 of 16
FIXED PRICE SUPPLY – NON-COMMERCIAL TERMS AND CONDITIONS
(APPLICABLE TO SUPPLY PURCHASES FOR NON-COMMERCIAL ITEMS > $10,000)
I. FAR AND DEAR CLAUSES INCORPORATED BY REFERENCE
The Jefferson Science Associates, LLC (JSA) has a prime contract with the U.S. Department of Energy (DE-AC05- 06OR23177) that requires flow down of certain Federal Acquisition Regulation (FAR) and DOE Acquisition Regulation (DEAR) clauses. Accordingly, the following FAR’s and agency FAR supplement clauses (DEAR’s) referenced under Part I below are incorporated herein by reference and made a part hereof. Except as may be expressly otherwise provided below in each of such clauses the term, "Contractor" shall mean JSA’s Subcontractor, and the term “Contract" shall mean "this Subcontract/Purchase Order". The term “Contracting Officer” shall mean JSA’s “Procurement Officer” where the intent of the clause is to give direct contracting authority over JSA’s [sub] contractor to authorize and direct changes, process claims, adjudicate disputes, authorize terminations, and conduct subcontract administration responsibilities to maintain the rights of the parties under the [sub] Contract; otherwise, the term shall mean the DOE Contracting Officer having responsibility over JSA’s prime contract referenced above. The term “Government” shall mean “JSA” except in cases where the action or responsibility is an inherently U.S. Government function that cannot be performed by JSA. Contact the JSA Procurement Department or JSA Procurement Officer for clarification of JSA required clauses.
FAR 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kapersky Lab and Other Covered Entities (Jul 2018)(Section 1634 of Pub. L. 115-91).
FAR 52.207-4 Economic Purchase Quantity-Supplies (AUG 1987)
FAR 52.211-5 Material Requirements (AUG 2000)
FAR 52.222-50 Combating Trafficking in Persons (Oct 2020)(22 U.S.C. chapter 78 and E.O. 13627);
Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
FAR 52.225-1 Buy American - Supplies (MAY 2014)(Modified by DEAR 970.2570)
FAR 52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021)
FAR 52.227-3 Patent Indemnity (APR 1984)
FAR 52.232-1 Payments (APR 1984)
FAR 52.232-8 Discounts for Prompt Payment (FEB 2002)
FAR 52.232-9 Limitation on Withholding of Payments (APR 1984)
FAR 52.232-11 Extras (APR 1984)
FAR 52.232-25 Prompt Payment (JAN 20017)
FAR 52.243-1 Changes-Fixed Price (AUG 1987)
FAR 52.246-2 Inspection of Supplies – Fixed Price (AUG 1996)
FAR 52.247-34 F.O.B. Destination (NOV 1991)-Applicable unless the FAR clause 52.247-29 F.O.B. Origin, listed below, is checked “ ”
FAR 52.247-64 Preference for Privately Owned U.S. Flag Commercial Vessels (Feb 2006)(46 U.S.C. App. 1241 and 10 U.S.C. 2631), if flow down is required in accordance with paragraph (d) of FAR clause 52.247-64).
SNS 2KCB Cryo Control Valves Page 2 of 16
FAR 52.249-1 Termination for Convenience of the Government (Fixed Price)(Short Form)(APR 1984) only applicable if aggregate subcontract amount <$100,000
FAR 52.249-8 Default (Fixed-Price Supply and Service) (APR 1984)
DEAR 952.203-70 Whistleblower Protection for Contractor Employees (DEC 2000)
DEAR 970.5227-8 Refund of Royalties (AUG 2002) (Applicable in subcontracts at any tier if royalties exceed $250)
APPLICABLE IF > $10,000
FAR 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010)(E.O. 13496), if flow down is required in accordance with paragraph (f) of FAR clause 52.222-40.
APPLICABLE IF > $15,000
FAR 52.222-20 Contracts for Material, Supplies, Articles, and Equipment Exceeding $15,000 (MAY 2014)
FAR 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020)(29 U.S.C. 793)
APPLICABLE IF > $30,000
FAR 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2018)
APPLICABLE IF > $35,000 AND NOT A SUBCONTRACT FOR COMMERCIALLY AVAILABLE OFF-
THE-SHELF ITEMS
FAR 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015)
APPLICABLE IF >$100,000
DEAR 970.5227-5 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2000) (SC Alternate)
APPLICABLE IF > $150,000
FAR 52.222-35 Equal Opportunity for Veterans (Jun 2020)(38 U.S.C. 4212)
FAR 52.222-37 Employment Reports on Veterans (Jun 2020)(38 U.S.C. 4212)
APPLICABLE IF ABOVE THE SIMPLIFIED ACQUISITION THRESHOLD
FAR 52.203-5 Covenant Against Contingent Fees (MAY 2014)
FAR 52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006)
FAR 52.203-7 Anti-Kickback Procedures (MAY 2014)
FAR 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010)
FAR 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (APR 2014)
FAR 52.215-14 Integrity of Unit Prices (OCT 2010)
FAR 52.219-8 Utilization of Small Business Concerns (Oct 2018)(15 U.S.C. 637(d)(2) and (3)), if the subcontract offers further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
FAR 52.219-14 Limitations on Subcontracting (MAR 2020)
SNS 2KCB Cryo Control Valves Page 3 of 16
FAR 52.227-1 Authorization and Consent (DEC 2007)
FAR 52.248-1 Value Engineering (OCT 2010)
FAR 52.249-2 Termination for Convenience of the Government (Fixed Price) (APR 2012)
SPECIAL NOTICE FOR SOFTWARE:
Invoice, contract, or sales agreement must specify if software is provided by electronic delivery and in the case of software provided exclusively by electronic delivery, expressly state no disks, tapes, drives, or other tangible media has been, or is to be used, in the delivery of the purchased software.
APPLICABLE IF >$700,000
FAR 52.219-9 Small Business Subcontracting Plan (Jun 2020)
APPLICABLE IF > $5,500,000
FAR 52.203-13 Contractor Code of Business Ethics and Conduct (June 2020) (41 U.S.C. 3509), if the subcontract exceeds the threshold specified in FAR 3.1004(a) on the date of the subcontract award, and has a performance period of more than 120 days. In altering this clause to identify the appropriate parties, all disclosures of violation of the civil False Claims Act or of Federal criminal law shall be directed to the agency Office of the Inspector General, with a copy to the Contracting Officer.
FAR 52.203-14 Display of Hotline Poster(s) (OCT 2015)(Modified by DEAR 903.1004)
FAR 52.210-1 Market Research (APR 2011)
FAR/DEAR CLAUSES INCORPORATED BY REFERENCE (APPLICABLE ONLY IF BOX IS MARKED
DEAR 952.204-77 Computer Security (AUG 2006)
DEAR 952.227-11 Patent Rights-Retention by the Contractor (Short Form) (MAR 1995)
DEAR 952.227-13 Patent Rights-Acquisition by the Government (SEP 1997)
DEAR 952.235-71 Research Misconduct (JUL 2005)
DEAR 952.250-70 Nuclear Hazards Indemnity Agreement (AUG 2016)
DEAR 970.5223-4 Workplace Substance Abuse Programs at DOE Sites (DEC 2010)
DEAR 970.5227-1 Rights in Data – Facilities (DEC 2000)
DEAR 970.5227-2 Rights in Data – Technology Transfer (DEC 2000)(SC Alternate)
DEAR 970.5227-4 Authorization and Consent (AUG 2002) (SC Alternate and paragraph (c) (3)
FAR 52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011)
FAR 52.208-8 Required Sources for Helium and Helium Usage Data (AUG 2018) (SC Alternate)
FAR 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data. (AUG 2011)
FAR 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data-Modifications.
(AUG 2011)
SNS 2KCB Cryo Control Valves Page 4 of 16
FAR 52.215-12 Subcontractor Certified Cost or Pricing Data (OCT 2010)
FAR 52.215-13 Subcontractor Certified Cost or Pricing Data-Modifications (OCT 2010)
FAR 52.217-2 Cancellation Under Multi-year Contracts (OCT 1997)
FAR 52.223-3 Hazardous Material Identification and Material Safety Data (Feb 2021)(Alternate I)(Jul 1995)
FAR 52.224-2 Privacy Act (APR 1984)
FAR 52.225-8 Duty-free Entry (OCT 2010)
FAR 52.225-9 Buy American – Construction Materials (MAY 2014)
FAR 52.225-21 Required Use of American Iron, Steel, and Manufactured Goods-Buy American Statute- Construction Materials (Jan 2021)
FAR 52.227-14 Rights in Data-General (MAY 2014)
FAR 52.227-16 Additional Data Rights (JUN 1987)
FAR 52.229-6 Taxes-Foreign Fixed-Price Contracts (FEB 2013)
FAR 52.230-2 Cost Accounting Standards (OCT 2015) (applicable to negotiated subcontracts in excess of
$750,000, with exceptions)
FAR 52.230-6 Administration of Cost Accounting Standards (JUN 2010)
FAR 52.242-5 Payments to Small Business Subcontractors (JAN 2017)
FAR 52.245-1 Government Property (JAN 2017)
FAR 52.245-9 Use and Charges (APR 2012) (Applicable only when Far 52.245-1 Government Property is marked “ ”)
FAR 52.247-29 F.O.B. Origin (FEB 2006)
FAR 52.247-63 Preference for U.S.-Flag Air Carriers (JUN 2003)
FAR 52.249-5 Termination for Convenience of the Government (Educational and Other Nonprofit
Institutions) (AUG 2016)
II. JSA CLAUSES
JSA 100 DISPUTES (JAN 2017)
All disputes between the parties pertaining to this Subcontract, which are not disposed of by agreement, shall be decided by litigation. Trial of any such litigation shall be confined exclusively to the Federal District Court for the Eastern District of Virginia, or and only in the event that the jurisdictional requirements for trial in Federal Court are not present, to the Circuit Court of the Commonwealth of Virginia in Newport News, Virginia.
The terms of this purchase order/Subcontract shall be construed and interpreted in accordance with the body of law applicable to the procurement of goods and services by the Federal Government. Nothing in this clause shall grant to the Subcontractor by implication any statutory rights or remedies not expressly set forth in this Subcontract.
SNS 2KCB Cryo Control Valves Page 5 of 16
There shall be no interruption in the performance of the work, and the Subcontractor shall proceed diligently with the performance of this Subcontract pending final resolution of any dispute, claim, or litigation arising under or related to this Subcontract between the parties hereto or between the Subcontractor and lower-tier subcontractors or suppliers.
The Contract Disputes Act of 1978 (41 U.S.C. Sections 601-613) shall not apply to this Subcontract; provided, however, that nothing in this clause shall prohibit Jefferson Science Associates, LLC (JSA), in its sole discretion, from sponsoring a claim of the Subcontractor for resolution under the provisions of its prime contract with the U.S.
Department of Energy (DOE). In the event that JSA so sponsors a claim at the request of the Subcontractor, the Subcontractor shall be bound by the decision of the cognizant DOE Contracting Officer to the same extent and in the same manner as JSA.
JSA 101 ASSIGNMENT (MAY 2019)
Neither party may assign this subcontract nor any of their rights or obligations under this agreement without the other party's written consent, except JSA may assign this subcontract, in whole or in part, without consent to any DOE National Lab, to DOE, or to such party as DOE may designate to perform JSA's obligations hereunder. Upon written notice to Subcontractor of such an assignment, JSA shall be relieved of all responsibility hereunder and Subcontractor shall thereafter look solely to such assignee for performance of JSA's obligations.
JSA 102 LABORATORY CLOSURE SCHEDULE (NOT INCLUDED)
JSA 103 HOLIDAYS
Jefferson Lab normally observes 10 days designated as JSA/Jefferson Lab holidays, and during the period between Christmas Eve and New Year's Day Jefferson Lab normally is closed. In addition, Laboratory management may close the Laboratory or modify operating hours at its discretion due to weather or other emergency. All subcontractor personnel will follow the holiday and closure schedule posted by JSA/Jefferson Lab at JLab Calendar except that Subcontractor may, upon prior approval of the JSA Procurement Officer or designated representative, perform work on a holiday or closure day at Jefferson Lab. The following paragraphs apply if the box to the left is marked “ ”.
No items shipped under this subcontract will be received on holiday or closure days.
Items delivered under this subcontract will be received on holiday or closure days except on weather or other emergency closure days.
The subcontractor will not normally be required to provide services on holiday or closure days. The subcontractor shall factor cost savings resulting from the December shutdown into the base price of the
JSA/Jefferson Lab may request a price adjustment for savings resulting from services not performed on weather or other emergency closure days.
The services to be provided on holiday or closure days are those specifically described in .
JSA 104 SUBCONTRACT MODIFICATION AUTHORITY (MAY 2020)
Notwithstanding any other provisions of this subcontract, the Head of Procurement (or designee) shall be the only individual authorized to (i) accept nonconforming work; (ii) waive any requirement of this subcontract; or (iii) modify any term or condition of this subcontract.
JSA 105 FOREIGN NATIONS CONTROL (NOV 2021)
Subcontractors in all Jefferson Lab agreements and subcontracts requiring access to Jefferson Lab must provide valid government issued pictured identification for access to Jefferson Lab property.
https://www.jlab.org/human_resources/calendar
SNS 2KCB Cryo Control Valves Page 6 of 16
Subcontractors who receive Jefferson Lab picture badges will certify their citizenship and place of birth status in writing. Non-U.S. citizens must provide United States Citizenship and Immigration Service (USCIS) documents for verification. The Jefferson Lab Technical Representative (TR) and Jefferson Lab Procurement Officer may resolve questions of citizenship and employment.
JSA 106 SUBCONTRACT ADMINISTRATION INFORMATION (NOV 2021)
A. Jessie Tenbusch is designated as the Procurement Officer with responsibility for administration and negotiation of any modifications to this subcontract.
B. Brian Mastracci is designated as the Technical Representative (TR) for the purpose of inspection and acceptance of supplies/services under this Purchase Order/Subcontract. Inspection and acceptance by anyone other than the party identified above is not authorized. The TR will be responsible for technical assistance in administration of this subcontract. Duties will involve inspection, review, reporting, and certification of the Subcontractor’s performance. The TR is also responsible to ensure that the subcontractor complies with all federal, state, DOE and Jefferson Lab environment, health and safety requirements. The TR will maintain performance records. When deficiencies are noted, they will be recorded by the TR and the information will be provided to the Procurement Officer for appropriate action.
C. Subcontract Correspondence Procedures. Correspondence submitted by the Subcontractor shall be subject to the following procedures:
1. Non-Technical Correspondence: The Subcontractor shall submit all non-technical correspondence to JSA's Procurement Officer [as identified in (A) above], JSA/Jefferson Lab, Procurement Department, 628 Hofstadter Road, Suite 5, Newport News, VA 23606.
2. Technical Correspondence: The Subcontractor shall submit all technical correspondence to the TR [as identified in (B) above], JSA/Jefferson Lab, 12000 Jefferson Avenue, Newport News, VA 23606, with an information copy to the Procurement Officer.
3. Invoices: Electronic submission of invoices to finance@jlab.org is highly preferred. If mailed, please send to the following address:
Jefferson Science Associates, LLC
628 Hofstadter Road Accounts Payable, Suite 4 Newport News, VA 23606
Invoices shall identify amount(s) by line item/cost elements or other format…