A13 JOFOC redacted.pdf

PDF 3 MB Posted

Attached to
CDC Pittsburgh Natural Gas
Solicitation number
97086
Issued by

About this file

This document is a PDF rendering error message rather than a federal contracting document. The file contains only Adobe Reader troubleshooting information and does not include solicitation details, contracting requirements, or any substantive procurement information. The document appears to be corrupted or improperly formatted, preventing access to its intended contents.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Template for Justification and Approval for Other Than Full and Open Competition Completion Instructions: The Department of Health and Human Services (HHS) has established a standard template for the preparation of a J&A for Other Than Full and Open Competition. If this is an 8(a) set-aside, please note this form is not required unless the acquisition is valued (including all options) at greater than $22 million. This template is NOT applicable for actions using simplified acquisition procedures (FAR Part 13), Federal Supply Schedule orders (FAR 8.4) or task or delivery orders subject to fair opportunity (FAR 16.505).

Tailor all aspects of this template to the individual acquisition. Consult FAR Subpart 6.3 for guidance. An addendum may be added in case additional space is needed.

When this document is printed, the blue italic instructions are automatically deleted on the printed version.

JUSTIFICATION AND APPROVAL FOR OTHER THAN FULL AND OPEN COMPETITION

2. Description of Action:

Nature:

Pricing:

Funds:

3. Description of Services or Supplies:

Basis for Approval (FAR 6.303-1(d)):

As applicable, briefly describe the services or supplies required to meet the agency's needs, including make & model number where appropriate. Include quantities of supplies or period of performance for services. Provide information for any options included. If the action is a modification to an existing contract, distinguish clearly between the work covered by the original contract and the work to be obtained by the proposed modification.

4. Authority and Rationale: Identify the statutory authority, FAR title and FAR citation permitting other than full and open competition. It may be one of the following most commonly used citations by the operating divisions of the Department of Health and Human Services (HHS), but other exceptions may apply per FAR Subpart 6.3.

Actions other than simplified acquisition procedures (select only one and provide an explanation):

Explain why the intended contractor is the only responsible source who can provide the required supplies or services. Discuss the unique capabilities, expertise, etc. that support the lack of competition/why no other type of supplies or services will satisfy agency requirements. Explain factors/unique qualifications such as proprietary data or exclusive licensing rights, if applicable. When competition is limited to items particular to one manufacturer, this justification must explain why the particular brand name, product, or feature is essential to the Government's requirements, and that market research indicates other companies' similar products, or products lacking the particular feature, do not meet, or cannot be modified to meet the agency's needs in accordance with FAR 11.105. If in connection with a follow-on contract for continued development or production of highly specialized equipment, detail the substantial duplication of cost or unacceptable delays. May not Exceed one year, including all options, unless the head of the agency (Secretary of HHS) determines that exceptional circumstances apply.

If unusual and compelling urgency is the basis for the justification, explain the chronological events leading up to the requirement and explain why time constraints cannot permit even a limited competition. Describe the detrimental effects/serious injury to the mission of the requiring activity or to the government, financial or otherwise, that will result if this justification is not approved. Describe impact of required delivery/performance date. Describe the detrimental effects/serious injury to the mission of the requiring activity or to the government, financial or otherwise, that will result if this justification is not approved and the product or service cannot be provided by the intended sole source contractor. Failure to plan for expiring funds is not a valid reason for citing this exception. May not exceed one year, including all options, unless the head of the agency determines that exceptional circumstances apply.

Provide a citation to the statutory authorization and a brief description of its content, or identify the specified source or other agency.

Provide the authority and citation to the applicable section of FAR 6.3.

Provide a full explanation to justify use of the exception.

5. Agency Actions to Take or Remove Barriers That Led to Other Than Full and Open Competition (If applicable):

Describe the actions, if any, the agency may take to remove or overcome any barriers that led to the restricted consideration prior to any subsequent acquisition for the supplies of services is made. If no such actions have been taken, explain why.

6. Bridge Contracts:

For contract extensions or bridge contracts when a competitive follow-on is in the process of being developed, summarize history of current contract and explain the reasons for any delays in the acquisition. Include discussion of the milestones for the follow-on action; the milestones should be as efficient as possible. Discuss why it would be neither cost effective nor realistic to expect another contractor to perform during the brief interim period; include issues such as start-up costs, phase-in, transfer of GFP, recruitment and staffing, etc. If the action is because of a protest, provide a brief discussion of the protest including the date the protest was filed and the basis of the protest. Explain that the action will provide the minimum quantity or performance period.

7. Actions to Increase Competition:

Describe efforts made to compete the action, including whether a notice was or will be publicized as required by FAR Subpart 5.2 or which exception under FAR 5.202 applies. If a notice was publicized, discuss the number of written responses to the synopsis and the results of the assessment of the written responses. List sources, if any, that expressed, in writing, an interest in the acquisition. Provide rationale if interested sources were rejected. If applicable, state that no other sources have expressed interest, but all offers received shall be considered. Describe what actions will be taken to increase competition before subsequent acquisition of the supplies or services is required. You may state that an action is a one-time requirement, but if a similar requirement arises, every effort will be made to compete it to the maximum extent possible. If action is sole source because of proprietary data or licensing rights and there will be a continuing need for the requirement, there must be evidence that advanced planning has been initiated to overcome the barriers to competition, or there should be documentation to support an analysis that replacement costs/licensing purchase costs outweigh the benefits of competition. If the action is a contract extension or bridge, explain actions to compete the follow-on. If action is an urgent new requirement and a competitive follow-on is anticipated, explain that efforts are underway to facilitate a full and open competition.

8. Market Research:

Describe the extent of the market research conducted to identify all qualified sources and the results thereof. “Market Research” is defined as those attempts you made to ascertain whether other qualified sources exist, and can include contact with knowledgeable experts regarding similar or duplicate requirements, contact with industry, results of a sources sought synopsis, or draft solicitations. Research of the marketplace may consist of written, electronic (i.e. email) telephonic, or world wide web inquiries. Lack of advanced planning is not an acceptable reason for the lack of market research, but true urgency may necessitate abbreviated market research that is limited to readily available historical and commercial information. If action is a contract extension or bridge contract, describe the market research efforts underway or completed for the follow-on. See FAR 10.002(b)(2).

9. Procurement History:

Was action competed?

If action was not competed, state the cited authority, summarize rationale, and describe the actions that were supposed to be taken to increase competition and the results thereof:

10. Additional Information to support the justification:

If applicable, explain why technical packages or specifications to facilitate competition were not developed or available; describe actions taken to remedy the situation.

11. Technical / Requirements Certification: By my signature below, I certify that the supporting data included in this J&A is accurate and complete.

Program Manager Name:

Position Title:

Email address:

Phone:

Program Manager Supervisor (or one level above Program Manager) Name:

Position Title:

Email address:

Signature:

Date:

12. Fair and Reasonable Price/Cost Determination: As Contracting Officer, by my signature below, I hereby determine that the anticipated price/cost to the Government for this contract action will be fair and reasonable.

Provide the basis for this determination, e.g., describe techniques to be used to determine fair and reasonable price (FAR Subpart 15.402), such as price analysis, cost analysis, cost realism. Per FAR Subpart 15.403-4(a)(1), the threshold for obtaining cost or pricing data is $750,000.

Name:

Phone:

Signature:

Date:

13. Contracting Officer's Approval (Required for proposed contract not to exceed $700,000 (value calculated including all options)): I hereby certify that this justification is accurate and complete to the best of my knowledge. I approve this justification subject to availability of funds, and provided that the services and supplies herin describe have otherwise been authorized for acquisition.

Name:

Phone:

Signature:

Date:

14. Legal Review:

All J&As greater than $68 million must have a legal review from the General Law Division of the Office of the General Counsel prior to sending it to the Department.

15. OPDIV Competition Advocate Approval (Required for proposed contract over $700,000 but not exceeding $13.5 million value calculated including all options)):

I have reviewed this justification and find that it adequately supports other than full and open competition.

Name:

Phone:

Signature:

Date:

16. Office of Small and Disadvantaged Business Utilization:

I have reviewed this justification and find that it adequately supports other than full and open competition.

Name:

Phone:

Signature:

Date:

17. OPDIV HCA Approval (Required for proposed contract over $13.5 million but not exceeding $68 million value calculated including all options)):

Name:

Phone:

Signature:

Date:

18. Department Competition Advocate:

Concur:

Non-Concur:

Name:

Phone:

Signature:

Date:

(The below approval paragraph is required if the cumulative contract value, including all options, exceeds $68 million.)

19. HHS Senior Procurement Executive (SPE) Approval:

Based on the foregoing justification, I hereby approve other than full and open competition for the above stated procurement, subject to the availability of funds, and provided that the services herein described have otherwise been authorized for acquisition.

State supplies/services being procured:

State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304:

State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304 Name:

Phone:

Signature:

Date:

11.0.0.20130303.1.892433.887364 Justification & Approval - Other Than Full and Open Competition Health and Human Services Justification & Approval - Other Than Full and Open Competition

AcquisitionTitle: Contract Year 2026 Natural Gas Utility for NIOSH Pittsburgh Facility
Agency: CDC
NIHDrop:
PSCDrop:
PSCOther:
AcqusitionYear: 2026
Author: Jessica L. Jones, Building Manager
CheckBox4: 1
CheckBox5: 0
CheckBox1: 0
Purchase order/contract number:
CheckBox8: 0
CheckBox7: 0
CheckBox6: 1
CheckBox9: 0
Agency Actions to Take or Remove Barriers That Led to Fair Opportunity Exception (If applicable): It would be prohibitively expensive to institute a construction project to reconfigure several thousand feet of gas utility lines to enable a different connection to an alternate gas utility supplier. Therefore, a sole source contract is required currently.
CheckBox10: 0
CheckBox11: 1
Other funds:
TextField5: Columbia Gas of Pennsylvania
TextField5: PO Box 2318
TextField5: Columbus, OH 43216-2318
CheckBox2: 0
CheckBox3: 0
TextField7: Redacted
As applicable, briefly describe the services or supplies required to meet the agency's needs, including make & model number where appropriate. Include quantities of supplies or period of performance for services. Provide information for any options included. If the action is a modification to an existing contract, distinguish clearly between the work covered by the basic order and the work to be obtained by the proposed modification.: This purchase requisition will provide continuing utility service for the NIOSH Pittsburgh campus for natural gas energy. This will serve the campus from March 1, 2026 through February 28, 2027. Natural gas is supplied to the campus via direct connections to Columbia Gas of Pennsylvania's area distribution lines. The natural gas is necessary for facility operations for building heating and laboratory systems.
CheckBox12: 1
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: Natural gas supply to the NIOSH Pittsburgh campus is only provided through direct connected public utility lines connected to the Columbia Gas of Pennsylvania's utility transport supply system. There are five (5) Columbia Gas distribution and metering locations connected to NIOSH owned utility lines. No other avenue for this utility supply delivery is reasonably available. The natural gas commodity could be sourced from Columbia Gas of Pennsylvania or via a third party utility choice, but there must be a contract with Columbia Gas either way because they own the lines and therefore it is not administratively or cost effective to have another contractor provide the gas.
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: The procurement of these utility services were delayed by the historically long government shutdown. This resulted in the procurement documents being received by the contracting officer on the evening of 2/24 with an expiration of the incumbent contract occurring on 2/28. The continuation of these services is necessary for the operation of the CDC's Pittsburgh campus and failure to make an urgent award would require a shutdown of that campus and a resulting negative impact to the CDC's mission.
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: Not applicable.
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: As previously discussed, natural gas supply to the NIOSH Pittsburgh campus is only provided through the five (5) direct connected public utility lines connected to the Columbia Gas of Pennsylvania's utility transport supply system. No other avenue for this utility supply delivery is reasonably available. The natural gas commodity could be sourced from Columbia Gas of Pennsylvania or via a third party utility choice, but there must be a contract with Columbia Gas either way because they own the lines and therefore it is not administratively or cost effective to have another contractor provide the gas.
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: The use of Columbia Gas of Pennsylvania to supply the natural gas utility distribution, metering and commodity supply for the CDC NIOSH Pittsburgh campus has proven historically to be cost competitive. Columbia Gas is the only vendor capable of distributing the gas to the facility so a contract must be established. Columbia Gas of PA provides these services as a regulated utility under the conditions set by the current supplement to PA P.U.C. Tariff No. 9 for each supply account as determined by the Pennsylvania Public Utility Commission. Columbia Gas as a regulated utility is not permitted to markup the gas commodity supply above market purchase costs. Natural gas commodity supply costs are adjusted quarterly to reflect current natural gas market conditions. In Pennsylvania third-party commodity suppliers are available to purchase the gas commodity that would be delivered and invoiced by Columbia Gas of PA. Whether or not a third-party supplier can provide a better commodity supply price for the full fiscal year is dependent on the market conditions prevalent at the time the contract is established. If a rate is locked in at a low initial cost pricing will be better than if later market conditions reflect rising natural gas pricing. The alternative can also be true that high initial pricing may overprice the commodity supply if future market conditions reflect lowering supply pricing. Third party suppliers include overhead and profit costs in their fixed price supply contracts. As of March 20, 2024, the Columbia Gas of PA tariff price to compare is $0.2497/therm of gas supply, while the average of ten potential third party 12 month fixed price suppliers is $0.4648/therm. Market research is available from the PAPUC "PAGasSwitch" website and snapshots of periodic pricing are saved for reference. Therefore, as previously discussed, contracting with Columbia Gas is required due to their ownership of the necessary infrastructure, and contracting with both Columbia Gas AND a third party provider is not administratively or cost effective for this requirement.
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: Action will be completed at the end of the contract period.
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: Previously determined to not be administratively or cost effective.
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: This is a utility contract where the prices paid are regulated by the Pennsylvania Public Utility Commission (PUC) which mandates that the utility pursue a least cost fuel procurement policy.
CheckBox13: 1
CheckBox14: 0
CheckBox15: 0
TextField9: 75D30124P19517
CheckBox16: 1
CheckBox17: 0
Program Manager name: Jessica L. Jones
Program Manager position title: Building Manager
Program Manager email address: yjc6@cdc.gov
Program Manager phone: 412.386.6424
Program Manager Supervisor name: Brance McCune
Program Manager Supervisor position title: Deputy Associate Director
Program Manager Supervisor email address: wgx5@cdc.gov
HHS Senior Procurement Executive (SPE) signature:
Program Manager Supervisor date:
Contract Officer's Approval name: Mike Davis
Contract Officer's Approval name: Mike Davis
HHS Senior Procurement Executive (SPE) phone: 770-488-2427
HHS Senior Procurement Executive (SPE) phone: 770-488-2427
Contract Officer's Approval date: 02/27/2026
Contract Officer's Approval date: 02/27/2026
HHS Senior Procurement Executive (SPE) name:
DateField6:
Office of Small Business date:
OPDIV HCA date:
Concur with Acquisition: 0
Non-Concur with Acquisition: 0
HHS Senior Procurement Executive (SPE) date:
State supplies/services being procured: This purchase requisition will provide continuing utility service for the NIOSH Pittsburgh campus for natural gas energy. This will serve the campus from March 1, 2026 through February 28, 2027. Natural gas is supplied to the campus via direct connections to Columbia Gas of Pennsylvania's area distribution lines. The natural gas is necessary for facility operations for building heating and laboratory systems.

File details come from the government source that posted it. Updated .