Sources Sought Notice – North Rim & Roaring Springs Rehabilitation Program

This Sources Sought Notice (SSN) issued April 22, 2026, by the National Park Service Denver Service Center seeks market research information regarding contractor capabilities for a utility infrastructure rehabilitation project at Grand Canyon National Park. The notice explicitly states that proposals are NOT being requested at this time; responses are voluntary with no cost reimbursement. The government anticipates issuing a Request for Proposal (RFP) in Summer/Fall 2026 with an expected contract award in Winter 2026/Spring 2027. The project scope includes rehabilitation of water, wastewater, electrical, and communication systems throughout the North Rim developed area and inner canyon sites including Roaring Springs Pump House, Manzanita Use Area, and Cottonwood Campground. Key components include directional drilling of two 8-to-26-inch diameter, 9,260-foot-long boreholes from the North Rim ballfield to Roaring Springs Pumphouse; water treatment plant installation; sewer collection system replacement; standby generator and transformer replacement; and fiber communications replacement. The project magnitude exceeds $10 million with an estimated period of performance of 36-48 months. The NAICS code is 237110 (Water and Sewer Line and Related Structures) with a small business size standard of $45 million. Bid, performance, and payment bonds will be required. The site is remote and high-elevation with seasonal access (May-October), requiring helicopter support for equipment transport and contractor self-sufficiency in logistics, housing, and access solutions.

Interested contractors should submit responses by May 13, 2026, to james_waller@ios.doi.gov and kristin_tauber@ios.doi.gov including: company information and DUNS number; business classification (large/small, HUBZone, VOSB, SDVOSB, WOSB, EDWOSB); bonding capacity statement; and demonstrated experience on projects of similar size, scope, and magnitude constructed under comparable conditions (large-scale utility infrastructure systems, directional drilling in complex geology, remote logistical challenges, water/wastewater treatment systems, electrical power systems, environmentally/culturally sensitive work, and helicopter-supported construction operations). A pre-proposal site visit is planned prior to North Rim seasonal closure in mid-November, subject to schedule and access conditions.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

12795 W. ALAMEDA PKWY

P.O. BOX 25287

DENVER, COLORADO 80225-0287

In Reply Refer to:

D5215 (DSC-CS)

GRCA 318719

Date: April 22, 2026

To: General Public (Via the Government’s Point Entry)

From: James Waller, Contracting Officer, National Park Service, Denver Service Center

Subject: Sources Sought Notice

Reference: GRCA 318719, North Rim & Roaring Springs Rehabilitation Program, Grand Canyon National Park

This is a Sources Sought Notice (SSN) for the purpose of conducting market research. Proposals are NOT being requested, nor accepted at this time. Responses are being requested from both large and small businesses.

Purpose: The purpose of this notice is to gain knowledge regarding the type of interested businesses and their qualifications. The National Park Service (NPS) will use information obtained through this notice to develop an acquisition strategy.

The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a small business or other socio-economical small business set-aside for the solicitation. Analysis of the quality of responses to this source sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement.

Additional Information: No proposal package, solicitation, specification or drawings are available with this notice.

Cost Reimbursement: Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests.

North American Industry Classification System (NAICS) code: 237110 Water and Sewer Line and Related Structures

Small Business Size Standard: $45

Solicitation: The NPS anticipates issuing a Request for Proposal (RFP) in the Summer/Fall 2026. The Government intends to schedule a pre-proposal site visit prior to seasonal closure of the North Rim (typically mid-November), subject to schedule and access conditions.

Bonding: The NPS anticipates bid, performance and payment bonds will be required

Project Description:

The National Park Service (NPS) has a requirement to rehabilitate the utility infrastructure systems throughout the North

Rim developed area and at certain inner canyon sites at Grand Canyon National Park, Arizona. This project will address critical system deficiencies associated with water, wastewater, electrical, and communication systems, along with their associated equipment, components, and support structures. Infrastructure includes water (raw water, treatment, and distribution), wastewater conveyance, power and communications (standby power, overhead power, solar power, fiber communications). The project will require work at locations throughout the North Rim developed area as well as at several geographically separate locations within the inner canyon including Roaring Springs Pump House, Manzanita Use

Area and Cottonwood Campground.

A key project component includes new boreholes to be directionally drilled from the North Rim to Roaring Springs Pump

House with carrier pipes to include raw and potable waterlines. Two approximately 8-to-26-inch diameter, 9,260-feet-long boreholes will be drilled sequentially using vertical direction drilling, extending from the drill site (i.e., bore entry site) at the North Rim ballfield to the bore exit site just west of Roaring Springs Pumphouse in the inner canyon, where the borehole would daylight. The planned boreholes have a vertical length of 3,310 feet, a total measured length of 9,260 feet, and will be drilled through several Paleozoic geologic units of variable lithology with the potential for a variety of geologic risks

The purpose of this project is to provide Grand Canyon National Park with reliable water, wastewater and power systems to serve the North Rim and related inner canyon locations. Critical and obsolete aspects of these utility systems will be replaced and rehabilitated to meet code requirements. These utility systems support visitor services and administrative operations.

The North Rim is a remote, high‑elevation site, with seasonal access generally from May through October, and limited road and staging areas. Helicopter access will be required for equipment or materials transport, primarily for inner canyon construction.

The project is located at: Grand Canyon National Park, North Rim, AZ.

The construction magnitude is greater than $10M

The surrounding area is rural with limited staging located adjacent to the site. The construction site is approximately 45 miles from nearest suppliers and lodging facilities (Jacobs Lake with limited facilities) and 80 miles to Kanab UT.

The North Rim of Grand Canyon National Park generally opens to the public in mid-May and closes to the public in mid-

November each year depending on weather and road conditions, with visitor facilities typically opening in mid-May and closing in mid-October. Due to impacts from the 2025 Dragon Bravo wildfire which impacted many North Rim facilities, the NPS has not determined what services, if any, will be available to the public or for contractor use starting in 2026 and beyond.

Seasonal or other shutdowns may occur during the period of performance and winter construction may be required throughout the period of performance of this project. The Contractor may need to coordinate winter access logistics with

NPS and may be required to provide their own access to certain work locations during the winter. The successful contractor on this project will be self-reliant and able to prosecute the work with limited reliance on NPS for logistics support and site access.

Due to the project’s location in a remote but popular national park and because much of the work of this project will be performed in areas with high public visitation, difficult access and in close proximity to sensitive natural and cultural resources, this project includes many critical requirements associated with contractor operations and visitor and resource protection. Contract activities and logistics must be structured to minimize visitor impact and protective measures are required to minimize impacts on park resources. These unique project requirements combined with the project’s logistical challenges will demand careful management, scheduling and work planning and very close attention and coordination on the part of the prime contractor and all subcontractors.

Scope of Work

Water System

• Rehabilitation to the Roaring Springs Pumphouse (RSPH) to supply raw water from the Roaring Springs source

• Raw and finished water pipelines between the North Rim water storage tanks (Tank Farm) and Roaring Springs

Pumphouse for improved reliability and reduced repairs

• North Rim Water Treatment Plant (NR WTP) at the Tank Farm site to meet water quality regulatory requirements

• Treated water supply to current inner canyon potable service locations via backfeed from the North Rim Water

Treatment Plant

• Rehabilitation of raw water pipeline between Roaring Springs Cave and the RSPH

Wastewater System

• Replacement of the sewer collection system

Power System

• Additional diesel fuel storage at Power Distribution Center to receive full deliveries and provide for longer outages

• Addition of fourth standby generator at Power Distribution Center

• Replacement of transformers which have exceeded life cycle at Power Distribution Center and throughout North

Rim campus

• Replacement of junction boxes and shunt reactors in poor condition throughout North Rim campus

• Replacement of overhead power from North Rim to RSPH to increase life expectancy and reliability

• Replacement of underground power from RSPH to Manzanita

• Replacement of fiber communications from RSPH to Manzanita

• Replacement of defunct solar power system at Cottonwood Campground

Construction Schedule

• Award: Expected Winter 2026/Spring 2027

• Period of Performance: 36-48 months (final duration will be defined in the solicitation)

Contractor Capabilities

Contractors responding to this notice should demonstrate experience and capabilities in projects of similar size, scope, and complexity, including:

• Construction and rehabilitation of large-scale utility infrastructure systems, including water, wastewater collection, power, and communications systems

• Directional drilling / vertical drilling for long-length, large-diameter installations in complex geologic conditions

• Construction and operation in remote, logistically challenging environments, including limited access, constrained staging, and reliance on helicopter support

• Installation and rehabilitation of water treatment systems and wastewater collection systems, including compliance with applicable federal and state regulatory requirements

• Electrical power generation and distribution systems, including standby power, overhead and underground distribution, and related components

• Execution of work in environmentally and culturally sensitive areas, including implementation of resource protection measures and coordination with stakeholders

• Managing construction in active public-use areas, including phasing, safety controls, and minimizing impacts to visitors

• Large, complex projects (>$100M) requiring multi-year scheduling, detailed logistics planning, and coordination of multiple subcontractors and disciplines

• Contractors should also demonstrate the ability to be self-sufficient in remote environments, including providing necessary logistics, transportation, housing, and access solutions with minimal reliance on Government support.

• Planning and execution of construction activities requiring helicopter support, including coordination of air operations, staging, external load transport, and delivery of materials and equipment to remote and inaccessible locations (e.g., inner canyon environments) under constrained conditions

Submittal Contents: Interested (small and large) businesses should submit the following information:

(1) Company name, DUNS number, address, point of contact, telephone number, and email address.

(2) Business type: Classification as a Large or Small Business under the above listed NAICS, Small Business

Administration (SBA) certified Historically Underutilized Business Zone (HUBZone), Veteran-Owned Small

Businesses (VOSB), Service-Disabled Veteran-Owned Small Businesses (SDVOSB), SBA certified Woman

Owned Small Business (WOSB), Economically Disadvantaged Woman Owned Small Business (EDWOSB). The size of a small business firm includes all parents, subsidiaries, affiliates, etc.—see 13 CFR 121.108.)

Misrepresentation of size status can result in penalties.

(3) Statement regarding your company’s bonding capacity. Letters from bonding companies are not required at this time.

(4) Information demonstrating experience and capability on projects of same or similar size, scope and magnitude, and constructed under similar conditions.

(5) In addition, businesses may submit existing marketing materials such as capability statements and brochures.

Submittal Due Date/Time: 05/13/2026