This sources sought notice provides information for a construction project to stabilize the concrete wharf at Alcatraz Island in the Golden Gate National Recreation Area. The National Park Service seeks to repair and seismically strengthen the historic steel-cased concrete piles, beams, and slabs of the wharf, which are in fair to poor condition with damage. Two new seismic resisting elements will be installed to upgrade the wharf's seismic risk category. Concrete repairs and seismic improvements will be undertaken in a phased approach to maintain visitor, employee, and concessionaire access while protecting species during nesting seasons. Interested small and large businesses should submit information by August 27th demonstrating relevant experience on projects of similar size, scope, and conditions, along with bonding capacity and marketing materials. The anticipated $10 million project will be awarded in spring 2022, with a planned 1050-day performance period including seasonal shutdowns.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
12795 W. ALAMEDA PKWY
P.O. BOX 25287
DENVER, COLORADO 80225-0287
In Reply Refer to:
D5215 (DSC-CS)
GOGA 215726
| Date: | 07/27/2021 |
| To: | General Public (Via the Government’s Point Entry) |
| From: | Greg Passig, Contracting Officer, National Park Service, Denver Service Center |
| Subject: | Sources Sought Notice |
| Reference: | GOGA 215726, Stabilize Alcatraz Wharf |
This is a Sources Sought Notice (SSN) for the purpose of conducting market research. Proposals are NOT being requested, nor accepted at this time. Responses are being requested from both large and small businesses.
Purpose: The purpose of this notice is to gain knowledge regarding the type of interested businesses and their qualifications. The National Park Service (NPS) will use information obtained through this notice to develop an acquisition strategy.
The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a small business or other socio-economical small business set-aside for the solicitation. Analysis of the quality of responses to this source sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement.
Additional Information: No proposal package, solicitation, specification or drawings are available with this notice.
Cost Reimbursement: Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests.
North American Industry Classification System (NAICS) code: 237990
Small Business Size Standard: $39,500,000
Solicitation: The NPS anticipates issuing a request for proposals in the spring of 2022.
Bonding: The NPS anticipates bid, performance and payment bonds will be required
Project Description:
The project is located at Golden Gate National Recreation Area, CA
The construction magnitude is Over $10M
Alcatraz Island receives an average of 1.6 million visitors annually. The Park will remain open during construction, thus contract activities and logistics must be structured and scheduled to minimize visitor impact. All visitors, Park personnel, concessionaire, and park partner operations utilize the fixed wharf for access to and queuing for the ferries. The fixed wharf is the only access and egress site for the island. Care must be taken to allow space for disembarkation of passengers, dock announcements, tram path, and ferry queuing area. Permanent public restrooms are situated on the fixed wharf; restroom facilities, whether permanent or temporary, must remain in service during construction operations. Nearly the entire deck of the wharf is used by the concessionaire, visitors, Park personnel, and park partner personnel, while the finger pier is exclusively used by the Park.
The construction site is on Alcatraz Island, at least two (2) miles over water (San Francisco Bay) from nearest suppliers and lodging facilities. Material, equipment, and personnel transportation service must be coordinated with the Park and Park Concessioner, Alcatraz Cruises. Alcatraz is the only approved vendor for landing at the floating berth (i.e. custom berthing configuration) attached to the fixed wharf. The Contractor may organize transportation services with any vendor of their choosing or self-perform material/personnel deliveries, but must coordinate with the Park and Alcatraz Cruises to prevent conflict with regularly scheduled ferries, provide certificates of insurance, and provide landing plans for each type of delivery. There is limited onsite staging area available at the fixed wharf.
The site requires protective measures to ensure the surrounding area remains undisturbed including erosion, sediment, and dust control. The fixed wharf structure is a historic resource and must be treated per the Secretary of the Interior’s Standards for the Treatment of Historic Properties. There are seasonal shutdowns mandated through the construction duration to accommodate protected species (e.g. bird nesting seasons). Special requirements exist for noise and acoustics management during construction operations, especially during pile driving activities.
The anticipated period of performance is 1,050 calendar days including seasonal shutdowns and any potential weather shutdowns.
Project Scope:
This project will make critical repairs to and seismically strengthen the concrete wharf on Alcatraz Island, a contributing feature of the Alcatraz Island National Historic Landmark District built in 1939. Work will include repair of the historic, steel-cased concrete piles, concrete beams, and concrete slabs. These elements are in fair to poor condition, with varying degrees of damage. Two new seismic resisting elements will be installed to bring the wharf up to a seismic Risk Category III structure. Concrete repairs and seismic improvements will be undertaken in a phased approach to maintain visitor, employee, and concessionaire traffic and to mitigate impacts to protected species.
Subject to availability of funds of a separately tracked project, GOGA 312663A Repair Finger Pier and Moveable Gangway at Alcatraz Island, a set of construction contract options will also include repairs to the finger pier. The finger pier is connected to/an extension of the concrete wharf. The project will repair or replace the existing wooden fender and bearing piles, cross bracing, gangway ramp landing and motorized pulley system, to match the existing.
Submittal Contents: Interested (small and large) businesses should submit the following information:
| (1) | Company name, DUNS number, address, point of contact, telephone number, and email address. |
| (2) | Business type: Classification as a Large or Small Business under the above listed NAICS, Small Business Administration (SBA) certified Historically Underutilized Business Zone (HUBZone), Veteran-Owned Small Businesses (VOSB), Service-Disabled Veteran-Owned Small Businesses (SDVOSB), SBA certified Woman Owned Small Business (WOSB), Economically Disadvantaged Woman Owned Small Business (EDWOSB). The size of a small business firm includes all parents, subsidiaries, affiliates, etc.—see 13 CFR 121.108.) Misrepresentation of size status can result in penalties. |
| (3) | Statement regarding your company’s bonding capacity. Letters from bonding companies are not required at this time. |
(4) Information demonstrating experience and capability on projects of same or similar size, scope and magnitude, and constructed under similar conditions.
(5) In addition businesses may submit existing marketing materials such as capability statements and brochures.
Submittal Due Date/Time: COB Mountain Time, 8/27/2021 Submit To: gregory_passig@nps.gov brian_tollensdorf@nps.gov image1.jpeg
File details come from the government source that posted it. Updated .