This is a Sources Sought Notice issued by the National Park Service (NPS), Denver Service Center, for market research purposes regarding the construction of a temporary wastewater treatment plant at the North Rim of Grand Canyon National Park. The notice is not requesting formal proposals at this time but is soliciting information from both large and small businesses to assess market interest and capability, which will inform the NPS acquisition strategy and any potential small business set-aside determination.

The project involves installing a temporary, packaged 90,000-gallon-per-day wastewater treatment plant with an estimated construction magnitude of $5 million to $10 million. The facility will include headworks, two 45,000-gallon-per-day membrane bioreactor (MBR) treatment units, equalization tank with aeration and pumping systems, treated effluent break tank, ultraviolet disinfection system, temporary chemical storage units, and on-site yard piping and cabling connected to existing utilities. The project is located at a remote, high-elevation site with seasonal access from May through October, approximately 45 miles from the nearest suppliers and lodging at Jacobs Lake and 80 miles from Kanab, Utah. Construction is scheduled for Fall 2026 (site preparation and utility installation) through Spring 2027 (equipment delivery, startup, and commissioning by May 15). The applicable NAICS code is 237110 (Water and Sewer Line and Related Structures) with a small business size standard of $45 million. Interested contractors must demonstrate experience with packaged wastewater treatment plants, temporary installations, remote site construction, and compliance with state and federal wastewater regulations. Responses must be submitted by April 2, 2026, to james_waller@nps.gov and kristin_tauber@nps.gov and should include company information, business classification status, bonding capacity statement, and project experience demonstrating similar size, scope, and construction conditions. The NPS anticipates issuing a Request for Proposals in Summer 2026, with bid, performance, and payment bonds anticipated to be required.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

12795 W. ALAMEDA PKWY

P.O. BOX 25287

DENVER, COLORADO 80225-0287

In Reply Refer to:

D5215 (DSC-CS)

GRCA 318719

Date: March 18, 2026

To: General Public (Via the Government’s Point Entry)

From: James Waller, Contracting Officer, National Park Service, Denver Service Center

Subject: Sources Sought Notice

Reference: GRCA 318719, Construct Temporary Wastewater Treatment Plant at North Rim, Grand Canyon

National Park

This is a Sources Sought Notice (SSN) for the purpose of conducting market research. Proposals are NOT being requested, nor accepted at this time. Responses are being requested from both large and small businesses.

Purpose: The purpose of this notice is to gain knowledge regarding the type of interested businesses and their qualifications. The National Park Service (NPS) will use information obtained through this notice to develop an acquisition strategy.

The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a small business or other socio-economical small business set-aside for the solicitation. Analysis of the quality of responses to this source sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement.

Additional Information: No proposal package, solicitation, specification or drawings are available with this notice.

Cost Reimbursement: Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests.

North American Industry Classification System (NAICS) code: 237110 Water and Sewer Line and Related Structures

Small Business Size Standard: $45

Solicitation: The NPS anticipates issuing a request for proposals in the Summer 2026.

Bonding: The NPS anticipates bid, performance and payment bonds will be required

Project Description:

Grand Canyon National Park requires the installation of a temporary wastewater treatment plant (WWTP) at the North

Rim to support visitor facilities and campgrounds during reconstruction or upgrades of the permanent wastewater system.

The North Rim is a remote, high‑elevation site, with seasonal access generally from May through October, and limited road and staging areas. Helicopter access will not be required for equipment or materials transport. The facility must provide temporary treatment capacity while ensuring continued compliance with Arizona Department of Environmental

Quality (ADEQ) effluent standards.

The project is located at: Grand Canyon National Park, AZ.

The construction magnitude is $5M -$10M

The surrounding area is rural with limited staging located adjacent to the site. The construction site is approximately 45 miles from nearest suppliers and lodging facilities (Jacobs Lake with limited facilities) and 80 miles to Kanab UT.

Grand Canyon National Park has not confirmed official campground or service openings for 2026; however, the target seasonal opening for roads and developed areas is May 15. Visitor facilities typically close mid-October, with day-use access extending to mid-November. Affected visitor facilities include:

• North Rim Campground and associated facilities

• Scenic viewpoints and trails that can be safely accessed

• Seasonal roads (AZ‑67) into the developed area.

Contract activities and logistics must be structured to minimize visitor impact. Protective measures are required to ensure the surrounding area remains undisturbed. Seasonal or other shutdowns may occur during the construction season. Winter construction may be required through December 2026, as weather and roadway access allow, to complete site preparation and utility installation so the site is ready for equipment deliveries and startup in Spring 2027, in time for the May 15 opening.

Scope of Work

The proposed project would install a temporary, packaged, 90,000 gallon per day (gpd) WWTP along the existing south fenceline of the WWTP (adjacent to the sludge drying beds) until a permanent WWTP can be constructed. The temporary packaged WWTP will include headworks, two 45,000 gpd MBR treatment units, an equalization tank with aeration and pumping system to the MBR units, and a treated effluent break tank and ultraviolet (UV) disinfection system. Temporary storage units would be installed for chemical storage and laboratory functions. On site utilities (yard piping/cabling) would be installed and connect to existing utilities.

Construction Schedule

• Fall 2026: Site preparation and utility installation

• Spring 2027: Major equipment deliveries, startup, and commissioning to allow operational use prior to May 15 seasonal opening

The North Rim wastewater treatment plant (WWTP) was destroyed by the Dragon Bravo Fire in 2025. The park's intent is to provide all visitor services to the extent possible for the 2027 operating season, using the 2026 and early 2027 to make repairs to or otherwise address damaged infrastructure. Wastewater infrastructure is critical to park operations and visitation. Currently, the only wastewater treatment available on the North Rim is via the existing septic system, which has a much lower treatment capacity than the former WWTP.

Contractor Capabilities

Contractors responding should demonstrate experience with packaged wastewater treatment plants, temporary installations, remote site construction, and compliance with state/federal wastewater regulations.

Submittal Contents: Interested (small and large) businesses should submit the following information:

(1) Company name, DUNS number, address, point of contact, telephone number, and email address.

(2) Business type: Classification as a Large or Small Business under the above listed NAICS, Small Business

Administration (SBA) certified Historically Underutilized Business Zone (HUBZone), Veteran-Owned Small

Businesses (VOSB), Service-Disabled Veteran-Owned Small Businesses (SDVOSB), SBA certified Woman

Owned Small Business (WOSB), Economically Disadvantaged Woman Owned Small Business (EDWOSB). The size of a small business firm includes all parents, subsidiaries, affiliates, etc.—see 13 CFR 121.108.)

Misrepresentation of size status can result in penalties.

(3) Statement regarding your company’s bonding capacity. Letters from bonding companies are not required at this time.

(4) Information demonstrating experience and capability on projects of same or similar size, scope and magnitude, and constructed under similar conditions.

(5) In addition businesses may submit existing marketing materials such as capability statements and brochures.

Submittal Due Date/Time: 04/02/2026

Submit To: CO: james_waller@nps.gov and CS: kristin_tauber@nps.gov mailto:james_waller@nps.gov mailto:kristin_tauber@nps.gov