A12_Sources_Sought_Notice_GRCA_190083_1.docx

DOCX document 62 KB Posted

Attached to
GRCA 190083 - Improve Potable Water Supply to Innercanyon and South Rim, Transc
Solicitation number
140P2022R0100
Issued by

About this file

This sources sought notice provides details for a competitive acquisition to improve potable water supply to the inner canyon and south rim areas of Grand Canyon National Park. The National Park Service seeks information from both large and small businesses to rehabilitate the park's primary water system with a construction magnitude estimated between $80-120 million. Work includes new surface water intake and treatment, replacement of water distribution piping via open cut and slipline methods, installation of new storage tanks and point of use disinfection systems. The project is located in a rural area with logistics challenges, requiring coordination with helicopter operations for inner canyon work. Interested businesses should provide company information, business classification, bonding capacity, and experience on similar size and scope projects by March 11, 2022 to inform market research and a potential small business set-aside determination for the anticipated request for proposals this summer.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

12795 W. ALAMEDA PKWY

P.O. BOX 25287

DENVER, COLORADO 80225-0287

In Reply Refer to:

D5215 (DSC-CS)

GRCA 190083

Date:February 24, 2022
To:General Public (Via the Government’s Point Entry)
From:Tim Burger, Contracting Officer, National Park Service, Denver Service Center
Subject:Sources Sought Notice
Reference:GRCA 190083 - Improve Potable Water Supply to Innercanyon and South Rim, Transcanyon Water Distribution Pipeline, Grand Canyon National Park

This is a Sources Sought Notice (SSN) for the purpose of conducting market research. Proposals are NOT being requested, nor accepted at this time. Responses are being requested from both large and small businesses.

Purpose: The purpose of this notice is to gain knowledge regarding the type of interested businesses and their qualifications. The National Park Service (NPS) will use information obtained through this notice to develop an acquisition strategy.

The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a small business or other socio-economical small business set-aside for the solicitation. Analysis of the quality of responses to this source sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement.

Additional Information: No proposal package, solicitation, specification or drawings are available with this notice.

Cost Reimbursement: Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests.

North American Industry Classification System (NAICS) code: 237110 Water and Sewer Line and Related Structures Construction

Small Business Size Standard: $39.5M

Solicitation: The NPS anticipates issuing a request for proposals in the summer of 2022.

Bonding: The NPS anticipates bid, performance and payment bonds will be required

Project Description:

Project Conditions

The project is located at Grand Canyon National Park, Arizona.

The construction magnitude is between $80M – $120M.

The surrounding area is rural with limited staging located at various locations on the south rim and inner canyon, pre-approved on construction drawings.

Material and equipment delivery will be to the south rim of the Grand Canyon. For work conducted inner canyon, materials and equipment will be required to be flow into specific project sites via contracted helicopter managed by contractor.

The closest cities to the south rim of the Grand Canyon are Williams AZ (60 miles), Flagstaff AZ (80 miles), Pheonix AZ (230 miles); two primary highways to access the south rim are 180 and 64.

The Park will remain open during construction, thus contract activities and logistics must be structured and scheduled to minimize visitor impact; some authorized closures will be permitted as per the construction documents.

The site requires protective measures to ensure the surrounding area remains undisturbed in order to protect cultural and natural resources during construction.

The anticipated period of performance of 915 calendar days including any potential weather shutdown.

There are additional restrictions of work by specific work sites in the construction documents.

Winter and summer construction may be required.

The inner-canyon work require the contractor to contract helicopter(s) and utilize the NPS’s heliport site as logistics staging area and coordinate with NPS heliport operations; some mandatory no fly days will occur due to emergency operations and or weather, contract documents provide more specifics on average shut down days per month.

Contractor housing is limited at the park and the surrounding area, park is in process of building 20 RV site with utilities on the south rim in support of contractor housing for projects on the south rim.

Significant elevation differences between project locations specifically the south rim and inner canyon make for diverse weather conditions and logistics challenges.

Project Scope:

This project will rehabilitate the parks primary water system that provides service to the south rim and inner canyon of the Grand Canyon National Park. Work includes new surface water intake (source) at Bright Angle Creek in the Phantom Ranch Delta that includes pump station, creek stabilization, surface water treatment plant, open cut replacement of water distribution and power system; replacement of water main, power and fiber micro-duct between Havasupai Gardens (former Indian Gardens), water distribution system at Havasupai Gardens, rehabilitation of pump station; replacement of water main via slipline between Havasupai Gardens and the south rim; new surface water treatment plant on the south rim to include new storage tanks and some distribution piping replacement; includes installation of point of use disinfection systems (UV) at upper northern inner canyon at cottonwood and manzanita districts. Limitations on closures and construction areas are specified in the contract documents and are intendended to minimize impacts to visitor, employee and concessions operations throughout the duration of the project. Coordination with permitting authority ADEQ (Arizona Department of Environmental Quality), power company APS (Arizona Power Service), and NPS heliport operations will be critical to success implementing the scope of this project.

Submittal Contents: Interested (small and large) businesses should submit the following information:

(1)Company name, DUNS number, address, point of contact, telephone number, and email address.
(2)Business type: Classification as a Large or Small Business under the above listed NAICS, Small Business Administration (SBA) certified Historically Underutilized Business Zone (HUBZone), Veteran-Owned Small Businesses (VOSB), Service-Disabled Veteran-Owned Small Businesses (SDVOSB), SBA certified Woman Owned Small Business (WOSB), Economically Disadvantaged Woman Owned Small Business (EDWOSB). The size of a small business firm includes all parents, subsidiaries, affiliates, etc.—see 13 CFR 121.108.) Misrepresentation of size status can result in penalties.
(3)Statement regarding your company’s bonding capacity. Letters from bonding companies are not required at this time.

(4) Information demonstrating experience and capability on projects of same or similar size, scope and magnitude, and constructed under similar conditions.

(5) In addition businesses may submit existing marketing materials such as capability statements and brochures.

Submittal Due Date/Time: 3PM Mountain Time, Friday, March 11, 2022

Submit To: timothy_burger@nps.gov and edwin_berry@contractor.nps.gov image1.jpeg