A10-078.pdf

PDF 54 KB Posted

Attached to
Compact, High Intensity, Low Cost, Free Standing Illumination Sources
Solicitation number
A10-078
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A10-078: Compact, High Intensity, Low Cost, Free Standing Illumination Sources

PROJECTED CMMC LEVEL REQUIREMENT:

N/A

TECHNOLOGY AREAS:

Electronics

MODERNIZATION PRIORITIES:

KEYWORDS:

high-luminosity illuminators, high-speed video, plasma lights, laser illumination, arc discharge lamp, ruggedized illuminator, MRAP

ADDITIONAL INFORMATION

OBJECTIVE:

The objective is to develop an innovative concept of an illumination system providing extremely high level of illumination of 200,000 lumens/sq meter for ultra-fast photography (million frames/sec or more) of dynamical events such as IED blasts or RPG impact on Army platforms and implement the concept into a prototype.

DESCRIPTION:

The Army needs high power light sources for high speed photography. The cameras with frame rates of million frames/sec or higher frame rates are increasingly being used for recording of fast events such as impact of a projectile on Army platforms such as tanks and APCs or an IED blast. To image fast events from a distance of 50 to 100 meters, high power collimated illumination sources are needed. This is because of the fact that with higher frame rates the number of available photons decrease proportionately, i.e. the number of available photons per pixel per frame for million frames per second will be approximately 33,000 times lower than 30 frames per second rate. We require illumination sources capable of delivering an illumination intensity of 50-200,000 lumens over one to several square meters of area for a number of applications. Higher intensity illuminators may be required in future so the solution should be scalable for higher illumination. Current state of the Art: The current technology for such illuminators are plasma light sources which are commonly used for stadium lighting, which ganged together can deliver up to 20,000 lumens. The size should also be no more than 65 cubic inches. However they cannot be focused into narrow divergence to deliver high illumination intensity at a distance of a hundred meter required for our application. Improved plasma sources or other technologies such as LEDs and lasers can be considered for the approach. The sources should be low maintenance and rugged to be deployable in the field.

The wavelength of the sources should be compatible with silicon CMOS or CCD imagers. The illuminator should be operable from line power or vehicle power. The size of the unit should not exceed 12x12x8" and the weight should not exceed 25lbs. They should also be low cost, easy to use and easy to repair and replace its components.

PHASE I:

In phase I, the objective would be to study Army's need for illumination systems and develop a solution to the address it. A convincing argument should be made through theoretical or experimental studies that the solution would be able to address all the aspects of the problem. A design of the illuminator should be made in phase I. The contractor should demonstrate the ability to produce significant quantities of the equipment in phase III. The contractor should define overall impacts and improvements in terms of maintenance, reliability and sustainability. The contractor should understand environmental and safety concerns, as well as, propose methods to address such concerns. Define metrics that will be used to in phase II to monitor the progress of the project and measure success. The deliverables of phase I will be the detailed design and documentation of the illuminator which would be built in phase II.

PHASE II:

In phase II, the contractor would build a prototype illuminator. A final design review will be held before starting the build. The illuminator prototype will be built and tested thoroughly in the laboratory and in the field. The deliverables will include the delivery of an illuminator for further testing by Army. A TRL (Technology Readiness Level) of 7 must be met by the prototype.

PHASE III DUAL USE APPLICATIONS:

Successful completion of phase II will demonstrate a working prototype which can built for multiple application. A variation of the design would be useful for commercial and industrial applications. Commercial applications would include ultra-fast photography of various industrial accident scenarios, automobile and airplane crash events, chemical fires, fast chemical reactions in chemical plants and in laboratories.

REFERENCES:

Proc. SPIE, Vol. 6876, 68760F (2008);1.

High brilliance and high efficiency: optimized high power diode laser bars;2.

3.

Note: All references are available from the topic author upon request. Contact Dr. Mark Mentzer at mark.mentzer@us.army.mil or (410) 278-3076.

4.

. Doron Nakar, Asher Malul, Daniel Feuermann, and Jeffrey M. Gordon, Radiometric characterization of ultrahigh radiance xenon short-arc discharge lamps, Appl. Opt. 47, 224-229 (2008)

5.

R. Hülsewede, H. Schulze, J. Sebastian, D. Schröder, J. Meusel, and P. Hennig6.

M. R. Krames, O. B. Shchekin, R. Mueller-Mach, G. O. Mueller, L. Zhou, G. Harbers, and M. G. Craford, " Status and Future of High-Power Light-Emitting Diodes for Solid-State Lighting," J. Display Technol. 3, 160-175 (2007)

7.

B.W. Baum, L.L. Shaw, S.C. Simonson, and K.A. Winer, Linear Collapse and Early Jet Formation in a Shaped Charge, Proceedings of the 14th International Symposium on Ballistics 1993, Vol. 2, p. 13-22, 1993.

8.

Peter Nebolsine, Christopher Rollins, and Edmond Lo, Physical Sciences, Inc., Final Report Subcontract No.

FMD 9401, High-Frame Rate Data Collection for Advanced Armor Instrumentation Enhanced Imagery, October 1994.

9.

Thuvan Piehler, Barrie Homan, Rachel Ehlers, Richard Lottero, and Kevin McNesby, ARL-RP-137, High Speed Laser Imaging, Emission and Temperature Measurements of Explosions, Insensitive Munitions & Energetic Materials Technology Symposium Proceedings, Bristol, UK, April 2006.

10.

TECHNICAL POINT OF CONTACT (TPOC):

None

File details come from the government source that posted it. Updated .