A10. J2. SOI - 129702223R0010.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 12970223R0010
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a schedule of items for a federal contract solicitation to perform road repairs on the Sierra Vista Scenic Byway in the Sierra National Forest. The solicitation was issued by the Forest Service's Specialized Project Operations Center Southwest Branch on August 7, 2023 under number 12970223R0010. Key work items include importing and placing 500 tons of riprap class 1, placing 290 tons of 3/4-inch class 2 base rock with compaction, performing 1.75 miles of full depth reclamation to a depth of 6 inches and width of 22 feet, laying 4913 tons of 3/4-inch hot mix asphalt, applying double chip seal to 8.77 miles of roadway, crack sealing and filling 8.77 miles of asphalt pavement, installing 10.52 miles of permanent pavement markings, performing temporary traffic control, placing 270 tons of pothole repairs using 3/4-inch hot mix asphalt, and maintaining drainage structures along 8.77 miles of roadway. Offerors are to provide unit pricing only as quantities are set, with a total price to be auto-calculated. The successful awardee must provide payment and performance bonds within 15 days of award.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Items
| CONTINUATION OF SF 1442 - SECTION B |
| SCHEDULE OF ITEMS |
| PROJECT TITLE | GAOA - Sierra Vista Scenic Byway Beasore Road Repairs | |||||
| UNIT | Sierra National Forest | |||||
| SOL # | 12970223R0010 | |||||
| Issuing Office | Specialized Project Operations Center (SPOC) Southwest Branch | Issuing Date: | 8/7/23 | |||
| ITEM NO. | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | AMOUNT | |
| 151.1 | Mobilization | 1 | Lump Sum | $0.00 | $0.00 | |
| 151.2 | Bid Bond - 20% of Total Order Value | 0.2 | PERCENT | $0.00 | $0.00 | |
| 251 | Import and place Riprap Class 1 | 500 | TON | $0.00 | $0.00 | |
| 301 | Caltrans 3/4" class 2 base rock, | |||||
| compaction method D. | 290 | TON | $0.00 | $0.00 | ||
| 304 | Full Depth Reclamation, Method 1, 6 | |||||
| inch depth, 22 feet wide. | 1.75 | MILE | $0.00 | $0.00 | ||
| 404 | 3/4" Hot Mix Asphalt. Caltrant | 4913 | TON | $0.00 | $0.00 | |
| 407 | Double course chip seal, type 2C | 8.77 | MILE | $0.00 | $0.00 | |
| 414 | Asphalt pavement crack sealing and | |||||
| filling | 8.77 | MILE | $0.00 | $0.00 | ||
| 634 | Permanent Pavement Markings, double | |||||
| yellow type A. | 10.52 | MILE | $0.00 | $0.00 | ||
| 635 | Temporary traffic control | 1 | LS | $0.00 | $0.00 | |
| 814 | Pothole repairs (3/4" Hot Mix Asphalt. | |||||
| Caltrants Type A, Grading: PG 64-16. ) | 270 | TON | $0.00 | $0.00 | ||
| 834 | Drainage structures maintenance | 8.77 | MILE | $0.00 | $0.00 | |
| SUBTOTAL | $0.00 | |||||
| TOTAL | $0.00 | |||||
| NOTES | 1. Offeror must fill in the UNIT price ONLY. Spreadsheet is formatted to auto populate the total price. | |||||
| 2. A bid bond is not applicable to this task order requirement. The Successful awardee that receives this order shall provide a digitally signed payment bond and performance bond within 15 calendar days of award against the IDIQ contract. | ||||||
| 3. Responses for quantities less than those listed in the numbered items may be rejected. | ||||||
| 4. Responses without prices for each item and sub-item may be rejected. | ||||||
| PRICE SUBMITTED BY | ||||||
| Company Name | ||||||
| POC | ||||||
| POC Phone | ||||||
| POC Email | ||||||
| UEI SAM No. |
File details come from the government source that posted it. Updated .