A10_127EAS25R0004-Att3-ProjectMap.pdf
PDF 2 MB Posted
- Attached to
- Eldorado NF Mosquito Site Prep Multi-year Federal contract opportunity
- Solicitation number
- 127EAS25R0004
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a geospatial map and project specification for the USDA Forest Service's Mosquito Mechanical Site Prep 2025 project located in the Georgetown Ranger District of Eldorado National Forest. The map details multiple optional and mandatory items across a complex topographical area, with specific operational constraints including controlled areas marked by different colored flagging, streamcourse protection zones (25'-100' equipment exclusion areas), and limited operating periods from February 15th through September 15th. The project includes road-related activities, with new road construction and reconstruction to be completed by August 2025 under separate contracts, and includes archaeological resource protection provisions with confidentiality restrictions. The map is color-coded to indicate various operational zones, terrain features, and project boundaries, with detailed metadata and geographic reference information included in the legend and peripheral annotations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A10_127EAS25R0004-Att7-SCAWD1977-0727.pdf | ||
| A10_0-RFP-127EAS25R0004_A2.pdf | ||
| A10_0-RFP-127EAS25R0004_A1.pdf | ||
| A10_127EAS25R0004-Att2-SOW.pdf | ||
| A10_127EAS25R0004-Att6-KTRKeyPersonnel.doc | DOC document | |
| A10_127EAS25R0004-Att4-SCAWD2015-5631.pdf | ||
| A10_127EAS25R0004-Att1-FillableSOI.xlsx | XLSX spreadsheet | |
| A10_0-RFP-127EAS25R0004.pdf | ||
| A10_127EAS25R0004-Att5-ExperienceQuestionnaire.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
003200
2 600
380 0
A A A A A A A A A A A A A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
A A A A A A A A A A A A A A A A
A A
A A
A A
A A A A
A A
A A
A A
A A
A A
A A
A A A A A A A A A A A A
A A A A A A A A A A A A A A A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
A A A A A A A A A A A A A A A A A A
A A A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA3
%%CA2
%%CA2%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA2 %%
CA
%%CA2
%%CA2
%%CA2%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA2
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1 %%CA1
%%CA1
%%CA1%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1 %%CA1
%%CA1
%%CA1%%
CA
%%CA1
%%CA1
%%CA1%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
%%CA1
N4
N F
N
13N65C
N2 2C
14N36
13N88
14N
13N6
14N56
N B
13N 41C
14N54
13N
13N95
14N22A
N
14N
N
13N
13N67
N
14N
13N41
N2
14N08
14N
T14 N R12 E
T
N R
E
T
N R
E
T14 N R13 E
10 11
323-29-5 323-29-5 323-29-7
323-29-4
323-45323-25
330-24-1
330-26-2
329-45-2
330-22
329-44
325-19
325-16
325-04
322-02
323-07
323-47
323-50-1
323-29-1
323-40
323-41 323-24
323-53
324-19
325-12
325-18
321-11
323-21
14N25WA
14N
25CA
N25
D
14N 25C
14N25X
14N25W
14N22B
N4
1E
14N25S
13N46A
14N
±0 1,000 2,000 3,000 4,000500
Feet
Mandatory Item 1
Optional Item 2
Optional Item 3
Optional Item 4
Optional Item 5
Optional Item 6
USDA FOREST SERVICE
NON-FS
Streamcourse Protection, 100' equipment exlusion each side (Perennial Stream)
Streamcourse Protection, 50' equipment exlusion each side (Intermittent Stream)
Streamcourse Protection, 25' equipment exlusion each side (Ephemeral Stream)
Canal Ditch
Connector
New road construction to be completed by August 2025 in a seperate contract
Road reconstruction to be completed by August 2025 in a seperate contract
%%CA1 Controlled Area, No operations permitted within zones flagged with pink and black checkered flagging
%%CA2 Controlled Area, No operations permitted within zones flagged with pink and green flagging
%%CA3
Controlled Area, No operations permitted within zones flagged with orange "NOXIOUS WEED" flagging unless approved by a Forest Service Botanist
A A
Protection of Improvements, Power Lines
Limited Operating Period, March 1st thru August 31st
Limited Operating Period, February 15th thru September 15th
Mosquito Mechanical Site Prep 2025 Georgetown Ranger District
Eldorado National Forest
9:;36
7 8 9
4 2
26 25
Stumpy Meadows Reservoir
T:\FS\NFS\Eldorado\Program\2400TimberMgmt\GIS\Workspace\hkuuskvere\HarrisonKuuskvere\2025SitePrep\2025SitePrep\MapProduct\ARCH_2025SitePrep04_30_2025.pdf
Confidential The above archaeological information is confidential.
The site location informaiton is exempt from FOIA and cannot be released. Feger to FSM 2361.4 for laws that provide for protection of sensitive information from public disclosure, including NHPA section 304(a), ARPA Section 9, the Freedom of Informatin Act (5 USC 552 {b}[3], and the Food, Conservation, and Energy Act of 2008.
1. Statutory Protection of the Confidentiality of the Archaeological Resource Information under 16 U.S.C.
470hh: The Section provides that "information concerning the nature and location of any archaeological resources" for which the excavtion or remocal requires an ARPA permit or permission under FOIA or under any other provison of law.
Such information may be disclosed if the federal land manager determines that disclouse would further the purposes of the Act and would not create a risk of harm to the resources or the site where they are located.
file:T:/FS/NFS/Eldorado/Program/2400TimberMgmt/GIS/Workspace/hkuuskvere/HarrisonKuuskvere/2025SitePrep/2025SitePrep/MapProduct/ARCH_2025SitePrep04_24_2025.pdf
File details come from the government source that posted it. Updated .