A1 - Statement of Work.pdf
PDF 236 KB Posted
- Attached to
- 2 ROPS Forklift and Flatbed Trailer Rental
- Solicitation number
- FA461026Q0025
About this file
This is a Statement of Work for the Booster Test Program at Vandenberg Space Force Base, dated 28 April 2026. The vendor shall supply two 25K or 36K forklifts and one 38 to 40 foot flatbed trailer (with 48 feet acceptable as alternative) to support booster configuration development. The forklifts must have minimum tine dimensions of 96 inches long by 6 inches wide by 2.5 inches thick, fitted with rubber anti-static straps for static electricity dissipation. One forklift must operate at Building 980 and one at the flightline. The flatbed trailer must transport equipment between Building 980 and the flightline and include C-track/sliding winch track configuration with 10 each 4-inch winch straps rated for 5,400 pounds Working Load Limit. All equipment shall be UL/ETL approved.
The vendor is responsible for full inspection and maintenance prior to delivery, providing all equipment hardware and labor, and responding within 4 hours to address faulty equipment. The base period runs from 26 May 2026 through 27 November 2026 (6 months), with one option period from 27 November 2026 through 28 May 2027 (6 months). Equipment must remain operational until mission needs expire, at which point the vendor is responsible for removal. The vendor must comply with federal, state, Air Force, local, and county laws and regulations. No government furnished items or equipment are specified. Points of contact include a Customer Representative and an Invoice Reviewer in Wide Area Work Flow.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Solicitation Forklift and Flatbed Rental (SAT).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work 25K forklifts and 40 foot flatbed trailer rental
CUI
Statement of Work For
Booster Test Program 28 April 2026
Statement of Work 25K forklifts and 40 foot flatbed trailer rental
1.0 BACKGROUND
Vandenberg Space Force Base is supporting Booster Test Program efforts, which started in April 2022 and is scheduled to end in November 2026. The Program is developing a new booster configuration. Two (2) 25K or 36K forklifts and one (1) 38 or 40 foot flatbed trailer are required to support this mission. The Forklifts have to be at minimum 25K and/or a maximum of 36K to perform the tasks required. A 48 foot trailer will be considered if a 38 to 40 foot trailer cannot be supplied.
2.0 OBJECTIVES
The vendor shall supply two (2) 25K or 36K forklifts and one (1) 38 to 40 foot (48ft) flatbed trailer to transport equipment.
3.0 DECRIPTION OF WORK
3.1 Installation
o Vendor shall provide two (2) 25K or 36K forklifts with with a minimum tines size of
96in (L) x 6in (W) x 2.5in (T) and fitted with a rubber anti-static strap that drags on the ground to dissipate static electricity. NOTE: Tines must be at least 96in long but cannot be greater than 8in (W) or 4in (T) o One (1) 25K to 36K forklift must be delivered and able to work at building 980.
o One (1) 25K to 36K forklift must be delivered and able to work at the flightline.
o One (1) 38 to 40 foot (53ft) flatbed trailer must be delivered and able to transport equipment from building 980 to the flightline and back. Trailer must a include C-track/sliding winch track configuration, 10ea 4” Winch Strap with Flat Hook, 40 ft Long, with a Working Load Limit (WLL) of 5,400 lbs.
3.2 Operation
o The 25K or 36K forklifts must be able to lift and move the equipment as needed.
o The 38 or 40 foot (48ft) flatbed trailer must be able to transport the equipment as needed.
3.2 Removal
o Rentals will remain operational until they are no longer needed to support the missions needs.
o Vendor is responsible for removing all equipment after period of operation has expired.
3.3 Supplied Items
o Vendor shall perform a full inspection and any required maintenance or repair of all material prior to delivery, even if previously provided on a residual contract.
o Vendor will supply all equipment, hardware, labor, materials, pickup & delivery o All equipment shall be UL/ETL approved.
o Vendor will respond in 4hrs or less to address/repair any faulty equipment.
4.0 DESIRED SKILLS AND KNOWLEDGE