A09-173: Smart Sensor Network for Platform Structural Health Monitoring
PROJECTED CMMC LEVEL REQUIREMENT:
N/A
TECHNOLOGY AREAS:
Electronics | Materials | Sensors
MODERNIZATION PRIORITIES:
KEYWORDS:
Bridging, Structural, Health, Monitoring, Sensors, Network
ADDITIONAL INFORMATION
OBJECTIVE:
Design and develop a real-time health monitoring system that can observe the condition of structural components on Army bridging platforms and notify a remote observer of decreased structural integrity.
DESCRIPTION:
The geographic scope of current Army operations in Iraq and Afghanistan has posed a great number of gap crossing situations. Many bridges that were designed to be used in a rapid deployment and temporary circumstance have begun to fill the role of semi-permanent bridges. These bridges are experiencing a high number of crossings with only periodic visual inspections being performed. Presently, there is no system in place that automatically records the number of vehicle crossings, predicts the remaining life of the bridge, or communicates that information to decision makers. With the current operations tempo in Iraq, these bridges are subjected to a number of crossings, traffic, and loads that are well beyond design characteristics. This level of stress and fatigue gives light to the problem of unanticipated failure that could have catastrophic results if failure occurs during a crossing. The challenge lies in ultimately creating a universal structural health monitoring system that can be incorporated on multiple bridge platforms. The system development would be marked by milestones, the first being installed on the Line of Communication Bridge (LOCB) by Fiscal Year (FY) 2010. Other milestones would include the integration on the Armored Vehicle Launch Bridge (AVLB) in FY 2011, the Rapidly Emplaced Bridging System (REBS) in FY 2012, and the Composite Joint Assault Bridge (CJAB) in FY 2013. The system should be able to scan and assess the overall integrity and remaining life of the bridge, its critical components, and notify inspection teams with critical data that can safeguard against bridge failures. The monitoring system will also provide a benefit in that inspection teams will be able to spend less time on each bridge, allowing for more efficient patrols and less exposure time of personnel to hostile situations.
PHASE I:
In Phase I, a feasibility study will be conducted to determine the trade-offs between a universal health monitoring system versus a bridge specific monitoring system. Also, a feasibility study will be conducted on incorporating system monitoring sensors on the LOCB, embedding them on this new platform design, and identifying reliable health assessment algorithms. This study will also include the size, weight, and power limitations of the sensor system. This study shall address a plan to acquire or generate power on unpowered bridge systems. The study will include computing requirements for the sensor network and a total cost comparison between alternative network designs. The results of the study will be detailed in a final report.
PHASE II:
Phase II will aim to develop the technology and design an acceptable prototype sensor network and health assessment algorithm based off of the findings in Phase I. The first bridge system to incorporate the health monitoring system shall be the LOCB, with the aim of integrating and testing on additional bridge systems. The prototype shall be self-sustaining and require minimal maintenance over an extended period of time. Minimal maintenance means that components shall not require replacement more frequently than regular system maintenance intervals. The sensor network shall be delivered, installed, and tested at a Government test facility to quantify improvement and system impacts. Testing will simulate structural degradation and report on how the health monitoring system responds. The results of the testing, along with detailed fabrication and integration plans, will be included in a final report.
PHASE III DUAL USE APPLICATIONS:
Phase III will involve a transition of the technology as we work with PM Bridging to deploy several health monitoring systems on LOC bridges, to be used in a continuously running demonstration and operational assessment. The results will aid the Army in evaluating the systems use and effectiveness in identifying bridges that require maintenance before grave conditions present themselves. The information provided from these deployed systems shall also help optimize inspection procedures, as well as demonstrate the challenges involved with integrating the health monitoring system on additional bridge systems. Civilian engineering will also benefit from the proposed research for use on public infrastructure such as highway and railway bridges, where real-time structural health assessment can increase safety and avert catastrophic failures that result in loss of life.
REFERENCES:
Choi, J.-H. (2000). The fracture analysis and remaining life estimation of the AVLB sub-components.
Morgantown, W. Va: [West Virginia University Libraries].
http://etd.wvu.edu/templates/showETD.cfm?recnum=1759.
1.
Dr. H. GangaRao, "Damage and Remaining Life Assessment for AVLB." Constructed Facilities Center West Virginia University, January 2001. http://www.intelligent-systems.info/papers/avlb.PDF