A07. Ref_2.1-245-8627737G.pdf
PDF 504 KB Posted
- Attached to
- Weld Repair Federal contract opportunity
- Solicitation number
- N0016724Q0312
About this file
This document appears to be a technical specification for Nickel-Aluminum-Bronze (NAB) sand or centrifugal castings used in Navy propulsor applications. It provides detailed requirements for the chemical composition, mechanical properties, casting repair procedures, quality assurance, and supplementary requirements.
The related federal contract opportunity is for the procurement of on-site weld repair services for various NAB castings at the Naval Foundry and Propeller Center in Philadelphia, PA in order to meet the Navy's technical specifications. The firm fixed price contract will be awarded by the Naval Surface Warfare Center Carderock Division. The solicitation number is N0016724Q0312.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment N0016724Q03120002.pdf | ||
| Amendment N0016724Q03120001.pdf | ||
| A07. Ref_2.4-NAVSEA T9074-AS-GIB-010-271.pdf | ||
| Solicitation - DD254 N00167-24-Q-0312 090524.pdf | ||
| A04. A001 DI-MISC-80508B (Technical Report-StudyServices).pdf | ||
| A07. Ref_2.2-NAVSEA S9074-AR-GIB-010-278.pdf | ||
| A07. Ref_2.3-NAVSEA S9074-AQ-GIB-010-248.pdf | ||
| A04. CDRL A001 (Technical Report) - Fully Signed.pdf | ||
| N0016724Q0312 CSS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A 53711 245 8627737 G
SIZE CAGE CODE ESWBS NAVSEA DRAWING NO REV.
DEPARTMENT OF THE NAVY
NAVAL SEA SYSTEMS COMMAND
WASHINGTON NAVY YARD, D.C. 20376-5160
NAVY PROPULSOR CASTING NICKEL-
ALUMINUM-BRONZE SPECIFICATION
NORFOLK NAVAL SHIPYARD DET.
NAVAL FOUNDRY AND
PROPELLER CENTER
PHILADELPHIA, PA 19112
PREPARED
CHECKED
APPROVED FOR NAVSEA 05P3
SCALE: FULL SHEET 1 OF 8
M. Crowley 10/29/21
T. G. Thayer 10/29/21
See Digital Signature
REVISIONS
SHEET REV DESCRIPTION DATE
APPROVED
A
CLARIFIED WELD PROCEDURE EQUIVALENCY IN NOTE 401.
CLARIFIED MACHINE GOUGE WELD CATEGORY IN NOTE 406.
CHANGED LOT TO APPLICABLE HEAT IN NOTE 601
C. MADDEN
2/12/2016
6-7
B
UPDATED NOTE 406 TO CLARIFY ABOUT SHIPYARDS
CLARIFIED NOTE 601
ADDED SUPPLEMENTAL REQUIREMENTS
C. MADDEN
7/10/2017
3-4 C
UPDATED NOTE 302 MECHANICAL REQUIREMENTS
UPDATED NOTE 303 REQUIREMENT, FIGURES AND
DIMENSIONS
C. MADDEN
11/02/2017
4-5
D
UPDATED NOTE 402 BASE METAL REQUIREMENT AND ADDED
NOTES 305, 403-405.
ADDED S4 & S5.
M. WELLS
1/23/2018
E
UPDATED TITLE
ADDED CENTRIFUGAL TO NOTE 101
UPDATED S4
M. WELLS
10/27/2019
F
UPDATED S1 TO PERMANENT COMPONENT INSTALLATION AND
ONE TIME APPROVAL
UPDATED S1.2 (THERMAL TRACES)
M. WELLS
8/20/2020
G
UPDATED NOTE 102 TO LATEST REVISION OF ASTM B824
UPDATED NOTE 402 TO INCLUDE PT METHOD CLARIFICATION
UPDATED NOTES 403 & 404 CONTINUAL VT USAGE IN VT
INSPECTED REGIONS
UPDATED AND MERGED NOTES S1 & S2 MOLD DESIGN
APPROVAL CLARIFICATION
UPDATE NOTE S4 0.060” MATERIAL EXCESS AND POST WELD
PT DEFFERAL
ADDED NOTE S6 TITANIUM ADDITION
SEE DIGITAL
SIGNATURE
NAVSEA 05P3 DIGITAL APPROVAL SIGNATURE
DISTRIBUTION STATEMENT A:
APPROVED FOR PUBLIC RELEASE. DISTRIBUTION IS UNLIMITED.
NFPC C1420 DIGITAL APPROVAL SIGNATURE
SCALE: FULL SHEET 2 OF 8
GENERAL NOTES
101. THE PURPOSE OF THIS DRAWING IS TO ESTABLISH REQUIREMENTS FOR NICKEL
ALUMINUM BRONZE SAND OR CENTRIFUGAL CASTINGS MADE OF UNS NO. C95800
ALLOY FOR USE IN NAVY PROPULSOR APPLICATIONS. CASTINGS SHALL BE AS-CAST
WITH NO TEMPER ANNEAL. WELD REPAIRS SHALL ALSO NOT REQUIRE TEMPER
ANNEAL.
102. MATERIAL FURNISHED UNDER THIS SPECIFICATION SHALL CONFORM TO THE
APPLICABLE REQUIREMENTS OF SECTIONS 9 TO 15 OF ASTM B824-17. WHERE THERE
IS CONFLICTING INFORMATION THIS SPECIFICATION TAKES PRECEDENCE OVER ASTM
B824-17.
103. UNLESS OTHERWISE SPECIFIED BY THE ORDERER THE UNIQUE HEAT
IDENTIFICATION NUMBER SHALL BE MARKED ON ALL CASTINGS.
CHEMICAL COMPOSITION
201. CHEMICAL COMPOSITION SHALL CONFORM TO THE REQUIREMENTS OF UNS NO.
C95800 LISTED IN TABLE 1 BELOW.
TABLE 1 - CHEMICAL REQUIREMENTS
CU AL FE* MN NI** SI PB SUM OF RESULTS
MIN. 79.0 8.5 3.5 0.8 4.0 99.5
MAX. 9.5 4.5 1.5 5.0 0.10 0.03
*IRON CONTENT SHALL NOT EXCEED THE NICKEL CONTENT
**NICKEL INCLUDES COBALT
202. THE COMPOSITION LIMITS DO NOT PRECLUDE THE PRESENCE OF OTHER
ELEMENTS. LIMITS MAY BE ESTABLISHED BY AGREEMENT BETWEEN MANUFACTURER
AND PURCHASER FOR THE UNNAMED ELEMENTS.
203. COPPER IS THE DIFFERENCE BETWEEN THE SUM OF RESULTS OF ALL ELEMENTS
DETERMINED AND 100%. WHEN ALL THE SPECIFICATION ELEMENTS ARE DETERMINED,
THE SUM OF RESULTS SHALL BE A MINIMUM OF 99.5%.
SCALE: FULL SHEET 3 OF 8
MECHANICAL PROPERTY REQUIREMENTS
301. THE MECHANICAL PROPERTIES SHALL BE DETERMINED FROM SEPARATELY CAST
TEST BAR CASTINGS.
302. MATERIAL FURNISHED UNDER THIS DRAWING SHALL CONFORM TO THE
MECHANICAL PROPERTIES STATED IN TABLE 2 SHOWN BELOW.
TABLE 2 - MECHANICAL REQUIREMENTS
TENSILE
STRENGTH
(KSI)
YIELD STRENGTH
0.5% EUL (KSI) ELONGATION (%)
MIN. 85 35 15
303. SEPARATELY CAST TEST BARS SHALL MEET THE PATTERN REQUIREMENTS AS
SHOWN IN FIGURES A AND B BELOW. THE MOLD MATERIAL SHALL BE SILICA SAND.
MINIMUM SAND THICKNESS AROUND THE MOLD CAVITY SHALL BE 1”. FIGURES A AND
B BELOW SHOW A SINGLE TEST BAR; MULTIPLE BARS MAY BE COMBINED IN A
SINGLE MOLD PROVIDED THE 1” MINIMUM SAND THICKNESS IS MET. THE ALLOWABLE
TOLERANCE ON ALL DIMENSIONS IS +/- 1/8”. TEST BAR DIMENSIONS SHALL
CONFORM TO FIGURE 8 OF ASTM E8/E8M FOR SMALL-SIZE SPECIMEN 3 WITH GAUGE
LENGTH FOUR TIMES THE DIAMETER (0.25” NOMINAL DIAMETER).
FIGURE A – TEST BAR PATTERN SIDE VIEW (SINGLE PATTERN)
SCALE: FULL SHEET 4 OF 8
304. ACCEPTANCE OR REJECTION SHALL BE BASED ON TENSILE STRENGTH, YIELD
STRENGTH, AND PERCENT ELONGATION. TENSILE STRENGTH AND YIELD STRENGTH
SHALL BE DETERMINED BY THE EXTENSION-UNDER-LOAD METHOD OF TEST METHODS
IN ASTM E8/E8M.
305. IN LIEU OF TEST BARS PER NOTE 303, STANDARD 0.5” NOMINAL DIAMETER
TEST BARS MAY BE POURED IAW ASTM B208, FIGURE 1 (A OR B).
CASTING REPAIR
401. ALL WELDING SHALL BE IN ACCORDANCE WITH S9074-AR-GIB-010A/278
EXCEPT AS MODIFIED BY THIS NOTE. ALL WELDERS AND WELD PROCEDURES SHALL
BE QUALIFIED IN ACCORDANCE WITH S9074-AQ-GIB-010/248. THIS SPECIFICATION
IS CHEMICALLY IDENTICAL TO MIL-B-24480A (BASE METAL GROUP S-36A PER
S9074-AR-GIB-010A/278). ANY WELD PROCEDURE QUALIFIED TO MIL-B-24480A MAY
BE USED FOR MATERIAL PRODUCED TO THIS SPECIFICATION.
402. SOUND BASE METAL IS DEFINED AS MEETING THE REQUIREMENTS OF MIL-STD-
2035A(SH), SECTION 7, CLASS 3, FINISHED MACHINE SURFACE CONDITION.
PARAGRAPHS 4.5 AND 7.5.4 AND TABLE IV DO NOT APPLY. LIQUID PENETRANT
INSPECTION (PT) SHALL BE IAW S9074-AS-GIB-010A/271, VISIBLE DYE (DEFINED
AS TYPE 2, PER S9074-AS-GIB010A/271 REVISION 1).
FIGURE B – TEST BAR PATTERN END VIEW (SINGLE PATTERN)
SCALE: FULL SHEET 5 OF 8
403. PRIOR TO WELDING ALL EXCAVATIONS SHALL BE PT INSPECTED AND PREPARED
TO SOUND BASE METAL AS DEFINED IN NOTE 402. IF THE PART SPECIFIC DRAWING
INSTRUCTS INITIAL INSPECTION OF AN AREA TO BE DONE BY VT, THE BASE METAL
OF EXCAVATIONS IN THAT AREA MAY ALSO BE INSPECTED BY VT AND SHALL MEET
THE CRITERIA OF SOUND BASE METAL AS DEFINED IN NOTE 402.
404. UNLESS OTHERWISE SPECIFIED IN THE PART SPECIFIC DRAWING, COMPLETED
WELD REPAIRS SHALL BE PT INSPECTED AND MEET THE SOUND BASE METAL
CRITERIA AS DEFINED IN NOTE 402. IF THE PART SPECIFIC DRAWING INSTRUCTS
INITIAL INSPECTION OF AN AREA TO BE DONE BY VT, COMPLETED WELD REPAIRS
IN THAT AREA MAY ALSO BE INSPECTED BY VT AND SHALL MEET THE CRITERIA
CALLED OUT IN THE PART SPECIFIC DRAWING.
405. IN ADDITION TO THE REQUIREMENTS OF NOTE 404, WHEN MORE THAN TWO
LAYERS OF WELD ARE NECESSARY TO WELD BUILD-UP OR TO REPAIR AN
EXCAVATION, EVERY THIRD LAYER SHALL BE PT INSPECTED AND MEET THE SOUND
BASE METAL CRITERIA AS DEFINED IN NOTE 402.
406. NO PEENING IS ALLOWED ON WELD METAL NOR BASE CASTING.
407. ONLY WELD FILLER WIRE IAW MIL-CUNIAL OF MIL-E-23765/3A IS
PERMITTED.
408. WELD REPAIR DEPTH SHALL BE DETERMINED FROM THE DESIGN SURFACE.
PRIOR TO COMPLETION OF MACHINING, THE DIMENSIONAL LIMITS FOR EACH
CATEGORY (MINOR, NOMINAL AND SPECIAL IAW S9074-AR-GIB-010A/278 SECTION
13) SHALL BE INCREASED BY THE AMOUNT OF LOCAL EXCESS MATERIAL REMAINING
ON THE CASTING. MACHINING GOUGES IN THE CASTING SHALL BE TREATED AS WELD
REPAIRS AND NOT WELD BUILD-UPS (S9074-AR-GIB-010A/278 SECTION 13).
409. MINOR AND NOMINAL WELD REPAIRS AS DEFINED ABOVE MAY BE MADE AT ANY
TIME DURING THE MANUFACTURING PROCESS WITHOUT APPROVAL. SPECIAL WELD
REPAIRS AT PUBLIC SHIPYARDS SHALL BE APPROVED BY THE NAVSEA AUTHORIZED
REPRESENTATIVE FOR INDIVIDUAL REPAIRS OF PROPULSORS PER S9074-AR-GIB-
010A/278 PRIOR TO WELDING. SPECIAL WELD REPAIRS AT NON-PUBLIC SHIPYARDS
REQUIRE NAVSEA 05P3 APPROVAL PRIOR TO WELDING.
410. ALL WELD REPAIRS, INCLUDING MINOR WELD REPAIRS, SHALL BE RECORDED
AND INCLUDE THE FOLLOWING:
A. A SKETCH, DRAWING OR PICTURE SHOWING THE DIMENSIONS DEPTH AND
LOCATIONS
B. WELD REPAIR INSPECTION RESULTS
C. CASTING IDENTIFICATION NUMBER
SCALE: FULL SHEET 6 OF 8
D. WELD REPAIR PROCEDURE IDENTIFICATION NUMBER
E. WELDER IDENTIFICATION
F. INSPECTOR IDENTIFICATION
411. CASTINGS SHALL NOT BE IMPREGNATED.
QUALITY ASSURANCE
501. UNLESS OTHERWISE SPECIFIED, THE MANUFACTURER IS RESPONSIBLE FOR
PERFORMANCE OF ALL INSPECTIONS AND TEST REQUIREMENTS SPECIFIED. THE
MANUFACTURER MAY USE ITS OWN OR ANY OTHER SUITABLE FACILITIES FOR THE
PERFORMANCE OF THE INSPECTION AND TEST REQUIREMENTS UNLESS DISAPPROVED
BY THE PURCHASER AT THE TIME THE ORDER IS PLACED. THE PURCHASER SHALL
HAVE THE RIGHT TO PERFORM ANY OF THE INSPECTIONS OR TESTS SET FORTH WHEN
SUCH INSPECTION AND TESTS ARE DEEMED NECESSARY TO ENSURE THAT THE
MATERIAL CONFORMS TO PRESCRIBED REQUIREMENTS.
CERTIFICATION
601. THE PURCHASER SHALL BE FURNISHED CERTIFICATION THAT SAMPLES
REPRESENTING EACH APPLICABLE HEAT HAVE BEEN TESTED AND INSPECTED AS
DIRECTED IN THIS SPECIFICATION AND REQUIREMENTS HAVE BEEN MET. THIS
CERTIFICATION SHALL INCLUDE ACTUAL CHEMICAL AND MECHANICAL TEST RESULTS.
SCALE: FULL SHEET 7 OF 8
SUPPLEMENTARY REQUIREMENTS
THE FOLLOWING SUPPLEMENTARY REQUIREMENTS SHALL APPLY ONLY WHEN SPECIFIED BY THE
PURCHASER IN THE DRAWING OR CONTRACT.
S1. MOLD DESIGN DOCUMENTATION & CASTING PROCESS APPROVAL.
VENDOR SHALL SUBMIT TO NAVSEA 05P3 FOR NAVSEA 05P3 APPROVAL THE
FOLLOWING INFORMATION PRIOR TO MOLD HEATING. MOLD DESIGN APPROVAL IS
ONLY FOR ONE CASTING UNLESS EXPLICITLY STATED. SUBSEQUENT CASTINGS MADE
TO THE SAME DESIGN MUST BE RE-APPROVED FOR UNLIMITED PRODUCTION:
1. DOCUMENTATION OF THE PLANNED MOLDING AND POURING OF THE CASTING IN
ACCORDANCE WITH LATEST REVISION OF NAVSEA DRAWING 810-7642133.
2. RESULTS OF CASTING SIMULATIONS OF THE PROPOSED MOLD DESIGN ALONG
WITH RATIONALE AS TO WHY THE CASTING SIMULATIONS REPRESENT THE
ACTUAL POUR IN ACCORDANCE WITH LATEST REVISION OF NAVSEA DRAWING
810-7642133. THERMAL TRACES FROM LIQUIDUS TO SOLIDUS AT APPROPRIATE
POINTS SHALL TO BE INCLUDED IN THE EVALUATION. JUSTIFICATION SHALL
BE PROVIDED USING EVALUATION RESULTS OF SIMILAR SIZED CASTINGS
RECENTLY COMPLETED, INCLUDING A COMPARISON OF THE ACTUAL CASTING
QUALITY VS THE PREDICTED CASTING QUALITY, AND THE RATIONALE FOR
CHANGES FROM PAST PRACTICES.
VENDOR SHALL SUBMIT TO NAVSEA 05P3 THE FOLLOWING INFORMATION, IF
APPLICABLE, WITHIN 60 DAYS AFTER THE POUR IS COMPLETE:
1. DOCUMENTATION OF THE ACTUAL AS-BUILT MOLD AND ACTUAL POURING
CONDITIONS.
S2. N/A
SCALE: FULL SHEET 8 OF 8
S3. EXTRACTED MECHANICAL SAMPLES
MECHANICAL TEST SAMPLES SHALL BE TAKEN FROM THE LOCATION DESIGNATED ON
THE PART DRAWING (OR LOCATION SPECIFIED BY THE PURCHASER) AND MEET THE
FOLLOWING MINIMUM REQUIREMENTS:
TABLE 3 – EXTRACTED SAMPLE MECHANICAL REQUIREMENTS
TENSILE
STRENGTH
(KSI)
YIELD STRENGTH
0.5% EUL (KSI) ELONGATION (%)
MIN. 60 24 10
S4. SURFACE INSPECTION PRIOR TO FINAL MACHINING
PRIOR TO FINAL MACHINING (DEFINED AS AT LEAST 0.060” MATERIAL EXCESS
ABOVE NET), ALL SURFACES SHALL MEET PT REQUIREMENTS OF SOUND BASE METAL
PER NOTE 402. WELD REPAIR OF ANY SOUND BASE METAL GRINDOUTS MAY BE
DEFFERED UNTIL AFTER FINAL MACHINING AT THE OPTION OF THE MANUFACTURER.
PT OF WELD REPAIRS MADE PRIOR TO FINAL MACHINING MAY BE DFFERED UNTIL
AFTER FINAL MACHINING AT THE OPTION OF THE MANUFACTURER. PT OF EVERY
THIRD LAYER OF WELD PER NOTE 405 STILL APPLIES. FIXTURING DATUMS MAY BE
FINISH MACHINED WITHOUT THIS PT INSPECTION PROVIDED THOSE SURFACES ARE
PT INSPECTED TO THE PART SPECIFIC DRAWING REQUIREMENTS PRIOR TO ANY
OTHER MACHINING.
S5. FIRST ARTICLE INSPECTION
THE FIRST CASTING AFTER MOLD DESIGN APPROVAL SHALL UNDERGO DESTRUCTIVE
TESTING. A CUTTING PLAN SHALL BE REVIEWED AND APPROVED BY NAVSEA 05P3.
AT A MINIMUM THE CUTTING PLAN SHALL SPECIFY CUTS AT LOCATIONS WITH THE
HIGHEST PROCLIVITY OF SHRINKAGE BASED ON CASTING SIMULATION SOFTWARE
RESULTS AND AT MAJOR ATTACHMENT HOLE LOCATIONS. ALL CUT SURFACES SHALL
BE LIQUID PENETRANT INSPECTED AND EVALUATED IAW SOUND BASE METAL
REQUIREMENTS PER NOTE 402.
ONCE THE DESIGN IS APPROVED, ANY SIGNIFICANT MOLD DESIGN CHANGE (AS
DETERMINED BY NAVSEA 05P3) WILL REQUIRE A NEW DESTRUCTIVE FIRST ARTICLE
TEST. THE VENDOR MAY SUBMIT FOR NAVSEA 05P3 APPROVAL A JUSTIFICATION WHY
DESTRUCTIVE TESTING IS NOT REQUIRED. AN ALTERNATE PLAN SUCH AS SPLITTING
RISERS AND COMPARING TO SIMULATION RESULTS MAY ALSO BE SUBMITTED FOR
NAVSEA 05P3 APPROVAL.
S6. COPPER TITANIUM MASTER ALLOY SHALL BE ADDED TO ACHIEVE A NOMINAL
0.048% TITANIUM BY WEIGHT.
| 2022-01-13T08:48:48-0500 | |
| PHAN.LUAN.D.1396199277 |
| 2022-01-20T10:21:50-0500 | |
| MADDEN.CRAIG.J.1228764570 |
File details come from the government source that posted it. Updated .