Basis of Estimate
| PROJECT INFORMATION | ||||
| Project: | Sny Magill Unit Riverbank Stabilization - Near-Term | |||
| Park: | Effigy Mounds National Monument | |||
| Park Alpha: | EFMO | |||
| PMIS Number: | 325227 | |||
| Estimate Date: | 6/16/22 | |||
| Prepared By: | Julie Lawson | |||
| Company: | NPS - MWRO | |||
| Address: | ||||
| City, State Zip: | ||||
| Phone: | 440-563-8073 | |||
| BACKGROUND SUPPORTING MATERIAL (Scope of Work): | ||||
| SOURCE OF COST DATA: | ||||
| ESTIMATE ASSUMPTIONS: | ||||
| MAJOR CHANGES FROM PREVIOUS ESTIMATE: | ||||
| DESCRIPTION OF MARK-UP & ADD-ONS: | ||||
| Location Factor: | 0.00% | Utilizing local market conditions near project site | ||
| Remoteness Factor: | 0.00% | Adjacent to commercial market centers, not remote | ||
| Wage Rate Factor: | 0.00% | Refer to Davis Bacon wages, adjust to local market labor rates as needed. Local union rates to be utilized | ||
| State & Local Taxes: | 0.00% | No State & Local Taxes | ||
| Design Contingency: | 0.00% | Preliminary analysis of project site indicates potential unknowns that may impact design in future | ||
| Standard. General Conditions: | 0.00% | Not itemized at this point | ||
| Government General Conditions: | 0.00% | Explain & Justify | ||
| Historic Preservation Factor: | 0.00% | Describe rationale for using this factor | ||
| Contractor Overhead: | 0.00% | Explain & Justify | ||
| Contractor Profit: | 0.00% | Explain & Justify | ||
| Bonds and Permits: | 0.00% | Explain & Justify | ||
| Contracting Method Adjustment: | 0.00% | Describe anticipated contract method and justify value used. | ||
| Annual Inflation Escalation Factor: | 0.00% | Projected annual inflation rate. | ||
| Time Until Project Midpoint (Months) | 0 | Number of months from estimate (or data) date until the projects midpoint of construction. | ||
| OTHER COMMENTS: | ||||
| This Contract is to supply materials only. Park labor will be used to install materials. |
&C&"Arial,Bold"United States Department of the Interior National Park Service &11Class C Construction Cost Estimate&4
&13BASIS OF ESTIMATE
&L&6&F &A&C&11Page &P of &N&R&6Print Date: &D
Estimate Summary
| Project: | Sny Magill Unit Riverbank Stabilization - Near-Term | Estimate By: | Julie Lawson | |||
| Park: | Effigy Mounds National Monument | Date: | 06/16/22 | |||
| Alpha: | EFMO | |||||
| PMIS: | 325227 | |||||
| Reviewed By: | ||||||
| Date: | ||||||
| Item No. | Description | Quantity | Unit | Cost/Unit | Total | |
| 1 | Near-Term Riverbank Stabilization | 1 | LS | $0 | $0 | |
| 2 | Not Used | 1 | $0 | $0 | ||
| 3 | Not Used | 1 | $0 | $0 | ||
| 4 | Not Used | 1 | $0 | $0 | ||
| 5 | Not Used | 1 | $0 | $0 | ||
| 6 | Not Used | 1 | $0 | $0 | ||
| 7 | Not Used | 1 | $0 | $0 | ||
| 8 | Not Used | 1 | $0 | $0 | ||
| 9 | Not Used | 1 | $0 | $0 | ||
| 10 | Not Used | 1 | $0 | $0 | ||
| 11 | Not Used | 1 | $0 | $0 | ||
| 12 | Not Used | 1 | $0 | $0 | ||
| 13 | Not Used | 1 | $0 | $0 | ||
| 14 | Not Used | 1 | $0 | $0 | ||
| 15 | Not Used | 1 | $0 | $0 | ||
| 16 | Not Used | 1 | $0 | $0 | ||
| 17 | Not Used | 1 | $0 | $0 | ||
| 18 | Not Used | 1 | $0 | $0 | ||
| Subtotal Direct Construction Costs | $0 | |||||
| Value of Government Furnished Property (GFP) Included in Direct Cost (see footnote)* | $0 | Note: Normally zero - see footnote. | ||||
| Direct Cost Subtotal without GFP | $0 | |||||
| Published Location Factor | 0.00% | $0 | ||||
| Remoteness Factor | 0.00% | $0 | ||||
| Federal Wage Rate Factor | 0.00% | $0 | ||||
| State & Local Taxes | 0.00% | $0 | ||||
| Design Contingency | 0.00% | $0 | ||||
| Total Direct Construction Costs | $0 | |||||
| Standard General Conditions | 0.00% | $0 | ||||
| Government General Conditions | 0.00% | $0 | ||||
| Historic Preservation Factor | 0.00% | $0 | ||||
| Subtotal NET Construction Cost | $0 | |||||
| Overhead | 0.00% | $0 | ||||
| Profit | 0.00% | $0 | ||||
| Estimated NET Construction Cost | $0 | |||||
| Bonds & Permits | 0.00% | $0 | ||||
| Contracting Method Adjustment | 0.00% | $0 | ||||
| Inflation Escalation | Months | $0 | ||||
| Archeological Monitoring During Construction | LS | $0 | ||||
| Total Estimated NET Cost of Construction | $0 | |||||
| * GFP costs are only used when the Government pre-purchases items, or provides other materials out of Government inventory, to be installed by contractor. Adjustments and Markup on GFP only include Inflation Escalation; No other adjustment factors or O&P markup have been applied. |
&C&"Arial,Bold"United States Department of the Interior National Park Service &11Class C Construction Cost Estimate&4 &"Arial,Regular" &"Arial,Bold"&13PROJECT COST SUMMARY &L&6&F &A&CPage &P of &N&R&6Print Date: &D, &T
Item 1
| Project: | Sny Magill Unit Riverbank Stabilization - Near-Term | Estimate By: | Julie Lawson | ||||
| Park: | Effigy Mounds National Monument | Date: | 06/16/22 | ||||
| Park Alpha: | EFMO | Reviewed By: | |||||
| PMIS Number: | 325227 | Date: | |||||
| Summary Item 1 | Near-Term Riverbank Stabilization | Total Cost: | $0 | ||||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| High Density Pre-Drilled Coir Logs | 900 | LF | |||||
| J Hook Rebar Anchors (10 pack) | 60 | EA | |||||
| Coir Fiber Twine | 1 | LS | |||||
| Coir Blanket | 6000 | SF | |||||
| Biodegradable Stakes 3.8 stakes/sy (500 pack) | 2 | EA | |||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| SUBTOTAL STABILIZATION | 1 | LS | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| A20 | STABILIZATION | ||||||
| LS | $0 | ||||||
| EA | $0 | ||||||
| EA | $0 | ||||||
| LS | $0 | ||||||
| LS | $0 | ||||||
| Unit | $0 | ||||||
| Unit | $ - 0 | $0 | |||||
| 0 | Unit | $ - 0 | $0 | ||||
| SUBTOTAL BASEMENT CONSTRUCTION | 1 | LS | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| B10 | SUPERSTRUCTURE | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SUPESTRUCTURE | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| B20 | EXTERIOR CLOSURE | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL EXTERIOR CLOSURE | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| B30 | ROOFING | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL ROOFING | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| C10 | INTERIOR CONSTRUCTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL INTERIOR CONSTRUCTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| C20 | STAIRCASES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL STAIRCASES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| C30 | INTERIOR FINISHES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL INTERIOR FINISHES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D10 | CONVEYING SYSTEMS | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL CONVEYING SYSTEMS | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D20 | PLUMBING | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL PLUMBING | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D30 | HVAC | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL HVAC | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D40 | FIRE PROTECTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL FIRE PROTECTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D50 | ELECTRICAL | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL ELECTRICAL | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| E10 | EQUIPMENT | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL EQUIPMENT | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| E20 | FURNISHINGS | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL FURNISHINGS | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| F10 | SPECIAL CONSTRUCTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SPECIAL CONSTRUCTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| F20 | SELECTIVE BUILDING DEMOLITION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SELECTIVE BUILDING DEMOLITION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G10 | SITE PREPARATION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE PREPARATION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G20 | SITE IMPROVEMENTS | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE IMPROVEMENTS | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G30 | SITE CIVIL/MECHANICAL UTILITIES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE CIVIL/MECHANICAL UTILITES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G 40 | SITE ELECTRICAL UTILITIES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE ELECTRICAL UTILITIES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G50 | OTHER SITE CONSTRUCTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL OTHER SITE CONSTRUCTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| CONTINGENCY | 0% | $0 | |||||
| TOTAL COST - | Near-Term Riverbank Stabilization | 1 | LS | $ - 0 | $0 |
&C&"Arial,Bold"United States Department of the Interior National Park Service &11Class C Construction Cost Estimate&4
&12LINE ITEM COST SUMMARY
&L&6&F, &A&C&9&P of &N&R&6&D &T
Item 2
| Project: | Sny Magill Unit Riverbank Stabilization - Near-Term | Estimate By: | Julie Lawson | ||||
| Park: | Effigy Mounds National Monument | Date: | 06/16/22 | ||||
| Park Alpha: | EFMO | Reviewed By: | Reviewer | ||||
| PMIS Number: | 325227 | Date: | Review Date | ||||
| Summary Item 2 | Not Used | Total Cost: | Total Cost | ||||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| $0 | |||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| SUBTOTAL STABILIZATION | 1 | LS | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| A20 | STABILIZATION | ||||||
| LS | $0 | ||||||
| EA | $ - 0 | $0 | |||||
| EA | $ - 0 | $0 | |||||
| LS | $ - 0 | $0 | |||||
| LS | $ - 0 | $0 | |||||
| Unit | $ - 0 | $0 | |||||
| Unit | $ - 0 | $0 | |||||
| 0 | Unit | $ - 0 | $0 | ||||
| SUBTOTAL BASEMENT CONSTRUCTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| B10 | SUPERSTRUCTURE | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SUPESTRUCTURE | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| B20 | EXTERIOR CLOSURE | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL EXTERIOR CLOSURE | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| B30 | ROOFING | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL ROOFING | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| C10 | INTERIOR CONSTRUCTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL INTERIOR CONSTRUCTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| C20 | STAIRCASES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL STAIRCASES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| C30 | INTERIOR FINISHES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL INTERIOR FINISHES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D10 | CONVEYING SYSTEMS | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL CONVEYING SYSTEMS | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D20 | PLUMBING | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL PLUMBING | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D30 | HVAC | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL HVAC | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D40 | FIRE PROTECTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL FIRE PROTECTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D50 | ELECTRICAL | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL ELECTRICAL | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| E10 | EQUIPMENT | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL EQUIPMENT | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| E20 | FURNISHINGS | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL FURNISHINGS | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| F10 | SPECIAL CONSTRUCTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SPECIAL CONSTRUCTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| F20 | SELECTIVE BUILDING DEMOLITION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SELECTIVE BUILDING DEMOLITION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G10 | SITE PREPARATION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE PREPARATION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G20 | SITE IMPROVEMENTS | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE IMPROVEMENTS | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G30 | SITE CIVIL/MECHANICAL UTILITIES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE CIVIL/MECHANICAL UTILITES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G 40 | SITE ELECTRICAL UTILITIES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE ELECTRICAL UTILITIES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G50 | OTHER SITE CONSTRUCTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL OTHER SITE CONSTRUCTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| TOTAL COST - | Not Used | 1 | LS | $ - 0 | $0 |
&C&"Arial,Bold"United States Department of the Interior National Park Service &11Class C Construction Cost Estimate&4
&12LINE ITEM COST SUMMARY
&L&6&F, &A&C&9&P of &N&R&6&D &T
Item 3
| Project: | Sny Magill Unit Riverbank Stabilization - Near-Term | Estimate By: | Julie Lawson | ||||
| Park: | Effigy Mounds National Monument | Date: | 06/16/22 | ||||
| Park Alpha: | EFMO | Reviewed By: | Reviewer | ||||
| PMIS Number: | 325227 | Date: | Review Date | ||||
| Summary Item | Not Used | Total Cost: | $0 | ||||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| $0 | |||||||
| 0 | Unit | $ - 0 | $0 | ||||
| 0 | Unit | $ - 0 | $0 | ||||
| 0 | Unit | $ - 0 | $0 | ||||
| 0 | Unit | $ - 0 | $0 | ||||
| 0 | Unit | $ - 0 | $0 | ||||
| 0 | Unit | $ - 0 | $0 | ||||
| 0 | Unit | $ - 0 | $0 | ||||
| SUBTOTAL STABILIZATION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| A20 | BASEMENT CONSTRUCTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL BASEMENT CONSTRUCTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| B10 | SUPERSTRUCTURE | ||||||
| Level 3 Code | Towpath Buckeye | LF | $0 | ||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SUPESTRUCTURE | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| B20 | EXTERIOR CLOSURE | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL EXTERIOR CLOSURE | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| B30 | ROOFING | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL ROOFING | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| C10 | INTERIOR CONSTRUCTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL INTERIOR CONSTRUCTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| C20 | STAIRCASES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL STAIRCASES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| C30 | INTERIOR FINISHES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL INTERIOR FINISHES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D10 | CONVEYING SYSTEMS | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL CONVEYING SYSTEMS | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D20 | PLUMBING | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL PLUMBING | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D30 | HVAC | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL HVAC | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D40 | FIRE PROTECTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL FIRE PROTECTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D50 | ELECTRICAL | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL ELECTRICAL | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| E10 | EQUIPMENT | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL EQUIPMENT | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| E20 | FURNISHINGS | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL FURNISHINGS | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| F10 | SPECIAL CONSTRUCTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SPECIAL CONSTRUCTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| F20 | SELECTIVE BUILDING DEMOLITION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SELECTIVE BUILDING DEMOLITION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G10 | SITE PREPARATION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE PREPARATION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G20 | SITE IMPROVEMENTS | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE IMPROVEMENTS | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G30 | SITE CIVIL/MECHANICAL UTILITIES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE CIVIL/MECHANICAL UTILITES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G 40 | SITE ELECTRICAL UTILITIES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE ELECTRICAL UTILITIES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G50 | OTHER SITE CONSTRUCTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL OTHER SITE CONSTRUCTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| TOTAL COST - | Not Used | 1 | LS | $ - 0 | $0 |
&C&"Arial,Bold"United States Department of the Interior National Park Service &11Class C Construction Cost Estimate&4
&12LINE ITEM COST SUMMARY
&L&6&F, &A&C&9&P of &N&R&6&D &T
Item 4
| Project: | Sny Magill Unit Riverbank Stabilization - Near-Term | Estimate By: | Julie Lawson | ||||
| Park: | Effigy Mounds National Monument | Date: | 06/16/22 | ||||
| Park Alpha: | EFMO | Reviewed By: | Reviewer | ||||
| PMIS Number: | 325227 | Date: | Review Date | ||||
| Summary Item | Not Used | Total Cost: | $0 | ||||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| SUBTOTAL STABILIZATION | 1 | LS | $ - 0 | $0 | 1172463 | ||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| A20 | STABILIZATION | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| $ - 0 | $0 | ||||||
| SUBTOTAL BASEMENT CONSTRUCTION | 1 | LS | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| B10 | SUPERSTRUCTURE | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SUPESTRUCTURE | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| B20 | EXTERIOR CLOSURE | ||||||
| Level 3 Code | CVSR 59.3 | LF | $0 | ||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL EXTERIOR CLOSURE | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| B30 | ROOFING | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL ROOFING | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| C10 | INTERIOR CONSTRUCTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL INTERIOR CONSTRUCTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| C20 | STAIRCASES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL STAIRCASES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| C30 | INTERIOR FINISHES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL INTERIOR FINISHES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D10 | CONVEYING SYSTEMS | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL CONVEYING SYSTEMS | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D20 | PLUMBING | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL PLUMBING | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D30 | HVAC | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL HVAC | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D40 | FIRE PROTECTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL FIRE PROTECTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| D50 | ELECTRICAL | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL ELECTRICAL | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| E10 | EQUIPMENT | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL EQUIPMENT | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| E20 | FURNISHINGS | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL FURNISHINGS | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| F10 | SPECIAL CONSTRUCTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SPECIAL CONSTRUCTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| F20 | SELECTIVE BUILDING DEMOLITION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SELECTIVE BUILDING DEMOLITION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G10 | SITE PREPARATION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE PREPARATION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G20 | SITE IMPROVEMENTS | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE IMPROVEMENTS | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G30 | SITE CIVIL/MECHANICAL UTILITIES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE CIVIL/MECHANICAL UTILITES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G 40 | SITE ELECTRICAL UTILITIES | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SITE ELECTRICAL UTILITIES | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| G50 | OTHER SITE CONSTRUCTION | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL OTHER SITE CONSTRUCTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| TOTAL COST - | Not Used | 1 | LS | $ - 0 | $0 |
&C&"Arial,Bold"United States Department of the Interior National Park Service &11Class C Construction Cost Estimate&4
&12LINE ITEM COST SUMMARY
&L&6&F, &A&C&9&P of &N&R&6&D &T
Item 5
| Project: | Sny Magill Unit Riverbank Stabilization - Near-Term | Estimate By: | Julie Lawson | ||||
| Park: | Effigy Mounds National Monument | Date: | 06/16/22 | ||||
| Park Alpha: | EFMO | Reviewed By: | Reviewer | ||||
| PMIS Number: | 325227 | Date: | Review Date | ||||
| Summary Item | Not Used | Total Cost: | $0 | ||||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| $0 | |||||||
| $0 | |||||||
| 0 | Unit | $ - 0 | $0 | ||||
| 0 | Unit | $ - 0 | $0 | ||||
| 0 | Unit | $ - 0 | $0 | ||||
| 0 | Unit | $ - 0 | $0 | ||||
| 0 | Unit | $ - 0 | $0 | ||||
| 0 | Unit | $ - 0 | $0 | ||||
| SUBTOTAL STABILIZATION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| A20 | BASEMENT CONSTRUCTION | ||||||
| Level 3 Code | Towpath Mudcatcher | LF | $0 | ||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL BASEMENT CONSTRUCTION | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| B10 | SUPERSTRUCTURE | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL SUPESTRUCTURE | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| B20 | EXTERIOR CLOSURE | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| SUBTOTAL EXTERIOR CLOSURE | 1 | VALUE | $ - 0 | $0 | |||
| Uniformat II WBS Code | Description | Quantity | Unit | Cost/Unit | Total Cost | Remarks | |
| B30 | ROOFING | ||||||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 | ||
| Level 3 Code | Description | 0 | Unit | $ - 0 | $0 |