Basis of Estimate

PROJECT INFORMATION
Project:Sny Magill Unit Riverbank Stabilization - Near-Term
Park:Effigy Mounds National Monument
Park Alpha:EFMO
PMIS Number:325227
Estimate Date:6/16/22
Prepared By:Julie Lawson
Company:NPS - MWRO
Address:
City, State Zip:
Phone:440-563-8073
BACKGROUND SUPPORTING MATERIAL (Scope of Work):
SOURCE OF COST DATA:
ESTIMATE ASSUMPTIONS:
MAJOR CHANGES FROM PREVIOUS ESTIMATE:
DESCRIPTION OF MARK-UP & ADD-ONS:
Location Factor:0.00%Utilizing local market conditions near project site
Remoteness Factor:0.00%Adjacent to commercial market centers, not remote
Wage Rate Factor:0.00%Refer to Davis Bacon wages, adjust to local market labor rates as needed. Local union rates to be utilized
State & Local Taxes:0.00%No State & Local Taxes
Design Contingency:0.00%Preliminary analysis of project site indicates potential unknowns that may impact design in future
Standard. General Conditions:0.00%Not itemized at this point
Government General Conditions:0.00%Explain & Justify
Historic Preservation Factor:0.00%Describe rationale for using this factor
Contractor Overhead:0.00%Explain & Justify
Contractor Profit:0.00%Explain & Justify
Bonds and Permits:0.00%Explain & Justify
Contracting Method Adjustment:0.00%Describe anticipated contract method and justify value used.
Annual Inflation Escalation Factor:0.00%Projected annual inflation rate.
Time Until Project Midpoint (Months)0Number of months from estimate (or data) date until the projects midpoint of construction.
OTHER COMMENTS:
This Contract is to supply materials only. Park labor will be used to install materials.

&C&"Arial,Bold"United States Department of the Interior National Park Service &11Class C Construction Cost Estimate&4

&13BASIS OF ESTIMATE

&L&6&F &A&C&11Page &P of &N&R&6Print Date: &D

Estimate Summary

Project:Sny Magill Unit Riverbank Stabilization - Near-TermEstimate By:Julie Lawson
Park:Effigy Mounds National MonumentDate:06/16/22
Alpha:EFMO
PMIS:325227
Reviewed By:
Date:
Item No.DescriptionQuantityUnitCost/UnitTotal
1Near-Term Riverbank Stabilization1LS$0$0
2Not Used1$0$0
3Not Used1$0$0
4Not Used1$0$0
5Not Used1$0$0
6Not Used1$0$0
7Not Used1$0$0
8Not Used1$0$0
9Not Used1$0$0
10Not Used1$0$0
11Not Used1$0$0
12Not Used1$0$0
13Not Used1$0$0
14Not Used1$0$0
15Not Used1$0$0
16Not Used1$0$0
17Not Used1$0$0
18Not Used1$0$0
Subtotal Direct Construction Costs$0
Value of Government Furnished Property (GFP) Included in Direct Cost (see footnote)*$0Note: Normally zero - see footnote.
Direct Cost Subtotal without GFP$0
Published Location Factor0.00%$0
Remoteness Factor0.00%$0
Federal Wage Rate Factor0.00%$0
State & Local Taxes0.00%$0
Design Contingency0.00%$0
Total Direct Construction Costs$0
Standard General Conditions0.00%$0
Government General Conditions0.00%$0
Historic Preservation Factor0.00%$0
Subtotal NET Construction Cost$0
Overhead0.00%$0
Profit0.00%$0
Estimated NET Construction Cost$0
Bonds & Permits0.00%$0
Contracting Method Adjustment0.00%$0
Inflation EscalationMonths$0
Archeological Monitoring During ConstructionLS$0
Total Estimated NET Cost of Construction$0
* GFP costs are only used when the Government pre-purchases items, or provides other materials out of Government inventory, to be installed by contractor. Adjustments and Markup on GFP only include Inflation Escalation; No other adjustment factors or O&P markup have been applied.

&C&"Arial,Bold"United States Department of the Interior National Park Service &11Class C Construction Cost Estimate&4 &"Arial,Regular" &"Arial,Bold"&13PROJECT COST SUMMARY &L&6&F &A&CPage &P of &N&R&6Print Date: &D, &T

Item 1

Project:Sny Magill Unit Riverbank Stabilization - Near-TermEstimate By:Julie Lawson
Park:Effigy Mounds National MonumentDate:06/16/22
Park Alpha:EFMOReviewed By:
PMIS Number:325227Date:
Summary Item 1Near-Term Riverbank StabilizationTotal Cost:$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
High Density Pre-Drilled Coir Logs900LF
J Hook Rebar Anchors (10 pack)60EA
Coir Fiber Twine1LS
Coir Blanket6000SF
Biodegradable Stakes 3.8 stakes/sy (500 pack)2EA
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
SUBTOTAL STABILIZATION1LS$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
A20STABILIZATION
LS$0
EA$0
EA$0
LS$0
LS$0
Unit$0
Unit$ - 0$0
0Unit$ - 0$0
SUBTOTAL BASEMENT CONSTRUCTION1LS$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
B10SUPERSTRUCTURE
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SUPESTRUCTURE1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
B20EXTERIOR CLOSURE
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL EXTERIOR CLOSURE1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
B30ROOFING
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL ROOFING1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
C10INTERIOR CONSTRUCTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL INTERIOR CONSTRUCTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
C20STAIRCASES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL STAIRCASES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
C30INTERIOR FINISHES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL INTERIOR FINISHES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D10CONVEYING SYSTEMS
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL CONVEYING SYSTEMS1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D20PLUMBING
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL PLUMBING1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D30HVAC
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL HVAC1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D40FIRE PROTECTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL FIRE PROTECTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D50ELECTRICAL
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL ELECTRICAL1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
E10EQUIPMENT
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL EQUIPMENT1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
E20FURNISHINGS
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL FURNISHINGS1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
F10SPECIAL CONSTRUCTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SPECIAL CONSTRUCTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
F20SELECTIVE BUILDING DEMOLITION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SELECTIVE BUILDING DEMOLITION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G10SITE PREPARATION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE PREPARATION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G20SITE IMPROVEMENTS
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE IMPROVEMENTS1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G30SITE CIVIL/MECHANICAL UTILITIES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE CIVIL/MECHANICAL UTILITES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G 40SITE ELECTRICAL UTILITIES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE ELECTRICAL UTILITIES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G50OTHER SITE CONSTRUCTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL OTHER SITE CONSTRUCTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
CONTINGENCY0%$0
TOTAL COST -Near-Term Riverbank Stabilization1LS$ - 0$0

&C&"Arial,Bold"United States Department of the Interior National Park Service &11Class C Construction Cost Estimate&4

&12LINE ITEM COST SUMMARY

&L&6&F, &A&C&9&P of &N&R&6&D &T

Item 2

Project:Sny Magill Unit Riverbank Stabilization - Near-TermEstimate By:Julie Lawson
Park:Effigy Mounds National MonumentDate:06/16/22
Park Alpha:EFMOReviewed By:Reviewer
PMIS Number:325227Date:Review Date
Summary Item 2Not UsedTotal Cost:Total Cost
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
SUBTOTAL STABILIZATION1LS$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
A20STABILIZATION
LS$0
EA$ - 0$0
EA$ - 0$0
LS$ - 0$0
LS$ - 0$0
Unit$ - 0$0
Unit$ - 0$0
0Unit$ - 0$0
SUBTOTAL BASEMENT CONSTRUCTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
B10SUPERSTRUCTURE
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SUPESTRUCTURE1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
B20EXTERIOR CLOSURE
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL EXTERIOR CLOSURE1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
B30ROOFING
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL ROOFING1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
C10INTERIOR CONSTRUCTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL INTERIOR CONSTRUCTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
C20STAIRCASES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL STAIRCASES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
C30INTERIOR FINISHES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL INTERIOR FINISHES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D10CONVEYING SYSTEMS
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL CONVEYING SYSTEMS1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D20PLUMBING
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL PLUMBING1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D30HVAC
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL HVAC1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D40FIRE PROTECTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL FIRE PROTECTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D50ELECTRICAL
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL ELECTRICAL1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
E10EQUIPMENT
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL EQUIPMENT1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
E20FURNISHINGS
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL FURNISHINGS1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
F10SPECIAL CONSTRUCTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SPECIAL CONSTRUCTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
F20SELECTIVE BUILDING DEMOLITION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SELECTIVE BUILDING DEMOLITION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G10SITE PREPARATION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE PREPARATION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G20SITE IMPROVEMENTS
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE IMPROVEMENTS1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G30SITE CIVIL/MECHANICAL UTILITIES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE CIVIL/MECHANICAL UTILITES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G 40SITE ELECTRICAL UTILITIES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE ELECTRICAL UTILITIES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G50OTHER SITE CONSTRUCTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL OTHER SITE CONSTRUCTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
TOTAL COST -Not Used1LS$ - 0$0

&C&"Arial,Bold"United States Department of the Interior National Park Service &11Class C Construction Cost Estimate&4

&12LINE ITEM COST SUMMARY

&L&6&F, &A&C&9&P of &N&R&6&D &T

Item 3

Project:Sny Magill Unit Riverbank Stabilization - Near-TermEstimate By:Julie Lawson
Park:Effigy Mounds National MonumentDate:06/16/22
Park Alpha:EFMOReviewed By:Reviewer
PMIS Number:325227Date:Review Date
Summary ItemNot UsedTotal Cost:$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
$0
0Unit$ - 0$0
0Unit$ - 0$0
0Unit$ - 0$0
0Unit$ - 0$0
0Unit$ - 0$0
0Unit$ - 0$0
0Unit$ - 0$0
SUBTOTAL STABILIZATION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
A20BASEMENT CONSTRUCTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL BASEMENT CONSTRUCTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
B10SUPERSTRUCTURE
Level 3 CodeTowpath BuckeyeLF$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SUPESTRUCTURE1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
B20EXTERIOR CLOSURE
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL EXTERIOR CLOSURE1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
B30ROOFING
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL ROOFING1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
C10INTERIOR CONSTRUCTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL INTERIOR CONSTRUCTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
C20STAIRCASES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL STAIRCASES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
C30INTERIOR FINISHES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL INTERIOR FINISHES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D10CONVEYING SYSTEMS
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL CONVEYING SYSTEMS1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D20PLUMBING
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL PLUMBING1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D30HVAC
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL HVAC1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D40FIRE PROTECTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL FIRE PROTECTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D50ELECTRICAL
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL ELECTRICAL1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
E10EQUIPMENT
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL EQUIPMENT1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
E20FURNISHINGS
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL FURNISHINGS1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
F10SPECIAL CONSTRUCTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SPECIAL CONSTRUCTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
F20SELECTIVE BUILDING DEMOLITION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SELECTIVE BUILDING DEMOLITION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G10SITE PREPARATION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE PREPARATION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G20SITE IMPROVEMENTS
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE IMPROVEMENTS1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G30SITE CIVIL/MECHANICAL UTILITIES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE CIVIL/MECHANICAL UTILITES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G 40SITE ELECTRICAL UTILITIES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE ELECTRICAL UTILITIES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G50OTHER SITE CONSTRUCTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL OTHER SITE CONSTRUCTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
TOTAL COST -Not Used1LS$ - 0$0

&C&"Arial,Bold"United States Department of the Interior National Park Service &11Class C Construction Cost Estimate&4

&12LINE ITEM COST SUMMARY

&L&6&F, &A&C&9&P of &N&R&6&D &T

Item 4

Project:Sny Magill Unit Riverbank Stabilization - Near-TermEstimate By:Julie Lawson
Park:Effigy Mounds National MonumentDate:06/16/22
Park Alpha:EFMOReviewed By:Reviewer
PMIS Number:325227Date:Review Date
Summary ItemNot UsedTotal Cost:$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$ - 0$0
$ - 0$0
SUBTOTAL STABILIZATION1LS$ - 0$01172463
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
A20STABILIZATION
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
$ - 0$0
SUBTOTAL BASEMENT CONSTRUCTION1LS$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
B10SUPERSTRUCTURE
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SUPESTRUCTURE1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
B20EXTERIOR CLOSURE
Level 3 CodeCVSR 59.3LF$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL EXTERIOR CLOSURE1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
B30ROOFING
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL ROOFING1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
C10INTERIOR CONSTRUCTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL INTERIOR CONSTRUCTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
C20STAIRCASES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL STAIRCASES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
C30INTERIOR FINISHES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL INTERIOR FINISHES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D10CONVEYING SYSTEMS
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL CONVEYING SYSTEMS1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D20PLUMBING
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL PLUMBING1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D30HVAC
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL HVAC1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D40FIRE PROTECTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL FIRE PROTECTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
D50ELECTRICAL
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL ELECTRICAL1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
E10EQUIPMENT
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL EQUIPMENT1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
E20FURNISHINGS
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL FURNISHINGS1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
F10SPECIAL CONSTRUCTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SPECIAL CONSTRUCTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
F20SELECTIVE BUILDING DEMOLITION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SELECTIVE BUILDING DEMOLITION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G10SITE PREPARATION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE PREPARATION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G20SITE IMPROVEMENTS
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE IMPROVEMENTS1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G30SITE CIVIL/MECHANICAL UTILITIES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE CIVIL/MECHANICAL UTILITES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G 40SITE ELECTRICAL UTILITIES
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SITE ELECTRICAL UTILITIES1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
G50OTHER SITE CONSTRUCTION
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL OTHER SITE CONSTRUCTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
TOTAL COST -Not Used1LS$ - 0$0

&C&"Arial,Bold"United States Department of the Interior National Park Service &11Class C Construction Cost Estimate&4

&12LINE ITEM COST SUMMARY

&L&6&F, &A&C&9&P of &N&R&6&D &T

Item 5

Project:Sny Magill Unit Riverbank Stabilization - Near-TermEstimate By:Julie Lawson
Park:Effigy Mounds National MonumentDate:06/16/22
Park Alpha:EFMOReviewed By:Reviewer
PMIS Number:325227Date:Review Date
Summary ItemNot UsedTotal Cost:$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
$0
$0
0Unit$ - 0$0
0Unit$ - 0$0
0Unit$ - 0$0
0Unit$ - 0$0
0Unit$ - 0$0
0Unit$ - 0$0
SUBTOTAL STABILIZATION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
A20BASEMENT CONSTRUCTION
Level 3 CodeTowpath MudcatcherLF$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL BASEMENT CONSTRUCTION1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
B10SUPERSTRUCTURE
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL SUPESTRUCTURE1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
B20EXTERIOR CLOSURE
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
SUBTOTAL EXTERIOR CLOSURE1VALUE$ - 0$0
Uniformat II WBS CodeDescriptionQuantityUnitCost/UnitTotal CostRemarks
B30ROOFING
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0
Level 3 CodeDescription0Unit$ - 0$0

This is the start of the file's text. The full file is on GovTribe.