A06_SPECIFICATIONS_RED_BRIDGE_CAMPGROUND.pdf
PDF 856 KB Posted
- Attached to
- BLM-CO GFO RED BRIDGE CAMPGROUND IMPROVEMENT Federal contract opportunity
- Solicitation number
- 140L1725Q0026
About this file
These specifications detail the Red Bridge Campground Improvements project for the Bureau of Land Management's Gunnison Field Office in Colorado. The project scope includes toilet parking and access construction, demolition of 27 wood barriers and 74 wood bollards, boulder placement, and fence repair. Key technical requirements include excavating approximately 30 cubic yards of material, providing a 6-inch aggregate base course meeting Colorado Department of Transportation specifications, placing boulders with minimum 30-inch dimensions to delineate campsite parking, and repairing two sections of existing wood fence by replacing missing horizontal members.
The project will be located near Powderhorn, Colorado, approximately 8 miles south of Lake City on Blue Mesa Road, with work to be completed within 150 days of the Notice to Proceed. Work is restricted to Monday through Friday, excluding federal holidays. The specifications outline detailed requirements for earthwork, aggregate placement, boulder positioning, site restoration, and quality control, with the goal of improving campground infrastructure and access while maintaining the site's natural characteristics.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B11_Pre-Bid_Questions_-_GFO_Red_Bridge_CG_0001.pdf | ||
| Sol_140L1725Q0026_Amd_0001.pdf | ||
| B11_Pre_Bid_Site_Visit_Attendees.pdf | ||
| A06_DRAWINGS_RED_BRIDGE_CAMPGROUND.pdf | ||
| A04_BID_SCHEDULE__RED_BRIDGE_CAMPGROUND.pdf | ||
| B03_WD___CO20250003.pdf | ||
| Sol_140L1725Q0026.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior Bureau of Land Management
Gunnison Field Office Colorado
Red Bridge Campground Improvements
SPECIFICATIONS
Red Bridge Campground Improvements Specifications
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 20 00 PRICE AND PAYMENT PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 46 00 QUALITY CONTROL
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 30 00 FENCE REPAIR
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 PROJECT DESCRIPTION
The work includes, but is not limited to; toilet parking and access construction, demolition of wood barriers and wood bollards, and boulder placement.
1.2 LOCATION
From Powderhorn Colorado: travel south on highway 149 towards Lake City for approximately 8 miles. Turn right on Blue Mesa road, travel approximately 2 miles, the campground is on the left.
The campground can be found by searching "Red Bridge Campground" in google maps.
Google maps address: 2258 Blue Mesa Rd, Powderhorn, CO 81243
1.3 WORK SCHEDULE
Work shall be completed within 150 days of the Notice to Proceed. Work is not allowed on Federal holidays. Work shall occur Monday through Friday.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
Payment items for the work of this contract for which contract payments will be made are listed in the SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job are included in the listed job item most closely associated with the work involved. The price and payment made for each item listed constitutes full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1 MOBILIZATION AND DEMOBILIZATION
1.1.1 Payment
Payment will be made for costs associated with mobilization and demobilization.
When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.
When 15% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 8% of the original Contract amount, whichever is lesser, will be paid.
Upon completion of work for the project, payment of the amount bid for mobilization in excess of 8% of the original Contract amount, will be paid.
1.1.2 Unit of Measure
Unit of measure: job.
1.2 DEMOLITION AND DISPOSAL
1.2.1 Payment
Payment will be made for all costs associated with demolition. Including transportation and disposal.
1.2.2 Unit of Measure
Unit of measure: job.
SECTION 01 20 00 Page 3
1.3 FENCE REPAIR
1.3.1 Payment
Payment will be made for all costs associated repairing the fence.
1.3.2 Unit of Measure
Unit of measure: Job.
1.4 SITE GRADING
1.4.1 Payment
Payment will be made for all costs associated with site grading.
Including; excavation, transportation, and placement of material.
1.4.2 Unit of Measure
Unit of measure: Job.
1.5 AGGREGATE BASE COURSE
1.5.1 Payment
Payment will be made for all costs associated with providing aggregate base course. Including preparation, transportation, and placement. Submit weight tickets for payment.
1.5.2 Unit of Measure
Unit of measure: ton.
1.6 BOULDERS
1.6.1 Payment
Payment will be made for all costs associated with providing boulders.
1.6.2 Unit of Measure
Unit of measure: Each.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 20 00 Page 4
SECTION 01 20 00 Page 5
SECTION 01 32 01
PROJECT SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Initial Project Schedule ; G
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, and pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required.
3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.2.1 Level of Detail Required
Develop the Project Schedule to the appropriate level of detail to address major milestones, work listed in the bid schedule, and to allow for satisfactory project planning and execution.
3.2.2 Mandatory Tasks
Include the following activities/tasks in the initial project schedule and all updates.
a. Submission, review and acceptance of submittals.
b. Long procurement activities.
c. Contractor's pre-final inspection.
d. Government's pre-final inspection.
e. Final inspection.
SECTION 01 32 01 Page 6
3.2.3 Government Activities
Include Government activities that could impact progress. These activities include, but are not limited to: Government inspections of work, Government approval of submittals.
3.3 WEEKLY PROGRESS MEETINGS
Conduct a weekly meeting with the Government for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress and to review planned activities.
3.4 FAILURE TO ACHIEVE PROGRESS
Should the progress fall behind the approved project schedule, the Contracting Officer may require provision of a written recovery plan for approval. The plan must detail how progress will be made-up to include which activities will be accelerated by adding additional crews, longer work hours, extra work days, etc.
3.4.1 Failure to Perform
Failure to perform work and maintain progress in accordance with the supplemental recovery plan may result in an interim and final unsatisfactory performance rating and may result in corrective action directed by the Contracting Officer pursuant to FAR 52.236-15 Schedules for Construction Contracts, FAR 52.249-10 Default (Fixed-Price Construction), and other contract provisions.
3.4.2 Recovery Schedule
Should the Contracting Officer find it necessary, submit a recovery schedule pursuant to FAR 52.236-15 Schedules for Construction Contracts.
SECTION 01 32 01 Page 7
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only.
1.2 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer's Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract.
This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government.
1.3 GOVERNMENT APPROVING AUTHORITY
The Contracting Officer's Representative will:
a. Note the date on which the submittal was received.
b. Review submittals for approval within 10 days of receipt.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the Contractor.
1.3.1 Review Notations
Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until
SECTION 01 33 00 Page 8 resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the Government. This applies only to "information-only submittals" as previously defined.
1.4 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer.
If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.5 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals is not to be construed as a complete check.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 9
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES
Red Bridge Campground Improvements
01 32 01 SD-01 Preconstruction Submittals
GInitial Project Schedule
01 46 00 SD-01 Preconstruction Submittals
1.2 GQuality Control (QC) Manager
31 00 00 SD-03 Product Data
2.1 GAggregate Base Course
SD-07 Certificates
3.6Aggregate Weight Tickets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SECTION 01 46 00
QUALITY CONTROL
PART 1 GENERAL
1.1 QUALITY CONTROL
Contractor shall establish and maintain an effective quality control (QC) system that complies with FAR 52.246-12 Inspection of Construction.
Quality control (QC) is comprised of plans, procedures, and organization necessary to produce an end product that complies with the contract requirements.
1.2 QUALITY CONTROL MANAGER
Provide a quality control (QC) manager at the work site to implement and manage the QC program. The QC Manager may also be the project superintendent.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Quality Control (QC) Manager ; G
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 QUALITY CONTROL
Contractor shall ensure that the construction complies with the requirements of the contract. At a minimum, perform the following prior to beginning work on each definable feature of work:
Review each paragraph of the applicable specification sections.
Review the contract drawings.
Verify that appropriate submittals have been approved.
Verify that the required preliminary work has been completed and complies with the contract.
Do not build upon nor conceal non-conforming work.
SECTION 01 46 00 Page 10
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
Provide all materials and labor necessary to demolish and remove existing wood barriers and wood bollards.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 PROTECTION OF EXISTING FEATURES
Take necessary precautions to avoid damage to existing trees, vegetation, and campground amenities which might be damaged during demolition.
3.2 WOOD BARRIERS AND WOOD BOLLARDS
Remove wood bollards and wood barriers. The Contracting Officer's Representative may designate some wood bollards to remain in place.
Use material excavated from the toilet parking to backfill holes created by the removal.
Approximate Demolition Quantities Demolition Item Approximate Quantity
Wood Barriers 27
Wood Bollards 74
3.3 DISPOSAL OF REMOVED MATERIALS
All materials removed, shall become the property of the Contractor and shall be removed from Government property and disposed of in a legal manor.
SECTION 02 41 00 Page 11
SECTION 31 00 00
EARTHWORK
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Aggregate Base Course ; G
SD-07 Certificates
Aggregate Weight Tickets
PART 2 PRODUCTS
2.1 AGGREGATE BASE COURSE
Aggregate base course shall meet the requirements of Colorado Department of Transportation Standard Specifications for Road and Bridge Construction 2023, section 703 AGGREGATES. Aggregate base course gradation shall meet the gradation shown in Table 703-2, Class 6.
2.2 BOULDERS
Imported boulders shall be solid rock and have a roughly cubic shape with minimum dimensions of 30 inches in all directions.
PART 3 EXECUTION
3.1 UNDERGROUND UTILITIES
The Contractor is responsible for locating underground utilities prior to construction. The Government is not aware of any underground utilities, however the Contractor shall verify the presence or absence prior to construction.
3.2 GENERAL EXCAVATION
Perform excavation of every type of material encountered to the lines, grades, and elevations indicated and as specified. During construction, perform excavation and fill in a manner and sequence that will provide proper drainage at all times.
3.3 GROUND SURFACE PREPARATION
Do not perform construction when surfaces are frozen or muddy. Prepare the subgrade to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Shape subgrade to drain.
SECTION 31 00 00 Page 12
3.4 TOILET PARKING AND ACCESS
Excavate for toilet parking as shown on the drawings. Regrade, as necessary, to provide toilet parking and access surface slopes less than 2%. Provide aggregate, 6 inch thickness, for the toilet parking and access. Compact the aggregate over the full width. Provide moisture, as required, to provide a firm surface without any soft areas.
3.5 AGGREGATE PLACEMENT - EXISTING CAMPGROUND
Aggregate in the existing campground shall not be placed until after the toilet and parking access is complete, and after demolition and boulder placement is complete. Remaining aggregate shall be placed in the existing campground at locations designated by the Contracting Officer's Representative. Spread aggregate uniformly and shape drain.
3.6 AGGREGATE WEIGHT TICKETS
Submit aggregate weight tickets . Weight tickets are required prior to payment.
3.7 EXCAVATION QUANTITY
The toilet parking requires approximately 30 cubic yards of material excavation.
3.8 EXCESS MATERIAL DISPOSAL
Place excavated material in the holes created by the removal of bollards.
All bollard holes shall be filled. Place excavated material in the hole, or depression, adjacent to the existing toilet on the southeast side of the toilet. Remaining excess material shall be placed next to the existing toilet excavation spoil pile as shown on the drawings.
3.9 FINISHING
Finish the surfaces to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Provide the degree of finish for graded areas within 0.2 foot of the grades and elevations indicated. Finish surfaces in a manner that will result in effective drainage, regardless of tolerance.
3.10 BOULDERS
Boulder locations shown on the drawings are approximate. Boulders shall be placed to delineate campsite parking and prohibit off road travel.
Exact location of boulders shall be marked by the Contracting Officer's Representative. Bury boulders as shown on the plans.
3.11 RESTORATION
Fix, restore, or regrade any damage to the parking areas, road, or any other part of the campground caused by the Contractor in completion of the work.
SECTION 31 00 00 Page 13
SECTION 32 30 00
FENCE REPAIR
PART 1 GENERAL
1.1 SECTION SUMMARY
Repair the existing wood fence in two locations.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 FENCE REPAIR
The existing campground fence is missing horizontal members in two locations. Contractor shall provide two horizontal members. Horizontal members shall be of the same type, and installed in the same manor, as the existing fence. Replacement horizontal members shall be firmly secured to the vertical posts.
SECTION 32 30 00 Page 14
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 00 - SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 PROJECT DESCRIPTION |
| 1.2 LOCATION |
| 1.3 WORK SCHEDULE |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 20 00 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 MOBILIZATION AND DEMOBILIZATION |
| 1.1.1 Payment |
| 1.1.2 Unit of Measure |
| 1.2 DEMOLITION AND DISPOSAL |
| 1.2.1 Payment |
| 1.2.2 Unit of Measure |
| 1.3 FENCE REPAIR |
| 1.3.1 Payment |
| 1.3.2 Unit of Measure |
| 1.4 SITE GRADING |
| 1.4.1 Payment |
| 1.4.2 Unit of Measure |
| 1.5 AGGREGATE BASE COURSE |
| 1.5.1 Payment |
| 1.5.2 Unit of Measure |
| 1.6 BOULDERS |
| 1.6.1 Payment |
| 1.6.2 Unit of Measure |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 32 01 - PROJECT SCHEDULE |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS |
| 3.2.1 Level of Detail Required |
| 3.2.2 Mandatory Tasks |
| 3.2.3 Government Activities |
| 3.3 WEEKLY PROGRESS MEETINGS |
| 3.4 FAILURE TO ACHIEVE PROGRESS |
| 3.4.1 Failure to Perform |
| 3.4.2 Recovery Schedule |
| 01 33 00 - SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 INFORMATION ONLY SUBMITTALS |
| 1.3 GOVERNMENT APPROVING AUTHORITY |
| 1.3.1 Review Notations |
| 1.4 DISAPPROVED SUBMITTALS |
| 1.5 APPROVED SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 46 00 - QUALITY CONTROL |
| PART 1 GENERAL |
| 1.1 QUALITY CONTROL |
| 1.2 QUALITY CONTROL MANAGER |
| 1.3 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 QUALITY CONTROL |
| DIVISION 02 - EXISTING CONDITIONS |
| 02 41 00 - DEMOLITION |
| PART 1 GENERAL |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 PROTECTION OF EXISTING FEATURES |
| 3.2 WOOD BARRIERS AND WOOD BOLLARDS |
| 3.3 DISPOSAL OF REMOVED MATERIALS |
| DIVISION 31 - EARTHWORK |
| 31 00 00 - EARTHWORK |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 AGGREGATE BASE COURSE |
| 2.2 BOULDERS |
| PART 3 EXECUTION |
| 3.1 UNDERGROUND UTILITIES |
| 3.2 GENERAL EXCAVATION |
| 3.3 GROUND SURFACE PREPARATION |
| 3.4 TOILET PARKING AND ACCESS |
| 3.5 AGGREGATE PLACEMENT - EXISTING CAMPGROUND |
| 3.6 AGGREGATE WEIGHT TICKETS |
| 3.7 EXCAVATION QUANTITY |
| 3.8 EXCESS MATERIAL DISPOSAL |
| 3.9 FINISHING |
| 3.10 BOULDERS |
| 3.11 RESTORATION |
| DIVISION 32 - EXTERIOR IMPROVEMENTS |
| 32 30 00 - FENCE REPAIR |
| PART 1 GENERAL |
| 1.1 SECTION SUMMARY |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 FENCE REPAIR |
File details come from the government source that posted it. Updated .