This document appears to be a set of specifications for 800 tons of limestone dust, 3/8" and below, to be delivered to a location in Crescent City, Florida for a project involving a nature trail. The limestone is required to be delivered between June 17, 2024 and June 28, 2024, with a delivery schedule of 8 truckloads per day. Pricing must be FOB (free on board) destination, with the contractor responsible for packing, marking, transporting, and unloading the material at the specified delivery point. The limestone is to be stockpiled at a designated location, and the project area has local conditions that require dry weather access. This requirement is associated with Solicitation Number 140FHR24Q0012 for "LIMESTONE BASE" issued by the Department of the Interior Fish and Wildlife Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A06_-_Specifications_0001.pdf | ||
| B09_-_Solicitation_Amendment_-_RFQ_Vendor_Questions_and_Government_Responses_0001.pdf | ||
| Sol_140FHR24Q0012_Amd_0001.pdf | ||
| B08_-_Solicitation_-_Welaka_NFH_Limestone_Stock_Pile_Location_Map.pdf | ||
| B08_-_Solicitation_-__Quote_Schedule_-_Attachment_3.pdf | ||
| Sol_140FHR24Q0012.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
Project: Welaka NFH Nature Trail PR Number: 40655190 Item: Limestone Base
1. Product Features
a. Name of Item: Limestone Base
b. Salient Characteristics:
(1) 800 tons of Limestone dust 3/8” and below.
(2) Limestone will be stock piled at designated location see attached map.
2. Delivery
a. Prices quoted must be FOB Destination.
(1) “F.o.b. destination” means --Free of expense to the Government delivered on board the carrier’s conveyance, at a specified delivery point where the consignee’s facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and supplies shall be delivered to the destination consignee’s wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or “constructive placement” as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including “piggyback”) is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for “heavy or bulky freight.” When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarder for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery when required, if transfer to truck is required to complete delivery to consignee.
b. Contractor responsibilities. The contractor shall -- (1)(i) Pack and mark the shipment to comply with contract specifications; or
(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;
(2) Prepare and distribute commercial bills of lading;
(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;
(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;
(5) Furnish a delivery schedule and designate the mode of delivering carrier; and
(6) Pay and bear all charges to the specified point of delivery.
c. Delivery Location:
(1) Product shall be delivered to the following location:
Across the road from 1011 County Road 309 Crescent City FL 32112 (See attached map)
d. Delivery Dates:
(1) Required commencement date for delivery: 6/17/24
(2) Last date for delivery: 6/28/24
e. Delivery Instructions:
The contractor that receives the contract will acquire the agreed upon Limestone Base and deliver it to the hatchery by dumping it at the designated dumping site located across the road from 1011 County Road 309 Crescent City FL 32112. (See attached map). A total of 8 truckloads of material will be delivered per day as scheduled in the delivery date window.
3. Customer Specific Delivery Requirements:
Local conditions that may affect delivery: Project area is a Nature Trail. Access requires dry weather.
4. Technical Point of Contact (POC):
TBD