A06_SPECIFICATIONS_CANM_MUSEUM_IMPROVEMENTS_1.pdf
PDF 728 KB Posted
- Attached to
- BLM-GAOA TRFO CANM MUSEUM INTERIOR IMPROVEMENTS Federal contract opportunity
- Solicitation number
- 140L1725R0010
About this file
The file is a detailed specification document for interior improvements at the Canyons of the Ancients Visitor Center & Museum in Dolores, Colorado. The project encompasses multiple renovation tasks including replacing basement luminaires, removing and refinishing wallpaper, remodeling the theater, replacing the stairlift, replacing urinals and toilets, and reconstructing the restroom wall. Specific work elements include installing new 2-foot by 4-foot LED troffer lights, reupholstering theater seats, installing new acoustic wall panels, replacing carpet, painting walls, and replacing plumbing fixtures.
The project is planned for completion within 180 days of the Notice to Proceed, with work restricted to Monday through Friday, excluding federal holidays. The estimated project value ranges between $250,000 and $500,000, and it is designated as a Total Small Business Set-Aside under NAICS code 237990. The solicitation is planned for release on August 4, 2025, with a closing date of September 4, 2025. The Bureau of Land Management's Tres Rios Field Office in Colorado is managing the project, and they encourage participation from various small business categories including Small Disadvantaged, Woman Owned, Service Disabled Veteran, HUBZone, 8a, and Indian Small Business Economic Enterprises.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A06_DRAWINGS_CANM_MUSEUM_IMPROVEMENTS_1.pdf | ||
| A04_BID_SCHEDULE_CANM_MUSEUM_IMPROVEMENTS_1.pdf | ||
| A06_SUPPLEMENTAL_PICTURES_CANM_MUSEUM_IMPROVEMENTS_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior Bureau of Land Management
Tres Rios Field Office Colorado
Canyons of the Ancients Visitor Center & Museum Interior Improvements
SPECIFICATIONS
CANM MUSEUM INTERIOR IMPROVEMENTS
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 20 00 PRICE AND PAYMENT PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 51 00 PORTABLE TOILET
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 20 15 WOOD MOLDING AND BASE TRIM
DI VI SI ON 09 - FI NI SHES
09 29 50 WALL PAPER REMOVAL AND WALL REFINISHING
09 30 15 RESTROOM WALL REPAIR
09 51 20 ACOUSTIC WALL TREATMENTS
09 70 00 CARPET REPLACEMENT
09 90 00 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 28 16 TOILET AND URINAL REPLACEMENT
DI VI SI ON 12 - FURNI SHI NGS
12 61 00 REUPHOLSTER THEATER SEATS
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 20 00 STAIR LIFT REPLACEMENT
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 56 20 LUMINAIRE REPLACEMENT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 PROJECT DESCRIPTION
The work includes, but is not limited to:
Replace basement ceiling luminaires.
Remove wallpaper and refinish walls.
Remodel theater.
Replace stairlift.
Replace urinals and toilets.
Reconstruct restroom wall.
1.2 PROJECT LOCATION
Canyons Of The Ancients Visitor Center & Museum
27501 CO-184
Dolores, CO 81323
1.3 WORK SCHEDULE
Work shall start after September 2, 2025. Work shall be completed within 180 days of issuance of the "Notice to Proceed". Work shall occur Monday
- Friday, between 8am and 5pm. Work will not be allowed on: Federal Holidays, December 26-31, and the day after Thanksgiving.
1.4 PUBLIC ACCESS
The museum will be open to the public, and employees will be working, during construction.
1.5 PUBLIC SAFETY
Contractor shall take precautions, as necessary, to protect the public and employees from construction hazards.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
Payment items for the work of this contract for which contract payments will be made are listed in the SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job are included in the listed job item most closely associated with the work involved. The price and payment made for each item listed constitutes full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1 MOBILIZATION AND DEMOBILIZATION
1.1.1 Payment
Payment will be made for costs associated with mobilization and demobilization.
When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.
When 15% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 8% of the original Contract amount, whichever is lesser, will be paid.
Upon completion of work for the project, payment of the amount bid for mobilization in excess of 8% of the original Contract amount, will be paid.
1.1.2 Unit of Measure
Unit of measure: job.
1.2 DEMOLITION
1.2.1 Payment
Payment will be made for all costs associated with demolition. Including removal, transportation, and disposal.
1.2.2 Unit of Measure
Unit of measure: job.
SECTION 01 20 00 Page 3
1.3 PORTABLE TOILET
1.3.1 Payment
Payment will be made for all costs associated with providing and maintaining a portable toilet.
1.3.2 Unit of Measure
Unit of measure: Job.
1.4 TOILET REPLACEMENT
1.4.1 Payment
Payment will be made for all costs associated with replacing toilets and flush valves.
1.4.2 Unit of Measure
Unit of measure: each.
1.5 URINAL REPLACEMENT
1.5.1 Payment
Payment will be made for all costs associated with replacing urinals and flush valves.
1.5.2 Unit of Measure
Unit of measure: each.
1.6 REPLACE URINAL HORIZONTAL DRAIN LINES
1.6.1 Payment
Payment will be made for all costs associated with replacing the urinal horizontal drain lines.
1.6.2 Unit of Measure
Unit of measure: Job.
1.7 RESTROOM WALL REPAIR
1.7.1 Payment
Payment will be made for all costs associated with repairing the restroom wall, including wall tile.
SECTION 01 20 00 Page 4
1.7.2 Unit of Measure
Unit of measure: job.
1.8 BASEMENT LUMINAIRE REPLACEMENT
1.8.1 Payment
Payment will be made for all costs associated with replacing luminaries in the basement and stairways.
1.8.2 Unit of Measure
Unit of measure: each.
1.9 STAIR LIFT REPLACEMENT
1.9.1 Payment
Payment will be made for all costs associated with replacing the stair lift.
1.9.2 Unit of Measure
Unit of measure: job.
1.10 REUPHOLSTER THEATER SEATS
1.10.1 Payment
Payment will be made for all costs associated with reupholstering the theater seats.
1.10.2 Unit of Measure
Unit of measure: each.
1.11 THEATER ACOUSTIC WALL TREATMENT
1.11.1 Payment
Payment will be made for all costs associated with replacing acoustic wall treatments, including removal and reinstallation of existing building components.
1.11.2 Unit of Measure
Unit of measure: job.
SECTION 01 20 00 Page 5
1.12 THEATER CARPET REPLACEMENT
1.12.1 Payment
Payment will be made for all costs associated with replacing carpet in the theater and theater entrance, including base trim and molding.
1.12.2 Unit of Measure
Unit of measure: job.
1.13 REMOVE WALLPAPER AND RETEXTURE WALLS
1.13.1 Payment
Payment will be made for all costs associated with removing wall paper and retexturing walls.
1.13.2 Unit of Measure
Unit of measure: job.
1.14 PAINTING
1.14.1 Payment
Payment will be made for all costs associated with painting.
1.14.2 Unit of Measure
Unit of measure: job.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 20 00 Page 6
SECTION 01 32 01
PROJECT SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Initial Project Schedule ; G
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, and pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required.
3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.2.1 Level of Detail Required
Develop the Project Schedule to the appropriate level of detail to address major milestones, work listed in the bid schedule, and to allow for satisfactory project planning and execution.
3.2.2 Mandatory Tasks
Include the following activities/tasks in the initial project schedule and all updates.
a. Submission, review and acceptance of submittals.
b. Long procurement activities.
c. Contractor's pre-final inspection.
d. Government's pre-final inspection.
e. Final inspection.
SECTION 01 32 01 Page 7
3.2.3 Government Activities
Include Government activities that could impact progress. These activities include, but are not limited to: Government inspections of work, Government approval of submittals.
3.3 WEEKLY PROGRESS MEETINGS
Conduct a weekly meeting with the Government for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress and to review planned activities.
3.4 FAILURE TO ACHIEVE PROGRESS
Should the progress fall behind the approved project schedule, the Contracting Officer may require provision of a written recovery plan for approval. The plan must detail how progress will be made-up to include which activities will be accelerated by adding additional crews, longer work hours, extra work days, etc.
3.4.1 Failure to Perform
Failure to perform work and maintain progress in accordance with the supplemental recovery plan may result in an interim and final unsatisfactory performance rating and may result in corrective action directed by the Contracting Officer pursuant to FAR 52.236-15 Schedules for Construction Contracts, FAR 52.249-10 Default (Fixed-Price Construction), and other contract provisions.
3.4.2 Recovery Schedule
Should the Contracting Officer find it necessary, submit a recovery schedule pursuant to FAR 52.236-15 Schedules for Construction Contracts.
SECTION 01 32 01 Page 8
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only.
1.2 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer's Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract.
This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government.
1.3 GOVERNMENT APPROVING AUTHORITY
The Contracting Officer's Representative will:
a. Note the date on which the submittal was received.
b. Review submittals for approval within 10 days of receipt.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the Contractor.
1.3.1 Review Notations
Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until
SECTION 01 33 00 Page 9 resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the Government. This applies only to "information-only submittals" as previously defined.
1.4 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer.
If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.5 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals is not to be construed as a complete check.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 10
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES
Canyons of the Ancients Visitor Center Improvements 2025
01 32 01 SD-01 Preconstruction Submittals
GInitial Project Schedule
06 20 15 SD-03 Product Data
2.2 GResilient Base Board
09 30 15 SD-03 Product Data
2.1 GWall Tile
09 51 20 SD-03 Product Data
2.1 GAcoustic Slat Wood Wall Panels
2.2 GFabric Wrapped Acoustic Wall
Panels
3.6 GTransition Between Acoustic Wall
Panels
SD-04 Samples
2.1.1 GColor And Samples
2.2.1 GColor And Samples
09 70 00 SD-03 Product Data
2.1 GCarpet
SD-04 Samples
2.2 GCarpet Color And Style Samples
09 90 00 SD-04 Samples
2.5 GPaint Colors
10 28 16 SD-03 Product Data
2.1 GToilet
2.2 GToilet Flush Valve
2.3 GUrinal
2.4 GUrinal Flush Valve
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES
Canyons of the Ancients Visitor Center Improvements 2025
12 61 00 SD-01 Preconstruction Submittals
3.1 GQualifications Of Upholsterer
SD-03 Product Data
2.1 GUpholstery Fabric
SD-04 Samples
2.2 GFabric Color And Pattern
14 20 00 SD-03 Product Data
2.1 GStair Lift
25 56 20 SD-03 Product Data
2.1 GBASEMENT LUMINAIRE
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SECTION 01 51 00
PORTABLE TOILET
PART 1 GENERAL
1.1 GENERAL
Provide a portable toilet (porta potty) before starting work in the public restrooms. Provide portable toilet until all work is complete in the public restrooms.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 LOCATION
Portable toilet (porta potty) shall be located near the flagpole, near the visitor parking lot. Exact location shall be approved by the Contracting Officer's Representative.
3.2 MAINTENANCE
Remove waste as necessary to provide a safe toilet. Maintain as necessary to provide toilet paper, hand sanitizer, and to ensure toilet surfaces are clean.
SECTION 01 51 00 Page 11
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
1.1 PREREQUISITE
Demolition shall not begin until all "special order" materials, (which are not readily available at the local hardware store), required for construction are in the contractor's possession.
1.2 ITEMS TO BE DEOMLISHED
Items to be demolished include, but are not limited to:
Basement luminaires Stairlift Theater wall treatments (acoustical panels) Theater carpet Wallpaper Urinals and toilets Urinal wall, as required for horizontal drain line replacement.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 GENERAL
Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction.
Protect items to remain during demolition and remodeling.
Prevent the spread of dust and debris outside of the work area.
3.2 DISPOSAL OF MATERIALS
Demolished items and materials become the property of the Contractor and must be removed from Government property and properly disposed of lawfully in accordance with applicable federal, state, and local regulations.
SECTION 02 41 00 Page 12
SECTION 06 20 15
WOOD MOLDING AND BASE TRIM
PART 1 GENERAL
1.1 SECTION SUMMARY
Reinstall and replace molding and base trim.
1.2 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN LUMBER STANDARDS COMMITTEE (ALSC)
ALSC PS 20 (2015) American Softwood Lumber Standard
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Resilient Base Board ; G
PART 2 PRODUCTS
2.1 WOOD MOLDING
C Select white woods. In accordance with the American Lumber Standards Committee ALSC PS 20 .
2.2 RESILIENT BASE BOARD
In accordance with ASTM F 1861. 0.125 inch thickness. 4 inch height.
PART 3 EXECUTION
3.1 WOOD MOLDING - THEATER ROOM ACOUSTIC WALL PANEL WALLS
Protect wood molding from damage when removing. Contractor is responsible for replacing damaged wood molding "in kind".
Contractor shall thoroughly clean existing molding. Remove dirt, loose particles, and other foreign matter and substances.
Existing wood molding has gaps. Contractor shall take measures, as necessary to provide closely fitted joints, in the style of the existing joints, such that no gaps are present in the reinstalled molding.
Reinstall in accordance with the drawings. Provide wood blocking the same thickness as the acoustic panel.
SECTION 06 20 15 Page 13
Install moldings and trim straight, plumb, level and with closely fitted joints. Cope returns and interior angles at molded items and miter external corners.
Blind nail to the extent practicable. Set and stop face nailing with a nonstaining putty to match the finish.
Contractor may choose to provide new wood molding instead of reinstalling existing. New molding shall have the same characteristics as the existing wood molding.
3.2 WOOD MOLDING - WALLS WITHOUT ACOUSTIC PANELS
If necessary to remove wood molding for the removal of wall paper or otherwise: reinstall "in kind" and in accordance with paragraph WOOD
MOLDING - THEATER ROOM ACOUSTIC WALL PANEL WALLS.
3.3 RESILIENT BASE BOARD MOLDING
Replace the resilient base board where existing in the theater entry room. Install as recommended by the manufacturer's printed installation instructions.
SECTION 06 20 15 Page 14
SECTION 09 29 50
WALL PAPER REMOVAL AND WALL REFINISHING
PART 1 GENERAL
1.1 SECTION SUMMARY
Remove wallpaper in the corridor and the multipurpose room. Refinish walls.
1.2 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C840 (2020) Standard Specification for Application and Finishing of Gypsum Board
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 DEMOLITION
Demolish wallpaper in accordance with 02 41 00 DEMOLITION. Completely remove the wallpaper, adhesive, and any adhesive residue.
3.2 EXISTING BUILDING COMPONENTS
Remove existing building components installed over the top of the wall paper, as required, to completely remove wallpaper. Reinstall existing building components. Existing building components include, but are not limited to; lighting, molding, signs, light switches, receptacles, fire alarms, egress lighting, and HVAC registers.
3.3 REPAIR
Repair any damage to existing wall substrate. Patch any holes, joints, fastener depressions, or other imperfections. Repairs and patches shall have a smooth and uniform appearance.
3.4 PREPARATION
Prepare gypsum board in accordance with ASTM C840, finish level 4.
Apply a primer coat to the wall prior to applying texturing in accordance with 09 90 00 PAINTS AND COATINGS.
3.5 TEXTURE
Retexture the walls, where wall paper was removed, with joint compound.
SECTION 09 29 50 Page 15
3.6 TEXTURE SAMPLES
Provide 4 different wall texture samples. Sample size shall be a minimum of 2' x 2'. Provide a variations of the following textures; knockdown, skip trowel, and orange peel. The Contracting Officer's Representative will choose one of the 4 wall textures for application on all walls where wallpaper was removed.
3.7 PAINTING
Paint walls in accordance with 09 90 00 PAINTS AND COATINGS.
SECTION 09 29 50 Page 16
SECTION 09 30 15
RESTROOM WALL REPAIR
PART 1 GENERAL
1.1 SECTION SUMMARY
Repair damage to the restroom wall that is necessary to replace the urinal horizontal drain lines.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Wall Tile ; G
1.3 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
TILE COUNCIL OF NORTH AMERICA (TCNA)
TCNA Hdbk (2017) Handbook for Ceramic, Glass, and Stone Tile Installation
PART 2 PRODUCTS
2.1 WALL TILE
Match type and color of existing wall tile.
2.2 GLASS-MAT GYPSUM WATER-RESISTANT BACKING BOARD
Provide 5/8 inch thick glass-mat water-resistant backing board for use as tile substrate.
PART 3 EXECUTION
3.1 DEMOLITION
Remove existing wall tiles and substrate, as necessary, for the replacement of the urinal horizontal drain lines in the men's public restroom.
3.2 WALL REPAIR
Repair wall after replacement of the urinal horizontal drain lines in the men's public restroom.
SECTION 09 30 15 Page 17
3.3 WALL SUBSTRATE
Provide glass-mat, water-resistant backing board for wall tile. Fill gaps with mortar and water proof seam tape.
3.4 INSTALLATION OF TILE
Install wall tile in accordance with the TCNA Hdbk, method B, and with grout joints. Use latex-portland cement mortar.
Install wall tile in the same locations and elevations as the existing wall tile.
3.5 REUSE OF WALL TILE
Removed wall tile may be reused if it is not damaged and reinstalled neat and professional in accordance with TCNA Hdbk.
3.6 URINAL PARTITIONS
Reinstall urinal partitions if they were removed for replacement of the urinal horizontal drain lines or for the wall repair.
SECTION 09 30 15 Page 18
SECTION 09 51 20
ACOUSTIC WALL TREATMENTS
PART 1 GENERAL
1.1 SECTION SUMMARY
Replace the acoustic wall treatments in the theater.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Acoustic Slat Wood Wall Panels ; G
Fabric Wrapped Acoustic Wall Panels ; G
Transition Between Acoustic Wall Panels ; G
SD-04 Samples
Color And Samples ; G
PART 2 PRODUCTS
2.1 ACOUSTIC SLAT WOOD WALL PANELS
Manufacturer: Acoustical Solutions, 2420 Grenoble Road, Richmond, VA 23294
Product: Alphasorb Designer Acoustic Slat Wood Wall Panel
2.1.1 ACOUSTIC SLAT WOOD WALL PANEL - COLOR AND SAMPLES
Color and style shall be from manufacturer's standard line. Contractor shall provide 2 samples for approval by Contracting Officer's Representative. The Contracting Officer's Representative will select the color codes, for obtaining samples. Desired color will be of earthen tones to match the acoustic fabric wall panels, carpet, and the existing Visitor Center's aesthetic
2.1.2 ACOUSTIC SLAT WOOD WALL PANEL CHARACTERISTICS
Material: Wood-veneered MDF board strips with polyethylene terephthalate acoustic felt backing.
Felt Backing: Black.
Orientation: Vertical.
Noise Reduction Coefficient (NRC) Rating: Minimum 0.70.
Fire Rating: Must meet Class A fire safety standards.
2.2 FABRIC WRAPPED ACOUSTIC WALL PANELS
Manufacturer: Acoustical Solutions, 2420 Grenoble Road, Richmond, SECTION 09 51 20 Page 19
VA 23294
Product: Alphasorb Anchorage Acoustic Panels, 1 inch thickness.
2.2.1 FABRIC WRAPPED ACOUSTIC WALL PANELS - COLOR AND SAMPLES
Color and style shall be from manufacturer's standard line. Contractor shall provide 3 samples for approval by Contracting Officer's Representative. The Contracting Officer's Representative will select the color codes, for obtaining samples. Desired color will be of earthen tones to match the acoustic slat wood wall panels, carpet, and the existing Visitor Center's aesthetic.
2.2.2 FABRIC WRAPPED ACOUSTIC WALL PANEL CHARACTERISTICS
Type: High-performance acoustic fabric panels.
Core: 6-7 lb. per cubic foot high-density fiberglass.
Thickness: 1 inch.
Edge Detail: Square.
Facing: 100% Polyester fabric.
Noise Reduction Coefficient (NRC) Rating: Minimum 0.80.
Attachment Method: HS Impaling Clips.
Fabrication: Wrap panel edges and return facing fabric 1 -2 inches (25.4 - 5 mm) on back of panel. Secure fabric with adhesive applied to edges and back of panel only.
Fire Rating: Must meet Class A fire safety standards.
PART 3 EXECUTION
3.1 REPLACEMENT LOCATIONS
All existing acoustic wall treatments in the theater shall be replaced.
Replacement acoustic wall treatments shall be in the same locations as the existing.
3.2 DEMOLITION
Demolish existing acoustic wall treatments in accordance with 02 41 00 DEMOLITION. Demolish existing recessed reveals, trim, adhesive and fasteners down to existing substrate backing.
3.3 PREPARATION
Clean substrates of substances that could impair wall covering's bond, including dirt, oil, grease, mold, mildew, and incompatible primers.
Prepare substrates to achieve a smooth, dry, clean surface free of flaking, unsound coatings, cracks, and defects.
Acclimatize wall covering materials by removing them from packaging in the installation areas as recommended by manufacturer's installation instructions.
3.4 INSTALLATION - ACOUSTIC SLAT WOOD WALL PANELS
Install acoustic slat wood wall panels in accordance with manufacturer's written installation instructions.
SECTION 09 51 20 Page 20
3.5 INSTALLATION - ACOUSTIC FABRIC WALL PANEL
Install acoustic fabric wall panels in accordance with manufacturer's written installation instructions.
Provide fasteners, clips, and other accessories, as required, to firmly secure acoustic panels. Install acoustic panels, neat, plumb, and true.
Provide 1/8" gap between panels at all vertical and horizontal seams.
3.6 TRANSITION BETWEEN ACOUSTIC WALL PANELS
The contractor shall provide a transition between the acoustic slat wood wall panels and the acoustic fabric wall panels. The transition method and materials shall be approved by the Contracting Officer's Representative. A recessed reveal, similar to existing conditions is the preferred method, however other methods that provide a neat and professional transition will be considered.
3.7 EXISTING BUILDING COMPONENTS
Reinstall all existing building components flush with acoustic wall treatments. Existing building components include, but are not limited to;
light switches, receptacles, fire alarms, egress lighting, audio visual wiring and accessories, molding, and HVAC registers.
SECTION 09 51 20 Page 21
SECTION 09 70 00
CARPET REPLACEMENT
PART 1 GENERAL
1.1 SECTION SUMMARY
Replace the carpet in the theater and theater entrance room. Location shown on the drawings.
1.2 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
CARPET AND RUG INSTITUTE (CRI)
CRI 104 (2015) Carpet Installation Standard for Commercial Carpet
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Carpet ; G
SD-04 Samples
Carpet Color And Style Samples ; G
PART 2 PRODUCTS
2.1 CARPET
Manufacturer: Mohawk Group Collection: Textural Effects Carpet Style: Matte Finish or Moss Moderne Product Type: Broadloom Size: 12 ft
2.2 CARPET COLOR AND STYLE SAMPLES
Color and style shall be from manufacturer's standard line. Contractor shall provide 2 samples of each style (4 samples total) for approval by Contracting Officer's Representative. The Contracting Officer's Representative will select the color codes for obtaining samples. Desired color will be of earthen tones to match the acoustic slat wood wall panels, acoustic fabric wall panels, and the existing Visitor Center's aesthetic.
SECTION 09 70 00 Page 22
2.3 CARPET "OR EQUAL" CHARACTERISTICS
Size: 12 ft.
Fiber: Premium Nylon.
Dye Method: Solution Dyed.
Pile Weight: 32 oz/yd2 (1085 g/m2).
Gauge: 1/12 (47.00 rows per 10cm).
Stitches per Inch: 10 (39.4 per 10cm).
Pile Thickness: 0.117.
Installation: Glue Down.
Installation Method: Side Match.
Flammability: Class 1 - Glue Down (ASTM E648).
Backing: equivalent to Unibond ® Plus as manufactured by Mohawk Group.
2.4 CARPET ADHESIVES
Manufacturer: Mohawk Group NuBroadlok Premium Plus
Or as recommended by carpet manufacturer and complies with flammability requirements.
2.5 SEAM ADHESIVE
Hot-melt adhesive tape or similar product recommended by carpet manufacturer.
2.6 TRANSITION STRIPS
Low profile. As recommended by the carpet manufacturer.
PART 3 EXECUTION
3.1 DEMOLITION
Demolish existing carpet, carpet cushion, underlayment, and adhesives in accordance with 02 41 00 DEMOLITION.
3.2 REPLACEMENT LOCATIONS
Replacement carpet shall be the same location, and extent, as the existing carpet.
3.3 INSTALLATION
Prepare concrete (subfloor) in accordance with the manufacturer's written installation instructions.
Install carpet in accordance with CRI 104 .
Install carpet in accordance with the manufacturer's written installation instructions.
3.4 TRANSITION STRIPS
Provide transition strips at all carpet transitions. Provide reducer strip with low-profile to minimize tripping hazards. Maintain accessibility at carpet transitions in accordance with ABA regulations.
SECTION 09 70 00 Page 23
3.5 WALL MOLDING (BASE TRIM)
Demolish existing wall molding. Provide new wall molding (base trim) in accordance with section 06 20 15 WOOD MOLDING AND BASE TRIM.
3.6 EXTRA CARPET
Provide full-width carpet equal to 5 percent of the carpet installed, packaged with protective covering for storage.
SECTION 09 70 00 Page 24
SECTION 09 90 00
PAINTS AND COATINGS
PART 1 GENERAL
1.1 SECTION SUMMARY
Paint the walls in the corridor, multipurpose room, and theater.
1.2 PAINTING INCLUDED
Drywall or gypsum surfaces in the corridor, multipurpose room, and theater. HVAC grilles on the theater walls. Surfaces behind portable objects and surface mounted articles readily detachable by removal of fasteners, such as screws and bolts.
1.3 PAINTING EXCLUDED
Molding, trim, door frames, doors. The theater entry room.
1.4 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
MASTER PAINTERS INSTITUTE (MPI)
MPI 52 (2016) Latex, Interior, (MPI Gloss Level 3)
MPI 151 (2016) Light Industrial Coating, Interior, Water Based (MPI Gloss Level 3)
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-04 Samples
Paint Colors ; G
PART 2 PRODUCTS
2.1 PRIMER
Zinsser Gardz Problem Surface Sealer.
2.2 PAINT - GYPSUM WALL BOARD
Sherwin-Williams, "Builder Solution", eggshell finish Or equal: MPI 52 Interior Latex
SECTION 09 90 00 Page 25
2.3 PAINT - METAL
Sherwin-Williams, "Pro Industrial DTM Acrylic", eggshell finish.
Or equal: MPI 151 Light Industrial Coating, Interior, Water Based
2.4 PAINT - PROJECTION SCREEN
Manufacturer: paint on screen Color: digital theater white
2.5 PAINT COLORS
Colors shall be selected to match the building (carpet, acoustic wall coverings, stone work, wood work, etc.). Submit color samples for approval.
Multipurpose room and corridor: beige Theater side and back walls: beige Theater projection wall (front wall): white Theater projection wall, projection area: as specified
PART 3 EXECUTION
3.1 PROTECTION OF AREAS AND SPACES NOT TO BE PAINTED
Prior to surface preparation and coating applications, remove, mask, or otherwise protect, hardware, hardware accessories, fixtures, and other items not to be coated that are in contact with surfaces to be coated.
Restore surfaces contaminated by coating materials, to original condition and repair damaged items.
3.2 SURFACE PREPARATION - LOCATIONS WERE WALLPAPER WAS REMOVED
Prepare surface in accordance with 09 29 50 WALL PAPER REMOVAL AND WALL
REFINISHING.
3.3 SURFACE PREPARATION - LOCATIONS WERE WALLPAPER WAS NOT REMOVED
Repair any damage to existing wall substrate. Patch any holes, joints, fastener depressions, or other imperfections. Repairs and patches shall have a smooth and uniform appearance. Remove dirt, loose particles, and other foreign matter and substances deleterious to coating performance of paint.
3.4 THEATER PROJECTION WALL, PROJECTION AREA
Paint the video projection area with projection screen paint. Approximate area is 20 feet by 10 feet. Contractor shall determine and verify exact projection area.
3.5 COATS REQUIRED - LOCATIONS WHERE WALL PAPER WAS REMOVED
One primer coat, two finish coats.
3.6 COATS REQUIRED - LOCATIONS WHERE WALL PAPER WAS NOT REMOVED
Two finish coats.
SECTION 09 90 00 Page 26
3.7 COATS REQUIRED - THEATER PROJECTION AREA
Two finish coats.
3.8 COATING APPLICATION
Thoroughly work coating materials into joints, crevices, and open spaces.
Special attention shall be given to insure that all edges, corners, and crevices receive a film thickness equal to that of adjacent painted surfaces. Allow time between coats to permit thorough drying. Provide finished surfaces free from runs, drops, ridges, waves, laps, brush marks, and variations in colors.
SECTION 09 90 00 Page 27
SECTION 10 28 16
TOILET AND URINAL REPLACEMENT
PART 1 GENERAL
1.1 SECTION SUMMARY
Replace toilets and urinals. Replace the urinal horizontal drain lines in the men's public restroom.
1.2 GENERAL
All plumbing work shall be in accordance with ICC IPC .
1.3 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME A112.19.2/CSA B45.1 (2018; ERTA 2018) Standard for Vitreous China Plumbing Fixtures and Hydraulic Requirements for Water Closets and Urinals
INTERNATIONAL CODE COUNCIL (ICC)
ICC IPC (2021) International Plumbing Code
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Toilet ; G
Toilet Flush Valve ; G
Urinal ; G
Urinal Flush Valve ; G
PART 2 PRODUCTS
2.1 TOILET
Manufacturer: Sloan Model: ST-2459 Elongated, wall mounted water closet.
Toilet shall be labeled to operate with a WaterSense flush valve.
ASME A112.19.2/CSA B45.1 , white vitreous china, siphon jet, elongated bowl, wall mounted. Provide white solid plastic elongated open-front seat
SECTION 10 28 16 Page 28 for men and closed-front seat for women.
2.2 TOILET FLUSH VALVE
Manufacturer: Sloan Model: 111-1.28-CO "Royal Manual Flushometer"
Flush valves shall be nonhold-open type, meet the EPA WaterSense product definition specified in http://www.epa.gov/watersense/partners/product_program_specs.html , use no more than 1.28 gallons per flush, and must be EPA WaterSense labeled.
2.3 URINAL
Manufacturer: Sloan Model: SU-10009
Urinals shall be labeled to operate with a WaterSense flush valve.
Urinals shall be ADA compliant. Urinals shall be White vitreous china, wall-mounted, wall outlet, siphon jet, integral trap, and extended side shields.
2.4 URINAL FLUSH VALVE
Manufacturer: Sloan Model: Royal 186 SFSM Flushometer
Urinal flush valves shall be nonhold-open type, meet the EPA WaterSense product definition specified in http://www.epa.gov/watersense/partners/product_program_specs.html , use no more than 0.125 gallons per flush, and must be EPA WaterSense labeled.
2.5 EXPOSED PLUMBING
Exposed to view components shall be chromium-plated or polished stainless steel.
PART 3 EXECUTION
3.1 URINAL HORIZONTAL DRAIN LINES - PUBLIC RESTROOM
Replace the urinal horizontal drain lines in the public men's restroom.
The urinal horizontal drain lines are clogged with uric scale (calcite -crystalized urine). Replaced urinal horizontal drain lines shall have a 2% slope. Repair the wall an accordance with section 09 30 15 RESTROOM
WALL REPAIR.
3.2 INSTALLATION
Furnish all labor and materials and perform all operations necessary for the installation of complete and operating plumbing systems.
Install toilets, urinals, and flush valves in accordance with the manufacturer's written installation instructions.
Mount the toilets and urinals to match the existing drain-waste-vent DWV plumbing.
Existing toilet carriers may be reused. Contractor shall verify the
SECTION 10 28 16 Page 29 specified toilets are compatible with the existing toilet carriers prior to ordering.
3.3 WORKMANSHIP
Perform work in accordance with good commercial practice. The appearance of the finished work shall be of importance. All components shall be installed cleanly in a professional manner; where exposed, components shall be installed at right angles parallel to building walls while being high and tight as possible to structure.
SECTION 10 28 16 Page 30
SECTION 12 61 00
REUPHOLSTER THEATER SEATS
PART 1 GENERAL
1.1 SECTION SUMMARY
Reupholster the theater seats.
1.2 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D4157 (2013; R 2017) Standard Test Method for Abrasion Resistance of Textile Fabrics (Oscillatory Cylinder Method)
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 101 (2021) Life Safety Code
STATE OF CALIFORNIA, DEPARTMENT OF CONSUMER AFFAIRS, BUREAU OF
HOME FURNISHINGS AND THERMAL INSULATION (CTB)
CTB 117-2000 Requirements, Test Procedure and Apparatus for Testing the Flame Retardance of Resilient Filling Materials Used in Upholstered Furniture
U.S. DEPARTMENT OF COMMERCE (DOC)
DOC CS 191 Commercial Standard for the Flammability of Clothing Textiles
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
16 CFR 1610 Standard for the Flammability of Clothing Textiles
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Qualifications Of Upholsterer ; G
SD-03 Product Data
Upholstery Fabric ; G
SECTION 12 61 00 Page 31
SD-04 Samples
Fabric Color And Pattern ; G
PART 2 PRODUCTS
2.1 UPHOLSTERY FABRIC
Provide fabric that is flame and smolder ignition resistant, and self-extinguishing, Class 1 fabric according to DOC CS 191 or 16 CFR 1610 , as applicable per authorities having jurisdiction, tested according to California Technical Bulletin CTB 117-2000 . Provide padding that complies with California Technical Bulletin CTB 117-2000 . Provide fabric and padding that comply with NFPA 101 .
Provide fabric upholstery for seating with minimum 55,000 double rub tests according to ASTM D4157.
Provide fabric upholstery treated to resist staining and soiling.
2.2 FABRIC COLOR AND PATTERN
Fabric color and pattern shall be approved by the Contracting Officer's Representative. Color shall be an earth tone, that coordinates well with the acoustic wall panels and carpet.
PART 3 EXECUTION
3.1 QUALIFICATIONS OF UPHOLSTERER
The primary upholsterer, or company doing the reupholstering, shall have a minimum of ten years experience in reupholstering furniture. Submit the qualifications of the primary upholsterer. The primary upholsterer may have up to two secondary upholsterers working under their direct supervision.
3.2 INSPECTION
Inspect all existing seating, including hardware components (screws, springs, brackets, etc), for damage prior to re-upholstery. Identify items requiring replacement or repair and notify the Contracting Officer's Representative prior to continuing work on damaged item.
3.3 CHAIR REPAIR
One chair shall be repaired. The chair does not spring into the up position when not in use. Repair the chair to automatically return to the up position when not in use.
Contractor shall assume that some repair, as identified in the inspection, for damaged hardware, springs, brackets, cushions, etc. may be required for 2 additional chairs. (total of 3 chairs repaired). Any more additional repair shall be cause for a mutually acceptable equitable adjustment.
3.4 REMOVAL
Carefully remove existing upholstery. Protect the chair, frame, SECTION 12 61 00 Page 32 structure, and other components from damage.
3.5 INSTALLATION
Fabric covering shall be taut. Fabric covering shall be free of welts, creases, stretch lines, and wrinkles. Install pile and pattern run in a consistent direction. Secure upholstery "in kind", and using appropriate techniques, as necessary for durability. Reinstall and tighten all hardware securely, ensuring there are no loose components upon completion.
SECTION 12 61 00 Page 33
SECTION 14 20 00
STAIR LIFT REPLACEMENT
PART 1 GENERAL
1.1 SECTION SUMMARY
Replace the stair lift, drive and guide rail system, and other stair lift components.
1.2 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME A18.1 (2023) Safety Standard for Platform Lifts and Stairway Chairlifts
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2023) National Electrical Code
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Stair Lift ; G
PART 2 PRODUCTS
2.1 STAIR LIFT
Manufacturer: Garaventa Lift Model: Xpress II Platform Deck: Size A, ADA compliant, 31.5 inches by 49.25 inches Drive and guide rail system Custom color: beige. Exact color to be chosen from the Manufacturer's available RAL colors by Contracting Officer's Representative.
PART 3 EXECUTION
3.1 DEMOLITION
Demolish existing stair lift in accordance with 02 41 00 DEMOLITION.
3.2 INSTALLATION
Provide structural reinforcement, as necessary, for proper and secure installation of lift system, including drive and guide rails.
SECTION 14 20 00 Page 34
Install in accordance with the manufacturer's written installation instructions and ASME A18.1 .
Install electrical work in accordance with NFPA 70 . Provide conduit for electrical conductors.
3.3 ACCEPTANCE TESTING
On completion of lift installation, perform acceptance tests as required and recommended by ASME A18.1 .
In addition to acceptance testing, load lift to rated capacity (550 pounds) and operate continuously for 20 minutes between landings.
Readjust system components, as required, for proper operation and accurate stopping at landings.
SECTION 14 20 00 Page 35
SECTION 25 56 30
LUMINAIRE REPLACEMENT
PART 1 GENERAL
1.1 SECTION SUMMARY
Replace the basement and stairway luminaires.
1.2 EXISTING CONDITIONS
A site visit to the basement is highly recommended prior to bidding.
Basement ceiling is approximately 14 feet tall (Contractor shall verify height). Existing building systems (electrical, plumbing, HVAC, etc) obstruct access to some basement luminaires.
1.3 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA
20-1; TIA 20-2; TIA 20-3; TIA 20-4)
National Electrical Code
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
BASEMENT LUMINAIRE; G
PART 2 PRODUCTS
2.1 BASEMENT LUMINAIRE - REPLACEMENT
Luminaire replacement shall have the following characteristics:
2 foot x 4 foot LED Troffer.
Minimum lumen output of 20,000 lumens per fixture.
Minimum L70 lumen maintenance value of 50,000 hours.
Wide beam angle.
Color Rendering Index (CRI) of 80 or higher.
Correlated Color Temperature (CCT) of 4000K or higher.
PART 3 EXECUTION
3.1 DEMOLITION
Demolish existing luminaires in accordance with 02 41 00 DEMOLITION.
SECTION 25 56 20 Page 36
3.2 LUMINAIRE REPLACEMENT
Replace luminaires. Install in accordance with manufacturer's written installation instructions. Connect to existing electrical wiring in accordance with NFPA 70 .
3.3 PROTECTION OF EXISTING CONDITIONS
Contractor shall take measures, as necessary, to protect artifacts and existing infrastructure from damage during the work.
3.4 SURVEILLANCE OF WORK IN THE BASEMENT
The basement stores priceless historic artifacts. Work is not allowed in the basement without a BLM escort. A BLM escort will be available on workdays, 8am to 5pm.
SECTION 25 56 20 Page 37
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 00 - SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 PROJECT DESCRIPTION |
| 1.2 PROJECT LOCATION |
| 1.3 WORK SCHEDULE |
| 1.4 PUBLIC ACCESS |
| 1.5 PUBLIC SAFETY |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 20 00 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 MOBILIZATION AND DEMOBILIZATION |
| 1.1.1 Payment |
| 1.1.2 Unit of Measure |
| 1.2 DEMOLITION |
| 1.2.1 Payment |
| 1.2.2 Unit of Measure |
| 1.3 PORTABLE TOILET |
| 1.3.1 Payment |
| 1.3.2 Unit of Measure |
| 1.4 TOILET REPLACEMENT |
| 1.4.1 Payment |
| 1.4.2 Unit of Measure |
| 1.5 URINAL REPLACEMENT |
| 1.5.1 Payment |
| 1.5.2 Unit of Measure |
| 1.6 REPLACE URINAL HORIZONTAL DRAIN LINES |
| 1.6.1 Payment |
| 1.6.2 Unit of Measure |
| 1.7 RESTROOM WALL REPAIR |
| 1.7.1 Payment |
| 1.7.2 Unit of Measure |
| 1.8 BASEMENT LUMINAIRE REPLACEMENT |
| 1.8.1 Payment |
| 1.8.2 Unit of Measure |
| 1.9 STAIR LIFT REPLACEMENT |
| 1.9.1 Payment |
| 1.9.2 Unit of Measure |
| 1.10 REUPHOLSTER THEATER SEATS |
| 1.10.1 Payment |
| 1.10.2 Unit of Measure |
| 1.11 THEATER ACOUSTIC WALL TREATMENT |
| 1.11.1 Payment |
| 1.11.2 Unit of Measure |
| 1.12 THEATER CARPET REPLACEMENT |
| 1.12.1 Payment |
| 1.12.2 Unit of Measure |
| 1.13 REMOVE WALLPAPER AND RETEXTURE WALLS |
| 1.13.1 Payment |
| 1.13.2 Unit of Measure |
| 1.14 PAINTING |
| 1.14.1 Payment |
| 1.14.2 Unit of Measure |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 32 01 - PROJECT SCHEDULE |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS |
| 3.2.1 Level of Detail Required |
| 3.2.2 Mandatory Tasks |
| 3.2.3 Government Activities |
| 3.3 WEEKLY PROGRESS MEETINGS |
| 3.4 FAILURE TO ACHIEVE PROGRESS |
| 3.4.1 Failure to Perform |
| 3.4.2 Recovery Schedule |
| 01 33 00 - SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 INFORMATION ONLY SUBMITTALS |
| 1.3 GOVERNMENT APPROVING AUTHORITY |
| 1.3.1 Review Notations |
| 1.4 DISAPPROVED SUBMITTALS |
| 1.5 APPROVED SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 51 00 - PORTABLE TOILET |
| PART 1 GENERAL |
| 1.1 GENERAL |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 LOCATION |
| 3.2 MAINTENANCE |
| DIVISION 02 - EXISTING CONDITIONS |
| 02 41 00 - DEMOLITION |
| PART 1 GENERAL |
| 1.1 PREREQUISITE |
| 1.2 ITEMS TO BE DEOMLISHED |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 GENERAL |
| 3.2 DISPOSAL OF MATERIALS |
| DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES |
| 06 20 15 - WOOD MOLDING AND BASE TRIM |
| PART 1 GENERAL |
| 1.1 SECTION SUMMARY |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 WOOD MOLDING |
| 2.2 RESILIENT BASE BOARD |
| PART 3 EXECUTION |
| 3.1 WOOD MOLDING - THEATER ROOM ACOUSTIC WALL PANEL WALLS |
| 3.2 WOOD MOLDING - WALLS WITHOUT ACOUSTIC PANELS |
| 3.3 RESILIENT BASE BOARD MOLDING |
| DIVISION 09 - FINISHES |
| 09 29 50 - WALL PAPER REMOVAL AND WALL REFINISHING |
| PART 1 GENERAL |
| 1.1 SECTION SUMMARY |
| 1.2 REFERENCES |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 DEMOLITION |
| 3.2 EXISTING BUILDING COMPONENTS |
| 3.3 REPAIR |
| 3.4 PREPARATION |
| 3.5 TEXTURE |
| 3.6 TEXTURE SAMPLES |
| 3.7 PAINTING |
| 09 30 15 - RESTROOM WALL REPAIR |
| PART 1 GENERAL |
| 1.1 SECTION SUMMARY |
| 1.2 SUBMITTALS |
| 1.3 REFERENCES |
| PART 2 PRODUCTS |
| 2.1 WALL TILE |
| 2.2 GLASS-MAT GYPSUM WATER-RESISTANT BACKING BOARD |
| PART 3 EXECUTION |
| 3.1 DEMOLITION |
| 3.2 WALL REPAIR |
| 3.3 WALL SUBSTRATE |
| 3.4 INSTALLATION OF TILE |
| 3.5 REUSE OF WALL TILE |
| 3.6 URINAL PARTITIONS |
| 09 51 20 - ACOUSTIC WALL TREATMENTS |
| PART 1 GENERAL |
| 1.1 SECTION SUMMARY |
| 1.2 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 ACOUSTIC SLAT WOOD WALL PANELS |
| 2.1.1 ACOUSTIC SLAT WOOD WALL PANEL - COLOR AND SAMPLES |
| 2.1.2 ACOUSTIC SLAT WOOD WALL PANEL CHARACTERISTICS |
| 2.2 FABRIC WRAPPED ACOUSTIC WALL PANELS |
| 2.2.1 FABRIC WRAPPED ACOUSTIC WALL PANELS - COLOR AND SAMPLES |
| 2.2.2 FABRIC WRAPPED ACOUSTIC WALL PANEL CHARACTERISTICS |
| PART 3 EXECUTION |
| 3.1 REPLACEMENT LOCATIONS |
| 3.2 DEMOLITION |
| 3.3 PREPARATION |
| 3.4 INSTALLATION - ACOUSTIC SLAT WOOD WALL PANELS |
| 3.5 INSTALLATION - ACOUSTIC FABRIC WALL PANEL |
| 3.6 TRANSITION BETWEEN ACOUSTIC WALL PANELS |
| 3.7 EXISTING BUILDING COMPONENTS |
| 09 70 00 - CARPET REPLACEMENT |
| PART 1 GENERAL |
| 1.1 SECTION SUMMARY |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 CARPET |
| 2.2 CARPET COLOR AND STYLE SAMPLES |
| 2.3 CARPET "OR EQUAL" CHARACTERISTICS |
| 2.4 CARPET ADHESIVES |
| 2.5 SEAM ADHESIVE |
| 2.6 TRANSITION STRIPS |
| PART 3 EXECUTION |
| 3.1 DEMOLITION |
| 3.2 REPLACEMENT LOCATIONS |
| 3.3 INSTALLATION |
| 3.4 TRANSITION STRIPS |
| 3.5 WALL MOLDING BASE TRIM |
| 3.6 EXTRA CARPET |
| 09 90 00 - PAINTS AND COATINGS |
| PART 1 GENERAL |
| 1.1 SECTION SUMMARY |
| 1.2 PAINTING INCLUDED |
| 1.3 PAINTING EXCLUDED |
| 1.4 REFERENCES |
| 1.5 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 PRIMER |
| 2.2 PAINT - GYPSUM WALL BOARD |
| 2.3 PAINT - METAL |
| 2.4 PAINT - PROJECTION SCREEN |
| 2.5 PAINT COLORS |
| PART 3 EXECUTION |
| 3.1 PROTECTION OF AREAS AND SPACES NOT TO BE PAINTED |
| 3.2 SURFACE PREPARATION - LOCATIONS WERE WALLPAPER WAS REMOVED |
| 3.3 SURFACE PREPARATION - LOCATIONS WERE WALLPAPER WAS NOT REMOVED |
| 3.4 THEATER PROJECTION WALL, PROJECTION AREA |
| 3.5 COATS REQUIRED - LOCATIONS WHERE WALL PAPER WAS REMOVED |
| 3.6 COATS REQUIRED - LOCATIONS WHERE WALL PAPER WAS NOT REMOVED |
| 3.7 COATS REQUIRED - THEATER PROJECTION AREA |
| 3.8 COATING APPLICATION |
| DIVISION 10 - SPECIALTIES |
| 10 28 16 - TOILET AND URINAL REPLACEMENT |
| PART 1 GENERAL |
| 1.1 SECTION SUMMARY |
| 1.2 GENERAL |
| 1.3 REFERENCES |
| 1.4 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 TOILET |
| 2.2 TOILET FLUSH VALVE |
| 2.3 URINAL |
| 2.4 URINAL FLUSH VALVE |
| 2.5 EXPOSED PLUMBING |
| PART 3 EXECUTION |
| 3.1 URINAL HORIZONTAL DRAIN LINES - PUBLIC RESTROOM |
| 3.2 INSTALLATION |
| 3.3 WORKMANSHIP |
| DIVISION 12 - FURNISHINGS |
| 12 61 00 - REUPHOLSTER THEATER SEATS |
| PART 1 GENERAL |
| 1.1 SECTION SUMMARY |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 UPHOLSTERY FABRIC |
| 2.2 FABRIC COLOR AND PATTERN |
| PART 3 EXECUTION |
| 3.1 QUALIFICATIONS OF UPHOLSTERER |
| 3.2 INSPECTION |
| 3.3 CHAIR REPAIR |
| 3.4 REMOVAL |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .