A06_SHIL_SPECIFICATIONS_FOR_JOINT_SEALING.docx
DOCX document 136 KB Posted
- Attached to
- CONCRETE ROAD JOINT CLEANING & SEALING
- Solicitation number
- 140P5222Q0038
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B03_Hardin_County_TN_2015-4649.txt | TXT text file | |
| Sol_140P5222Q0038.pdf | ||
| Provisions_and_Clauses.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FOR CONCRETE ROAD JOINT CLEANING AND SEALING FOR HAMBURG-PURDY ROAD
1. SUMMARY OF WORK: The maintenance work to be performed under this contract shall consist of cleaning and sealing of all concrete joints in Hamburg-Purdy road. The contractor shall furnish all materials, tools, equipment, and labor necessary for all work pertaining to this work at Shiloh National Military Park. This road is approximately 2 miles in length with an estimated 20,000 linear feet of joints.
2. LOCATION and INFORMATION: The site of work is located at Shiloh National Military Park at 1055 Pittsburg Landing Road, Shiloh Tennessee 38376. A site visit is recommended. Contact at the park is Randy Martin, phone number is 731-689-5275.
3. JOINT MATERIAL: Joint material shall conform to the following:
· Joint and crack sealant, hot applied: ASTM D6690, Type II pr Type III for concrete and asphalt pavements.
· Crack filler, hot-applied, for concrete pavements: ASTM D5078 and asphalt concrete pavements.
· Proprietary asphalt- rubber products, furnish the following:
1. Source and grade of asphalt binder;
2. Total quantity of granulated rubber and mass as a percent of asphalt-rubber mixture;
3. Granulated rubber-types and quantity of each type (if blend);
4. Mass as a percent of combined rubber;
5. Heating and application temperatures;
· Elastomeric joint sealant: ASTM C920, Type M, Grade NS, Class 25, Use T1 or T2 (Gray in color)
· Flexible cellular joint filler: ASTM D1056, Type 2, Class B or Class C, Grades 3, 4 or 5
4. MONITORING OF TRAFFIC: The contractor shall work with the park to best utilize area during joint cleaning and sealing operations. Signs and or flagging may be utilized for flow of tour route traffic.
5. RIGHT-OF-WAY: All work under this contract shall be done within the confines of Hamburg-Purdy road. Upon completion, the contractor shall leave the area free from surplus sealant or debris from the cleaning and sealing process. It shall be the responsibility of the contractor to restore any items (i.e. curbs, sidewalks, driveways, shrubbery, utility facilities, etc.) within the area damaged due to the sealing process.
6. TRAFFIC CONTROL: The work shall be carried out at all times in a manner causing a minimum interference with visitor traffic. The contractor shall provide necessary barricades and warning signs. The contractor shall barricade or divert traffic from all cleaning and sealing until it is cooled for a sufficient period of time to prevent scuffing or flushing of the joints wherever possible. The contractor shall post signs (in areas determined ), at least 24 hours prior to commencement of cleaning and sealing operations. It shall be the contractors responsibility to coordinate with the park to ensure all vehicles are prevented from entering the work site.
7. UTILITIES TO BE MARKED: The contractor shall work with park staff to mark and record each utility opening or manhole which is affected if any. Any utility facility which is broken or damaged by the contractor shall be replaced entirely at the contractors cost.
8. JOINT CLEANING AND SEALING APPLICATION: This work consists of routing, cleaning, sealing, and filling cracks in concrete asphalt pavement surfaces. Clean expansion joints to a depth of 2 inches. Clean longitudinal and transverse joints to a depth of 1.5 inches. Fill designated joints with poured joint filler. Reseal joints immediately after cleaning. Place sealant below concrete surface to preclude the tracking of sealant onto concrete roadway surfaces.
9. WEATHER LIMITATIONS: Bituminous mixtures shall not be placed (1) when either the air temperature or the temperature of the surface on which the mixture is to be placed is below 40 degrees F. (2) on any wet or frozen surface or (3) when weather conditions prevent the proper handling or finishing of the mixture, as determined by the park or his/her designated representative. Mixture shall not be placed during inclement weather.
10. EQUIPMENT REQUIREMENTS: Equipment; Furnish equipment with the following capabilities:
· Router – A power rotary impact router or vertical spindle router capable of creating a reservoir to the required depth and width without damaging adjacent pavement.
· Air Lance - A hot compressed air lance capable of providing clean, oil-free compressed air at a volume of 100 cubic feet (2.8 cubic meters) per minute, a pressure of 120 pounds per square inch (830 kilopascals), and a temperature of 2000 °F (1100 °C).
· Application Wand - A wand attached to a heated hose attached to a heated material chamber that maintains material temperature within manufacturer’s tolerances. Supply proper wand tips for desired application.
· Heating Kettle - An indirect-heating double boiler capable of constant and effective agitation. Fill the space between the inner and outer shells with oil or other heat transfer medium. Provide an accurate and calibrated thermometer with a range from 200 to 600 °F in 5 °F graduations (90 to 320 °C in 2 °C graduations) located so the material temperature can be safely checked.
· Squeegee or Screed - A hand-held squeegee or screed of appropriate configuration for filling cracks flush with the surface, underfilling cracks to recess below the surface, or overfilling cracks to an overband shape.
· Compressor - A compressor capable of producing oil- and water-free air at a minimum rate of 100 cubic feet (2.8 cubic meters) per minute with a minimum continuous line pressure of 125 pounds per square inch (860 kilopascals).
11. CLEANING AND SEALING SPECIFICATION:
· Cleaning: Prevent debris from entering waterways, travel lanes open to public traffic, or areas designated not to be disturbed. Remove dirt, dust, and other deleterious material from the crack walls and cavity using a stream of air or other approved methods. Blow or brush dry material off the pavement surface.
· Sealing and Filling: Dry the crack surfaces with the hot air lance before sealing or filling. Do not seal or fill cracks when the pavement surface temperature is below 40 °F (5 °C) and weather conditions are rainy or foggy.
· Sealing: Submit a copy of and adhere to the manufacturer’s recommendations for heating and applying the hot applied crack material. Heat the material to pouring temperature in a heating kettle and continuously agitate the material.
· Discard Sealant When:
· Heated above the safe heating temperature recommended by manufacturer.
· Held at pouring temperature for more than 12 hours.
· Reheated more than once.
· Not consistent or uniform in appearance.
12. PROCESS OF SEALING AND PREP:
· Warm and dry the crack surfaces using a hot-compressed air lance if the pavement temperature is lower than 40 °F (5 °C) or moisture is present. Keep the lance moving to prevent burning the pavement surface. Place and finish the material within 5 minutes after heating the pavement surface with the lance.
· Use an application wand to place material in each crack or joint from the bottom up. Insulate the wand to maintain pouring temperature while placing material. Return the wand to the heating kettle immediately after sealing each crack. Use a squeegee or screed to strike off the material.
13. INSPECTION: Inspection of all work will be by COR or a designated representative.
14. GENERAL: This Contract shall be based upon payment by the Contractor of wage rates based on the Davis Bacon Act.
15. MATERIALS, WORKMANSHIP, AND EQUIPMENT: Whenever not explicitly described in these specifications, all materials, workmanship, and equipment used in carrying out the work shall be of the best of the respective grades and qualities. The contractor shall at all times provide adequate supervision and sufficient labor and equipment for prosecuting the work to full completion in the manner and within the time required by the contract.
a. Workmen. All workmen must have sufficient skill and experience to perform properly the work assigned to them. Any foreman or workman employed by the contractor or by any subcontractor who, in the opinion of the contracting officer, does not perform his work satisfactorily and in a skillful manner or is disrespectful, intemperate, disorderly, or otherwise objectionable, shall, on the written request of the contracting officer, be removed immediately by the contractor or subcontractor employing such person and he shall not be employed again on any portion of the work without the written consent of the contracting officer.
b. Equipment. All equipment used on the work shall be of sufficient size and in good mechanical condition so as to meet the requirements of the work and to produce a satisfactory quality of work. The contracting officer may order the removal, and require replacement of any unsatisfactory equipment. Should the contractor fail to furnish suitable and sufficient equipment for the satisfactory prosecution of the work, the contracting officer may withhold payment of estimates which are or may become due, or may suspend the work until such equipment has been provided.
17.CONTRACTOR TO BE PRESENT OR REPRESENTED: The contractor shall at all times either be personally present on the job site or be represented thereon by a responsible agent to be designated in writing by the contractor, who shall have full authority to act for him in all cases and carry out any instructions relative to the work which may be given by the contracting officer, either personally or through an authorized representative. The contractor's agent shall not be changed during the life of the contract without the written approval of the contracting officer.
18. LEGAL RESTRICTIONS AND PERMITS: The contractor is assumed to be familiar with, and at all times shall observe and comply with, all Federal, State, and local laws, park regulations, safety laws, building and construction codes, and ordinances and regulations in any manner affecting the conduct of the work.
The contractor shall procure, at his own expense, all necessary licenses and permits and shall give due and adequate notices necessary and incident to the due and lawful prosecution of the work.
Trucks and other heavy equipment shall be confined to the limits of the project parking areas and roads to and from the project. A special permit does not relieve the Contractor of liability for damage resulting from the moving of material or equipment.
Unless otherwise permitted, do not operate equipment or vehicles that exceed the legal load limits over new or existing structures, or pavements within the project. Half loads are expected on park roads.
19. PROTECTION AND RESTORATION OF PROPERTY: The contractor shall be responsible for the preservation from injury or damage, resulting directly or indirectly from the execution of the work, of all public and private property along and adjacent to the park. He shall use every precaution necessary to prevent damage to pipes, conduits, and other underground structures; also, all overhead structures such as wires, cables, etc.; and poles, trees, shrubbery and crops, within or outside of the right-of-way. Any utility lines damaged by the contractor shall be repaired at once at his expense. All trails and roads adjacent to or intersecting the project shall be protected from damage.
When or where any direct or indirect damage or injury is done to public or private property by or on account of any act, omission, neglect, or misconduct in the execution of the work, or in consequence of the non-execution thereof, on the part of the contractor, he shall restore or have restored, at his expense, such property to a condition similar or equal to that existing before such damage or injury was done, by repairing, rebuilding, or otherwise restoring same, or he shall make good such damage or injury in some other acceptable manner.
The contractor shall save harmless the Government and all of its representatives from all suits, actions, or claims of any character brought on account of any injuries or damages sustained by any person or property in consequence of any neglect in safeguarding the work, or through the use of unacceptable materials in the work or on account of any act or omission by the said contractor or his employees, or from any suits, actions, or claims arising under the Workmen's Compensation laws or any other law, bylaw, ordinance, regulations, order, or decree. During the prosecution of the work, the contractor shall be responsible for any injury or damage to any person or property resulting from any act, omission, neglect, or misconduct in the manner or method of executing said work satisfactorily, or due to the non-execution of said work at any time, or due to defective work or materials, and said responsibility shall continue until the date of final inspection.
There shall be no personal liability upon the contracting officer or his designated representative or upon Government agents or Government employees for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.
20. CONTRACTOR'S PROTECTION: The contractor shall, during the continuance of work under this contract and also extra work in connection therewith, maintain liability insurance in sufficient amount to protect himself from any liability for damages for injury to any employees, the public or other persons, including any liability which may arise by virtue of any statute.
The policies shall be, in all respects, satisfactory to the contracting officer. Evidence that such insurance is in force shall be submitted immediately upon the signing of the contract, by either presenting the policies or the Liability Company's usual form of certificate for inspection. The policies and certificates shall certify, among other things, that the insurance will not be canceled or lapsed during the progress of the work covered by these specifications.
All insurance policies shall be issued only by companies authorized to do business under the laws of the state in which the work is to be accomplished, and copies of all policies shall be filed with the contracting officer before the work is started.
21. TIME FOR COMPLETION: The contractor shall complete the entire cleaning and sealing of joints within 120 calendar days after the date of Notice to Proceed.
22. AWARD WITHIN AVAILABLE FUNDING AND PAYMENT: The contractor shall provide a price to complete work as a whole. Progress payments during project are allowable.