A06_Map Drawings GAOA Sweet Creek 2 Trail Bridge - Plan Set Final-Signed.pdf
PDF 3 MB Posted
- Attached to
- 12048925Q0006 - GAOA SWEET CREEK TRIAL BRIDGE #2
- Solicitation number
- 12048925Q0006
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a set of construction drawings and plans for the Sweet Creek Trail Bridge #2 project, which is part of a federal contract opportunity. The key details are:
The project involves the construction of a 40-foot span prefabricated timber glulam pedestrian bridge along Forest Service Trail #1319 at mile post 0.2793 in the Siuslaw National Forest, Central Coast Ranger District. The work includes clearing, excavation, bridge placement, timber decking and railing installation, gabion placement, concrete grade beam placement, backwall construction, stair construction, and trail embankment construction. The use of a helicopter may be required for bridge placement. The solicitation number is 12048925Q0006 and the federal agency is the Department of Agriculture Forest Service. The drawings provide detailed specifications for the bridge substructure, superstructure, and stair details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A04_Cust. GAOA Sweet Creek #2 - Contract Template.docx | DOCX document | |
| B03_Davis-Bacon Act WD OR20240057.pdf | ||
| RFQ SOLICITATION 12048925Q0006 SWEET CREEK TRAIL BRIDGE 2 11202024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Forest Service
SWEET CREEK TRAIL
BRIDGE #2
OREGON
LANE COUNTY
(R06) PACIFIC NORTHWEST
SIUSLAW NATIONAL FOREST
CENTRAL COAST RANGER DISTRICT
TRAIL 1319 - M.P. 0.2793
(LAT 43.954864, LONG -123.902862)
INDEX OF SHEETS
SHEET SHEET TITLE
TITLE & VICINITY MAP
ESTIMATE OF QUANTITIES
GLULAM STRINGER TRAIL BRIDGE 1 (STANDARD PLAN)
GLULAM STRINGER TRAIL BRIDGE 2 (STANDARD PLAN)
GLULAM STRINGER TRAIL BRIDGE 3 (STANDARD PLAN)
SILL ON GABION BASKET (STANDARD PLAN)
BRIDGE PLAN & ELEVATION
ABUTMENT 2 & BACKWALL DETAILS
STAIR DETAILS #1
STAIR DETAILS #2
SHEET OF1 10
RECOMMENDED BY:
ZONE ENGINEER
ALEX YETAYEW, ACTING FOREST ENGINEER, SIUSLAW NF
REVIEWED BY:
SREO = REGION 6, SUB REGIONAL
ENGINEERING ORGANIZATION
PROJECT LOCATION
p p o o o o o o9726 o58
PROJECT
SITE
WESTERN OREGON INDEX MAP
THE
DALLESPORTLAND
SALEM
NEWPORT
FLORENCE
CORVALLIS
EUGENE
TILLAMOOK
BEND
5COOS
BAY
GRANTS
PASS
ROSEBURG 97
MEDFORD
DYLAN NICOLLE, PE, CIVIL ENGINEER, SREO
T18S R11W T18S R10W T18S R9W
T18S R12W
T19S R12W
WOAHINK
LAKE
SILTCOOS
LAKE
T19S R11W T19S R10W
T19S R9W
T20S R11WT20S R12W T20S R10W T20S R9W
FLORENCE, OR
SIUSLAW
RIVER 101
MAPLETON, OR
126 TO EUGENE, OR
45 MILES
SWEET CREEK TRAIL BRIDGE
#3 PROJECT LOCATION
LEGEND
FOREST SERVICE ROAD
STATE HIGHWAY
US HIGHWAY
CITY OR TOWN
VICINITY MAP
T21S R12W
REEDSPORT, OR
UMPQUA
RIVER
T21S R11W T21S R10W T21S R9W
1 2 40
SCALE IN MILES
TO INTERSTATE 5:
56 MILES
SMITH
RIVER
MICHELE HOLMAN, DISTRICT RANGER, CENTRAL COAST RD
DESIGNED BY:
COLE SMITH, PE, STRUCTURAL ENGINEER, SREO
SWEET CREEK HOMESTEAD TRAIL HEAD
COLE SMITH Digitally signed by COLE SMITH Date: 2024.01.03 09:51:40 -08'00'
DYLAN NICOLLE Digitally signed by DYLAN NICOLLE Date: 2024.01.03 10:01:39 -08'00'
ROBERT SANDERS Digitally signed by ROBERT SANDERS Date: 2024.04.17 08:18:46 -07'00'
ALEMAYEHU YETAYEW
Digitally signed by ALEMAYEHU
YETAYEW
Date: 2024.04.18 11:13:51 -07'00'
CONSTRUCTION NOTES:
1) PERFORM CONSTRUCTION IN CONFORMANCE WITH THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL LANDS FP-14 US CUSTOMARY UNITS EXCEPT AS MODIFIED BY SUPPLEMENTAL SPECIFICATIONS AND CLAUSES IN THE CONTRACT DOCUMENT OR THE PLANS.
2) CONTRACTOR SHALL ENSURE ALL EQUIPMENT USED AT THE PROJECT SITE HAS BEEN CLEANED AND WEED-FREE PRIOR TO ENTERING FOREST SERVICE LAND.
3) CONTRACTING OFFICER APPROVAL IS REQUIRED PRIOR TO THE PLACEMENT OF THE FOLLOWING ITEMS: BEDDING OR LEVELING COURSE OF BRIDGE ABUTMENTS AND SETTING OF BRIDGE SUPERSTRUCTURE.
4) REMOVE ALL CONSTRUCTION RELATED REFUSE FROM GOVERNMENT LAND PRIOR TO FINAL ACCEPTANCE.
5) REPAIR ANY DAMAGE TO THE EXISTING TRAIL SYSTEM DUE TO CONTRACTOR'S OPERATIONS, INSIDE OR OUTSIDE THE PROJECT BOUNDARY, AT THE CONTRACTOR'S EXPENSE, PRIOR TO FINAL ACCEPTANCE.
6) CONFINE CONSTRUCTION EQUIPMENT TO THE ROADWAY OR TRAIL, UNLESS OTHERWISE SHOWN ON THE PLANS OR APPROVED BY THE CONTRACTING OFFICER.
7) STORING OF ALL EQUIPMENT ON GOVERNMENT LANDS WILL BE AT THE CONTRACTOR'S RISK AND AT A LOCATION APPROVED BY THE CONTRACTING OFFICER.
8) DEPTHS OF SOIL AND AGGREGATE ARE GIVEN AS FINAL COMPACTED DEPTHS.
10) THE GENERAL STAGING AREA FOR THIS PROJECT SHALL BE AT THE SWEET CREEK HOMESTEAD TRAIL HEAD. THE CONTRACTOR IS PERMITTED A SINGLE INDUSTRIAL CAMP (WITH APPROVED INDUSTRIAL CAMP PERMIT FROM THE SIUSLAW NATIONAL FOREST). THE CONTRACTOR IS PERMITTED TO USE A HELICOPTER FOR THIS PROJECT. THE HELICOPTER STAGING AREA SHALL BE DESIGNATED (IF NEEDED) PRIOR TO HELICOPTER USE WITHIN 20 MILES OF THE PROJECT SITE. THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING THE CO OF HELICOPTER USE A MINIMUM OF 14 DAYS IN ADVANCE.
11) THE CONTRACTOR SHALL INFORM THE GOVERNMENT OF ANY PLANNED TRAIL CLOSURE AT LEAST 21 DAYS IN ADVANCE.
12) CONTRACTOR SHALL COMPLY WITH SECTION H OF THE CONTRACT FOR TIMING RESTRICTIONS.
13) DIRECTIONS TO THE PROJECT SITE:
FROM EUGENE, OR TRAVEL APPROX. 46 MILES WEST ON OR-126. TURN LEFT (WEST) ONTO S BANK MAPLETON WEST RD/SWEET CREEK ROAD AND TRAVEL APPROX. 10.3 MILES TO THE HOMESTEAD TRAIL HEAD.
BASE BID ITEMS
ITEM NUMBER DESCRIPTION PAY UNIT ESTIMATED QUANTITY REMARKS
15101 MOBILIZATION LUMP SUM ALL INCLUDES FIRE PROTECTION & EQUIPMENT CLEANING
20158 CLEARING AND GRUBBING LUMP SUM ALL INCLUDES REMOVAL OF ROCK FACE FOR NEW TRAIL BRIDGE
20301A REMOVAL OF EXISTING TRAIL BRIDGE, DISPOSAL METHOD A LUMP SUM ALL SEE DETAILS ON SHEET 7
20301B REMOVAL OF ROCK FACE, DISPOSAL METHOD F LUMP SUM ALL
57101 PREFABRICATED TRAIL BRIDGE SUPERSTRUCTURE AND SUBSTRUCTURE - 40'-0" SPAN,
DESIGN FABRICATE DELIVER AND INSTALL LUMP SUM ALL
ALL COMPONENTS, LABOR AND INCIDENTALS NECESSARY FOR BRIDGE AND STAIR CASE
INSTALLATION INCLUDING CONCRETE SUBSTRUCTURE UNITS, GABION BASKET/ROCK, BEARINGS, BACKWALLS, STAIR STRUCTURE, DECKING AND ALL FASTENERS. INCLUDES LOADING, TRANSPORT &
UNLOADING AT THE BRIDGE LOCATION.
ESTIMATE OF QUANTITIES
PROJECT NAME
United States Department of Agriculture Forest Service
OFSHEET
963 - GLULAM TRAIL BRIDGECENTRAL COAST RANGER DISTRICT
SIUSLAW NATIONAL FOREST
SWEET CREEK TRAIL BRIDGE #2 2021
3 10GSB
SWEET CREEK TRAIL BRIDGE #2 2021
4GSB
GAOA NORTH FORK SMITH TRAIL BRIDGES #1, #3 & #4 2021
5 10
B
B
GSB
965 - TRAIL BRIDGE SUBSTRUCTURESCENTRAL COAST RANGER DISTRICT
SWEET CREEK TRAIL BRIDGE #2 12/11/2023
6 10
B
B
GAB
(NOT SHOWN ON DRAWING) REMOVE
AND DISPOSE OF EXISTING 30 FT
LENGTH (2) x SOLID SAWN PT
STRINGER TRAIL BRIDGE AS FOLLOWS:
- REMOVE ALL PRESSURE TREATED
(PT) 3X12 DECK MEMBERS, BACK WALL
PLANKS AND HARDWARE AND DISPOSE
LEGALLY OFF OF GOVERNMENT LAND
- REMOVE (2) 6X18 X 30 FT PT SOLID
SAWN DOUGLAS FIR BEAMS (BOTH
BROKEN DOWN THE MIDDLE) AND
DISPOSE LEGALLY OFF OF
GOVERNMENT LAND.
- REMOVE PT TIMBER SILLS AT
ABUTMENT 1 AND ABUTMENT 2 AS
WELL AS PT RAILROAD TIES AT
ABUTMENT 1 APPROACH AND DISPOSE
LEGALLY OFF OF GOVERNMENT LAND
- REMOVE EXISTING NATIVE ROUND
TIMBER RAILING AND SCATTER ON THE
UPHILL SIDE OF THE TRAIL AT LEAST 10
FT OFF OF THE TRAIL.
PROJECT NAME
United States Department of Agriculture Forest Service
OFSHEET
BACKFILL BEHIND BACKWALLS WITH SUITABLE ON
SITE MATERIAL, TYP. COMPACT IN 4" LIFTS WITH A
HAND TAMPER UNTIL VISIBLE DEFLECTION CEASES.
PLACE ABUTMENT 2 AT AN ELEVATION SUCH THAT THE TOP OF THE NEW
BRIDGE DECK MATCHES THE TOP OF THE EXISTING TRAIL. PLACE
ABUTMENT 1 AT ELEVATION THAT MATCHES THE PROPOSED
GRADIENT (3%) AS SHOWN IN THE BRIDGE ELEVATION DETAIL ON THIS
SHEET.
C BEARING ABUTMENT 1 AND C OF
BRIDGE AS STAKED BY CO
L L
7" RING SHANK
NAILS, TYP BRIDGE RAIL CAP
6" 40'-0" CENTERLINE BEARING TO CENTERLINE BEARING 6"
EXISTING
TRAIL
BRIDGE ELEVATION
0' 2' 4'2'
SCALE IN FEET
BRIDGE PLAN
0' 2' 4'2'
SCALE IN FEET
5'-0", MAX,
TYP.
C BEARING ABUTMENT 2 AND C OF
BRIDGE AS STAKED BY CO
L L
NEW TIMBER GLULAM TRAIL
BRIDGE STRUCTURE
PT TIMBER BACKWALL. SEE
DETAILS ON SHEET 8
REINFORCED CONCRETE GRADE
BEAM. SEE DETAILS ON SHEET 8
EXISTING TRAIL SURFACE
EXISTING
TRAIL
DIP IN BEDROCK/CLIFF AREA
EXISTING GROUND
ALONG BRIDGE
CENTERLINE
(2) - 5 1/8" WIDTH x 24" DEPTH x 41'-0"
GLULAM STRINGER TRAIL BRIDGE
40'-0" CENTERLINE BEARING TO CENTERLINE BEARING
5'-0", MAX,
TYP.
41'-0" OUT-OUT
3% ON
BRIDGE
BEDROCK
REINFORCED CONCRETE GRADE
BEAM. SEE DETAILS ON SHEET 8
GABION BASKET. SEE
DETAILS ON SHEET 6
STAIR STRUCTURE. SEE
DETAILS ON SHEETS 9 & 10
STAIR STRUCTURE. SEE
DETAILS ON SHEETS 9 & 10
NOTE:
FABRICATE RAIL POST HOLES AND CUT
BEAMS ENDS TO BE INSTALLED PLUMB.
BEDROCK
APPROX. 8' x 6' x 4' ROCK OUTCROP TO BE REMOVED TO
PROVIDE CLEARANCE FOR NEW BRIDGE (PAY ITEM 20301B)
PROJECT NAME
Forest Service
OFSHEET
SUBSTRUCTURE AND DESIGN NOTES:
CONCRETE SILL: CAST-IN-PLACE OR PRECAST IS ACCEPTABLE. USE
STRUCTURAL CONCRETE WITH A 7 SACK MIN. MIX. 4%-6% AIR ENTRAINMENT,
SLUMP NOT EXCEEDING 4 INCHES, AND MAXIMUM AGGREGATE SIZE OF 3/4 INCH.
SUBMIT A MIX DESIGN TO BE APPROVED BY THE CO. PROVIDE A TROWELED
SURFACE FINISH UNLESS OTHERWISE SPECIFIED.
REINFORCING STEEL: FURNISH REINFORCING STEEL CONFORMING TO ASTM
A615 (AASHTO M31) GRADE 60. PROVIDE 2 INCH CLEAR CONCRETE COVER FOR
ALL REBAR, UNLESS NOTED OTHERWISE ON THE PLANS.
BEARING CAPACITY: BRIDGE ABUTMENTS SHALL BE UNDERLAIN BY BEDROCK.
THE ESTIMATED UNFACTORED BEARING CAPACITY OF BEDROCK IS 2000 PSI.
SNOW LOAD: SNOW LOAD IN THE PROJECT AREA = 23 PSF.
HYDRAULICS: THIS BRIDGE IS CROSSING A DIP IN THE ROCK/CLIFF AREA OF THE
TRAIL AND IS NOT CROSSING A STREAM, THEREFORE HYDRAULIC
CALCULATIONS ARE N/A.
2" IF PRECAST, 3" IF
CAST-IN-PLACE
1' -6
2'-0"
TYPICAL GRADE BEAM SECTION
#4 HOOPS WITH 3" MINIMUM EXTENSIONS @
12" MAXIMUM SPACING.
4 - #6 EQUALLY SPACED
(2) X 3/4" ANCHOR BOLT AT EACH BEARING SHOE W/ 3/4" HEX
NUT AND PLAIN WASHER, TYP. EMBED 3/4" Ø ALL THREAD 8"
MIN. INTO GRADE BEAM.
C SUPERSTRUCTURE
BEARING & ABUTMENT
L
NOT TO SCALE
ABUTMENT 2 ELEVATION TYPICAL
NOT TO SCALE ABUTMENT 2 PROFILE VIEW
NOT TO SCALE
6" , C
LR
GLULAM GIRDERS
4X12 TREATED TIMBER BACKWALL PLANKS; LENGTHS AS NEEDED TO RETAIN FILL AT A
MAX. SIDE SLOPE OF 1.5H : 1V. FASTEN EACH BACKING PLANK TO EACH STRINGER WITH
(3) - 7" RING SHANK NAILS. RIP BOTTOM BACKWALL PLANK TO FIT, AS SHOWN
TIMBER DECK PLANK, TYP.
FINISHED TRAIL
SURFACE
BEARING SHOE, TYP. SEE DETAIL ON THIS SHEET
EXISTING GROUND
NEW GROUND: SLOPE TO DRAIN (1% MIN.)
BACKFILL AROUND GRADE BEAM WITH SUITABLE ON SITE MATERIAL.
COMPACT IN 4" LIFTS WITH A HAND TAMPER UNTIL VISIBLE
DEFLECTION CEASES. MATCH THE EXISTING GRADE.
REINFORCED CONCRETE GRADE BEAM
(SEE DETAILS BELOW)
4'-0"
NOTE: RAILING NOT SHOWN FOR CLARITY
C 1"Ø HOLE FOR
3/4"Ø BOLT & NUT
W/STANDARD PLAIN
WASHERS
C
BEARING
8"
8"
2"
SIDE VIEW
8 1/2"
C 7/8"Ø HOLES
ANCHOR BOLTS
1/2"
PLATE
C
STRINGER
FULL PEN.
C BEARING
& STRINGER
2"
1/
2"
4 1/2" 5 1/2"
4 1/2" 1'-2 1/2"
C 7/8"Ø HOLES FOR
ANCHOR BOLTS
C BEARING &
ABUTMENT
1/2" PLATE
PLAN
1/2" x STRINGER WIDTH x 6"
ELASTOMERIC
PAD
BEARING SHOE DETAIL
END VIEW
NOT TO SCALE
1 1/2" 1"
4 1/4"
L
L
L
L
L
L
L
STRINGER WIDTH
MINUS 1/4"
5 1/2"
3/4" Ø BOLT & NUT W/ (2) - MALLEABLE IRON WASHERS
4X6 BACKING PLANK STIFFENER. ATTACH W/ (2) 1/2" Ø
BOLTS W/ (2) MALLEABLE IRON WASHERS PER BACKING
PLANK SPACED DIAGONALLY FROM EACH OTHER
1.5H
1V
PLACE GRADE BEAM ON SOLID ROCK. FILL IN/FLATTEN ANY INCONSISTENCIES IN
ROCK WITH IN-SITU MATERIAL TO ENSURE UNIFORM BEARING. COMPACT WITH A
HAND TAMPER UNTIL VISIBLE DEFLECTION CEASES.
4 - #6 REBAR EQUALLY SPACED
PROJECT NAME
Forest Service
OFSHEET
STAIR STRINGER DETAIL (2 AT ABUTMENT 1 END)
NOT TO SCALE
6" 9"
13/16" Ø
11/16" Ø
1'
- 1
/4
3 3/4"
4"
6' -2
10'-1 1/4"
11"
TYP.
3 1/2"
9"
13/16" Ø
1'-3 3/8" 3"
9/16" Ø
4"
2"
STAIR RAILING TYPE, GEOMETRY AND
CONNECTIONS TO MATCH BRIDGE RAILING.
SEE TYPICAL CROSS SECTION ON SHEET 4
FIELD CUT ENDS OF BRIDGE AND
STAIR RAILING TO MATCH UP AS
SHOWN, TYP. ALL RAILING ENDS
STAIR POST, TYP. SEE DETAIL ON THIS SHEET
FIELD CUT RAIL ENDS
PLUMB AND IN LINE WITH
FRONT EDGE OF BOTTOM
STAIR TREAD AS SHOWN
7" MAX STEP HEIGHT
ONTO FIRST STEP
FILL EXISTING TRAIL AS
NEEDED WITH ON SITE
MATERIAL TO CONSTRUCT
STAIRS AS SHOWN.
COMPACT WITH 3 PASSES
OF A VIBRATING PLATE
COMPACTOR
8X12 X 4'-6" PT TIMBER DF-L SILL. PLACE
AND COMPACT 6" OF ON SITE ROCK (3"
MINUS) UNDER THE SILL FOR DRAINAGE
SEE STAIR
TREAD
DETAIL ON
SHEET 10
SEE STAIR STRINGER TO
SILL CONNECTION. SEE
DETAIL ON SHEET 10
STAIR STRINGER TO
SUPERSTRUCTURE
CONNECTION. SEE
DETAIL ON SHEET 10
CONCRETE SILL ON
GABION FOUNDATION. SEE
DETAILS ON SHEET 8
PT 4X12 DF-L STAIR
TREAD, TYP.
PT 6X18 DF-L
STAIR
STRINGER
STAIR RAIL POST DETAIL
NOT TO SCALE
5 1/2"
5' -5
/8
4X6 PT DF-L STAIR
RAIL POST, TYP.
13/16" Ø HOLES. ATTACH
POSTS WITH (2) 3/4" Ø X 13"
LENGTH HEX BOLTS WITH
NUTS AND M.I. WASHERS
3"
9"
STAIR GEOMETRY NOTE:
STAIR GEOMETRY MAY BE MODIFIED TO ACCOMMODATE
ACTUAL SUB-SURFACE FIELD CONDITIONS AND/OR
DEVIATION IN SUPERSTRUCTURE DEPTH FROM WHAT IS
ASSUMED ON THE PLAN SET SHEETS. IF STAIR GEOMETRY
DEVIATES FROM WHAT IS SHOWN ON THIS SHEET, THE
CONTRACTOR SHALL SUBMIT THE PROPOSED CHANGE TO
THE CO IN WRITING FOR REVIEW AND APPROVAL AT LEAST
14 DAYS PRIOR TO CONSTRUCTING THE STAIRS.
BEARING ASSEMBLY, TYP. SEE
DETAILS ON SHEET 8
20% MAX
GABION FOUNDATION. SEE
DETAILS ON SHEET 6
9"
13/16" Ø
5'-11 3/8"
7" TY
P.
2'-5"
4 7/8"
17 1/2"
5 1/2"
3 1/2"2 3/16"5 1/4"
2'-2 1/2"
PLAN
(2) 3/4" Ø X 12" LENGTH
HEX BOLTS WITH NUTS
AND M.I. WASHER, TYP.
4X6 RAIL POST, TYP.
C BRIDGEL
PT 4X12 DF-L
DECK PLANK
ELEVATION
4X12 DECK
PLANK
4X6 STAIR RAIL POST, TYP.
4X12 STAIR TREAD,
TYP.
STAIR STRINGER TO BACKWALL
ANGLE: L4X4X3/8, TYP.
PT 6X18 DF-L STAIR STRINGER
4X12 X 4'-6" PT DF-L BACKWALL (RIP
BOTTOM PLANK TO FIT)
PT 4X12 X 3'-3" DF-L STAIR TREAD,
TYP. ATTACH TO STAIR STRINGER
WITH (2) 5/16" Ø X 7" GRK RSS
SCREWS (OR APPROVED EQUAL)
AT EACH CONNECTION, TYP.
PT 6X18 DF-L
STAIR STRINGER.
STAIR TREAD DETAIL
NOT TO SCALE
(3) X 5/16" Ø X 7" GRK RSS SCREWS (OR
APPROVED EQUAL) AT EACH BACKWALL
TO GLULAM BEAM CONNECTION.
(2) 5/8" Ø X 6" HEX BOLTS THRU 4X12 BACKWALL PLANK WITH
HEX NUTS AND (1) STD. WASHER & (1) M.I. WASHER, TYP.
(2) 5/8" Ø X 8" HEX BOLTS WITH HEX NUTS AND (1) STD.
WASHER & (1) M.I. WASHER, TYP.
5 1/8" X 24" GLULAM BEAM, TYP.
4X6 RAIL POST BLOCK, TYP.
PT 4X12 DF-L
STAIR TREAD
PLANK
4X12 X 4'-6" PT DF-L BACKWALL (RIP
BOTTOM PLANK TO FIT)
STAIR STRINGER TO SUPERSTRUCTURE CONNECTION
NOT TO SCALE
4X6 STAIR RAIL POST, TYP.
PT 6X18 DF-L STAIR STRINGER
(2) 5/8" Ø X 6" HEX BOLTS THRU 4X12 BACKWALL PLANK WITH
HEX NUTS AND (1) STD. WASHER & (1) M.I. WASHER, TYP.
(2) 5/8" Ø X 8" HEX BOLTS WITH HEX NUTS AND (1) STD.
WASHER & (1) M.I. WASHER, TYP.
BEARING SHOE, TYP.
CONCRETE SILL
NOTE:
1ST BRIDGE RAIL POST
NOT SHOWN FOR CLARITY
PROJECT NAME
United States Department of Agriculture Forest Service
OFSHEET
9/16" Ø HOLES FOR 1/2" Ø X 6" HEX
BOLTS WITH HEX NUTS AND (1) STD.
WASHER & (1) M.I. WASHER
1 1/2"
L3X4X3/8
1 13/16"
STAIR STRINGER TO SILL
CONNECTION DETAIL
NOT TO SCALE
4"
9/16" Ø HOLES FOR 1/2" Ø X 5" LAG
BOLTS WITH (1) STD. WASHER
1 1/2"
6"
4"
1 13/16"
1 13/16"
STAIR STRINGER TO BACKWALL ANGLE
NOT TO SCALE
2 1/2"
2 1/2"
4"
9"
11/16" Ø, ALL HOLES
L 4" X 4" X 3/8"
STAIR STRINGER TO BACKWALL
ANGLE: L4X4X3/8, TYP.
(2) AT EACH STAIR STRINGER
CONNECTION AS SHOWN
(2) X 5/8" Ø X 8" LAG SCREWS AT EACH
INTERIOR STAIR STRINGER CONNECTION.
(LAG INTO BACKWALL PLANK AND
GLULAM BEAM AS SHOWN)
File details come from the government source that posted it. Updated .