This solicitation is for the demolition of seven education buildings at Fort Thompson in South Dakota. The Bureau of Indian Affairs is seeking quotes for the complete demolition of buildings 118, 128, 129, 137, 138, 139, and 150 by December 1, 2021. A mandatory site visit will be held on June 22. Quotes must be submitted to Karen Cooper at the Bureau of Indian Affairs by July 1 via email. This acquisition is set aside for Native American-owned small businesses under the Buy Indian Act.

View the file

Other files

File Type Posted
A06_Specifications.pdf PDF
Sol_140A2321Q0341.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O N

D

ES

IG

N

P R

O

JE

C T-

C O

N

TR

AC

T

N O

. 1

A1

0F

G01

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

TI

TL

E

SH

EE

T

FORT THOMPSON EDUCATION BUILDING

DEMOLITION PROJECT

FORT THOMPSON SOUTH DAKOTA

EDUCATION BUILDINGS 14-02, NO. 118, 128, 129, 137, 138, 139, AND 150

DEMOLITION DESIGN PROJECT

GENERAL

G01-TITLE SHEET

G02-SITE USE PLAN

CIVIL

C01-EXISTING SURVEY

C02-EXISTING SURVEY

C03-FINAL GRADING PLAN

C04-FINAL GRADING PLAN

ARCHITECTURAL PLANS

A01-BUILDING 118 PLANS

A02-BUILDING 118 PLANS

A03-BUILDING 128 PLANS

A04-BUILDING 129 PLANS

A05-BUILDING 137 PLANS

A06-BUILDING 139 PLANS

A07-BUILDING 150 PLANS

A08-ENLARGED FLOOR PLANS

ARCHITECTURAL ELEVATIONS/SECTIONS/DETAILS

A10-ELEVATIONS

A11-ELEVATIONS

A12-ELEVATIONS

A20-SECTIONS/DETAILS

A21-SECTIONS/DETAILS

REGULATED/HAZARDOUS MATERIALS ABATEMENT

H01- HAZARDOUS MATERIAL ABATEMENT-BUILDING 118

H02- HAZARDOUS MATERIAL ABATEMENT-BUILDING 118

H03- HAZARDOUS MATERIAL ABATEMENT-BUILDING 128, 129

H04- HAZARDOUS MATERIAL ABATEMENT-BUILDING 137,138

H05- HAZARDOUS MATERIAL ABATEMENT-BUILDING 139,150

Date

CONCUR:

Bureau of Indian Affairs Great Plains Region Division of Facilities

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

100% CD- DATE: 04-16-2021

Issue for BID - 4-21-2021 jdadave Highlight

Scale: NTS

REGIONAL SITE LOCATION1

Scale: NTS

LOCAL SITE LOCATION2

Scale: NTS

SITE USE PLAN3

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

G02

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

SI

TE

U

SE

P

LA

N

DEMOLISH ALL BUILT ELEMENTS WITHIN

DEMOLITION ZONE EXCEPT AS NOTED

SITE USE BOUNDARY

LEGEND

NIC NOT IN CONTRACT

138 NO DEMOLITION/

REMEDIATION ONLY

XXX DEMOLITION

SITE USE BOUNDARY

DEMOLITION ZONE

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

NOTE:

NO CONSTRUCTION TRAFFIC OF ANY KIND IS ALLOWED OUTSIDE THE "DEMOLITION ZONE" WITHOUT WRITTEN APPROVAL FROM THE OWNER (BIA). IF, WHAT ARE BELIEVED TO BE ARTIFACTS FOUND DURING CONSTRUCTION, THE CONTRACTOR SHALL CEASE ANY CONSTRUCTION ACTIVITIES AND SHALL CONTACT THE GOVERNMENT ARCHAEOLOGIST AND TRIBAL

HISTORIC PRESERVATION OFFICE.

DR. SEBASTION LEBEAU II

B.I.A. ARCHAEOLOGIST

PHONE #: (605) 226-7656

MERLE MARKS

TRIBAL HISTORIC PRESERVATION OFFICE

PHONE #: (605) 245-2221

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

100% CD- DATE: 04-16-2021

Issue for BID - 4-21-2021

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

C01

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

EX

IS

TI

N

G S

U R

VE

Y

D

EM

O

LI

TI

O N

P

LA

N

PROPOSED CONTOUR LINE

MATCH LINE

DEMOLISH ALL BUILT ELEMENTS WITHIN

DEMOLITION ZONE EXCEPT AS NOTED

DEMOLITION ZONE

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

A A

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

I HEREBY CERTIFY THAT THIS

SURVE� PLAN OR REPORT

WAS PREPARED UNDER MY

DIRECT SUPERVISION AND

THAT I AM A REGISTERED

LAND SURVEYOR IN THE

STATE OF SOUTH DAKOTA.

DATE: 2020

NOTE:

THIS SURVEY WAS PERFORMED

WITHOUT THE BENEFIT OF A

TITLE REPORT OR TITLE

COMMITMENT. EASEMENTS AND

RIGHT-OF-WAY VACATIONS OF

RECORD WERE NOT RESEARCHED

AND ARE NOT SHOWN UNLESS

OTHERWISE NOTED.

NOTE: Building to be 100% remediated of hazardous & regulated material (ref: Specification and Dwgs. H01-H05).

DO NOT DEMOLISH BUILDING

NOTE: Building to be 100% remediated of hazardous & regulated material, and 100% Demolished (ref: Specification and Dwgs. H01-H05)

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

C02

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

ISSUED FOR BID

EX

IS

TI

N

G S

U R

VE

Y

D

EM

O

LI

TI

O N

P

LA

N

PROPOSED CONTOUR LINE

MATCH LINE

DEMOLITION ZONE

DEMOLISH ALL BUILT ELEMENTS WITHIN

DEMOLITION ZONE EXCEPT AS NOTED

TREES TO REMAIN

AS INDICATED

A A

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

I HEREBY CERTIFY THAT THIS

SURVE� PLAN OR REPORT

WAS PREPARED UNDER MY

DIRECT SUPERVISION AND

THAT I AM A REGISTERED

LAND SURVEYOR IN THE

STATE OF SOUTH DAKOTA.

DATE: 2020

NOTE:

THIS SURVEY WAS PERFORMED

WITHOUT THE BENEFIT OF A

TITLE REPORT OR TITLE

COMMITMENT. EASEMENTS AND

RIGHT-OF-WAY VACATIONS OF

RECORD WERE NOT RESEARCHED

AND ARE NOT SHOWN UNLESS

OTHERWISE NOTED.

NOTE: Building to be 100% remediated of hazardous & regulated material, and 100% Demolished (ref: Specification and Dwgs.

H01-H04)

NOTE: Building to be 100% remediated of hazardous & regulated material, and 100% Demolished (ref: Specification and Dwgs.

H01-H04)

NOTE: Building to be 100% remediated of hazardous & regulated material, and 100% Demolished (ref: Specification and Dwgs.

H01-H04)

NOTE: Building to be 100% remediated of hazardous & regulated material, and 100% Demolished (ref: Specification and Dwgs.

H01-H04)

NOTE: Building to be 100% remediated of hazardous & regulated material, and 100% Demolished (ref: Specification and Dwgs. H01-H04)

NOTE: Building NOT IN CONTRACT (NIC)

NOTE: Building NOT IN CONTRACT (NIC)

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

C03

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

FI

N

AL

G

R

AD

IN

G

P

LA

N

N O

TH

DEMOLITION ZONE

BLDG

NIC

1451.5

1452.0

.5

1452.0

.0

A A

.0

.5

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

AVG. SLOPE 1%

AVG. SLOPE 1%

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

C04

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

FI

N

AL

G

R

AD

IN

G

P

LA

N

SO

U

TH

DEMOLITION ZONE

BLDG

NIC

BLDG

NIC

.5

.0

1451.5

1451.0

1450.5

1450.0

1449.5 1450.0

A A

.0

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

AVG. SLOPE 1%

AVG

. SLO

PE <1%

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

Scale: 1/16" = 1'-0" FOUNDATION PLAN1 Scale: 1/16" = 1'-0"

FLOOR PLAN2

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

A01

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

BL

D

G

P

LA

N

S

P U

D N

D N

U P

7'

-3

5' -0

/4

6'

-2

/4

5'

105'-7 1/2"

19'-11" 16'-9" 37'-10" 31'-1 1/2"

66'

28'-0 3/4" 27'-10 3/4"

'-4

6' -1

3/

4"

'-6

/4

'-5

'-0

/4

'-3

/4

'-2

'-4

'-9

/4

'-8

'-7

'-1

3/

4"

12'-5 3/4"

11'-4 3/4"

48'-2 1/2" 33'-6 1/2"

'-6

/4

'-1

1/ 2"

'-6

/4

38'-2"

'-9

/4

A08

A08

A08

SLIDE

RAMP

UP

A10

A10

A11

A10

A10

A10

A11

REFERENCE A18 FOR

BASEMENT PLAN

A20

A20

A20

A20

A20

A20

TYP FOR ALL

CLASSROOMS

A10

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

A02

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

BL

D

G

P

LA

N

S

Scale: 1/16" = 1'-0" REFLECTED CEILING PLAN1 Scale: 1/16" = 1'-0"

ROOF PLAN2

CURVED AND ELEVATED ROOF OVER GYM

ELEVATED ROOF

SMOKE STACK

ELECTRICAL HOOKUP

A08

A08

A20

A20

A20

A20

A20

A20

A20

A20

A20

A20

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

Scale: 1/8" = 1'-0" FOUNDATION PLAN1 Scale: 1/8" = 1'-0"

FLOOR PLAN2

Scale: 1/8" = 1'-0" ROOF PLAN4Scale: 1/8" = 1'-0"

REFLECTED CEILING PLAN3

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

A03

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

BL

D

G

P

LA

N

S

TYP

A21

39'-7"

'-1

1"

A11

A11

A11

A11

'-7

7'

-8

7' -8

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

FOUNDATION PLAN1

Scale: 1/8" = 1'-0"

FLOOR PLAN2

Scale: 1/8" = 1'-0" ROOF PLAN4Scale: 1/8" = 1'-0"

REFLECTED CEILING PLAN3

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

A04

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

BL

D

G

P

LA

N

S

TYP

A21

24'-4"

36'-7"

'-1

0"2 A21

A11

A11

VENT

ELECTRICAL CONNECT

PITCH, EST

PITCH, EST

PITCH, EST

PITCH, EST

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

FOUNDATION PLAN1 Scale: 1/8" = 1'-0"

FLOOR PLAN2

Scale: 1/8" = 1'-0" ROOF PLAN4Scale: 1/8" = 1'-0"

REFLECTED CEILING PLAN3

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

A05

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

BL

D

G

P

LA

N

S

FOUNDATION FOR ENTRY?

ADDED AFTER PREFAB BUILDINGS

FOUNDATION PIERS

62'-8"

'-4

A12

A12

A12

A12

PI

TC

H , E

ST

PI

TC

H , E

ST

3PI

TC

H

, E

ST

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

B TYPICAL

D TYPICAL

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

Scale: 1/8" = 1'-0"

FLOOR PLAN2

Scale: 1/8" = 1'-0" ROOF PLAN4Scale: 1/8" = 1'-0"

REFLECTED CEILING PLAN3

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

A06

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

BL

D

G

P

LA

N

S

TYP

TYP

A21

41'-11"

6' -1

1"

'-1

1"

4'-6"

'-1

0" 4'

-1 0"

5'-9"

5'-5"

6' -6

11'-11"4'-5"4'-8" 6 A12

A21

A12

A12

A12

PITCH, EST

PITCH, EST

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

SIM.

D

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

Scale: 1/8" = 1'-0"

FLOOR PLAN2

Scale: 1/8" = 1'-0" ROOF PLAN4Scale: 1/8" = 1'-0"

REFLECTED CEILING PLAN3

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

A07

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

BL

D

G

P

LA

N

S

FOUNDATION PIERS

64'

32'

6' -6

7' -6

19'-3"7'-6"10'-6"7'-6"

A14

A14

A14

A14

19'-3"

A21

64'

PI

TC

H , E

ST

1 PI

TC

H

, E

ST

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

Scale: 3/16" = 1'-0"

BLDG 118 RESTROOM DETAIL2

Scale: 3/16" = 1'-0"

BLDG 118 KITCHEN DETAIL1

Scale: 3/16" = 1'-0"

BLDG 118 ADMINISTRATION DETAIL3

Scale: 3/16" = 1'-0"

BASEMENT FLOOR PLAN4

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

A08

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

EN

LA

R G

ED

F

LO

O

R P

LA

N

S

D N

U P

8'-8 1/2" 15'-2 1/2" 7'-4 1/2" 9'-4 1/2"

7' -3

/4

'-3

7' -9

/4

4'-8 3/4"

47'-10 3/4"

6' -1

1"

TYP

15'-3 1/4"7'-4 1/2"

6' -1

0"

'-6

/2

8' -1

'-4

/4

7'

'-7

/4

'-5

/4

'-9

/4

7'

-6

/2

'-6

7 1/2"

TYP

COMPOSED OF CAST IN PLACE CONCRETE WITH

ATTACHED FLUORESCENT LIGHTING

SLIDE

RAMP

UP

DEMOLISH ENTIRE STRUCTURE BELOW GRADE

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

BLDG 118 EAST, (SOUTH) ELEVATION1

Scale: NTS

BLDG 118 EAST, (CENTER) ELEVATION2

Scale: NTS BLDG 118 SOUTH ELEVATION4Scale: NTS

BLDG 118 EAST, (NORTH) ELEVATION3

Scale: NTS

BLDG 118 WEST,(NORTH) ELEVATION5

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

A10

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

EL

EV

AT

IO

N S

F

A A B B C

C D D E E F

G G H

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

BLDG 118 WEST,(SOUTH) ELEVATION1

SCALE

TITLE3

Scale: NTS BLDG 128 - EAST ELEVATION3 Scale: NTS

BLDG 128 - SOUTH ELEVATION4

Scale: NTS BLDG 128 - WEST ELEVATION5 Scale: NTS

BLDG 128 - NORTH ELEVATION6

Scale: NTS BLDG 129 - SOUTH7 Scale: NTS

BLDG 129 - WEST8

Scale: NTS

BLDG 118 - NORTH ELEVATION2

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

A11

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

EL

EV

AT

IO

N S

I IH

TYP

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

BLDG 139 EAST4 Scale: NTS

BLDG 139 - SOUTH5 Scale: NTS

BLDG 139 - NORTH6

Scale: NTS BLDG 137 - EAST (WEST SIM)1 Scale: NTS

BLDG 137 - SOUTH2 Scale: NTS

BLDG 137 - NORTH3

Scale: NTS BLDG 150 - EAST (WEST SIM)7 Scale: NTS

BLDG 150 - NORTH (SOUTH SIM)8

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

A12

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

EL

EV

AT

IO

N S

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

UTILITY TUNNEL

Scale: 3/4" = 1'-0" SECTION - BASEMENT1 Scale: 3/4" = 1'-0"

SECTION - SLAB ON GRADE (TYP)2 Scale: 3/4" = 1'-0"

SECTION - TUNNEL3

DEMOLISH TO

BOTTOM OF FOOTING

(TYP)

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

A20

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

SE

C

TI

O

N S/

D

ET

IA

LS

BU

IL

D

IN

G

DEMOLISH TO

BOTTOM OF FOOTING

(TYP)

DEMOLISH TO

BOTTOM OF FOOTING

(TYP)

FOUNDATION WALL

CONCRETE

CAST IN PLACE CONCRETE

FLOOR SYSTEM

WINDOW ASSEMBLY

ROOF STRUCTURAL SYSTEM

GUTTER ASSEMBLY

WINDOW ASSEMBLY

MASONRY EXTERIOR

T.O.S.

ROOF ASSEMBLY

SUSPENDED CEILING

CONCRETE

FOUNDATION WALL

T.O.S.

ROOF ASSEMBLY

ROOF STRUCTURAL SYSTEM

CONCRETE

ROOF STRUCTURAL SYSTEM

GUTTER ASSEMBLY

WINDOW ASSEMBLY

MASONRY EXTERIOR

T.O.S.

ROOF ASSEMBLY

SUSPENDED CEILING

WINDOW ASSEMBLY

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

2X WOOD JOISTS FRAMING

WITH WOOD DECK AND

FLOOR FINISH TYP

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

A21

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

SE

C

TI

O

N S/

D

ET

AI

LS

Scale: 3/4" = 1'-0" METAL BUILDING SECTION (TYP)1 Scale: 3/4" = 1'-0"

BUILDING SECTION (TYP)2 Scale: 3/4" = 1'-0"

WALL SECTION (TYP)3

DEMOLISH TO

BOTTOM OF FOOTING

(TYP)

DEMOLISH TO

BOTTOM OF FOOTING

(TYP)

WINDOW ASSEMBLY

METAL SIDING

GUTTER ASSEMBLY

ROOF STRUCTURAL SYSTEM

ROOF ASSEMBLY

METAL SIDING

METAL SIDING

CONCRETE SLAB

GRAB ON GRADE

GUTTER ASSEMBLY

ROOF ASSEMBLY

ROOF STRUCTURAL SYSTEM

SUSPENDED CEILING

WINDOW ASSEMBLY

T.O.S.

METAL SIDING

METAL SIDING

TO STRUCTURE

TO FLOOR

A

GYP WALL BOARD

METAL STUDS

TO STRUCTURE

GYP WALL BOARD

WOOD STUDS

PAINT

8" CMU ASSEMBLY

1 - TILE VENEER ONE SIDE

2 - TILE VENEER BOTH SIDES

TO FLOOR

D

WOOD PANEL

WOOD STUDS

TO FLOOR

B

TO STRUCTURE

TO FLOOR

C

TO STRUCTURE

WINDOW ASSEMBLY

WINDOW ASSEMBLY

METAL SIDING

EXTERIOR SYSTEM & ASSEMBLIES

1 BRICK VENEER

2 METAL SIDING

3 WOOD SIDING

4 BUILT UP ROOF

5 ASPHALT ROOF SYSTEM

6 METAL ROOF SYSTEM

7 GUTTER / DS ASSEMBLY

8 WOOD STEP / RAMP ASSEMBLY

9 CONC. STEP / RAMP ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY

11 HVAC EQUIPMENT AND ASSEMBLY

12 EXTERIOR EQUIPMENT (FFE)

13 UTILITY: TERMINATE, CAP, AND MARK

LOCATION BELOW GRADE / ABANDON

SUPPLY - SIDE IN PLACE

14 UTILITY CONNECTION / ACCESS TO

REMAIN IN PLACE

15 TREES TO REMAIN

INTERIOR SYSTEM & ASSEMBLIES

1 PAINTED GYP WALL ASSEMBLY

2 PAINTED CMU WALL ASSEMBLY

3 INTERIOR FIXTURE (FFE)

4 CASEWORK / CABINET ASSEMBLY

5 FLOOR FINISH ASSEMBLY OVER CONC. SUB

FLOOR

6 FLOOR FINISH ASSEMBLY OVER WOOD SUB

FLOOR

7 COOKING / FOOD SERVICE EQUIPMENT

ASSEMBLY

8 CONCRETE STEP / RAMP ASSEMBLY

9 SUSPENDED ACOUSTIC TILE CEILING

ASSEMBLY

10 ELECTRICAL EQUIPMENT AND ASSEMBLY,

LIGHT FIXTURES

11 HVAC EQUIPMENT AND ASSEMBLY

12 PLUMBING EQUIPMENT ASSEMBLY

DOOR-FRAME-WINDOW ASSEMBLIES

DEMOLITION SCHEDULE

1 FIELD VERIFY ALL DIMENSIONS &

CONDITIONS PRIOR TO START OF WORK.

REPORT NOTED DIFFERENCES TO

ARCHITECT.

2 DEMOLISH ALL FURNITURE, FIXTURES, AND

EQUIPMENT (INCLUDING LOOSE FFE) IN

DEMOLITION ZONE

3 REFERENCE SPECIFICATIONS FOR

ADDITIONAL NOTES

GENERAL NOTES

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

A METAL FRAME WINDOW ASSEMBLY

B METAL FRAME / WOOD DOOR ASSEMBLY

C METAL DOOR & FRAME / ASSEMBLY

D WOOD DOOR & FRAME / ASSEMBLY

E WOOD FRAME WINDOW ASSEMBLY

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

WHITE LEAD-BASED PAINT ON WALL STORAGE CABINETRY

RED,TAN, AND WHITE PAINT ON EXTERIOR FASCIA AND TRIM ARE LEAD

BASED PAINTS

RED PAINT ON EXTERIOR CENTER RAILING IS LEAD BASED PAINT

TAN PAINT ON WINDOW PANEL INSERTS IS LEAD BASED PAINT.

NOTE: THIS IS FACTORY APPLIED PAINT AND GENERALLY ALWAYS

REMAINS INTACT

GRAY PAINT ON METAL STAIR COMPONENTS INSIDE THE BUILDING IS

LEAD BASED PAINT

NOTE: NO ORANGE STRUCTURAL STEEL PAINT WAS IDENTIFIED. THIS

ALMOST ALWAYS IS LEAD BASED PAINT. NONE NOTED IN THIS BUILDING.

H01

BULK SAMPLE LOCATIONS

1/16" = 1'-0"

H01

LEAD BASED PAINT LOCATIONS

1/16" = 1'-0"

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

H01

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

H

AZ

AR

D

O U

S M

AT

. B

LD

G

118A-27

118A-28

118A-38,39,40,41,43

118A-34,35,36,37

118A-31

118A-42

118A-44,45,46

118A-48 118A-47

118A-85-88, 93

118A-78-81

118A-26

118A-66,67,68,69

118A-70,71

118A-25

118A-23,24

118A-72

118A-50A,50B

118A-63,64,65

118A-22

118A-49A,49B 118A-73,74,75,76,77

118A-29A,29B 118A-19,20,21

118A-82,83,84

118A-18 118A-30 118A-15,16,17

118A-08,09,10,11,12,13,14

118A-01,02,03,04,05,06,07 118A-32,33

PLAYGROUND

EQUIPMENT IN THIS

AREA

(NO LEAD BASED

PAINT)

P U

D N

D N

U P

P U

D N

D N

U P

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

OLD CEILING MONOCOTE PLASTER W/ RESIDUAL ACM

CEILING SPRAY/ CEILING FIRE PROOFING MATERIAL

ACM NEW CEILING MONOCOTE PLASTER

NON-ACM 12" FLOOR TILE & ACM BLACK FLOOR TILE

MASTIC

CONCRETE BLOCK WALLS WITH VERMICULITE INSIDE

THE BLOCK

CERAMIC TILE OVER ACM BLACK MASTIC

BLACK CAULK BETWEEN SIDEWALKS AND BUILDING BRICK

CONTAINS ASBESTOS. OTHER CAULKS OF VARIOUS LIGHTER

COLORS DO NOT CONTAIN ASBESTOS.

SILVER SEALANT ON LIGHTING ROD CABLES IS

ASBESTOS-CONTAINING

CAULK BETWEEN METAL COLUMNS ON UPPER GYM EXTERIOR

IS ASBESTOS-CONTAINING

H02

FLOOR ACM LOCATIONS

1/16" = 1'-0"

H02

CEILING ACM LOCATIONS

1/16" = 1'-0"

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

H02

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

H

AZ

AR

D

O U

S M

AT

. B

LD

G

Possible ACM gaskets in boilers and tunnel has ACM debris remaining from a previous abatement; this condition is hidden right now because of all the fiberglass discarded during the copper harvesting

ACM Black Sink Undercoating

ACM

COUNTERTOPS

P U

D N

D N

U P

P U

D N

D N

U P

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

NO ASBESTOS-CONTAINING;

ASBESTOS CONTAMINATED

MATERIALS

NO LEAD-BASED PAINT

FLUORESCENT LIGHT BALLASTS

ARE PCB

BUILDING IS FULL OF DEBRIS

MIXED WITH CHEMICAL

CONTAINERS

THIS BUILDING WAS USED FOR

STORAGE AND HAS BEEN

VANDALIZED

H03

BULK SAMPLE LOCATIONS BLDG 128

1/8" = 1'-0"

H03

BURN LOCATIONS BLDG 128

1/8" = 1'-0"

ACM EXTERIOR A/C UNIT CAULKING

ACM SINK UNDERCOATING

THERE IS ACM MATERIAL IN THE

ROOFING WHICH IS NOT SHINGLES OR

TAR PAPER: LIKELY THE SEALANT

DETERIORATED LEAD-BASED PAINT ON

PORCH POSTS

FLUORESCENT LIGHT BALLASTS ARE

NON-PCB

EXTERIOR FASCIA (BLUE) & THE EXTERIOR

SOFFIT (WHITE) HAVE LEAD BASED PAINT

H03

BULK SAMPLE LOCATIONS BLDG 129

1/8" = 1'-0"

H03

ACM LOCATIONS BLDG 129

1/8" = 1'-0"

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

H03

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

H

AZ

AR

D

O U

S M

AT

. B

LD

G

, 1

39'-7"

7' -8

7'

-8

'-1

1"

7' -8

24'-1"

'-7

/2

5'-4" 7'-5"

'-9

/2

5' -5

5'

-5

4' 4'

2'-10"

'-6

BURNED AREA

LEAD PAINTED POSTS ARE

4"X4"

AC UNIT IS GONE; CAULK

IS MOSTLY STILL THERE;

WINDOW IS BOARDED UP

AC UNIT IS GONE; CAULK

IS MOSTLY STILL THERE;

WINDOW IS BOARDED UP

MECHANICAL ROOM HAD A

DIFFERENT HEATING SYSTEM,

FORCED AIR FURNACE? WITH

DUCTWORK IN THE CRAWLSPACE;

BLDG HAD A UST THAT WAS

REMOVED A WHILE AGO;

ASSUMED WHEN THE HEATING

SYSTEM WAS MODFIFIED TO

ELECTRIC?

CRAWLSPACE OPENING

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

THERE ARE NO ASBESTOS-CONTAINING

MATERIALS OR LEAD-BASED PAINT IN

THIS BUILDING

FLUORESCENT LIGHT BALLASTS CONTAIN

PCBS

H04

HAZARDOUS MATS. BLDG 137

1/8" = 1'-0"

ACM INTERIOR DOOR CAULKING

ACM TRANSITE PIPING LYING ON

THE GROUND

H04

BULK SAMPLE LOCATIONS - BLDG 138

1/?" = 1'-0"

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

H04

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

H

AZ

AR

D

O U

S M

AT

. B

LD

G

, 1

AC UNIT REMAINS

DRINKING WATER FOUNTAIN HERE

MERCURY THERMOSTAT

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

H05

BULK SAMPLE LOCATIONS BLDG 139

1/8" = 1'-0"

GWB TAPING COMPOUND IN THE MECHANICAL ROOM CONTAINS

ASBESTOS

THE ROOFING MATERIAL CONTAINS ASBESTOS IN ITS

CONSTRUCTION; THE ROOF IS IN VERY POOR CONDITION AND WILL

NEED TO BE REMOVED TOTALLY AS ACM.

THIS BUILDING HAD A UST THAT WAS REMOVED. OLD HEATING

SYSTEM POSSIBLY A BOILER SYSTEM. PIPING REMAINS IN THE

CRAWLSPACE. CURRENTLY HEATED WITH ELECTRIC BASEBOARD.

FITTINGS ON THE OLD PIPING ARE CEMENTITIOUS BUT NEGATIVE

FOR ACM.

FLUORESCENT BALLASTS ARE NON-PCB

NO LEAD BASED PAINT IN THIS BUILDING

H05

HAZARADOUS MATS. BLDG 139

1/8" = 1'-0"

H05

ACM LOCATIONS BLDG 139

1/8" = 1'-0"

ACM SINK UNDERCOATING

ACM ROOFING TAR PAPER & PERIMETER SEALANT

SITE SPECIFIC NOTES & ASBESTOS CONTAINING MATERIAL

NUMBERS REPRESENT BULK SAMPLE LOCATIONS

*NOTE-1* ACM ROOFING TAR EXISTS BENEATH ROOFING SHINGLES

*NOTE-2* ACM ROOFING SEALANT EXISTS AROUND THE PERIMETER

NO ASBESTOS-CONTAINING MATERIALS OR

LEAD BASED PAINT

FLUORESCENT LIGHT BALLASTS ARE NON-PCB

COULDN'T FIND THE HOT WATER HEATER

BUT THERE HAS BEEN EXTENSIVE VANDALISM IN

THE BUILDING AND IT MAY BE CONCEALED

OR REMOVED

HVAC UNITS BOTH HEAT AND COOL AND

ARE LOCATED ON EITHER END OF THE

PORTABLE BUILDING56

H05

HAZARDOUS MATS. BLDG 150

1/8" = 1'-0"

C R

O W

C R

EE

K

A G

EN

C

Y D

EM

O

LI

TI

O N

D

ES

IG

N

FT

. T

H O

M

PS

O N

S O

U

TH

D A

K O

TA

ED

U C

AT

IO

N B

U

IL

D

IN

G S

-0

N

O . 1

, 1

, 1

, 1

, 1

, 1

D

EM

O

LI

TI

O

N D

ES

IG

N P

R O

JE

C

T- C

O N

TR

AC

T N

O . 1

A1

0F

H05

RJM - ATB

DMS

7/9/2020

REV:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET:

AS NOTED

H

AZ

AR

D

O U

S M

AT

. B

LD

G

, 1

DOUBLE BOWLED

SINK WITH ACM

UNDERCOATING

MERCURY

THERMOSTAT

DRINKING

FOUNTAIN

HERE

ACCESS TO THE

CRAWLSPACE BELOW

THE CRAWLSPACE IS DIRT

FLOORED AND EXTENDS

COMPLETELY UNDER THE

BUILDING; THE FITTINGS WERE

DETERMINED TO BE NON-ACM.

DUCT VENT SEALANT IS ACM;

THIS IS NOT IN THE

CRAWLSPACE; LIMITED THE

MECHANICAL ROOM ONLY

BUILDING HAS BEEN

VANDALIZED AND DEBRIS

STREWN THROUGHOUT

HOT WATER

HEATER

THESE ENTRANCES ARE

BLOCKED BY TREES GROWING

UP INTO THE STEPS

JOSEPH DAVID

ASSOCIATES LLC

19970 CHLOE LAYNE

SPIRO, OK 74959

JOSEPHDAVIDASSOCIATES.COM

BEAR STEELE GLOBAL, LTD CO

LEGEND TECHNICAL SERVICES

INC

ISSUED FOR BID

40% DD - DATE: 11-03-2020

99% CD- DATE: 02-05-2021

2021-04-22T08:52:44-0500
TIFFANY EWING

File details come from the government source that posted it. Updated .