A06_Drawings.pdf
PDF 5 MB Posted
- Attached to
- Demolition of Ft. Thompson Education Buildings
- Solicitation number
- 140A2321Q0341
About this file
This solicitation is for the demolition of seven education buildings at Fort Thompson in South Dakota. The Bureau of Indian Affairs is seeking quotes for the complete demolition of buildings 118, 128, 129, 137, 138, 139, and 150 by December 1, 2021. A mandatory site visit will be held on June 22. Quotes must be submitted to Karen Cooper at the Bureau of Indian Affairs by July 1 via email. This acquisition is set aside for Native American-owned small businesses under the Buy Indian Act.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A06_Specifications.pdf | ||
| Sol_140A2321Q0341.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O N
D
ES
IG
N
P R
O
JE
C T-
C O
N
TR
AC
T
N O
. 1
A1
0F
G01
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
TI
TL
E
SH
EE
T
FORT THOMPSON EDUCATION BUILDING
DEMOLITION PROJECT
FORT THOMPSON SOUTH DAKOTA
EDUCATION BUILDINGS 14-02, NO. 118, 128, 129, 137, 138, 139, AND 150
DEMOLITION DESIGN PROJECT
GENERAL
G01-TITLE SHEET
G02-SITE USE PLAN
CIVIL
C01-EXISTING SURVEY
C02-EXISTING SURVEY
C03-FINAL GRADING PLAN
C04-FINAL GRADING PLAN
ARCHITECTURAL PLANS
A01-BUILDING 118 PLANS
A02-BUILDING 118 PLANS
A03-BUILDING 128 PLANS
A04-BUILDING 129 PLANS
A05-BUILDING 137 PLANS
A06-BUILDING 139 PLANS
A07-BUILDING 150 PLANS
A08-ENLARGED FLOOR PLANS
ARCHITECTURAL ELEVATIONS/SECTIONS/DETAILS
A10-ELEVATIONS
A11-ELEVATIONS
A12-ELEVATIONS
A20-SECTIONS/DETAILS
A21-SECTIONS/DETAILS
REGULATED/HAZARDOUS MATERIALS ABATEMENT
H01- HAZARDOUS MATERIAL ABATEMENT-BUILDING 118
H02- HAZARDOUS MATERIAL ABATEMENT-BUILDING 118
H03- HAZARDOUS MATERIAL ABATEMENT-BUILDING 128, 129
H04- HAZARDOUS MATERIAL ABATEMENT-BUILDING 137,138
H05- HAZARDOUS MATERIAL ABATEMENT-BUILDING 139,150
Date
CONCUR:
Bureau of Indian Affairs Great Plains Region Division of Facilities
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
100% CD- DATE: 04-16-2021
Issue for BID - 4-21-2021 jdadave Highlight
Scale: NTS
REGIONAL SITE LOCATION1
Scale: NTS
LOCAL SITE LOCATION2
Scale: NTS
SITE USE PLAN3
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
G02
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
SI
TE
U
SE
P
LA
N
DEMOLISH ALL BUILT ELEMENTS WITHIN
DEMOLITION ZONE EXCEPT AS NOTED
SITE USE BOUNDARY
LEGEND
NIC NOT IN CONTRACT
138 NO DEMOLITION/
REMEDIATION ONLY
XXX DEMOLITION
SITE USE BOUNDARY
DEMOLITION ZONE
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
NOTE:
NO CONSTRUCTION TRAFFIC OF ANY KIND IS ALLOWED OUTSIDE THE "DEMOLITION ZONE" WITHOUT WRITTEN APPROVAL FROM THE OWNER (BIA). IF, WHAT ARE BELIEVED TO BE ARTIFACTS FOUND DURING CONSTRUCTION, THE CONTRACTOR SHALL CEASE ANY CONSTRUCTION ACTIVITIES AND SHALL CONTACT THE GOVERNMENT ARCHAEOLOGIST AND TRIBAL
HISTORIC PRESERVATION OFFICE.
DR. SEBASTION LEBEAU II
B.I.A. ARCHAEOLOGIST
PHONE #: (605) 226-7656
MERLE MARKS
TRIBAL HISTORIC PRESERVATION OFFICE
PHONE #: (605) 245-2221
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
100% CD- DATE: 04-16-2021
Issue for BID - 4-21-2021
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
C01
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
EX
IS
TI
N
G S
U R
VE
Y
D
EM
O
LI
TI
O N
P
LA
N
PROPOSED CONTOUR LINE
MATCH LINE
DEMOLISH ALL BUILT ELEMENTS WITHIN
DEMOLITION ZONE EXCEPT AS NOTED
DEMOLITION ZONE
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
A A
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
I HEREBY CERTIFY THAT THIS
SURVE� PLAN OR REPORT
WAS PREPARED UNDER MY
DIRECT SUPERVISION AND
THAT I AM A REGISTERED
LAND SURVEYOR IN THE
STATE OF SOUTH DAKOTA.
DATE: 2020
NOTE:
THIS SURVEY WAS PERFORMED
WITHOUT THE BENEFIT OF A
TITLE REPORT OR TITLE
COMMITMENT. EASEMENTS AND
RIGHT-OF-WAY VACATIONS OF
RECORD WERE NOT RESEARCHED
AND ARE NOT SHOWN UNLESS
OTHERWISE NOTED.
NOTE: Building to be 100% remediated of hazardous & regulated material (ref: Specification and Dwgs. H01-H05).
DO NOT DEMOLISH BUILDING
NOTE: Building to be 100% remediated of hazardous & regulated material, and 100% Demolished (ref: Specification and Dwgs. H01-H05)
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
C02
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
ISSUED FOR BID
EX
IS
TI
N
G S
U R
VE
Y
D
EM
O
LI
TI
O N
P
LA
N
PROPOSED CONTOUR LINE
MATCH LINE
DEMOLITION ZONE
DEMOLISH ALL BUILT ELEMENTS WITHIN
DEMOLITION ZONE EXCEPT AS NOTED
TREES TO REMAIN
AS INDICATED
A A
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
I HEREBY CERTIFY THAT THIS
SURVE� PLAN OR REPORT
WAS PREPARED UNDER MY
DIRECT SUPERVISION AND
THAT I AM A REGISTERED
LAND SURVEYOR IN THE
STATE OF SOUTH DAKOTA.
DATE: 2020
NOTE:
THIS SURVEY WAS PERFORMED
WITHOUT THE BENEFIT OF A
TITLE REPORT OR TITLE
COMMITMENT. EASEMENTS AND
RIGHT-OF-WAY VACATIONS OF
RECORD WERE NOT RESEARCHED
AND ARE NOT SHOWN UNLESS
OTHERWISE NOTED.
NOTE: Building to be 100% remediated of hazardous & regulated material, and 100% Demolished (ref: Specification and Dwgs.
H01-H04)
NOTE: Building to be 100% remediated of hazardous & regulated material, and 100% Demolished (ref: Specification and Dwgs.
H01-H04)
NOTE: Building to be 100% remediated of hazardous & regulated material, and 100% Demolished (ref: Specification and Dwgs.
H01-H04)
NOTE: Building to be 100% remediated of hazardous & regulated material, and 100% Demolished (ref: Specification and Dwgs.
H01-H04)
NOTE: Building to be 100% remediated of hazardous & regulated material, and 100% Demolished (ref: Specification and Dwgs. H01-H04)
NOTE: Building NOT IN CONTRACT (NIC)
NOTE: Building NOT IN CONTRACT (NIC)
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
C03
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
FI
N
AL
G
R
AD
IN
G
P
LA
N
N O
TH
DEMOLITION ZONE
BLDG
NIC
1451.5
1452.0
.5
1452.0
.0
A A
.0
.5
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
AVG. SLOPE 1%
AVG. SLOPE 1%
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
C04
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
FI
N
AL
G
R
AD
IN
G
P
LA
N
SO
U
TH
DEMOLITION ZONE
BLDG
NIC
BLDG
NIC
.5
.0
1451.5
1451.0
1450.5
1450.0
1449.5 1450.0
A A
.0
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
AVG. SLOPE 1%
AVG
. SLO
PE <1%
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
Scale: 1/16" = 1'-0" FOUNDATION PLAN1 Scale: 1/16" = 1'-0"
FLOOR PLAN2
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
A01
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
BL
D
G
P
LA
N
S
P U
D N
D N
U P
7'
-3
5' -0
/4
6'
-2
/4
5'
105'-7 1/2"
19'-11" 16'-9" 37'-10" 31'-1 1/2"
66'
28'-0 3/4" 27'-10 3/4"
'-4
6' -1
3/
4"
'-6
/4
'-5
'-0
/4
'-3
/4
'-2
'-4
'-9
/4
'-8
'-7
'-1
3/
4"
12'-5 3/4"
11'-4 3/4"
48'-2 1/2" 33'-6 1/2"
'-6
/4
'-1
1/ 2"
'-6
/4
38'-2"
'-9
/4
A08
A08
A08
SLIDE
RAMP
UP
A10
A10
A11
A10
A10
A10
A11
REFERENCE A18 FOR
BASEMENT PLAN
A20
A20
A20
A20
A20
A20
TYP FOR ALL
CLASSROOMS
A10
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
A02
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
BL
D
G
P
LA
N
S
Scale: 1/16" = 1'-0" REFLECTED CEILING PLAN1 Scale: 1/16" = 1'-0"
ROOF PLAN2
CURVED AND ELEVATED ROOF OVER GYM
ELEVATED ROOF
SMOKE STACK
ELECTRICAL HOOKUP
A08
A08
A20
A20
A20
A20
A20
A20
A20
A20
A20
A20
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
Scale: 1/8" = 1'-0" FOUNDATION PLAN1 Scale: 1/8" = 1'-0"
FLOOR PLAN2
Scale: 1/8" = 1'-0" ROOF PLAN4Scale: 1/8" = 1'-0"
REFLECTED CEILING PLAN3
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
A03
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
BL
D
G
P
LA
N
S
TYP
A21
39'-7"
'-1
1"
A11
A11
A11
A11
'-7
7'
-8
7' -8
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
FOUNDATION PLAN1
Scale: 1/8" = 1'-0"
FLOOR PLAN2
Scale: 1/8" = 1'-0" ROOF PLAN4Scale: 1/8" = 1'-0"
REFLECTED CEILING PLAN3
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
A04
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
BL
D
G
P
LA
N
S
TYP
A21
24'-4"
36'-7"
'-1
0"2 A21
A11
A11
VENT
ELECTRICAL CONNECT
PITCH, EST
PITCH, EST
PITCH, EST
PITCH, EST
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
FOUNDATION PLAN1 Scale: 1/8" = 1'-0"
FLOOR PLAN2
Scale: 1/8" = 1'-0" ROOF PLAN4Scale: 1/8" = 1'-0"
REFLECTED CEILING PLAN3
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
A05
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
BL
D
G
P
LA
N
S
FOUNDATION FOR ENTRY?
ADDED AFTER PREFAB BUILDINGS
FOUNDATION PIERS
62'-8"
'-4
A12
A12
A12
A12
PI
TC
H , E
ST
PI
TC
H , E
ST
3PI
TC
H
, E
ST
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
B TYPICAL
D TYPICAL
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
Scale: 1/8" = 1'-0"
FLOOR PLAN2
Scale: 1/8" = 1'-0" ROOF PLAN4Scale: 1/8" = 1'-0"
REFLECTED CEILING PLAN3
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
A06
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
BL
D
G
P
LA
N
S
TYP
TYP
A21
41'-11"
6' -1
1"
'-1
1"
4'-6"
'-1
0" 4'
-1 0"
5'-9"
5'-5"
6' -6
11'-11"4'-5"4'-8" 6 A12
A21
A12
A12
A12
PITCH, EST
PITCH, EST
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
SIM.
D
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
Scale: 1/8" = 1'-0"
FLOOR PLAN2
Scale: 1/8" = 1'-0" ROOF PLAN4Scale: 1/8" = 1'-0"
REFLECTED CEILING PLAN3
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
A07
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
BL
D
G
P
LA
N
S
FOUNDATION PIERS
64'
32'
6' -6
7' -6
19'-3"7'-6"10'-6"7'-6"
A14
A14
A14
A14
19'-3"
A21
64'
PI
TC
H , E
ST
1 PI
TC
H
, E
ST
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
Scale: 3/16" = 1'-0"
BLDG 118 RESTROOM DETAIL2
Scale: 3/16" = 1'-0"
BLDG 118 KITCHEN DETAIL1
Scale: 3/16" = 1'-0"
BLDG 118 ADMINISTRATION DETAIL3
Scale: 3/16" = 1'-0"
BASEMENT FLOOR PLAN4
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
A08
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
EN
LA
R G
ED
F
LO
O
R P
LA
N
S
D N
U P
8'-8 1/2" 15'-2 1/2" 7'-4 1/2" 9'-4 1/2"
7' -3
/4
'-3
7' -9
/4
4'-8 3/4"
47'-10 3/4"
6' -1
1"
TYP
15'-3 1/4"7'-4 1/2"
6' -1
0"
'-6
/2
8' -1
'-4
/4
7'
'-7
/4
'-5
/4
'-9
/4
7'
-6
/2
'-6
7 1/2"
TYP
COMPOSED OF CAST IN PLACE CONCRETE WITH
ATTACHED FLUORESCENT LIGHTING
SLIDE
RAMP
UP
DEMOLISH ENTIRE STRUCTURE BELOW GRADE
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
BLDG 118 EAST, (SOUTH) ELEVATION1
Scale: NTS
BLDG 118 EAST, (CENTER) ELEVATION2
Scale: NTS BLDG 118 SOUTH ELEVATION4Scale: NTS
BLDG 118 EAST, (NORTH) ELEVATION3
Scale: NTS
BLDG 118 WEST,(NORTH) ELEVATION5
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
A10
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
EL
EV
AT
IO
N S
F
A A B B C
C D D E E F
G G H
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
BLDG 118 WEST,(SOUTH) ELEVATION1
SCALE
TITLE3
Scale: NTS BLDG 128 - EAST ELEVATION3 Scale: NTS
BLDG 128 - SOUTH ELEVATION4
Scale: NTS BLDG 128 - WEST ELEVATION5 Scale: NTS
BLDG 128 - NORTH ELEVATION6
Scale: NTS BLDG 129 - SOUTH7 Scale: NTS
BLDG 129 - WEST8
Scale: NTS
BLDG 118 - NORTH ELEVATION2
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
A11
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
EL
EV
AT
IO
N S
I IH
TYP
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
BLDG 139 EAST4 Scale: NTS
BLDG 139 - SOUTH5 Scale: NTS
BLDG 139 - NORTH6
Scale: NTS BLDG 137 - EAST (WEST SIM)1 Scale: NTS
BLDG 137 - SOUTH2 Scale: NTS
BLDG 137 - NORTH3
Scale: NTS BLDG 150 - EAST (WEST SIM)7 Scale: NTS
BLDG 150 - NORTH (SOUTH SIM)8
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
A12
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
EL
EV
AT
IO
N S
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
UTILITY TUNNEL
Scale: 3/4" = 1'-0" SECTION - BASEMENT1 Scale: 3/4" = 1'-0"
SECTION - SLAB ON GRADE (TYP)2 Scale: 3/4" = 1'-0"
SECTION - TUNNEL3
DEMOLISH TO
BOTTOM OF FOOTING
(TYP)
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
A20
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
SE
C
TI
O
N S/
D
ET
IA
LS
BU
IL
D
IN
G
DEMOLISH TO
BOTTOM OF FOOTING
(TYP)
DEMOLISH TO
BOTTOM OF FOOTING
(TYP)
FOUNDATION WALL
CONCRETE
CAST IN PLACE CONCRETE
FLOOR SYSTEM
WINDOW ASSEMBLY
ROOF STRUCTURAL SYSTEM
GUTTER ASSEMBLY
WINDOW ASSEMBLY
MASONRY EXTERIOR
T.O.S.
ROOF ASSEMBLY
SUSPENDED CEILING
CONCRETE
FOUNDATION WALL
T.O.S.
ROOF ASSEMBLY
ROOF STRUCTURAL SYSTEM
CONCRETE
ROOF STRUCTURAL SYSTEM
GUTTER ASSEMBLY
WINDOW ASSEMBLY
MASONRY EXTERIOR
T.O.S.
ROOF ASSEMBLY
SUSPENDED CEILING
WINDOW ASSEMBLY
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
2X WOOD JOISTS FRAMING
WITH WOOD DECK AND
FLOOR FINISH TYP
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
A21
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
SE
C
TI
O
N S/
D
ET
AI
LS
Scale: 3/4" = 1'-0" METAL BUILDING SECTION (TYP)1 Scale: 3/4" = 1'-0"
BUILDING SECTION (TYP)2 Scale: 3/4" = 1'-0"
WALL SECTION (TYP)3
DEMOLISH TO
BOTTOM OF FOOTING
(TYP)
DEMOLISH TO
BOTTOM OF FOOTING
(TYP)
WINDOW ASSEMBLY
METAL SIDING
GUTTER ASSEMBLY
ROOF STRUCTURAL SYSTEM
ROOF ASSEMBLY
METAL SIDING
METAL SIDING
CONCRETE SLAB
GRAB ON GRADE
GUTTER ASSEMBLY
ROOF ASSEMBLY
ROOF STRUCTURAL SYSTEM
SUSPENDED CEILING
WINDOW ASSEMBLY
T.O.S.
METAL SIDING
METAL SIDING
TO STRUCTURE
TO FLOOR
A
GYP WALL BOARD
METAL STUDS
TO STRUCTURE
GYP WALL BOARD
WOOD STUDS
PAINT
8" CMU ASSEMBLY
1 - TILE VENEER ONE SIDE
2 - TILE VENEER BOTH SIDES
TO FLOOR
D
WOOD PANEL
WOOD STUDS
TO FLOOR
B
TO STRUCTURE
TO FLOOR
C
TO STRUCTURE
WINDOW ASSEMBLY
WINDOW ASSEMBLY
METAL SIDING
EXTERIOR SYSTEM & ASSEMBLIES
1 BRICK VENEER
2 METAL SIDING
3 WOOD SIDING
4 BUILT UP ROOF
5 ASPHALT ROOF SYSTEM
6 METAL ROOF SYSTEM
7 GUTTER / DS ASSEMBLY
8 WOOD STEP / RAMP ASSEMBLY
9 CONC. STEP / RAMP ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY
11 HVAC EQUIPMENT AND ASSEMBLY
12 EXTERIOR EQUIPMENT (FFE)
13 UTILITY: TERMINATE, CAP, AND MARK
LOCATION BELOW GRADE / ABANDON
SUPPLY - SIDE IN PLACE
14 UTILITY CONNECTION / ACCESS TO
REMAIN IN PLACE
15 TREES TO REMAIN
INTERIOR SYSTEM & ASSEMBLIES
1 PAINTED GYP WALL ASSEMBLY
2 PAINTED CMU WALL ASSEMBLY
3 INTERIOR FIXTURE (FFE)
4 CASEWORK / CABINET ASSEMBLY
5 FLOOR FINISH ASSEMBLY OVER CONC. SUB
FLOOR
6 FLOOR FINISH ASSEMBLY OVER WOOD SUB
FLOOR
7 COOKING / FOOD SERVICE EQUIPMENT
ASSEMBLY
8 CONCRETE STEP / RAMP ASSEMBLY
9 SUSPENDED ACOUSTIC TILE CEILING
ASSEMBLY
10 ELECTRICAL EQUIPMENT AND ASSEMBLY,
LIGHT FIXTURES
11 HVAC EQUIPMENT AND ASSEMBLY
12 PLUMBING EQUIPMENT ASSEMBLY
DOOR-FRAME-WINDOW ASSEMBLIES
DEMOLITION SCHEDULE
1 FIELD VERIFY ALL DIMENSIONS &
CONDITIONS PRIOR TO START OF WORK.
REPORT NOTED DIFFERENCES TO
ARCHITECT.
2 DEMOLISH ALL FURNITURE, FIXTURES, AND
EQUIPMENT (INCLUDING LOOSE FFE) IN
DEMOLITION ZONE
3 REFERENCE SPECIFICATIONS FOR
ADDITIONAL NOTES
GENERAL NOTES
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
A METAL FRAME WINDOW ASSEMBLY
B METAL FRAME / WOOD DOOR ASSEMBLY
C METAL DOOR & FRAME / ASSEMBLY
D WOOD DOOR & FRAME / ASSEMBLY
E WOOD FRAME WINDOW ASSEMBLY
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
WHITE LEAD-BASED PAINT ON WALL STORAGE CABINETRY
RED,TAN, AND WHITE PAINT ON EXTERIOR FASCIA AND TRIM ARE LEAD
BASED PAINTS
RED PAINT ON EXTERIOR CENTER RAILING IS LEAD BASED PAINT
TAN PAINT ON WINDOW PANEL INSERTS IS LEAD BASED PAINT.
NOTE: THIS IS FACTORY APPLIED PAINT AND GENERALLY ALWAYS
REMAINS INTACT
GRAY PAINT ON METAL STAIR COMPONENTS INSIDE THE BUILDING IS
LEAD BASED PAINT
NOTE: NO ORANGE STRUCTURAL STEEL PAINT WAS IDENTIFIED. THIS
ALMOST ALWAYS IS LEAD BASED PAINT. NONE NOTED IN THIS BUILDING.
H01
BULK SAMPLE LOCATIONS
1/16" = 1'-0"
H01
LEAD BASED PAINT LOCATIONS
1/16" = 1'-0"
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
H01
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
H
AZ
AR
D
O U
S M
AT
. B
LD
G
118A-27
118A-28
118A-38,39,40,41,43
118A-34,35,36,37
118A-31
118A-42
118A-44,45,46
118A-48 118A-47
118A-85-88, 93
118A-78-81
118A-26
118A-66,67,68,69
118A-70,71
118A-25
118A-23,24
118A-72
118A-50A,50B
118A-63,64,65
118A-22
118A-49A,49B 118A-73,74,75,76,77
118A-29A,29B 118A-19,20,21
118A-82,83,84
118A-18 118A-30 118A-15,16,17
118A-08,09,10,11,12,13,14
118A-01,02,03,04,05,06,07 118A-32,33
PLAYGROUND
EQUIPMENT IN THIS
AREA
(NO LEAD BASED
PAINT)
P U
D N
D N
U P
P U
D N
D N
U P
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
OLD CEILING MONOCOTE PLASTER W/ RESIDUAL ACM
CEILING SPRAY/ CEILING FIRE PROOFING MATERIAL
ACM NEW CEILING MONOCOTE PLASTER
NON-ACM 12" FLOOR TILE & ACM BLACK FLOOR TILE
MASTIC
CONCRETE BLOCK WALLS WITH VERMICULITE INSIDE
THE BLOCK
CERAMIC TILE OVER ACM BLACK MASTIC
BLACK CAULK BETWEEN SIDEWALKS AND BUILDING BRICK
CONTAINS ASBESTOS. OTHER CAULKS OF VARIOUS LIGHTER
COLORS DO NOT CONTAIN ASBESTOS.
SILVER SEALANT ON LIGHTING ROD CABLES IS
ASBESTOS-CONTAINING
CAULK BETWEEN METAL COLUMNS ON UPPER GYM EXTERIOR
IS ASBESTOS-CONTAINING
H02
FLOOR ACM LOCATIONS
1/16" = 1'-0"
H02
CEILING ACM LOCATIONS
1/16" = 1'-0"
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
H02
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
H
AZ
AR
D
O U
S M
AT
. B
LD
G
Possible ACM gaskets in boilers and tunnel has ACM debris remaining from a previous abatement; this condition is hidden right now because of all the fiberglass discarded during the copper harvesting
ACM Black Sink Undercoating
ACM
COUNTERTOPS
P U
D N
D N
U P
P U
D N
D N
U P
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
NO ASBESTOS-CONTAINING;
ASBESTOS CONTAMINATED
MATERIALS
NO LEAD-BASED PAINT
FLUORESCENT LIGHT BALLASTS
ARE PCB
BUILDING IS FULL OF DEBRIS
MIXED WITH CHEMICAL
CONTAINERS
THIS BUILDING WAS USED FOR
STORAGE AND HAS BEEN
VANDALIZED
H03
BULK SAMPLE LOCATIONS BLDG 128
1/8" = 1'-0"
H03
BURN LOCATIONS BLDG 128
1/8" = 1'-0"
ACM EXTERIOR A/C UNIT CAULKING
ACM SINK UNDERCOATING
THERE IS ACM MATERIAL IN THE
ROOFING WHICH IS NOT SHINGLES OR
TAR PAPER: LIKELY THE SEALANT
DETERIORATED LEAD-BASED PAINT ON
PORCH POSTS
FLUORESCENT LIGHT BALLASTS ARE
NON-PCB
EXTERIOR FASCIA (BLUE) & THE EXTERIOR
SOFFIT (WHITE) HAVE LEAD BASED PAINT
H03
BULK SAMPLE LOCATIONS BLDG 129
1/8" = 1'-0"
H03
ACM LOCATIONS BLDG 129
1/8" = 1'-0"
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
H03
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
H
AZ
AR
D
O U
S M
AT
. B
LD
G
, 1
39'-7"
7' -8
7'
-8
'-1
1"
7' -8
24'-1"
'-7
/2
5'-4" 7'-5"
'-9
/2
5' -5
5'
-5
4' 4'
2'-10"
'-6
BURNED AREA
LEAD PAINTED POSTS ARE
4"X4"
AC UNIT IS GONE; CAULK
IS MOSTLY STILL THERE;
WINDOW IS BOARDED UP
AC UNIT IS GONE; CAULK
IS MOSTLY STILL THERE;
WINDOW IS BOARDED UP
MECHANICAL ROOM HAD A
DIFFERENT HEATING SYSTEM,
FORCED AIR FURNACE? WITH
DUCTWORK IN THE CRAWLSPACE;
BLDG HAD A UST THAT WAS
REMOVED A WHILE AGO;
ASSUMED WHEN THE HEATING
SYSTEM WAS MODFIFIED TO
ELECTRIC?
CRAWLSPACE OPENING
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
THERE ARE NO ASBESTOS-CONTAINING
MATERIALS OR LEAD-BASED PAINT IN
THIS BUILDING
FLUORESCENT LIGHT BALLASTS CONTAIN
PCBS
H04
HAZARDOUS MATS. BLDG 137
1/8" = 1'-0"
ACM INTERIOR DOOR CAULKING
ACM TRANSITE PIPING LYING ON
THE GROUND
H04
BULK SAMPLE LOCATIONS - BLDG 138
1/?" = 1'-0"
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
H04
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
H
AZ
AR
D
O U
S M
AT
. B
LD
G
, 1
AC UNIT REMAINS
DRINKING WATER FOUNTAIN HERE
MERCURY THERMOSTAT
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
H05
BULK SAMPLE LOCATIONS BLDG 139
1/8" = 1'-0"
GWB TAPING COMPOUND IN THE MECHANICAL ROOM CONTAINS
ASBESTOS
THE ROOFING MATERIAL CONTAINS ASBESTOS IN ITS
CONSTRUCTION; THE ROOF IS IN VERY POOR CONDITION AND WILL
NEED TO BE REMOVED TOTALLY AS ACM.
THIS BUILDING HAD A UST THAT WAS REMOVED. OLD HEATING
SYSTEM POSSIBLY A BOILER SYSTEM. PIPING REMAINS IN THE
CRAWLSPACE. CURRENTLY HEATED WITH ELECTRIC BASEBOARD.
FITTINGS ON THE OLD PIPING ARE CEMENTITIOUS BUT NEGATIVE
FOR ACM.
FLUORESCENT BALLASTS ARE NON-PCB
NO LEAD BASED PAINT IN THIS BUILDING
H05
HAZARADOUS MATS. BLDG 139
1/8" = 1'-0"
H05
ACM LOCATIONS BLDG 139
1/8" = 1'-0"
ACM SINK UNDERCOATING
ACM ROOFING TAR PAPER & PERIMETER SEALANT
SITE SPECIFIC NOTES & ASBESTOS CONTAINING MATERIAL
NUMBERS REPRESENT BULK SAMPLE LOCATIONS
*NOTE-1* ACM ROOFING TAR EXISTS BENEATH ROOFING SHINGLES
*NOTE-2* ACM ROOFING SEALANT EXISTS AROUND THE PERIMETER
NO ASBESTOS-CONTAINING MATERIALS OR
LEAD BASED PAINT
FLUORESCENT LIGHT BALLASTS ARE NON-PCB
COULDN'T FIND THE HOT WATER HEATER
BUT THERE HAS BEEN EXTENSIVE VANDALISM IN
THE BUILDING AND IT MAY BE CONCEALED
OR REMOVED
HVAC UNITS BOTH HEAT AND COOL AND
ARE LOCATED ON EITHER END OF THE
PORTABLE BUILDING56
H05
HAZARDOUS MATS. BLDG 150
1/8" = 1'-0"
C R
O W
C R
EE
K
A G
EN
C
Y D
EM
O
LI
TI
O N
D
ES
IG
N
FT
. T
H O
M
PS
O N
S O
U
TH
D A
K O
TA
ED
U C
AT
IO
N B
U
IL
D
IN
G S
-0
N
O . 1
, 1
, 1
, 1
, 1
, 1
D
EM
O
LI
TI
O
N D
ES
IG
N P
R O
JE
C
T- C
O N
TR
AC
T N
O . 1
A1
0F
H05
RJM - ATB
DMS
7/9/2020
REV:
DRAWN BY:
CHECKED BY:
DATE:
SCALE:
SHEET:
AS NOTED
H
AZ
AR
D
O U
S M
AT
. B
LD
G
, 1
DOUBLE BOWLED
SINK WITH ACM
UNDERCOATING
MERCURY
THERMOSTAT
DRINKING
FOUNTAIN
HERE
ACCESS TO THE
CRAWLSPACE BELOW
THE CRAWLSPACE IS DIRT
FLOORED AND EXTENDS
COMPLETELY UNDER THE
BUILDING; THE FITTINGS WERE
DETERMINED TO BE NON-ACM.
DUCT VENT SEALANT IS ACM;
THIS IS NOT IN THE
CRAWLSPACE; LIMITED THE
MECHANICAL ROOM ONLY
BUILDING HAS BEEN
VANDALIZED AND DEBRIS
STREWN THROUGHOUT
HOT WATER
HEATER
THESE ENTRANCES ARE
BLOCKED BY TREES GROWING
UP INTO THE STEPS
JOSEPH DAVID
ASSOCIATES LLC
19970 CHLOE LAYNE
SPIRO, OK 74959
JOSEPHDAVIDASSOCIATES.COM
BEAR STEELE GLOBAL, LTD CO
LEGEND TECHNICAL SERVICES
INC
ISSUED FOR BID
40% DD - DATE: 11-03-2020
99% CD- DATE: 02-05-2021
| 2021-04-22T08:52:44-0500 | |
| TIFFANY EWING |