A06-_BID_SCHED.pdf
PDF 102 KB Posted
- Attached to
- IA-DESOTO NWR-PAVEMENT REHAB
- Solicitation number
- 140F0222R0014
About this file
This document contains a bid schedule for road repair work on a federal lands project. The bid schedule outlines three items of work including repair of two separate road areas listed as line item numbers one and two, both to be completed on a lump sum basis. Line item number three covers additional authorized excavation to be billed at $X per cubic yard. Bidders are instructed to provide unit pricing for the estimated quantities and are informed that payment will be made based on actual work completed at the provided rates. Incomplete bids will be deemed non-responsive. This bid schedule corresponds to a solicitation issued by the U.S. Fish and Wildlife Service Region 2 for pavement rehabilitation work at the DeSoto National Wildlife Refuge in Iowa under solicitation number 140F0222R0014.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CPARS_Notice.pdf | ||
| PPQ.docx | DOCX document | |
| A04_SOW-SPECS.pdf | ||
| B03-Wage_Determination.pdf | ||
| Sol_140F0222R0014.pdf | ||
| Notice_to_Offerors.pdf | ||
| A06_MAPS-PLANS.pdf | ||
| BidBond__Form_SF24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHED_wc.doc
Standard Form 36, July 1966
General Services Ad 30181-00-c-xxx Fed Proc. Reg. (41 cfs) 1-16.101
Name of Bidder ______________
Bid Schedule
Furnish all labor, tools, equipment, materials, superintendence and transportation necessary to construct the project in accordance with the Technical Specifications, Drawings, and terms and conditions contained herein as follows:
Basic Contract
Item No. Supplies/Services Quantity Unit Unit Price Total Amount
Item 1 Road Repair Area 1 1 L.S. $_______ $_______
Item 2 Road Repair Area 2 1 L.S. $_______ $_______
Item 3 Additional Authorized Excavation 5 C.YD. $_______ $_______
TOTAL OF BASIC CONTRACT $___________
Incomplete bids will be considered non-responsive. If estimated quantities are listed, Bidders must only bid estimated quantities listed. These quantities indicated are the Government’s best estimate of actual quantities needed to complete the work. Payment will be made for actual amount of work done on the basis of unit or lump sum prices listed.
File details come from the government source that posted it. Updated .