2025 FUEL BREAK MOWING Upper Snake Field, Idaho
Solicitation number
140L2625Q0023
Issued by

About this file

This document is a Bid Schedule for the 2025 Big Desert Fuel Break Mowing project solicited by the Bureau of Land Management's Idaho Region. The solicitation (140L2625Q0023) covers rangeland vegetation mowing across six specific road areas totaling 2,516 acres, including Arco/Minidoka Road, Big Butte Road, Cox's Well Road, Number 2 Well Road, Serviceberry Butte Road, and Stage Road.

The project has a 32-day performance period from April 14, 2025 to no later than May 15, 2025, with potential challenges including limited road access due to late winter/early spring conditions such as mud, wet terrain, or snow. Contractors must be prepared to begin work within three days of notification by the Contracting Officer Representative and are prohibited from working if soil or vegetation damage could occur. The bid schedule provides a detailed breakdown of acreage by road segment, allowing potential bidders to price each section individually while offering an all-or-none total bid option.

View the file

Other files

File Type Posted
B03_Attach_1_WD_15-5507_Rev_24.pdf PDF
A05_Attach_2_-_2025_BDFB_Mowing_PWS.docx DOCX document
A06_Attach_5_2025_BDFB_Mowing_Vicinity_Map.pdf PDF
Sol_140L2625Q0023.pdf PDF
A06_Attach_4_Mowing_Unit_Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

2025 BIG DESERT FUEL BREAK MOWING

Rangeland Vegetation Mowing

Item No.
Item Description
Estimated

Quantity Unit of Measure

Unit Price
Total Cost
0001
Rangeland Mowing
2,516
ac.
$
$

Cost Breakdown per Work Element

Item no.
Item Description
Estimated Quantity*
Unit of Measure
Unit Price
Total
0001A
Arco/Minidoka Road – 7.7 mi.
280
ac.
$
$
0001B
Big Butte Road – 9.4 mi.
341
ac.
$
$
0001C
Cox’s Well Road – 12.6 mi.
457
ac.
$
$
0001D
Number 2 Well Road – 17.6 mi.
640
ac.
$
$
0001E
Serviceberry Butte Road – 11.6 mi.
421
ac.
$
$
0001F
Stage Road – 10.4 mi.
377
ac.
$
$
TOTAL (ALL OR NONE)
$

*GIS Calculated Quantity ac = acre

PERIOD OF PERFORMANCE: 32 Days (including holidays and weekends) ESTIMATED START DATE: April 14, 2025 and to end NLT May 15, 2025 TOTAL ESTIMATED ACRES: 2,516 ac.

· The mowing may coincide with late winter/early spring conditions. During the mowing, roads may not be passable and backcountry access may be limited due to muddy, wet, or snow-covered conditions.

· Work will not be permitted if conditions will result in damage to soils and nontreatment vegetation.

· The contractor will be required to start work within three days after being notified by the Contracting Officer Representative (COR).

(END OF SUPPLIES/SERVICES AND PRICES/COSTS)