A06-140L1724R0002-CONTRACT_SPECIFICATIONS_1.pdf
PDF 607 KB Posted
- Attached to
- TRFO WEBER MT PARKING AND MUD SPRING Federal contract opportunity
- Solicitation number
- 140L1724R0002
About this file
This document provides specifications for a construction project for the Bureau of Land Management Tres Rios Field Office in Colorado. The project includes site grading, earthwork, fencing, road and parking area construction at the Weber Mountain WSA and Mud Spring locations.
The specifications cover various requirements for mobilization, demolition, surveying, clearing and grubbing, site grading, compaction, aggregate base course, signage, boulders, concrete, steel gates, fencing, painting and other site furnishings. Payment will be made for each item listed based on job, linear foot, ton or each unit. Aggregate and weight tickets are required for payment. The selected contractor must complete the work within 150 days of notice to proceed and during specified timeframes and holidays.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A4-140L1724R0002-_BID_SCHEDULE_1.pdf | ||
| A06-140L1724R0002-_CONTRACT_DRAWINGS_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior Bureau of Land Management
Tres Rios Field Office Colorado
TRFO Parking 2023
Weber Mountain WSA Parking Lot and Mud Spring Fencing
SPECIFICATIONS
Weber Mt WSA Parking and Mud Spring Fencing
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 20 00 PRICE AND PAYMENT PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 46 00 QUALITY CONTROL
01 57 60 SUPPLEMENTAL ENVIRONMENTAL CONTROLS
01 80 00 PHOTOGRAPHIC DOCUMENTATION
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 20 00 SURVEY AND PROJECT STAKEOUT
02 41 00 DEMOLITION
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DI VI SI ON 05 - METALS
05 50 12 STEEL GATE - ROAD
05 50 13 STEEL POST AND CABLE FENCE AND ACCESS GAP
DI VI SI ON 09 - FI NI SHES
09 90 10 PAINTING
DI VI SI ON 12 - FURNI SHI NGS
12 93 00 SITE FURNISHINGS
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 31 26 WIRE FENCE AND TRAIL ACCESS GAP
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 PROJECT DESCRIPTION
The work includes, but is not limited to; site grading, earthwork, fencing, road and parking area construction.
1.2 LOCATION
The project locations are near Mancos and Cortez, CO.
1.2.1 Weber Mountain WSA
From Mancos, CO, travel south on county road 41 for approximately 7 miles.
Weber Mountain WSA Coordinates Latitude 37.252919° Longitude -108.308819°
1.2.2 Mud Spring
From Cortez, CO, travel south on highway 491. Travel approximately 2 miles. Turn west on County road G (by the Cortez airport). Travel approximately 3 miles. Turn south on road 21. Travel approximately 1 mile. Turn west on unnamed BLM road.
Mud Spring Coordinates Latitude 37.297458° Longitude -108.669364°
1.3 WORK SCHEDULE
Work shall be completed within 150 days of the Notice to Proceed. Work shall occur Monday through Friday. Work is not allowed on Federal holidays and the following dates: December 22 through January 1.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
Payment items for the work of this contract for which contract payments will be made are listed in the SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job are included in the listed job item most closely associated with the work involved. The price and payment made for each item listed constitutes full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1 MOBILIZATION AND DEMOBILIZATION - WEBER MOUNTAIN WSA
1.1.1 Payment
Payment will be made for costs associated with mobilization and demobilization.
When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.
When 15% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 8% of the original Contract amount, whichever is lesser, will be paid.
Upon completion of work for the project, payment of the amount bid for mobilization in excess of 8% of the original Contract amount, will be paid.
1.1.2 Unit of Measure
Unit of measure: job.
1.2 DEMOLITION - WEBER MOUNTAIN WSA
1.2.1 Payment
Payment will be made for all costs associated with demolition. Including transportation and disposal.
1.2.2 Unit of Measure
Unit of measure: job.
SECTION 01 20 00 Page 3
1.3 SURVEY - STAKE OUT - WEBER MOUNTAIN WSA
1.3.1 Payment
Payment will be made for all costs associated with surveying and staking out the work.
1.3.2 Unit of Measure
Unit of measure: Job.
1.4 CLEARING AND GRUBBING - WEBER MOUNTAIN WSA
1.4.1 Payment
Payment will be made for all costs associated with clearing and grubbing.
Including transportation and disposal of materials.
1.4.2 Unit of Measure
Unit of measure: Job.
1.5 SITE GRADING - WEBER MOUNTAIN WSA
1.5.1 Payment
Payment will be made for all costs associated with site grading.
1.5.2 Unit of Measure
Unit of measure: Job.
1.6 MOISTURE CONDITIONING AND COMPACTION - WEBER MOUNTAIN WSA
1.6.1 Payment
Payment will be made for all costs associated with moisture conditioning and compaction of the subgrade and aggregate.
1.6.2 Unit of Measure
Unit of measure: Job.
1.7 AGGREGATE BASE COURSE - WEBER MOUNTAIN WSA
1.7.1 Payment
Payment will be made for all costs associated with providing aggregate base course. Including preparation, transportation, and placement. Submit weight tickets for payment.
SECTION 01 20 00 Page 4
1.7.2 Unit of Measure
Unit of measure: ton.
1.8 STEEL PARKING DELINEATOR - WEBER MOUNTAIN WSA
1.8.1 Payment
Payment will be made for all costs associated with providing steel parking delineators.
1.8.2 Unit of Measure
Unit of measure: Each.
1.9 CONCRETE PARKING STOP - WEBER MOUNTAIN WSA
1.9.1 Payment
Payment will be made for all costs associated with providing parking stops.
1.9.2 Unit of Measure
Unit of measure: Each.
1.10 BOULDERS - WEBER MOUNTAIN WSA
1.10.1 Payment
Payment will be made for all costs associated with providing boulders.
1.10.2 Unit of Measure
Unit of measure: Each.
1.11 RELOCATE EXISTING SIGN - WEBER MOUNTAIN WSA
1.11.1 Payment
Payment will be made for all costs associated with relocating the existing sign. Including excavation, grading, and foundation.
1.11.2 Unit of Measure
Unit of measure: Each.
SECTION 01 20 00 Page 5
1.12 HIDDEN DRIVE SIGN - WEBER MOUNTAIN WSA
1.12.1 Payment
Payment will be made for all costs associated with providing a hidden drive sign.
1.12.2 Unit of Measure
Unit of measure: Each.
1.13 MOBILIZATION AND DEMOBILIZATION - MUD SPRING
1.13.1 Payment
Payment will be made for costs associated with mobilization and demobilization.
When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.
When 15% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 8% of the original Contract amount, whichever is lesser, will be paid.
Upon completion of work for the project, payment of the amount bid for mobilization in excess of 8% of the original Contract amount, will be paid.
1.13.2 Unit of Measure
Unit of measure: job.
1.14 SURVEY - STAKE OUT - MUD SPRING
1.14.1 Payment
Payment will be made for all costs associated with surveying and staking out the work.
1.14.2 Unit of Measure
Unit of measure: Job.
1.15 WIRE FENCING - MUD SPRING
1.15.1 Payment
Payment will be made for all costs associated with providing wire fencing. Including the trail access gap, wire gate, end panels, and corner panels.
SECTION 01 20 00 Page 6
1.15.2 Unit of Measure
Unit of measure: Linear Foot.
1.16 STEEL POST AND CABLE FENCE - MUD SPRING
1.16.1 Payment
Payment will be made for all costs associated with providing steel post and wire rope fencing.
1.16.2 Unit of Measure
Unit of measure: linear foot, measured straight between posts.
1.17 STEEL POST FENCE - ACCESS GAP - MUD SPRING
1.17.1 Payment
Payment will be made for all costs associated with providing the access gap. Including transportation, preparation, grading, foundation, and erection.
1.17.2 Unit of Measure
Unit of measure: Each.
1.18 GATE - MUD SPRING
1.18.1 Payment
Payment will be made for all costs associated with providing a gate.
Including lock open post, signs, painting and foundation.
1.18.2 Unit of Measure
Unit of measure: Each.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 20 00 Page 7
SECTION 01 32 01
PROJECT SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Initial Project Schedule ; G
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, and pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required.
3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.2.1 Level of Detail Required
Develop the Project Schedule to the appropriate level of detail to address major milestones, work listed in the bid schedule, and to allow for satisfactory project planning and execution.
3.2.2 Mandatory Tasks
Include the following activities/tasks in the initial project schedule and all updates.
a. Submission, review and acceptance of submittals.
b. Long procurement activities.
c. Contractor's pre-final inspection.
d. Government's pre-final inspection.
e. Final inspection.
SECTION 01 32 01 Page 8
3.2.3 Government Activities
Include Government activities that could impact progress. These activities include, but are not limited to: Government inspections of work, Government approval of submittals.
3.3 WEEKLY PROGRESS MEETINGS
Conduct a weekly meeting with the Government for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress and to review planned activities.
3.4 FAILURE TO ACHIEVE PROGRESS
Should the progress fall behind the approved project schedule, the Contracting Officer may require provision of a written recovery plan for approval. The plan must detail how progress will be made-up to include which activities will be accelerated by adding additional crews, longer work hours, extra work days, etc.
3.4.1 Failure to Perform
Failure to perform work and maintain progress in accordance with the supplemental recovery plan may result in an interim and final unsatisfactory performance rating and may result in corrective action directed by the Contracting Officer pursuant to FAR 52.236-15 Schedules for Construction Contracts, FAR 52.249-10 Default (Fixed-Price Construction), and other contract provisions.
3.4.2 Recovery Schedule
Should the Contracting Officer find it necessary, submit a recovery schedule pursuant to FAR 52.236-15 Schedules for Construction Contracts.
SECTION 01 32 01 Page 9
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only.
1.2 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer's Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract.
This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government.
1.3 GOVERNMENT APPROVING AUTHORITY
The Contracting Officer's Representative will:
a. Note the date on which the submittal was received.
b. Review submittals for approval within 10 days of receipt.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the Contractor.
1.3.1 Review Notations
Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until
SECTION 01 33 00 Page 10 resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the Government. This applies only to "information-only submittals" as previously defined.
1.4 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer.
If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.5 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals is not to be construed as a complete check.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 11
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES
TRFO Weber Mt WSA Parking and Mud Spring Fencing 2023
01 32 01 SD-01 Preconstruction Submittals
GInitial Project Schedule
01 46 00 SD-01 Preconstruction Submittals
1.2 GQuality Control (QC) Manager
01 57 60 SD-01 Preconstruction Submittals
3.4 GSpill Prevention And Cleanup
Plan
SD-11 Closeout Submittals
3.3 GPhotographic Documentation
05 50 13 SD-11 Closeout Submittals
3.5 GPhotographic Documentation
3.6 GPhotographic Documentation
12 93 00 SD-03 Product Data
2.2 GConcrete Parking Stops
2.3 GHidden Drive Sign
31 00 00 SD-03 Product Data
2.1 GAggregate Base Course
SD-07 Certificates
3.8Aggregate Weight Tickets
SD-11 Closeout Submittals
3.7.2 GPhotographic Documentation
3.7.4 GPhotographic Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SECTION 01 46 00
QUALITY CONTROL
PART 1 GENERAL
1.1 QUALITY CONTROL
Contractor shall establish and maintain an effective quality control (QC) system that complies with FAR 52.246-12 Inspection of Construction.
Quality control (QC) is comprised of plans, procedures, and organization necessary to produce an end product that complies with the contract requirements.
1.2 QUALITY CONTROL MANAGER
Provide a quality control (QC) manager at the work site to implement and manage the QC program. The QC Manager may also be the project superintendent.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Quality Control (QC) Manager ; G
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 QUALITY CONTROL
Contractor shall ensure that the construction complies with the requirements of the contract. At a minimum, perform the following prior to beginning work on each definable feature of work:
Review each paragraph of the applicable specification sections.
Review the contract drawings.
Verify that appropriate submittals have been approved.
Verify that the required preliminary work has been completed and complies with the contract.
Do not build upon nor conceal non-conforming work.
SECTION 01 46 00 Page 12
SECTION 01 57 60
SUPPLEMENTAL ENVIRONMENTAL CONTROLS
PART 1 GENERAL
1.1 DEFINITIONS
Equipment: for the purpose of this specification, equipment shall include, but isn't limited to; dozers, backhoes, trackhoes, trailers, graders, compactors, or any other construction equipment used to accomplish the work. Passenger vehicles are not considered equipment.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Spill Prevention And Cleanup Plan ; G
SD-11 Closeout Submittals
Photographic Documentation ; G
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 EROSION CONTROL
Contractor shall implement measures, as necessary, to control erosion.
Contractor shall inspect site after rain (or melt) events and mitigate areas where erosion or sediment runoff is occurring. Erosion includes wind. Contractor shall water exposed soils, as necessary, to prevent wind erosion.
3.2 FIRE PREVENTION
All equipment shall have a spark arrester installed. The Contractor shall have a fire extinguisher and shovel readily available to contain and extinguish fires.
3.3 EQUIPMENT CLEANING AND MAINTENANCE
Equipment shall be cleaned prior to arriving on site. Equipment shall arrive on site free from dirt, debris, weeds, and seeds. All equipment shall be inspected by the Contracting Officer's Representative, on site, and prior to unloading. Notify the Contracting Officer's Representative at least 7 days prior to equipment delivery to coordinate inspection. If equipment leaves the jobsite, and returns at a later date, then equipment shall be re-inspected before reentering the work site.
SECTION 01 57 60 Page 13
Equipment maintenance will not be allowed on site. Equipment leaking fluids shall be removed from site.
Provide photographic documentation in accordance with section 01 80 00 .
Provide pictures demonstrating equipment is clean while the equipment is onsite, and prior to unloading. Pictures shall show the equipment and the project site in the same photograph.
3.4 SPILL PREVENTION
The Contractor shall submit a spill prevention and cleanup plan. The spill prevention and cleanup plan shall identify foreseeable accidents, including spills while adding fluids to equipment, and identify an action plan to rapidly clean all accidents. Cleanup materials and equipment shall be on site during work.
3.5 WASTE CONTROL
All waste generated by the work shall be contained and removed from the site and disposed of in a legal manor.
SECTION 01 57 60 Page 14
SECTION 01 80 00
PHOTOGRAPHIC DOCUMENTATION
PART 1 GENERAL
1.1 SUMMARY OF WORK
Document that the work is in compliance with contract requirements.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 PHOTOGRAPHS
Provide photographs in sufficient detail and quantity to demonstrate compliance with contract requirements. Submit electronic photographs via email. Photographs sent via text message will not be accepted.
Photographs do not negate requirements for Contracting Officer's Representative's inspections and approvals on specified items of work.
SECTION 01 80 00 Page 15
SECTION 02 20 00
SURVEY AND PROJECT STAKEOUT
PART 1 GENERAL
1.1 SECTION SUMMARY
The contractor shall stake out the project as detailed on the drawings.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 PROJECT STAKEOUT
The contractor shall stake out the project as detailed on the drawings, or as required for construction.
3.2 STAKEOUT REVIEW
The Contracting Officer's Representative and the Contractor shall review the layout, as staked, together prior to ground disturbance. The Contractor shall coordinate a date for the review that works for both the Contractor and the Contracting Officer's Representative.
The Contracting Officer's Representative may make minor modifications to the layout in order to minimize the damage to existing vegetation, or for constructability. The contractor shall receive approval of the stakeout prior to clearing and grubbing, or other earth disturbing activities.
SECTION 02 20 00 Page 16
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
Provide all materials and labor necessary to demolish and remove the Weber Mountain WSA fencing.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 FENCE REMOVAL
Exact location of fence removal shall be staked by the Contracting Officer's Representative. Do not disturb the fence located on private land.
Take necessary precautions to avoid damage to existing trees and vegetation which might be damaged during demolition.
Approximate Removal Quantities Location Approximate Linear Feet
Parking Area 450
Road 41 1,600
3.2 DISPOSAL OF REMOVED MATERIALS
All materials removed, shall become the property of the Contractor and shall be removed from Government property and disposed of in a legal manor.
SECTION 02 41 00 Page 17
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C387/C387M (2017) Standard Specification for Packaged, Dry, Combined Materials for Concrete and High Strength Mortar
PART 2 PRODUCTS
2.1 CONCRETE
Prepackaged concrete mix shall be identified as conforming to ASTM C387/C387M Normal Strength Concrete; Normal Weight Concrete, with a minimum compressive strength of 4,500 psi.
PART 3 EXECUTION
3.1 PREPACKAGED CONCRETE MIXTURE
Use the minimum amount of water to make the mixture. Adding too much water to the mixture will greatly reduce the overall compressive strength. Average slump shall be between 2" to 4".
3.2 FOOTINGS
Concrete for footings may be placed in excavations without forms.
Excavation width must be a minimum of 4 inches greater than indicated if forms are not used.
3.3 CONCRETE CONSOLIDATION
Concrete shall be adequately vibrated, rodded, or spaded into place to fill voids.
SECTION 03 30 00 Page 18
SECTION 05 50 12
STEEL GATE - ROAD
PART 1 GENERAL
Provide a steel gate as shown on the plans and as specified below.
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2020) Structural Welding Code - Steel
PART 2 PRODUCTS
2.1 STEEL
Steel shall pipe shall be in accordance with ASTM A53/A53M.
2.2 SIGNS
Signs shall comply with the Manual of Uniform Traffic Control Devices (MUTCD). OM4-1 signs shall be 18" x 18". OM2-2V signs shall be 12" x 6".
2.3 CONCRETE
In accordance with section 03 30 00 .
PART 3 EXECUTION
3.1 FABRICATION, WELDING, AND INSTALLATION
Verify all dimensions prior to fabrication. Perform welding in accordance with AWS D1.1/D1.1M . Field verify post locations prior to setting. Set posts vertically in concrete piers. Fill posts with concrete.
3.2 PAINT
Paint all surfaces in accordance with section 09 90 10 .
3.3 SIGNS
Firmly secure signs to the gate and gate posts. Provide galvanized or stainless steel hardware.
SECTION 05 50 12 Page 19
3.4 CONCRETE FOUNDATION
Provide concrete in accordance with section 03 30 00 CAST-IN-PLACE CONCRETE. The end posts and corner posts shall have a concrete foundation.
Provide photographic documentation in accordance with section 01 80 00 PHOTOGRAPHIC DOCUMENTATION of the concrete foundation. Show the depth and width of the foundation, prior to concrete placement.
SECTION 05 50 12 Page 20
SECTION 05 50 20
STEEL POST AND CABLE FENCE AND ACCESS GAP
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
ASTM INTERNATIONAL (ASTM)
ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A500/A500M (2018) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-11 Closeout Submittals
Photographic Documentation ; G
PART 2 PRODUCTS
2.1 STEEL PIPE
Provide in accordance with ASTM A500/A500M or ASTM A53/A53M as applicable.
Pipe shall be either:
a. 3.5 inch (3 inch nominal), schedule 80 steel.
b. 2-7/8 inch drill pipe, 0.362 inch wall thickness, steel.
Used pipe may be supplied for the steel posts; however pipe must be clean of excessive oil, grease, rust, etc. Used pipe must be straight and have no dents, bends, or obvious defects. All other materials shall be new.
2.2 PAINTING
Painting is not required.
SECTION 05 50 13 Page 21
2.3 WIRE ROPE
9/16 inch diameter, 6x26 Warrington or Seale strand configuration.
PART 3 EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
Verify all field dimensions prior to fabrication. Set steel pipe vertical and plumb. Layout the fence line continuous and straight, make curves consistent and smooth. Drive posts without disturbing in-situ soil.
3.2 WELDING
Perform welding in accordance with AWS D1.1/D1.1M
3.3 WIRE ROPE
Wire rope shall be permanently and securely fastened to every third fence post to prevent movement of wire through the post. There are several different ways to achieve this requirement. The detail on the plans is one possible way. The contractor may propose, for approval, any method that permanently prevents movement of wire through the post.
Wire rope shall be installed with as few splices as practical.
3.4 ACCESS GAP IN THE FENCE
Construct access gap as shown on the plans. Set steel pipe vertical and plumb.
3.5 CONCRETE FOUNDATION - FENCE POSTS
Provide concrete in accordance with section 03 30 00 CAST-IN-PLACE
CONCRETE.
Ten (10) fence posts shall have a concrete foundation. The fence posts with the concrete foundation shall be end or corner posts. The remaining fence posts do not require a concrete foundation.
Provide photographic documentation in accordance with section 01 80 00 PHOTOGRAPHIC DOCUMENTATION of the concrete foundation. Show the depth and width of the foundation, prior to concrete placement.
3.6 CONCRETE FOUNDATION - ACCESS GAP POSTS
Provide concrete in accordance with section 03 30 00 CAST-IN-PLACE
CONCRETE.
All access gap posts shall have a concrete foundation.
Provide photographic documentation in accordance with section 01 80 00 PHOTOGRAPHIC DOCUMENTATION of the concrete foundation. Show the depth and width of the foundation, prior to concrete placement.
SECTION 05 50 13 Page 22
SECTION 09 90 10
PAINTING
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
Paint the vehicle gate.
PART 2 PRODUCTS
2.1 PRIMER
Sherwin-Williams: "Multi-Purpose Interior/Exterior Latex Primer/Sealer".
2.2 PAINT
Wood and Metal Surfaces:
Sherwin-Williams: "All Surface Enamel Latex".
2.3 PAINT COLOR
Color shall be Sherwin Williams "7512 Pavilion Beige".
PART 3 EXECUTION
3.1 SURFACE PREPARATION
Remove dirt, splinters, loose particles, disintegrated coatings, and other foreign matter and substances prior to applying paint.
3.2 APPLICATION
Apply primer to metal surfaces.
Apply two coats of paint to all surfaces. Allow time between coats to permit thorough drying.
Only apply paints to surfaces that are completely free of moisture as determined by sight or touch.
Apply each coat of paint so that dry film is of uniform thickness and free from runs, drops, ridges, waves, pinholes or other voids, laps, brush marks, and variations in color, texture, and finish.
SECTION 09 90 10 Page 23
SECTION 12 93 00
SITE FURNISHINGS
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Concrete Parking Stops ; G
Hidden Drive Sign ; G
PART 2 PRODUCTS
2.1 STEEL PARKING DELINEATORS
Steel parking delineators shall be schedule 40 steel pipe. Used pipe may be supplied; however pipe must be clean and free of oil, grease, rust, etc. Pipe must be straight and have no dents, bends, or obvious defects.
2.2 CONCRETE PARKING STOPS
Parking stops shall be reinforced concrete. With minimum dimensions of;
six foot length, eight inch width, and 5 inch height.
2.3 HIDDEN DRIVE SIGN
Sign shall have the text "HIDDEN DRIVE AHEAD".
24" x 24" Engineer grade reflective aluminum sign https://www.myparkingsign.com/ Sign: K-6530-EG-24x24, or approved equal.
2.4 HIDDEN DRIVE SIGN POST
Steel, U-Channel sign post, 8 foot total length, 1-3/8" channel depth, 3/8" holes on 1" centers, and be painted brown.
2.5 BOULDERS
Imported boulders shall be solid rock and have a roughly cubic shape with minimum dimensions of 24 inches in all directions.
PART 3 EXECUTION
3.1 STEEL PARKING DELINEATORS
Steel parking delineators shall be installed as shown on the drawings.
Tops of the steel parking delineators shall be set three inches above the finished grade of the aggregate surfacing.
SECTION 12 93 00 Page 24
3.2 CONCRETE PARKING STOPS
Each parking stop shall be held in place with two (2) #4 rebars, 24 inches long.
3.3 BOULDERS
Bury boulders as shown on the plans.
3.4 RELOCATE EXISTING SIGN
Relocate the existing Weber Mountain WSA sign. Install the sign plumb.
Provide a concrete foundation around the sign posts. Minimum concrete foundation dimensions per post: 12 inch diameter and 18 inch depth.
SECTION 12 93 00 Page 25
SECTION 31 00 00
EARTHWORK
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Aggregate Base Course ; G
SD-07 Certificates
Aggregate Weight Tickets
SD-11 Closeout Submittals
Photographic Documentation ; G
PART 2 PRODUCTS
2.1 AGGREGATE BASE COURSE
Aggregate base course shall meet the requirements of Colorado Department of Transportation Standard Specifications for Road and Bridge Construction 2022, section 703 AGGREGATES. Aggregate base course gradation shall meet the gradation shown in Table 703-2, Class 6.
PART 3 EXECUTION
3.1 UNDERGROUND UTILITIES
The Contractor is responsible for locating underground utilities prior to construction. The Government is not aware of any underground utilities, however the Contractor shall verify the presence or absence prior to construction.
3.2 GENERAL EXCAVATION
Perform excavation of every type of material encountered to the lines, grades, and elevations indicated and as specified. Perform excavation and fill in a manner and sequence that will provide proper drainage at all times, including during construction.
3.3 GROUND SURFACE PREPARATION
Clear and grub in accordance with section 31 11 00 . Do not perform construction when surfaces are frozen or muddy. Prepare the subgrade to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Shape subgrade to drain.
SECTION 31 00 00 Page 26
3.4 EARTHWORK QUANTITIES
Location Cut (Cubic Yards) Fill (Cubic Yards) Net (Cubic Yards)
Weber Mt WSA 90 10 80
3.5 INTERSECTION WITH COUNTY ROAD 41
The new road shall match the existing elevation at County Road 41.
3.6 VIBRATORY COMPACTION EQUIPMENT
Vibratory compaction equipment shall have a minimum of 10,000 pounds impact per vibration and a minimum frequency of 1,000 vibrations per minute.
3.7 AGGREGATE PLACEMENT LOCATIONS
3.7.1 Subgrade
Contractor shall prepare the subgrade to the lines and grades shown on the plans.
3.7.2 Subgrade Compaction
Moisten material as necessary to achieve compaction. Compact the subgrade by operating vibratory compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.
Provide photographic documentation in accordance with section 01 80 00 .
3.7.3 Aggregate Base Course
Contractor shall receive approval of the subgrade prior to placing aggregate base course. Place base course aggregate to the lines and grades shown on the plans.
3.7.4 Aggregate Base Course Compaction
Moisten material as necessary to achieve compaction. Compact the base course aggregate by operating vibratory compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.
Provide photographic documentation in accordance with section 01 80 00 .
3.8 AGGREGATE WEIGHT TICKETS
Submit aggregate weight tickets . Weight tickets are required prior to payment.
3.9 EXCESS MATERIAL DISPOSAL
Excess cut material shall be placed uniformly on site, at designated locations. Excess cut material shall not be removed from the work site.
SECTION 31 00 00 Page 27
3.10 FINISHING
Finish the surfaces to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Provide the degree of finish for graded areas within 0.2 foot of the grades and elevations indicated. Finish surfaces in a manner that will result in effective drainage, regardless of tolerance.
SECTION 31 00 00 Page 28
SECTION 31 11 00
CLEARING AND GRUBBING
PART 1 GENERAL
Not Used.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 SURVEY STAKE OUT
Prior to clearing and grubbing, the contractor shall stake out the roads and parking areas, as detailed on the drawings, in accordance with 02 20 00 SURVEY AND PROJECT STAKEOUT. The Contracting Officer's Representative will review the layout as staked and may make minor modifications to the layout in order to minimize the damage to existing vegetation. The contractor shall receive approval of the stakeout prior to clearing and grubbing.
3.2 CLEARING AND GRUBBING LIMITS
Clearing and grubbing limits shall be within the road and parking areas, including the ditches.
3.3 PROTECTION
Protect trees and vegetation from damage incident to clearing, grubbing, and construction operations.
3.4 CLEARING
Clearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Trees, stumps, roots, brush, and other vegetation in areas to be cleared shall be cut off flush with or below the original ground surface.
3.5 GRUBBING
Grubbing consists of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas.
Remove material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, to a depth of not less than 12 inches below the original surface level of the ground in the area of new road construction. Fill depressions made by grubbing with suitable material and compact to make the surface conform with the original adjacent surface of the ground.
SECTION 31 11 00 Page 29
3.6 DISPOSAL OF CLEARING AND GRUBBING VEGETATION
Dispose of clearing and grubbing material in locations designated on the plans. Logs, stumps, roots, brush, rotten wood, and other organic material resulting from the clearing and grubbing operations, shall be uniformly scattered on site in piles less than 18 inches off the ground.
Process, mulch, cut, or limb material as necessary to comply with disposal pile requirements.
SECTION 31 11 00 Page 30
SECTION 32 31 26
WIRE FENCE AND TRAIL ACCESS GAP
PART 1 GENERAL
1.1 CRITERIA FOR BIDDING
End panels, corner panels, and the wire gate are included in the bid schedule cost for wire fencing, measured and paid by linear foot. The following are required:
Item Quantity
End Panels 4
Corner Panels 8
Wire Gate 1
The contractor is responsible for determining the quantity of the remaining fence items, including, but not limited to; wood line posts, metal line posts, wire stays, wire.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)
AWPA U1 (2017) Use Category System: User Specification for Treated Wood
ASTM INTERNATIONAL (ASTM)
ASTM A121 (2013) Standard Specification for Metallic-Coated Carbon Steel Barbed Wire
ASTM A702 (2013) Standard Specification for Steel Fence Posts and Assemblies, Hot Wrought
PART 2 PRODUCTS
2.1 BARBLESS WIRE
Barbless wire shall be a strand of two (2) 12-1/2-gauge, galvanized wires twisted together. Wire shall be a Class 1 zinc coating as per ASTM A121.
The minimum breaking strength of each wire shall be 950-lb force. The barbless wire shall conform to ASTM A121.
SECTION 32 31 26 Page 31
2.2 WOOD POSTS AND BRACES - PANELS AND GATES
Wood posts and braces used for the panels and gates shall be sound single-stem members of round cross section and have 5 inches minimum diameter at the small end. Provide posts free of ring shake, season cracks more than 1/4 inch wide, splits in the end, and unsound knots.
Treat posts in accordance with AWPA U1.
2.3 WOOD FENCE POSTS
Wood fence posts shall be sound single-stem members of round cross section and have 4 inches minimum diameter at the small end. Provide posts free of ring shake, season cracks more than 1/4 inch wide, splits in the end, and unsound knots. Treat posts in accordance with AWPA U1.
2.4 STEEL FENCE POSTS
Steel fence posts shall conform to ASTM A702; green with white or silver top "T" bar type, with a welded or riveted anchor plate. Furnish with clip-type wire fasteners (punched tabs for fastening wires are not acceptable). Steel posts shall be manufactured from wrought, rail or new billet steel, shall have a minimum weight of 1.33 pounds per linear foot.
The anchor plates shall weigh a minimum of 0.67 pounds and shall have a minimum area of 18 square inches.
PART 3 EXECUTION
3.1 ALIGNMENT
The Contractor shall stake the fence alignment for approval by the Contracting Officer's Representative in accordance with section 02 20 00
SURVEY AND PROJECT STAKEOUT.
3.2 CLEARING
Clearing shall be limited to cutting of brush in the fence line alignment. Maximum clearing width is 6 feet on each side of the fence line. Minimize disturbance to existing vegetation.
3.3 END PANELS, CORNER PANELS, AND GATE PANELS
Construct as shown on the drawings. Corner panels shall be constructed at changes in fence alignment. End and corner panels shall be used to construct the trail intersection gap.
Set posts plumb in dug or drilled holes. Post holes shall provide adequate open space around the post so backfill can be tamped the full depth around the post. Place backfill in layers of 9 inches or less, moistened to optimum condition, and compacted with hand tampers. Notch posts at the connection with the rail.
3.4 WOOD LINE POSTS
Set posts plumb in dug or drilled holes. Post holes shall provide adequate open space around the post so backfill can be tamped the full depth around the post. Place backfill in layers of 9 inches or less, moistened to optimum condition, and compacted with hand tampers.
SECTION 32 31 26 Page 32
3.4.1 Wood Line Post Frequency
Every third line post shall be a wood post.
3.5 STEEL LINE POSTS
Posts shall be driven plumb.
3.6 WIRE
Wire is properly stretched when it is springy to the touch. Stretch tightly and staple to wood posts or securely attach to steel posts with standard manufactured wire clips. Drive staples into wood until the staple comes in contact with the wire against the post, but not so tight as to crimp the wire or prevent free movement of the wire between the post and the staple. Do not drive staples parallel to the grain of the wood.
3.7 WIRE CLIPS
Wire clips shall be used on every wire at steel post locations. Secure wire to steel posts by bending clip ends over or around wire, crimping ends to secure wire on both sides of the post, but not so tight as to prevent free movement of the wire through the clip. Each side of the clip shall be twisted around the wire and back parallel to the clip itself.
3.8 BRACE WIRE
Shall be double looped in a crisscross fashion, twisted tight with either four plies of 9-gauge smooth wire or 8 plies of 12-1/2-gauge wires. Leave one end of the stick long enough to fasten behind the horizontal brace to prevent wire from unwinding.
3.9 SPIKING
Predrilled lead holes shall be used. The hole diameter shall be three-fourths the diameter of the spike and drilled to a depth that is one-half the length of the spike.
3.10 TRAIL ACCESS GAP
Provide a trail access gap. Trail access gap shall be constructed using end and corner panels.
3.11 WIRE GATE
Provide a wire gate at the south intersection with the existing fence.
SECTION 32 31 26 Page 33
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 00 - SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 PROJECT DESCRIPTION |
| 1.2 LOCATION |
| 1.2.1 Weber Mountain WSA |
| 1.2.2 Mud Spring |
1.3 WORK SCHEDULE
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 20 00 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 MOBILIZATION AND DEMOBILIZATION - WEBER MOUNTAIN WSA |
| 1.1.1 Payment |
| 1.1.2 Unit of Measure |
| 1.2 DEMOLITION - WEBER MOUNTAIN WSA |
| 1.2.1 Payment |
| 1.2.2 Unit of Measure |
| 1.3 SURVEY - STAKE OUT - WEBER MOUNTAIN WSA |
| 1.3.1 Payment |
| 1.3.2 Unit of Measure |
| 1.4 CLEARING AND GRUBBING - WEBER MOUNTAIN WSA |
| 1.4.1 Payment |
| 1.4.2 Unit of Measure |
| 1.5 SITE GRADING - WEBER MOUNTAIN WSA |
| 1.5.1 Payment |
| 1.5.2 Unit of Measure |
| 1.6 MOISTURE CONDITIONING AND COMPACTION - WEBER MOUNTAIN WSA |
| 1.6.1 Payment |
| 1.6.2 Unit of Measure |
| 1.7 AGGREGATE BASE COURSE - WEBER MOUNTAIN WSA |
| 1.7.1 Payment |
| 1.7.2 Unit of Measure |
| 1.8 STEEL PARKING DELINEATOR - WEBER MOUNTAIN WSA |
| 1.8.1 Payment |
| 1.8.2 Unit of Measure |
| 1.9 CONCRETE PARKING STOP - WEBER MOUNTAIN WSA |
| 1.9.1 Payment |
| 1.9.2 Unit of Measure |
| 1.10 BOULDERS - WEBER MOUNTAIN WSA |
| 1.10.1 Payment |
| 1.10.2 Unit of Measure |
| 1.11 RELOCATE EXISTING SIGN - WEBER MOUNTAIN WSA |
| 1.11.1 Payment |
| 1.11.2 Unit of Measure |
| 1.12 HIDDEN DRIVE SIGN - WEBER MOUNTAIN WSA |
| 1.12.1 Payment |
| 1.12.2 Unit of Measure |
| 1.13 MOBILIZATION AND DEMOBILIZATION - MUD SPRING |
| 1.13.1 Payment |
| 1.13.2 Unit of Measure |
| 1.14 SURVEY - STAKE OUT - MUD SPRING |
| 1.14.1 Payment |
| 1.14.2 Unit of Measure |
| 1.15 WIRE FENCING - MUD SPRING |
| 1.15.1 Payment |
| 1.15.2 Unit of Measure |
| 1.16 STEEL POST AND CABLE FENCE - MUD SPRING |
| 1.16.1 Payment |
| 1.16.2 Unit of Measure |
| 1.17 STEEL POST FENCE - ACCESS GAP - MUD SPRING |
| 1.17.1 Payment |
| 1.17.2 Unit of Measure |
| 1.18 GATE - MUD SPRING |
| 1.18.1 Payment |
| 1.18.2 Unit of Measure |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 32 01 - PROJECT SCHEDULE |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS |
| 3.2.1 Level of Detail Required |
| 3.2.2 Mandatory Tasks |
| 3.2.3 Government Activities |
| 3.3 WEEKLY PROGRESS MEETINGS |
| 3.4 FAILURE TO ACHIEVE PROGRESS |
| 3.4.1 Failure to Perform |
| 3.4.2 Recovery Schedule |
| 01 33 00 - SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 INFORMATION ONLY SUBMITTALS |
| 1.3 GOVERNMENT APPROVING AUTHORITY |
| 1.3.1 Review Notations |
| 1.4 DISAPPROVED SUBMITTALS |
| 1.5 APPROVED SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 46 00 - QUALITY CONTROL |
| PART 1 GENERAL |
| 1.1 QUALITY CONTROL |
| 1.2 QUALITY CONTROL MANAGER |
| 1.3 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 QUALITY CONTROL |
| 01 57 60 - SUPPLEMENTAL ENVIRONMENTAL CONTROLS |
| PART 1 GENERAL |
| 1.1 DEFINITIONS |
| 1.2 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 EROSION CONTROL |
| 3.2 FIRE PREVENTION |
| 3.3 EQUIPMENT CLEANING AND MAINTENANCE |
| 3.4 SPILL PREVENTION |
| 3.5 WASTE CONTROL |
| 01 80 00 - PHOTOGRAPHIC DOCUMENTATION |
| PART 1 GENERAL |
| 1.1 SUMMARY OF WORK |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 PHOTOGRAPHS |
| DIVISION 02 - EXISTING CONDITIONS |
| 02 20 00 - SURVEY AND PROJECT STAKEOUT |
| PART 1 GENERAL |
| 1.1 SECTION SUMMARY |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 PROJECT STAKEOUT |
| 3.2 STAKEOUT REVIEW |
| 02 41 00 - DEMOLITION |
| PART 1 GENERAL |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 FENCE REMOVAL |
| 3.2 DISPOSAL OF REMOVED MATERIALS |
| DIVISION 03 - CONCRETE |
| 03 30 00 - CAST-IN-PLACE CONCRETE |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| PART 2 PRODUCTS |
| 2.1 CONCRETE |
| PART 3 EXECUTION |
| 3.1 PREPACKAGED CONCRETE MIXTURE |
| 3.2 FOOTINGS |
| 3.3 CONCRETE CONSOLIDATION |
| DIVISION 05 - METALS |
| 05 50 12 - STEEL GATE - ROAD |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| PART 2 PRODUCTS |
| 2.1 STEEL |
| 2.2 SIGNS |
| 2.3 CONCRETE |
| PART 3 EXECUTION |
| 3.1 FABRICATION, WELDING, AND INSTALLATION |
| 3.2 PAINT |
| 3.3 SIGNS |
| 3.4 CONCRETE FOUNDATION |
| 05 50 13 - STEEL POST AND CABLE FENCE AND ACCESS GAP |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 STEEL PIPE |
| 2.2 PAINTING |
| 2.3 WIRE ROPE |
| PART 3 EXECUTION |
| 3.1 GENERAL INSTALLATION REQUIREMENTS |
| 3.2 WELDING |
| 3.3 WIRE ROPE |
| 3.4 ACCESS GAP IN THE FENCE |
| 3.5 CONCRETE FOUNDATION - FENCE POSTS |
| 3.6 CONCRETE FOUNDATION - ACCESS GAP POSTS |
| DIVISION 09 - FINISHES |
| 09 90 10 - PAINTING |
| PART 1 GENERAL |
| 1.1 DESCRIPTION OF WORK |
| PART 2 PRODUCTS |
| 2.1 PRIMER |
| 2.2 PAINT |
| 2.3 PAINT COLOR |
| PART 3 EXECUTION |
| 3.1 SURFACE PREPARATION |
| 3.2 APPLICATION |
| DIVISION 12 - FURNISHINGS |
| 12 93 00 - SITE FURNISHINGS |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 STEEL PARKING DELINEATORS |
| 2.2 CONCRETE PARKING STOPS |
| 2.3 HIDDEN DRIVE SIGN |
| 2.4 HIDDEN DRIVE SIGN POST |
| 2.5 BOULDERS |
| PART 3 EXECUTION |
| 3.1 STEEL PARKING DELINEATORS |
| 3.2 CONCRETE PARKING STOPS |
| 3.3 BOULDERS |
| 3.4 RELOCATE EXISTING SIGN |
| DIVISION 31 - EARTHWORK |
| 31 00 00 - EARTHWORK |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 AGGREGATE BASE COURSE |
| PART 3 EXECUTION |
| 3.1 UNDERGROUND UTILITIES |
| 3.2 GENERAL EXCAVATION |
| 3.3 GROUND SURFACE PREPARATION |
| 3.4 EARTHWORK QUANTITIES |
| 3.5 INTERSECTION WITH COUNTY ROAD 41 |
| 3.6 VIBRATORY COMPACTION EQUIPMENT |
| 3.7 AGGREGATE PLACEMENT LOCATIONS |
| 3.7.1 Subgrade |
| 3.7.2 Subgrade Compaction |
| 3.7.3 Aggregate Base Course |
| 3.7.4 Aggregate Base Course Compaction |
| 3.8 AGGREGATE WEIGHT TICKETS |
| 3.9 EXCESS MATERIAL DISPOSAL |
| 3.10 FINISHING |
| 31 11 00 - CLEARING AND GRUBBING |
| PART 1 GENERAL |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 SURVEY STAKE OUT |
| 3.2 CLEARING AND GRUBBING LIMITS |
| 3.3 PROTECTION |
| 3.4 CLEARING |
| 3.5 GRUBBING |
| 3.6 DISPOSAL OF CLEARING AND GRUBBING VEGETATION |
| DIVISION 32 - EXTERIOR IMPROVEMENTS |
| 32 31 26 - WIRE FENCE AND TRAIL ACCESS GAP |
| PART 1 GENERAL |
| 1.1 CRITERIA FOR BIDDING |
| 1.2 REFERENCES |
| PART 2 PRODUCTS |
| 2.1 BARBLESS WIRE |
| 2.2 WOOD POSTS AND BRACES - PANELS AND GATES |
| 2.3 WOOD FENCE POSTS |
| 2.4 STEEL FENCE POSTS |
| PART 3 EXECUTION |
| 3.1 ALIGNMENT |
| 3.2 CLEARING |
| 3.3 END PANELS, CORNER PANELS, AND GATE PANELS |
| 3.4 WOOD LINE POSTS |
| 3.4.1 Wood Line Post Frequency |
| 3.5 STEEL LINE POSTS |
| 3.6 WIRE |
| 3.7 WIRE CLIPS |
| 3.8 BRACE WIRE |
| 3.9 SPIKING |
| 3.10 TRAIL ACCESS GAP |
| 3.11 WIRE GATE |
File details come from the government source that posted it. Updated .