This document provides specifications for a construction project for the Bureau of Land Management Tres Rios Field Office in Colorado. The project includes site grading, earthwork, fencing, road and parking area construction at the Weber Mountain WSA and Mud Spring locations.

The specifications cover various requirements for mobilization, demolition, surveying, clearing and grubbing, site grading, compaction, aggregate base course, signage, boulders, concrete, steel gates, fencing, painting and other site furnishings. Payment will be made for each item listed based on job, linear foot, ton or each unit. Aggregate and weight tickets are required for payment. The selected contractor must complete the work within 150 days of notice to proceed and during specified timeframes and holidays.

View the file

Other files for this federal contract opportunity

Other files attached to TRFO WEBER MT PARKING AND MUD SPRING, newest first.
File Type Posted
A4-140L1724R0002-_BID_SCHEDULE_1.pdf PDF
A06-140L1724R0002-_CONTRACT_DRAWINGS_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior Bureau of Land Management

Tres Rios Field Office Colorado

TRFO Parking 2023

Weber Mountain WSA Parking Lot and Mud Spring Fencing

SPECIFICATIONS

Weber Mt WSA Parking and Mud Spring Fencing

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 20 00 PRICE AND PAYMENT PROCEDURES

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 46 00 QUALITY CONTROL

01 57 60 SUPPLEMENTAL ENVIRONMENTAL CONTROLS

01 80 00 PHOTOGRAPHIC DOCUMENTATION

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 20 00 SURVEY AND PROJECT STAKEOUT

02 41 00 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DI VI SI ON 05 - METALS

05 50 12 STEEL GATE - ROAD

05 50 13 STEEL POST AND CABLE FENCE AND ACCESS GAP

DI VI SI ON 09 - FI NI SHES

09 90 10 PAINTING

DI VI SI ON 12 - FURNI SHI NGS

12 93 00 SITE FURNISHINGS

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 31 26 WIRE FENCE AND TRAIL ACCESS GAP

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 PROJECT DESCRIPTION

The work includes, but is not limited to; site grading, earthwork, fencing, road and parking area construction.

1.2 LOCATION

The project locations are near Mancos and Cortez, CO.

1.2.1 Weber Mountain WSA

From Mancos, CO, travel south on county road 41 for approximately 7 miles.

Weber Mountain WSA Coordinates Latitude 37.252919° Longitude -108.308819°

1.2.2 Mud Spring

From Cortez, CO, travel south on highway 491. Travel approximately 2 miles. Turn west on County road G (by the Cortez airport). Travel approximately 3 miles. Turn south on road 21. Travel approximately 1 mile. Turn west on unnamed BLM road.

Mud Spring Coordinates Latitude 37.297458° Longitude -108.669364°

1.3 WORK SCHEDULE

Work shall be completed within 150 days of the Notice to Proceed. Work shall occur Monday through Friday. Work is not allowed on Federal holidays and the following dates: December 22 through January 1.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 2

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

Payment items for the work of this contract for which contract payments will be made are listed in the SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job are included in the listed job item most closely associated with the work involved. The price and payment made for each item listed constitutes full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.1 MOBILIZATION AND DEMOBILIZATION - WEBER MOUNTAIN WSA

1.1.1 Payment

Payment will be made for costs associated with mobilization and demobilization.

When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.

When 15% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 8% of the original Contract amount, whichever is lesser, will be paid.

Upon completion of work for the project, payment of the amount bid for mobilization in excess of 8% of the original Contract amount, will be paid.

1.1.2 Unit of Measure

Unit of measure: job.

1.2 DEMOLITION - WEBER MOUNTAIN WSA

1.2.1 Payment

Payment will be made for all costs associated with demolition. Including transportation and disposal.

1.2.2 Unit of Measure

Unit of measure: job.

SECTION 01 20 00 Page 3

1.3 SURVEY - STAKE OUT - WEBER MOUNTAIN WSA

1.3.1 Payment

Payment will be made for all costs associated with surveying and staking out the work.

1.3.2 Unit of Measure

Unit of measure: Job.

1.4 CLEARING AND GRUBBING - WEBER MOUNTAIN WSA

1.4.1 Payment

Payment will be made for all costs associated with clearing and grubbing.

Including transportation and disposal of materials.

1.4.2 Unit of Measure

Unit of measure: Job.

1.5 SITE GRADING - WEBER MOUNTAIN WSA

1.5.1 Payment

Payment will be made for all costs associated with site grading.

1.5.2 Unit of Measure

Unit of measure: Job.

1.6 MOISTURE CONDITIONING AND COMPACTION - WEBER MOUNTAIN WSA

1.6.1 Payment

Payment will be made for all costs associated with moisture conditioning and compaction of the subgrade and aggregate.

1.6.2 Unit of Measure

Unit of measure: Job.

1.7 AGGREGATE BASE COURSE - WEBER MOUNTAIN WSA

1.7.1 Payment

Payment will be made for all costs associated with providing aggregate base course. Including preparation, transportation, and placement. Submit weight tickets for payment.

SECTION 01 20 00 Page 4

1.7.2 Unit of Measure

Unit of measure: ton.

1.8 STEEL PARKING DELINEATOR - WEBER MOUNTAIN WSA

1.8.1 Payment

Payment will be made for all costs associated with providing steel parking delineators.

1.8.2 Unit of Measure

Unit of measure: Each.

1.9 CONCRETE PARKING STOP - WEBER MOUNTAIN WSA

1.9.1 Payment

Payment will be made for all costs associated with providing parking stops.

1.9.2 Unit of Measure

Unit of measure: Each.

1.10 BOULDERS - WEBER MOUNTAIN WSA

1.10.1 Payment

Payment will be made for all costs associated with providing boulders.

1.10.2 Unit of Measure

Unit of measure: Each.

1.11 RELOCATE EXISTING SIGN - WEBER MOUNTAIN WSA

1.11.1 Payment

Payment will be made for all costs associated with relocating the existing sign. Including excavation, grading, and foundation.

1.11.2 Unit of Measure

Unit of measure: Each.

SECTION 01 20 00 Page 5

1.12 HIDDEN DRIVE SIGN - WEBER MOUNTAIN WSA

1.12.1 Payment

Payment will be made for all costs associated with providing a hidden drive sign.

1.12.2 Unit of Measure

Unit of measure: Each.

1.13 MOBILIZATION AND DEMOBILIZATION - MUD SPRING

1.13.1 Payment

Payment will be made for costs associated with mobilization and demobilization.

When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.

When 15% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 8% of the original Contract amount, whichever is lesser, will be paid.

Upon completion of work for the project, payment of the amount bid for mobilization in excess of 8% of the original Contract amount, will be paid.

1.13.2 Unit of Measure

Unit of measure: job.

1.14 SURVEY - STAKE OUT - MUD SPRING

1.14.1 Payment

Payment will be made for all costs associated with surveying and staking out the work.

1.14.2 Unit of Measure

Unit of measure: Job.

1.15 WIRE FENCING - MUD SPRING

1.15.1 Payment

Payment will be made for all costs associated with providing wire fencing. Including the trail access gap, wire gate, end panels, and corner panels.

SECTION 01 20 00 Page 6

1.15.2 Unit of Measure

Unit of measure: Linear Foot.

1.16 STEEL POST AND CABLE FENCE - MUD SPRING

1.16.1 Payment

Payment will be made for all costs associated with providing steel post and wire rope fencing.

1.16.2 Unit of Measure

Unit of measure: linear foot, measured straight between posts.

1.17 STEEL POST FENCE - ACCESS GAP - MUD SPRING

1.17.1 Payment

Payment will be made for all costs associated with providing the access gap. Including transportation, preparation, grading, foundation, and erection.

1.17.2 Unit of Measure

Unit of measure: Each.

1.18 GATE - MUD SPRING

1.18.1 Payment

Payment will be made for all costs associated with providing a gate.

Including lock open post, signs, painting and foundation.

1.18.2 Unit of Measure

Unit of measure: Each.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 20 00 Page 7

SECTION 01 32 01

PROJECT SCHEDULE

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Initial Project Schedule ; G

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

Prepare for approval a Project Schedule, as specified herein, and pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required.

3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS

3.2.1 Level of Detail Required

Develop the Project Schedule to the appropriate level of detail to address major milestones, work listed in the bid schedule, and to allow for satisfactory project planning and execution.

3.2.2 Mandatory Tasks

Include the following activities/tasks in the initial project schedule and all updates.

a. Submission, review and acceptance of submittals.

b. Long procurement activities.

c. Contractor's pre-final inspection.

d. Government's pre-final inspection.

e. Final inspection.

SECTION 01 32 01 Page 8

3.2.3 Government Activities

Include Government activities that could impact progress. These activities include, but are not limited to: Government inspections of work, Government approval of submittals.

3.3 WEEKLY PROGRESS MEETINGS

Conduct a weekly meeting with the Government for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress and to review planned activities.

3.4 FAILURE TO ACHIEVE PROGRESS

Should the progress fall behind the approved project schedule, the Contracting Officer may require provision of a written recovery plan for approval. The plan must detail how progress will be made-up to include which activities will be accelerated by adding additional crews, longer work hours, extra work days, etc.

3.4.1 Failure to Perform

Failure to perform work and maintain progress in accordance with the supplemental recovery plan may result in an interim and final unsatisfactory performance rating and may result in corrective action directed by the Contracting Officer pursuant to FAR 52.236-15 Schedules for Construction Contracts, FAR 52.249-10 Default (Fixed-Price Construction), and other contract provisions.

3.4.2 Recovery Schedule

Should the Contracting Officer find it necessary, submit a recovery schedule pursuant to FAR 52.236-15 Schedules for Construction Contracts.

SECTION 01 32 01 Page 9

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only.

1.2 INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the Contracting Officer's Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract.

This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government.

1.3 GOVERNMENT APPROVING AUTHORITY

The Contracting Officer's Representative will:

a. Note the date on which the submittal was received.

b. Review submittals for approval within 10 days of receipt.

c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.

Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the Contractor.

1.3.1 Review Notations

Submittals will be returned to the Contractor with the following notations:

a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.

b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.

c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until

SECTION 01 33 00 Page 10 resubmittal is approved.

d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.

e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the Government. This applies only to "information-only submittals" as previously defined.

1.4 DISAPPROVED SUBMITTALS

Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer.

If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

1.5 APPROVED SUBMITTALS

The Contracting Officer's approval of submittals is not to be construed as a complete check.

Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 33 00 Page 11

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES

TRFO Weber Mt WSA Parking and Mud Spring Fencing 2023

01 32 01 SD-01 Preconstruction Submittals

GInitial Project Schedule

01 46 00 SD-01 Preconstruction Submittals

1.2 GQuality Control (QC) Manager

01 57 60 SD-01 Preconstruction Submittals

3.4 GSpill Prevention And Cleanup

Plan

SD-11 Closeout Submittals

3.3 GPhotographic Documentation

05 50 13 SD-11 Closeout Submittals

3.5 GPhotographic Documentation

3.6 GPhotographic Documentation

12 93 00 SD-03 Product Data

2.2 GConcrete Parking Stops

2.3 GHidden Drive Sign

31 00 00 SD-03 Product Data

2.1 GAggregate Base Course

SD-07 Certificates

3.8Aggregate Weight Tickets

SD-11 Closeout Submittals

3.7.2 GPhotographic Documentation

3.7.4 GPhotographic Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SECTION 01 46 00

QUALITY CONTROL

PART 1 GENERAL

1.1 QUALITY CONTROL

Contractor shall establish and maintain an effective quality control (QC) system that complies with FAR 52.246-12 Inspection of Construction.

Quality control (QC) is comprised of plans, procedures, and organization necessary to produce an end product that complies with the contract requirements.

1.2 QUALITY CONTROL MANAGER

Provide a quality control (QC) manager at the work site to implement and manage the QC program. The QC Manager may also be the project superintendent.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Quality Control (QC) Manager ; G

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 QUALITY CONTROL

Contractor shall ensure that the construction complies with the requirements of the contract. At a minimum, perform the following prior to beginning work on each definable feature of work:

Review each paragraph of the applicable specification sections.

Review the contract drawings.

Verify that appropriate submittals have been approved.

Verify that the required preliminary work has been completed and complies with the contract.

Do not build upon nor conceal non-conforming work.

SECTION 01 46 00 Page 12

SECTION 01 57 60

SUPPLEMENTAL ENVIRONMENTAL CONTROLS

PART 1 GENERAL

1.1 DEFINITIONS

Equipment: for the purpose of this specification, equipment shall include, but isn't limited to; dozers, backhoes, trackhoes, trailers, graders, compactors, or any other construction equipment used to accomplish the work. Passenger vehicles are not considered equipment.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Spill Prevention And Cleanup Plan ; G

SD-11 Closeout Submittals

Photographic Documentation ; G

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 EROSION CONTROL

Contractor shall implement measures, as necessary, to control erosion.

Contractor shall inspect site after rain (or melt) events and mitigate areas where erosion or sediment runoff is occurring. Erosion includes wind. Contractor shall water exposed soils, as necessary, to prevent wind erosion.

3.2 FIRE PREVENTION

All equipment shall have a spark arrester installed. The Contractor shall have a fire extinguisher and shovel readily available to contain and extinguish fires.

3.3 EQUIPMENT CLEANING AND MAINTENANCE

Equipment shall be cleaned prior to arriving on site. Equipment shall arrive on site free from dirt, debris, weeds, and seeds. All equipment shall be inspected by the Contracting Officer's Representative, on site, and prior to unloading. Notify the Contracting Officer's Representative at least 7 days prior to equipment delivery to coordinate inspection. If equipment leaves the jobsite, and returns at a later date, then equipment shall be re-inspected before reentering the work site.

SECTION 01 57 60 Page 13

Equipment maintenance will not be allowed on site. Equipment leaking fluids shall be removed from site.

Provide photographic documentation in accordance with section 01 80 00 .

Provide pictures demonstrating equipment is clean while the equipment is onsite, and prior to unloading. Pictures shall show the equipment and the project site in the same photograph.

3.4 SPILL PREVENTION

The Contractor shall submit a spill prevention and cleanup plan. The spill prevention and cleanup plan shall identify foreseeable accidents, including spills while adding fluids to equipment, and identify an action plan to rapidly clean all accidents. Cleanup materials and equipment shall be on site during work.

3.5 WASTE CONTROL

All waste generated by the work shall be contained and removed from the site and disposed of in a legal manor.

SECTION 01 57 60 Page 14

SECTION 01 80 00

PHOTOGRAPHIC DOCUMENTATION

PART 1 GENERAL

1.1 SUMMARY OF WORK

Document that the work is in compliance with contract requirements.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 PHOTOGRAPHS

Provide photographs in sufficient detail and quantity to demonstrate compliance with contract requirements. Submit electronic photographs via email. Photographs sent via text message will not be accepted.

Photographs do not negate requirements for Contracting Officer's Representative's inspections and approvals on specified items of work.

SECTION 01 80 00 Page 15

SECTION 02 20 00

SURVEY AND PROJECT STAKEOUT

PART 1 GENERAL

1.1 SECTION SUMMARY

The contractor shall stake out the project as detailed on the drawings.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 PROJECT STAKEOUT

The contractor shall stake out the project as detailed on the drawings, or as required for construction.

3.2 STAKEOUT REVIEW

The Contracting Officer's Representative and the Contractor shall review the layout, as staked, together prior to ground disturbance. The Contractor shall coordinate a date for the review that works for both the Contractor and the Contracting Officer's Representative.

The Contracting Officer's Representative may make minor modifications to the layout in order to minimize the damage to existing vegetation, or for constructability. The contractor shall receive approval of the stakeout prior to clearing and grubbing, or other earth disturbing activities.

SECTION 02 20 00 Page 16

SECTION 02 41 00

DEMOLITION

PART 1 GENERAL

Provide all materials and labor necessary to demolish and remove the Weber Mountain WSA fencing.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 FENCE REMOVAL

Exact location of fence removal shall be staked by the Contracting Officer's Representative. Do not disturb the fence located on private land.

Take necessary precautions to avoid damage to existing trees and vegetation which might be damaged during demolition.

Approximate Removal Quantities Location Approximate Linear Feet

Parking Area 450

Road 41 1,600

3.2 DISPOSAL OF REMOVED MATERIALS

All materials removed, shall become the property of the Contractor and shall be removed from Government property and disposed of in a legal manor.

SECTION 02 41 00 Page 17

SECTION 03 30 00

CAST-IN-PLACE CONCRETE

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C387/C387M (2017) Standard Specification for Packaged, Dry, Combined Materials for Concrete and High Strength Mortar

PART 2 PRODUCTS

2.1 CONCRETE

Prepackaged concrete mix shall be identified as conforming to ASTM C387/C387M Normal Strength Concrete; Normal Weight Concrete, with a minimum compressive strength of 4,500 psi.

PART 3 EXECUTION

3.1 PREPACKAGED CONCRETE MIXTURE

Use the minimum amount of water to make the mixture. Adding too much water to the mixture will greatly reduce the overall compressive strength. Average slump shall be between 2" to 4".

3.2 FOOTINGS

Concrete for footings may be placed in excavations without forms.

Excavation width must be a minimum of 4 inches greater than indicated if forms are not used.

3.3 CONCRETE CONSOLIDATION

Concrete shall be adequately vibrated, rodded, or spaded into place to fill voids.

SECTION 03 30 00 Page 18

SECTION 05 50 12

STEEL GATE - ROAD

PART 1 GENERAL

Provide a steel gate as shown on the plans and as specified below.

1.1 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2020) Structural Welding Code - Steel

PART 2 PRODUCTS

2.1 STEEL

Steel shall pipe shall be in accordance with ASTM A53/A53M.

2.2 SIGNS

Signs shall comply with the Manual of Uniform Traffic Control Devices (MUTCD). OM4-1 signs shall be 18" x 18". OM2-2V signs shall be 12" x 6".

2.3 CONCRETE

In accordance with section 03 30 00 .

PART 3 EXECUTION

3.1 FABRICATION, WELDING, AND INSTALLATION

Verify all dimensions prior to fabrication. Perform welding in accordance with AWS D1.1/D1.1M . Field verify post locations prior to setting. Set posts vertically in concrete piers. Fill posts with concrete.

3.2 PAINT

Paint all surfaces in accordance with section 09 90 10 .

3.3 SIGNS

Firmly secure signs to the gate and gate posts. Provide galvanized or stainless steel hardware.

SECTION 05 50 12 Page 19

3.4 CONCRETE FOUNDATION

Provide concrete in accordance with section 03 30 00 CAST-IN-PLACE CONCRETE. The end posts and corner posts shall have a concrete foundation.

Provide photographic documentation in accordance with section 01 80 00 PHOTOGRAPHIC DOCUMENTATION of the concrete foundation. Show the depth and width of the foundation, prior to concrete placement.

SECTION 05 50 12 Page 20

SECTION 05 50 20

STEEL POST AND CABLE FENCE AND ACCESS GAP

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel

ASTM INTERNATIONAL (ASTM)

ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A500/A500M (2018) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-11 Closeout Submittals

Photographic Documentation ; G

PART 2 PRODUCTS

2.1 STEEL PIPE

Provide in accordance with ASTM A500/A500M or ASTM A53/A53M as applicable.

Pipe shall be either:

a. 3.5 inch (3 inch nominal), schedule 80 steel.

b. 2-7/8 inch drill pipe, 0.362 inch wall thickness, steel.

Used pipe may be supplied for the steel posts; however pipe must be clean of excessive oil, grease, rust, etc. Used pipe must be straight and have no dents, bends, or obvious defects. All other materials shall be new.

2.2 PAINTING

Painting is not required.

SECTION 05 50 13 Page 21

2.3 WIRE ROPE

9/16 inch diameter, 6x26 Warrington or Seale strand configuration.

PART 3 EXECUTION

3.1 GENERAL INSTALLATION REQUIREMENTS

Verify all field dimensions prior to fabrication. Set steel pipe vertical and plumb. Layout the fence line continuous and straight, make curves consistent and smooth. Drive posts without disturbing in-situ soil.

3.2 WELDING

Perform welding in accordance with AWS D1.1/D1.1M

3.3 WIRE ROPE

Wire rope shall be permanently and securely fastened to every third fence post to prevent movement of wire through the post. There are several different ways to achieve this requirement. The detail on the plans is one possible way. The contractor may propose, for approval, any method that permanently prevents movement of wire through the post.

Wire rope shall be installed with as few splices as practical.

3.4 ACCESS GAP IN THE FENCE

Construct access gap as shown on the plans. Set steel pipe vertical and plumb.

3.5 CONCRETE FOUNDATION - FENCE POSTS

Provide concrete in accordance with section 03 30 00 CAST-IN-PLACE

CONCRETE.

Ten (10) fence posts shall have a concrete foundation. The fence posts with the concrete foundation shall be end or corner posts. The remaining fence posts do not require a concrete foundation.

Provide photographic documentation in accordance with section 01 80 00 PHOTOGRAPHIC DOCUMENTATION of the concrete foundation. Show the depth and width of the foundation, prior to concrete placement.

3.6 CONCRETE FOUNDATION - ACCESS GAP POSTS

Provide concrete in accordance with section 03 30 00 CAST-IN-PLACE

CONCRETE.

All access gap posts shall have a concrete foundation.

Provide photographic documentation in accordance with section 01 80 00 PHOTOGRAPHIC DOCUMENTATION of the concrete foundation. Show the depth and width of the foundation, prior to concrete placement.

SECTION 05 50 13 Page 22

SECTION 09 90 10

PAINTING

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

Paint the vehicle gate.

PART 2 PRODUCTS

2.1 PRIMER

Sherwin-Williams: "Multi-Purpose Interior/Exterior Latex Primer/Sealer".

2.2 PAINT

Wood and Metal Surfaces:

Sherwin-Williams: "All Surface Enamel Latex".

2.3 PAINT COLOR

Color shall be Sherwin Williams "7512 Pavilion Beige".

PART 3 EXECUTION

3.1 SURFACE PREPARATION

Remove dirt, splinters, loose particles, disintegrated coatings, and other foreign matter and substances prior to applying paint.

3.2 APPLICATION

Apply primer to metal surfaces.

Apply two coats of paint to all surfaces. Allow time between coats to permit thorough drying.

Only apply paints to surfaces that are completely free of moisture as determined by sight or touch.

Apply each coat of paint so that dry film is of uniform thickness and free from runs, drops, ridges, waves, pinholes or other voids, laps, brush marks, and variations in color, texture, and finish.

SECTION 09 90 10 Page 23

SECTION 12 93 00

SITE FURNISHINGS

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Concrete Parking Stops ; G

Hidden Drive Sign ; G

PART 2 PRODUCTS

2.1 STEEL PARKING DELINEATORS

Steel parking delineators shall be schedule 40 steel pipe. Used pipe may be supplied; however pipe must be clean and free of oil, grease, rust, etc. Pipe must be straight and have no dents, bends, or obvious defects.

2.2 CONCRETE PARKING STOPS

Parking stops shall be reinforced concrete. With minimum dimensions of;

six foot length, eight inch width, and 5 inch height.

2.3 HIDDEN DRIVE SIGN

Sign shall have the text "HIDDEN DRIVE AHEAD".

24" x 24" Engineer grade reflective aluminum sign https://www.myparkingsign.com/ Sign: K-6530-EG-24x24, or approved equal.

2.4 HIDDEN DRIVE SIGN POST

Steel, U-Channel sign post, 8 foot total length, 1-3/8" channel depth, 3/8" holes on 1" centers, and be painted brown.

2.5 BOULDERS

Imported boulders shall be solid rock and have a roughly cubic shape with minimum dimensions of 24 inches in all directions.

PART 3 EXECUTION

3.1 STEEL PARKING DELINEATORS

Steel parking delineators shall be installed as shown on the drawings.

Tops of the steel parking delineators shall be set three inches above the finished grade of the aggregate surfacing.

SECTION 12 93 00 Page 24

3.2 CONCRETE PARKING STOPS

Each parking stop shall be held in place with two (2) #4 rebars, 24 inches long.

3.3 BOULDERS

Bury boulders as shown on the plans.

3.4 RELOCATE EXISTING SIGN

Relocate the existing Weber Mountain WSA sign. Install the sign plumb.

Provide a concrete foundation around the sign posts. Minimum concrete foundation dimensions per post: 12 inch diameter and 18 inch depth.

SECTION 12 93 00 Page 25

SECTION 31 00 00

EARTHWORK

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-03 Product Data

Aggregate Base Course ; G

SD-07 Certificates

Aggregate Weight Tickets

SD-11 Closeout Submittals

Photographic Documentation ; G

PART 2 PRODUCTS

2.1 AGGREGATE BASE COURSE

Aggregate base course shall meet the requirements of Colorado Department of Transportation Standard Specifications for Road and Bridge Construction 2022, section 703 AGGREGATES. Aggregate base course gradation shall meet the gradation shown in Table 703-2, Class 6.

PART 3 EXECUTION

3.1 UNDERGROUND UTILITIES

The Contractor is responsible for locating underground utilities prior to construction. The Government is not aware of any underground utilities, however the Contractor shall verify the presence or absence prior to construction.

3.2 GENERAL EXCAVATION

Perform excavation of every type of material encountered to the lines, grades, and elevations indicated and as specified. Perform excavation and fill in a manner and sequence that will provide proper drainage at all times, including during construction.

3.3 GROUND SURFACE PREPARATION

Clear and grub in accordance with section 31 11 00 . Do not perform construction when surfaces are frozen or muddy. Prepare the subgrade to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Shape subgrade to drain.

SECTION 31 00 00 Page 26

3.4 EARTHWORK QUANTITIES

Location Cut (Cubic Yards) Fill (Cubic Yards) Net (Cubic Yards)

Weber Mt WSA 90 10 80

3.5 INTERSECTION WITH COUNTY ROAD 41

The new road shall match the existing elevation at County Road 41.

3.6 VIBRATORY COMPACTION EQUIPMENT

Vibratory compaction equipment shall have a minimum of 10,000 pounds impact per vibration and a minimum frequency of 1,000 vibrations per minute.

3.7 AGGREGATE PLACEMENT LOCATIONS

3.7.1 Subgrade

Contractor shall prepare the subgrade to the lines and grades shown on the plans.

3.7.2 Subgrade Compaction

Moisten material as necessary to achieve compaction. Compact the subgrade by operating vibratory compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.

Provide photographic documentation in accordance with section 01 80 00 .

3.7.3 Aggregate Base Course

Contractor shall receive approval of the subgrade prior to placing aggregate base course. Place base course aggregate to the lines and grades shown on the plans.

3.7.4 Aggregate Base Course Compaction

Moisten material as necessary to achieve compaction. Compact the base course aggregate by operating vibratory compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.

Provide photographic documentation in accordance with section 01 80 00 .

3.8 AGGREGATE WEIGHT TICKETS

Submit aggregate weight tickets . Weight tickets are required prior to payment.

3.9 EXCESS MATERIAL DISPOSAL

Excess cut material shall be placed uniformly on site, at designated locations. Excess cut material shall not be removed from the work site.

SECTION 31 00 00 Page 27

3.10 FINISHING

Finish the surfaces to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Provide the degree of finish for graded areas within 0.2 foot of the grades and elevations indicated. Finish surfaces in a manner that will result in effective drainage, regardless of tolerance.

SECTION 31 00 00 Page 28

SECTION 31 11 00

CLEARING AND GRUBBING

PART 1 GENERAL

Not Used.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 SURVEY STAKE OUT

Prior to clearing and grubbing, the contractor shall stake out the roads and parking areas, as detailed on the drawings, in accordance with 02 20 00 SURVEY AND PROJECT STAKEOUT. The Contracting Officer's Representative will review the layout as staked and may make minor modifications to the layout in order to minimize the damage to existing vegetation. The contractor shall receive approval of the stakeout prior to clearing and grubbing.

3.2 CLEARING AND GRUBBING LIMITS

Clearing and grubbing limits shall be within the road and parking areas, including the ditches.

3.3 PROTECTION

Protect trees and vegetation from damage incident to clearing, grubbing, and construction operations.

3.4 CLEARING

Clearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Trees, stumps, roots, brush, and other vegetation in areas to be cleared shall be cut off flush with or below the original ground surface.

3.5 GRUBBING

Grubbing consists of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas.

Remove material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, to a depth of not less than 12 inches below the original surface level of the ground in the area of new road construction. Fill depressions made by grubbing with suitable material and compact to make the surface conform with the original adjacent surface of the ground.

SECTION 31 11 00 Page 29

3.6 DISPOSAL OF CLEARING AND GRUBBING VEGETATION

Dispose of clearing and grubbing material in locations designated on the plans. Logs, stumps, roots, brush, rotten wood, and other organic material resulting from the clearing and grubbing operations, shall be uniformly scattered on site in piles less than 18 inches off the ground.

Process, mulch, cut, or limb material as necessary to comply with disposal pile requirements.

SECTION 31 11 00 Page 30

SECTION 32 31 26

WIRE FENCE AND TRAIL ACCESS GAP

PART 1 GENERAL

1.1 CRITERIA FOR BIDDING

End panels, corner panels, and the wire gate are included in the bid schedule cost for wire fencing, measured and paid by linear foot. The following are required:

Item Quantity

End Panels 4

Corner Panels 8

Wire Gate 1

The contractor is responsible for determining the quantity of the remaining fence items, including, but not limited to; wood line posts, metal line posts, wire stays, wire.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)

AWPA U1 (2017) Use Category System: User Specification for Treated Wood

ASTM INTERNATIONAL (ASTM)

ASTM A121 (2013) Standard Specification for Metallic-Coated Carbon Steel Barbed Wire

ASTM A702 (2013) Standard Specification for Steel Fence Posts and Assemblies, Hot Wrought

PART 2 PRODUCTS

2.1 BARBLESS WIRE

Barbless wire shall be a strand of two (2) 12-1/2-gauge, galvanized wires twisted together. Wire shall be a Class 1 zinc coating as per ASTM A121.

The minimum breaking strength of each wire shall be 950-lb force. The barbless wire shall conform to ASTM A121.

SECTION 32 31 26 Page 31

2.2 WOOD POSTS AND BRACES - PANELS AND GATES

Wood posts and braces used for the panels and gates shall be sound single-stem members of round cross section and have 5 inches minimum diameter at the small end. Provide posts free of ring shake, season cracks more than 1/4 inch wide, splits in the end, and unsound knots.

Treat posts in accordance with AWPA U1.

2.3 WOOD FENCE POSTS

Wood fence posts shall be sound single-stem members of round cross section and have 4 inches minimum diameter at the small end. Provide posts free of ring shake, season cracks more than 1/4 inch wide, splits in the end, and unsound knots. Treat posts in accordance with AWPA U1.

2.4 STEEL FENCE POSTS

Steel fence posts shall conform to ASTM A702; green with white or silver top "T" bar type, with a welded or riveted anchor plate. Furnish with clip-type wire fasteners (punched tabs for fastening wires are not acceptable). Steel posts shall be manufactured from wrought, rail or new billet steel, shall have a minimum weight of 1.33 pounds per linear foot.

The anchor plates shall weigh a minimum of 0.67 pounds and shall have a minimum area of 18 square inches.

PART 3 EXECUTION

3.1 ALIGNMENT

The Contractor shall stake the fence alignment for approval by the Contracting Officer's Representative in accordance with section 02 20 00

SURVEY AND PROJECT STAKEOUT.

3.2 CLEARING

Clearing shall be limited to cutting of brush in the fence line alignment. Maximum clearing width is 6 feet on each side of the fence line. Minimize disturbance to existing vegetation.

3.3 END PANELS, CORNER PANELS, AND GATE PANELS

Construct as shown on the drawings. Corner panels shall be constructed at changes in fence alignment. End and corner panels shall be used to construct the trail intersection gap.

Set posts plumb in dug or drilled holes. Post holes shall provide adequate open space around the post so backfill can be tamped the full depth around the post. Place backfill in layers of 9 inches or less, moistened to optimum condition, and compacted with hand tampers. Notch posts at the connection with the rail.

3.4 WOOD LINE POSTS

Set posts plumb in dug or drilled holes. Post holes shall provide adequate open space around the post so backfill can be tamped the full depth around the post. Place backfill in layers of 9 inches or less, moistened to optimum condition, and compacted with hand tampers.

SECTION 32 31 26 Page 32

3.4.1 Wood Line Post Frequency

Every third line post shall be a wood post.

3.5 STEEL LINE POSTS

Posts shall be driven plumb.

3.6 WIRE

Wire is properly stretched when it is springy to the touch. Stretch tightly and staple to wood posts or securely attach to steel posts with standard manufactured wire clips. Drive staples into wood until the staple comes in contact with the wire against the post, but not so tight as to crimp the wire or prevent free movement of the wire between the post and the staple. Do not drive staples parallel to the grain of the wood.

3.7 WIRE CLIPS

Wire clips shall be used on every wire at steel post locations. Secure wire to steel posts by bending clip ends over or around wire, crimping ends to secure wire on both sides of the post, but not so tight as to prevent free movement of the wire through the clip. Each side of the clip shall be twisted around the wire and back parallel to the clip itself.

3.8 BRACE WIRE

Shall be double looped in a crisscross fashion, twisted tight with either four plies of 9-gauge smooth wire or 8 plies of 12-1/2-gauge wires. Leave one end of the stick long enough to fasten behind the horizontal brace to prevent wire from unwinding.

3.9 SPIKING

Predrilled lead holes shall be used. The hole diameter shall be three-fourths the diameter of the spike and drilled to a depth that is one-half the length of the spike.

3.10 TRAIL ACCESS GAP

Provide a trail access gap. Trail access gap shall be constructed using end and corner panels.

3.11 WIRE GATE

Provide a wire gate at the south intersection with the existing fence.

SECTION 32 31 26 Page 33

PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 - SUMMARY OF WORK
PART 1 GENERAL
1.1 PROJECT DESCRIPTION
1.2 LOCATION
1.2.1 Weber Mountain WSA
1.2.2 Mud Spring

1.3 WORK SCHEDULE

PART 2 PRODUCTS
PART 3 EXECUTION
01 20 00 - PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 MOBILIZATION AND DEMOBILIZATION - WEBER MOUNTAIN WSA
1.1.1 Payment
1.1.2 Unit of Measure
1.2 DEMOLITION - WEBER MOUNTAIN WSA
1.2.1 Payment
1.2.2 Unit of Measure
1.3 SURVEY - STAKE OUT - WEBER MOUNTAIN WSA
1.3.1 Payment
1.3.2 Unit of Measure
1.4 CLEARING AND GRUBBING - WEBER MOUNTAIN WSA
1.4.1 Payment
1.4.2 Unit of Measure
1.5 SITE GRADING - WEBER MOUNTAIN WSA
1.5.1 Payment
1.5.2 Unit of Measure
1.6 MOISTURE CONDITIONING AND COMPACTION - WEBER MOUNTAIN WSA
1.6.1 Payment
1.6.2 Unit of Measure
1.7 AGGREGATE BASE COURSE - WEBER MOUNTAIN WSA
1.7.1 Payment
1.7.2 Unit of Measure
1.8 STEEL PARKING DELINEATOR - WEBER MOUNTAIN WSA
1.8.1 Payment
1.8.2 Unit of Measure
1.9 CONCRETE PARKING STOP - WEBER MOUNTAIN WSA
1.9.1 Payment
1.9.2 Unit of Measure
1.10 BOULDERS - WEBER MOUNTAIN WSA
1.10.1 Payment
1.10.2 Unit of Measure
1.11 RELOCATE EXISTING SIGN - WEBER MOUNTAIN WSA
1.11.1 Payment
1.11.2 Unit of Measure
1.12 HIDDEN DRIVE SIGN - WEBER MOUNTAIN WSA
1.12.1 Payment
1.12.2 Unit of Measure
1.13 MOBILIZATION AND DEMOBILIZATION - MUD SPRING
1.13.1 Payment
1.13.2 Unit of Measure
1.14 SURVEY - STAKE OUT - MUD SPRING
1.14.1 Payment
1.14.2 Unit of Measure
1.15 WIRE FENCING - MUD SPRING
1.15.1 Payment
1.15.2 Unit of Measure
1.16 STEEL POST AND CABLE FENCE - MUD SPRING
1.16.1 Payment
1.16.2 Unit of Measure
1.17 STEEL POST FENCE - ACCESS GAP - MUD SPRING
1.17.1 Payment
1.17.2 Unit of Measure
1.18 GATE - MUD SPRING
1.18.1 Payment
1.18.2 Unit of Measure
PART 2 PRODUCTS
PART 3 EXECUTION
01 32 01 - PROJECT SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.2.1 Level of Detail Required
3.2.2 Mandatory Tasks
3.2.3 Government Activities
3.3 WEEKLY PROGRESS MEETINGS
3.4 FAILURE TO ACHIEVE PROGRESS
3.4.1 Failure to Perform
3.4.2 Recovery Schedule
01 33 00 - SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
1.2 INFORMATION ONLY SUBMITTALS
1.3 GOVERNMENT APPROVING AUTHORITY
1.3.1 Review Notations
1.4 DISAPPROVED SUBMITTALS
1.5 APPROVED SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
01 46 00 - QUALITY CONTROL
PART 1 GENERAL
1.1 QUALITY CONTROL
1.2 QUALITY CONTROL MANAGER
1.3 SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 QUALITY CONTROL
01 57 60 - SUPPLEMENTAL ENVIRONMENTAL CONTROLS
PART 1 GENERAL
1.1 DEFINITIONS
1.2 SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 EROSION CONTROL
3.2 FIRE PREVENTION
3.3 EQUIPMENT CLEANING AND MAINTENANCE
3.4 SPILL PREVENTION
3.5 WASTE CONTROL
01 80 00 - PHOTOGRAPHIC DOCUMENTATION
PART 1 GENERAL
1.1 SUMMARY OF WORK
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 PHOTOGRAPHS
DIVISION 02 - EXISTING CONDITIONS
02 20 00 - SURVEY AND PROJECT STAKEOUT
PART 1 GENERAL
1.1 SECTION SUMMARY
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 PROJECT STAKEOUT
3.2 STAKEOUT REVIEW
02 41 00 - DEMOLITION
PART 1 GENERAL
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 FENCE REMOVAL
3.2 DISPOSAL OF REMOVED MATERIALS
DIVISION 03 - CONCRETE
03 30 00 - CAST-IN-PLACE CONCRETE
PART 1 GENERAL
1.1 REFERENCES
PART 2 PRODUCTS
2.1 CONCRETE
PART 3 EXECUTION
3.1 PREPACKAGED CONCRETE MIXTURE
3.2 FOOTINGS
3.3 CONCRETE CONSOLIDATION
DIVISION 05 - METALS
05 50 12 - STEEL GATE - ROAD
PART 1 GENERAL
1.1 REFERENCES
PART 2 PRODUCTS
2.1 STEEL
2.2 SIGNS
2.3 CONCRETE
PART 3 EXECUTION
3.1 FABRICATION, WELDING, AND INSTALLATION
3.2 PAINT
3.3 SIGNS
3.4 CONCRETE FOUNDATION
05 50 13 - STEEL POST AND CABLE FENCE AND ACCESS GAP
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
PART 2 PRODUCTS
2.1 STEEL PIPE
2.2 PAINTING
2.3 WIRE ROPE
PART 3 EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
3.2 WELDING
3.3 WIRE ROPE
3.4 ACCESS GAP IN THE FENCE
3.5 CONCRETE FOUNDATION - FENCE POSTS
3.6 CONCRETE FOUNDATION - ACCESS GAP POSTS
DIVISION 09 - FINISHES
09 90 10 - PAINTING
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
PART 2 PRODUCTS
2.1 PRIMER
2.2 PAINT
2.3 PAINT COLOR
PART 3 EXECUTION
3.1 SURFACE PREPARATION
3.2 APPLICATION
DIVISION 12 - FURNISHINGS
12 93 00 - SITE FURNISHINGS
PART 1 GENERAL
1.1 SUBMITTALS
PART 2 PRODUCTS
2.1 STEEL PARKING DELINEATORS
2.2 CONCRETE PARKING STOPS
2.3 HIDDEN DRIVE SIGN
2.4 HIDDEN DRIVE SIGN POST
2.5 BOULDERS
PART 3 EXECUTION
3.1 STEEL PARKING DELINEATORS
3.2 CONCRETE PARKING STOPS
3.3 BOULDERS
3.4 RELOCATE EXISTING SIGN
DIVISION 31 - EARTHWORK
31 00 00 - EARTHWORK
PART 1 GENERAL
1.1 SUBMITTALS
PART 2 PRODUCTS
2.1 AGGREGATE BASE COURSE
PART 3 EXECUTION
3.1 UNDERGROUND UTILITIES
3.2 GENERAL EXCAVATION
3.3 GROUND SURFACE PREPARATION
3.4 EARTHWORK QUANTITIES
3.5 INTERSECTION WITH COUNTY ROAD 41
3.6 VIBRATORY COMPACTION EQUIPMENT
3.7 AGGREGATE PLACEMENT LOCATIONS
3.7.1 Subgrade
3.7.2 Subgrade Compaction
3.7.3 Aggregate Base Course
3.7.4 Aggregate Base Course Compaction
3.8 AGGREGATE WEIGHT TICKETS
3.9 EXCESS MATERIAL DISPOSAL
3.10 FINISHING
31 11 00 - CLEARING AND GRUBBING
PART 1 GENERAL
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 SURVEY STAKE OUT
3.2 CLEARING AND GRUBBING LIMITS
3.3 PROTECTION
3.4 CLEARING
3.5 GRUBBING
3.6 DISPOSAL OF CLEARING AND GRUBBING VEGETATION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 31 26 - WIRE FENCE AND TRAIL ACCESS GAP
PART 1 GENERAL
1.1 CRITERIA FOR BIDDING
1.2 REFERENCES
PART 2 PRODUCTS
2.1 BARBLESS WIRE
2.2 WOOD POSTS AND BRACES - PANELS AND GATES
2.3 WOOD FENCE POSTS
2.4 STEEL FENCE POSTS
PART 3 EXECUTION
3.1 ALIGNMENT
3.2 CLEARING
3.3 END PANELS, CORNER PANELS, AND GATE PANELS
3.4 WOOD LINE POSTS
3.4.1 Wood Line Post Frequency
3.5 STEEL LINE POSTS
3.6 WIRE
3.7 WIRE CLIPS
3.8 BRACE WIRE
3.9 SPIKING
3.10 TRAIL ACCESS GAP
3.11 WIRE GATE

File details come from the government source that posted it. Updated .