A06_-_140L1722R0008-Specifications_1.pdf
PDF 506 KB Posted
- Attached to
- GAOA, TRFO PAINTED HAND Federal contract opportunity
- Solicitation number
- 140L1722R0008
About this file
This solicitation package outlines requirements for a construction project at the Painted Hand Site located within the Canyons of the Ancients National Monument in Colorado. Work includes road and parking area construction, fencing, a precast concrete toilet, gazebo, kiosk, picnic tables, and demolition. A pre-bid site tour will be held on July 12, 2022. The solicitation will be set aside for small businesses with a NAICS code of 237990 and size standard of $39.5 million. The estimated price range is $250,000 to $500,000. The solicitation is anticipated to be issued on July 12, 2022 and should be monitored on SAM.gov. The Bureau of Land Management Colorado Region is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A04_-_140L1722R0008-Schedule_of_Items_1.pdf | ||
| A06_-_140L1722R0008-Plans_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior Bureau of Land Management
Tres Rios Field Office Canyons of the Ancients National Monument
Painted Hand Site Improvements and Road Relocation
SPECIFICATIONS
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 20 00 PRICE AND PAYMENT PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 57 60 SUPPLEMENTAL ENVIRONMENTAL CONTROLS
DI VI SI ON 05 - METALS
05 50 13 STEEL POST AND CABLE FENCE
05 50 20 GAZEBO
DI VI SI ON 09 - FI NI SHES
09 90 10 PAINTING
DI VI SI ON 12 - FURNI SHI NGS
12 60 00 PRECAST CONCRETE TOILET BUILDING
12 93 00 SITE FURNISHINGS
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 00 50 ROAD CONSTRUCTION, RECONSTRUCTION, AND RECONDITIONING
31 11 00 CLEARING AND GRUBBING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 PROJECT DESCRIPTION
The work includes, but is not limited to; road and parking area construction, fencing, precast concrete toilet, gazebo, kiosk, picnic tables, and demolition.
1.2 LOCATION
The project is located in Montezuma County, CO. Approximately 35 miles west of the city of Cortez, CO. Within the Canyons of the Ancients National Monument.
Latitude 37.453883° Longitude -108.972237°
Driving directions from Cortez, CO: Travel north on 491, Turn west on BB, Turn South on 10.
1.3 WORK SCHEDULE
Work shall occur Monday - Friday, excluding federal holidays.
1.4 PUBLIC ACCESS DURING CONSTRUCTION
The road access's the Hovenweep National Park Monument. Public vehicle access must be provided at all times during the work. The road may not be closed to the public. Allow public access to the existing Painted Hand parking area until the proposed parking area is complete.
1.5 SPECIAL COORDINATION
The project is located within an archaeologically sensitive area. All earth disturbance must be monitored by the Canyons of the Ancients National Monument (CANM) archaeologist. Earth disturbance will not be allowed without the archaeologist present. The archaeologist will monitor the work for disturbance to archaeological sites.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
Payment items for the work of this contract for which contract payments will be made are listed in the SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job are included in the listed job item most closely associated with the work involved. The price and payment made for each item listed constitutes full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1 MOBILIZATION AND DEMOBILIZATION
1.1.1 Payment
Payment will be made for costs associated with mobilization and demobilization.
When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.
When 15% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 8% of the original Contract amount, whichever is lesser, will be paid.
Upon completion of work for the project, payment of the amount bid for mobilization in excess of 8% of the original Contract amount, will be paid.
1.1.2 Unit of Measure
Unit of measure: job.
1.2 SURVEY - STAKE OUT
1.2.1 Payment
Payment will be made for all costs associated with surveying and staking out the work.
1.2.2 Unit of Measure
Unit of measure: Job.
SECTION 01 20 00 Page 3
1.3 CLEARING AND GRUBBING
1.3.1 Payment
Payment will be made for all costs associated with clearing and grubbing.
Including transportation and disposal of materials.
1.3.2 Unit of Measure
Unit of measure: Job.
1.4 ROAD CONSTRUCTION AND RECONSTRUCTION
1.4.1 Payment
Payment will be made for all costs associated with constructing new road and reconstructing existing road.
1.4.2 Unit of Measure
Unit of measure: mile.
1.5 SITE GRADING
1.5.1 Payment
Payment will be made for all costs associated with grading the parking area and ancillary features.
1.5.2 Unit of Measure
Unit of measure: Job.
1.6 AGGREGATE BASE COURSE
1.6.1 Payment
Payment will be made for all costs associated with providing aggregate base course. Including preparation, transportation, placement, moisture conditioning, and compaction. Submit weight tickets.
1.6.2 Unit of Measure
Unit of measure: ton.
1.7 MOISTURE CONDITIONING AND COMPACTION
1.7.1 Payment
Payment will be made for all costs associated with moisture conditioning and compaction of the subgrade and aggregate.
SECTION 01 20 00 Page 4
1.7.2 Unit of Measure
Unit of measure: Job.
1.8 PRECAST CONCRETE TOILET BUILDING
1.8.1 Payment
Payment will be made for all costs associated with providing a precast concrete toilet building. Including preparation, transportation, bedding material, installation, and backfill compaction.
1.8.2 Unit of Measure
Unit of measure: Each.
1.9 STEEL PARKING DELINEATOR
1.9.1 Payment
Payment will be made for all costs associated with providing steel parking delineators.
1.9.2 Unit of Measure
Unit of measure: Each.
1.10 CONCRETE PARKING STOP
1.10.1 Payment
Payment will be made for all costs associated with providing parking stops.
1.10.2 Unit of Measure
Unit of measure: Each.
1.11 PICNIC TABLE
1.11.1 Payment
Payment will be made for all costs associated with providing picnic tables. Including grading and aggregate surfacing around picnic tables.
1.11.2 Unit of Measure
Unit of measure: Each.
SECTION 01 20 00 Page 5
1.12 GAZEBO
1.12.1 Payment
Payment will be made for all costs associated with providing a gazebo.
Including preparation, grading, foundation, erection, and aggregate.
1.12.2 Unit of Measure
Unit of measure: Each.
1.13 KIOSK
1.13.1 Payment
Payment will be made for all costs associated with providing a kiosk.
Including transportation, preparation, grading, foundation, erection, and painting.
1.13.2 Unit of Measure
Unit of measure: Each.
1.14 TRAFFIC SIGN
1.14.1 Payment
Payment will be made for all costs associated with providing and installing a traffic sign.
1.14.2 Unit of Measure
Unit of measure: Each.
1.15 STEEL POST AND CABLE FENCE
1.15.1 Payment
Payment will be made for all costs associated with providing and installing fencing.
1.15.2 Unit of Measure
Unit of measure: linear foot, measured straight between posts.
SECTION 01 20 00 Page 6
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 20 00 Page 7
SECTION 01 32 01
PROJECT SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Initial Project Schedule ; G
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, and pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required.
3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.2.1 Level of Detail Required
Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution.
3.2.2 Mandatory Tasks
Include the following activities/tasks in the initial project schedule and all updates.
a. Submission, review and acceptance of submittals.
b. Long procurement activities
c. Contractor's pre-final inspection.
d. Government's pre-final inspection.
e. Final inspection.
SECTION 01 32 01 Page 8
3.2.3 Government Activities
Include Government activities that could impact progress. These activities include, but are not limited to: Government inspections of work, Government approval of submittals.
3.3 WEEKLY PROGRESS MEETINGS
Conduct a weekly meeting with the Government for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress and to review planned activities.
3.4 FAILURE TO ACHIEVE PROGRESS
Should the progress fall behind the approved project schedule, the Contracting Officer may require provision of a written recovery plan for approval. The plan must detail how progress will be made-up to include which activities will be accelerated by adding additional crews, longer work hours, extra work days, etc.
3.4.1 Failure to Perform
Failure to perform work and maintain progress in accordance with the supplemental recovery plan may result in an interim and final unsatisfactory performance rating and may result in corrective action directed by the Contracting Officer pursuant to FAR 52.236-15 Schedules for Construction Contracts, FAR 52.249-10 Default (Fixed-Price Construction), and other contract provisions.
3.4.2 Recovery Schedule
Should the Contracting Officer find it necessary, submit a recovery schedule pursuant to FAR 52.236-15 Schedules for Construction Contracts.
SECTION 01 32 01 Page 9
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only.
1.2 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer's Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract.
This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.3 GOVERNMENT APPROVING AUTHORITY
The Contracting Officer's Representative will:
a. Note the date on which the submittal was received.
b. Review submittals for approval within 10 days of receipt.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the Contractor.
1.3.1 Review Notations
Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with
SECTION 01 33 00 Page 10 appropriate changes. No work shall proceed for this item until resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the Government. This applies only to "information-only submittals" as previously defined.
1.4 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer.
If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.5 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals is not to be construed as a complete check.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 11
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES
01 32 01 SD-01 Preconstruction Submittals
GInitial Project Schedule
01 57 60 SD-01 Preconstruction Submittals
3.4 GSpill Prevention And Cleanup
Plan
05 50 20 SD-01 Preconstruction Submittals
2.1 GGazebo
3.1 GFoundation Design
3.2 GInstallation Instructions
09 90 10 SD-04 Samples
2.2 GColor Samples
12 60 00 SD-03 Product Data
2.1 GPrecast Toilet Building
3.1 GManufacturer's Product
Specifications and installation instructions
12 93 00 SD-03 Product Data
2.1 GPicnic Tables
2.5 GParking Stops
31 00 00 SD-03 Product Data
2.1 GAggregate Base Course
SD-07 Certificates
3.5Aggregate Weight Tickets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SECTION 01 57 60
SUPPLEMENTAL ENVIRONMENTAL CONTROLS
PART 1 GENERAL
1.1 DEFINITIONS
Equipment: for the purpose of this specification, equipment shall include, but isn't limited to; dozers, backhoes, trackhoes, trailers, graders, compactors, or any other construction equipment used to accomplish the work. Passenger vehicles are not considered equipment.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Spill Prevention And Cleanup Plan ; G
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 EROSION CONTROL
Contractor shall inspect site after rain (or melt) events and mitigate areas where erosion or sediment runoff is occurring. Erosion includes wind. Contractor shall water exposed soils, as necessary, to prevent wind erosion.
3.2 FIRE PREVENTION
All equipment shall have a spark arrester installed. The Contractor shall have a fire extinguisher and shovel readily available to contain and extinguish fires.
3.3 EQUIPMENT CLEANING AND MAINTENANCE
Equipment shall be cleaned prior to arriving on site. Equipment shall arrive on site free from dirt, debris, weeds, and seeds. All equipment shall be inspected by the Contracting Officer's Representative prior to arriving on site. Notify the Contracting Officer's Representative at least 3 days prior to equipment delivery to coordinate inspection. If equipment leaves the jobsite and returns at a later date, then equipment shall be re-inspected before reentering the work site.
Equipment maintenance will not be allowed on site. Equipment leaking fluids shall be removed from site.
SECTION 01 57 60 Page 12
3.4 SPILL PREVENTION
The Contractor shall submit a spill prevention and cleanup plan. The spill prevention and cleanup plan shall identify foreseeable accidents, including spills while adding fluids to equipment, and identify an action plan to rapidly clean all accidents. Cleanup materials and equipment shall be on site during work.
3.5 WASTE CONTROL
All waste generated by the work shall be contained and removed from the site and disposed of in a legal manor.
SECTION 01 57 60 Page 13
SECTION 05 50 20
STEEL POST AND CABLE FENCE
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
ASTM INTERNATIONAL (ASTM)
ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A500/A500M (2018) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
PART 2 PRODUCTS
2.1 STEEL PIPE
Provide in accordance with ASTM A500/A500M or ASTM A53/A53M as applicable.
Pipe shall be either:
a. 3.5 inch (3 inch nominal), schedule 80 steel.
b. 2-7/8 inch drill pipe, 0.362 inch wall thickness, steel.
Used pipe may be supplied for the steel posts; however pipe must be clean of excessive oil, grease, rust, etc. Used pipe must be straight and have no dents, bends, or obvious defects. All other materials shall be new.
2.2 PAINTING
Painting is not required.
2.3 WIRE ROPE
9/16 inch diameter, 6x26 Warrington or Seale strand configuration.
PART 3 EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
Verify all field dimensions prior to fabrication. Set steel pipe vertical and plumb. Layout the fence line continuous and straight, make curves consistent and smooth. Drive posts without disturbing in-situ soil.
SECTION 05 50 13 Page 14
3.1.1 DRILLED HOLES
Solid rock may be present at fence post locations. If holes are drilled to facilitate post installation, then high strength, non-shrink grout shall be placed between any gaps in the fence post and the drilled hole.
3.2 WELDING
Perform welding in accordance with AWS D1.1/D1.1M
3.3 WIRE ROPE
Wire rope shall be permanently and securely fastened to every third fence post to prevent movement of wire through the post. There are several different ways to achieve this requirement. The contractor may choose any method that permanently prevents movement of wire through the post.
Wire rope shall be installed with as few splices as practical.
3.4 GAPS IN THE FENCE - ACCESS
There shall be a 6 foot gap in the fence at access locations to the trail, gazebo, and toilet.
SECTION 05 50 13 Page 15
SECTION 05 50 20
GAZEBO
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Gazebo; G
Foundation Design ; G
Installation Instructions ; G
PART 2 PRODUCTS
2.1 GAZEBO
Gazebo shall be, 15' x 20' Mesa, HR-36, as manufactured by Classic Recreation Systems Inc.
Roofing shall be 24 gauge, HR-36 panels, factory coated with Kynar500 finish. Steel shall be factory powder coated. Submit gazebo details and color samples for approval.
http://shadesun.com/
(928) 775-3307 11875 E. Berry Drive Dewey AZ 86327
PART 3 EXECUTION
3.1 FOUNDATION
The foundation shall be as required by the gazebo manufacturer. Submit the manufacturer's foundation design .
3.2 ERECTION
Erect the gazebo in accordance with the manufacturer's installation instructions. Submit the manufacturer's installation instructions .
SECTION 05 50 20 Page 16
SECTION 09 90 10
PAINTING
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
Paint the kiosk.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-04 Samples
Color Samples ; G
PART 2 PRODUCTS
2.1 PAINT
Metal Surfaces:
Sherwin-Williams Macropoxy 646-100 Fast Cure Epoxy
Wood Surfaces:
Sherwin-Williams All Surface Enamel Latex
2.2 PAINT COLORS
Color shall be similar to the gazebo. Contractor shall submit color samples to be approved by the Contracting Officer's Representative.
PART 3 EXECUTION
3.1 SURFACE PREPARATION
Remove dirt, splinters, loose particles, disintegrated coatings, and other foreign matter and substances prior to applying paint.
3.2 APPLICATION
Apply two coats of paint to all surfaces designated to be painted or repainted. Allow time between coats to permit thorough drying.
Only apply paints to surfaces that are completely free of moisture as determined by sight or touch.
Apply each coat of paint so that dry film is of uniform thickness and free from runs, drops, ridges, waves, pinholes or other voids, laps, brush marks, and variations in color, texture, and finish.
SECTION 09 90 10 Page 17
SECTION 09 90 10 Page 18
SECTION 12 60 00
PRECAST CONCRETE TOILET BUILDING
PART 1 GENERAL
1.1 SCOPE
This specification covers the installation of a precast toilet building as produced by CXT Incorporated.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Precast Toilet Building ; G
Manufacturer's Product Specifications and installation instructions ; G
PART 2 PRODUCTS
2.1 PRECAST TOILET BUILDING
The precast toilet building shall be manufactured by CXT Incorporated.
CXT Incorporated Spokane Industrial Park 3808 North Sullivan Road, Building 7 Spokane, WA 99216 Phone 800-696-5766
2.1.1 MODEL
Gunnison Right Hand, single vault
2.1.2 TEXTURES AND COLORS
Ext er i or Locat i on Texture Color
Walls Barnwood Sand Beige
Roof Cedar Shake Granite Rock
2.1.3 WALL VENT LOCATION
The wall vent shall be on the right wall, upon entering the door.
SECTION 12 60 00 Page 19
2.1.4 ADDITIONAL BUILDING REQUIREMENTS
The deadbolt lock shall be vendor supplied with Schlage cylinder #1152.
Privacy Latch and ADA handles on the doors.
Supply (2) 3 roll paper holders, for a total of 6 rolls. Note: (1) 3 roll holder is standard, (2) 3 roll paper holders will require additional coordination with the manufacturer.
Install an owl guard for each vent.
Install unisex signage.
2.2 PRODUCT REQUIREMENTS
The precast toilet building shall meet the following criteria.
2.2.1 Manufacturer Criteria
The manufacturer supplying the precast concrete vault toilet must meet the following:
A. Manufacturer must be ISO 9001 certified.
B. Manufacturing plant must be PCI certified.
C. Manufacturer must provide stamped, engineered drawings prior to acceptance.
D. Manufacturer must show four (4) examples of Sweet Smelling Technology designed precast concrete vault toilet facilities produced, installed, and in use as an example of their ability to perform.
E. Manufacture shall provide a twenty (20) year warranty.
F. UL 752 Bullet Resistance on 4" thick concrete samples.
2.2.2 Design Criteria
2.2.2.1 Roof Snow Load
Vault buildings are designed to withstand a 350 pounds per square foot snow load.
2.2.2.2 Floor Load
Vault buildings are designed to withstand 400 pounds per square foot floor load.
2.2.2.3 Wind Load
Vault buildings shall withstand the effects of 150 miles per hour (3-second gust) wind exposure C.
2.2.2.4 Earthquake
Vault buildings will withstand the effects of a seismic design category E earthquake.
2.2.2.5 Sweet Smelling Technology (SST)
Vault buildings shall incorporate design aspects of SST as outlined by Briar Cook for the U.S. Forest Service. All wall to floor interior
SECTION 12 60 00 Page 20 surface seams shall have a minimum 1" radius coving made of high strength grout. The vault shall have a bottom slope of 1" per foot from under the toilet riser out to the outside cleanout area. The vault shall have a 24" diameter (minimum) lightweight manhole cover installed to the rear or side of the building. The manhole cover should be raised, with the surrounding concrete sloped away using a minimum slope of ½" per foot. The depth of the vault shall be no deeper than 4½' to 5'. A 12" diameter round pipe will be installed to vent the vault and the pipe shall be raised a minimum of 3' above the highest point of the roof. Vent pipe shall be straight up from the vault. There shall be only one vent opening in the building.
2.2.2.6 Additional Design Standards
Single vault buildings shall be an all concrete design with a minimum 7/12 roof pitch. Vault buildings shall have a minimum 4" wall, 4½" roof, and 5" floor thickness. Vault buildings shall have a one-piece floor unit to prevent panels that migrate in different directions during periods of freeze/thaw stress. Vault buildings shall have a one-piece full length and width vault unit to support the building, screen area, and snow loads evenly.
2.2.2.7 Concrete - Colored
The roof panels, building walls, and screen panels shall be colored concrete. Color shall match the existing concrete toilet building on site.
2.2.2.8 Doors - Steel
Doors are flush panel type 1¾" thick, minimum 16-gauge galvanized steel, top painted with DTM ALKYD.
Door frames are knockdown or welded type, single rabbet, minimum 16-gauge prime coated steel top painted with DTM ALKYD, width to suit wall thickness. Three (3) rubber door silencers are provided on latch side of frame. Three hinges (3) per door with dull chrome plating 4½" x 4½", adjustable tension, and automatic closing for each door. Dome style doorstop stop meeting ANSI 156.16. Provide door sweep at the bottom of door with an adjustable brush.
2.2.2.9 Grab Bars
Grab ars shall be 18-gauge, type 304 stainless steel with 1½" clearance.
Able to withstand 300-pound top loading.
2.2.2.10 Riser
Riser shall meet ADA standards, be constructed of molded one-piece HDPE polyethylene, and have a smooth surface and have high impact resistance at extremely cold temperatures.
2.2.2.11 Toilet Paper Dispenser
Toilet Paper Dispenser shall be constructed of ¼" thick, type 304 stainless steel, hold three (3) standard rolls of toilet paper.
Fastening system able to withstand 300-pound top loading.
2.2.2.12 Polyethylene Vault Liner
Polyethylene Vault Liner shall be made of a Roto molded 8460
SECTION 12 60 00 Page 21 polyethylene. Hold up to 1,000 gallons of waste. Minimum thickness .100.
2.3 CONTRACTOR PROPOSED SUBSITUTIONS
Contractor proposed substitutions to the precast toilet building specified shall be submitted with the bid. If proposed substitution doesn't meet the specifications, the bid will not be considered. If a bid is submitted without a proposed substitution, then the contractor shall install the precast toilet building specified.
PART 3 EXECUTION
3.1 INSTALLATION
Install the precast toilet building in accordance with the manufacturer's product specifications. The entire manufacturer's specification will be incorporated, including the excavation, elevation, backfill, compaction, and material requirements. A sand or aggregate bedding material shall be installed. Submit the manufacturer's product specifications and installation instructions , which will supplement this specification section.
3.1.1 Finish Floor Elevation and Slope
The finish floor elevation will be provided by the BLM. The contractor shall install the precast toilet building within 0.05 feet of the elevation provided. The precast toilet building shall be sloped between 1% and 1.5% to allow water to drain out of the interior of the building, through the door.
3.1.2 Backfill and Compaction
Backfill and compact in accordance with the manufacturer's product specifications. In addition to the compaction specified in the manufacturer's product specifications:
Backfill adjacent to the precast toilet building shall be placed in 8 inch, maximum, lifts and compacted with a whacker-type mechanical tamper or equivalent.
SECTION 12 60 00 Page 22
SECTION 12 93 00
SITE FURNISHINGS
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Picnic Tables ; G
Parking Stops ; G
PART 2 PRODUCTS
2.1 PICNIC TABLES
Picnic tables shall be "one piece" reinforced concrete as manufactured by Outdoor Creations Inc. or approved equal, with the Bureau of Land Management (BLM) logo cast into both sides of the table.
Outdoor Creations Inc. Model 100S. Color: Tan.
2.2 KIOSK
Kiosk will be Government provided. The kiosk is new and needs to be assembled. The Contractor is responsible for transportation of the kiosk from storage to the project site. The kiosk is stored at:
Canyons Of The Ancients Visitor Center & Museum
27501 CO-184
Dolores, CO 81323
The kiosk was manufactured by "Wood Product Signs". Kiosk features include:
Custom 9' Utah Roof Kit with metal roof
(3) 6" x 6" x 10'4" Metal Posts
(2) 36" x 48" - Bulletin Boards
2.3 TRAFFIC SIGNS
Signs shall have a brown background and white lettering. Sign shall be aluminum "municipal-grade". Signs with text shall be 36" x 12", with 2" lettering. Sign with arrow shall be 24" x 12". Sign text and arrow as shown on the drawings.
U-Channel sign post shall be steel, 8 foot total length, have a 1-3/8" channel depth, 3/8" holes on 1" centers, and be painted brown.
SECTION 12 93 00 Page 23
2.4 STEEL PARKING DELINEATORS
Steel parking delineators shall be schedule 40 steel pipe. Used pipe may be supplied; however pipe must be clean of excessive oil, grease, rust, etc. Pipe must be straight and have no dents, bends, or obvious defects.
2.5 CONCRETE PARKING STOPS
Parking stops shall be reinforced concrete. With minimum dimensions of;
six foot length, eight inch width, and 5 inch height.
PART 3 EXECUTION
3.1 PICNIC TABLES
Grade the ground surface level prior to placing picnic tables. Place aggregate under the picnic tables as shown on the drawings. Picnic tables shall be placed in locations staked by the Contracting Officer. Location shown on the drawings is approximate.
3.2 KIOSK
Construct the kiosk according to the manufacturer's directions. Paint all metal and wood surfaces. Install the kiosk posts plumb, construct concrete foundation as shown on the drawings.
3.3 TRAFFIC SIGN
Securely fasten sign to post using appropriate hardware. Install traffic sign post plumb. When rock prevents driving, excavate or drill a hole, place post in hole, and grout post securely in position with cement grout or mortar. Install at location staked by the Contracting Officer.
3.4 STEEL PARKING DELINEATORS
Steel parking delineators shall be installed as shown on the drawings.
Tops of the steel parking delineators shall be set three inches above the finished grade of the aggregate surfacing.
3.5 CONCRETE PARKING STOPS
Each parking stop shall be held in place with two (2) #4 rebars, 24 inches long.
SECTION 12 93 00 Page 24
SECTION 31 00 00
EARTHWORK
PART 1 GENERAL
1.1 CRITERIA FOR BIDDING
Solid rock is visibly present. Contractor shall assume that rock will be present when installing the precast concrete toilet, fence posts, gazebo, kiosk, and sign post.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Aggregate Base Course ; G
SD-07 Certificates
Aggregate Weight Tickets
PART 2 PRODUCTS
2.1 AGGREGATE BASE COURSE
Aggregate base course shall meet the requirements of Colorado Department of Transportation Standard Specifications for Road and Bridge Construction 2021, section 703 AGGREGATES. Aggregate base course gradation shall meet the gradation shown in Table 703-2, Class 6.
PART 3 EXECUTION
3.1 UNDERGROUND UTILITIES
The Contractor is responsible for locating underground utilities prior to construction. The Government is not aware of any underground utilities, however the Contractor shall verify the presence or absence prior to construction.
3.2 GENERAL EXCAVATION
Perform excavation of every type of material encountered to the lines, grades, and elevations indicated and as specified. During construction, perform excavation and fill in a manner and sequence that will provide proper drainage at all times.
3.2.1 Differing Site Condition - Excavation for Precast Toilet
The contractor must try to excavate with a hydraulic excavator, in good working condition and with a minimum power rating of 150 horsepower, before a modification under the differing site conditions clause will be allowed.
SECTION 31 00 00 Page 25
If excavation cannot be completed with a hydraulic excavator, with a minimum power rating of 150 horsepower, then the Contractor and the Contracting Officer will agree on alternate methods of excavation, and modify the contract. Alternate methods of excavation include, but are not limited to; larger equipment, rock hammers, and rock drills. Blasting will not be allowed, due to the potential for vibration damage to the nearby ruins.
3.3 GROUND SURFACE PREPARATION
Clear and grub in accordance with section 31 11 00 . Do not perform construction when surfaces are frozen or muddy. Prepare the subgrade to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Shape subgrade to drain.
3.4 AGGREGATE PLACEMENT LOCATIONS
3.4.1 Subgrade
Contractor shall prepare the subgrade to the lines and grades shown on the plans.
3.4.2 Subgrade Compaction
Moisten material as necessary to achieve compaction. Compact the subgrade by operating vibratory compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.
3.4.3 Aggregate Base Course
Contractor shall receive approval of the subgrade prior to placing aggregate base course. Place base course aggregate to the lines and grades shown on the plans.
3.4.4 Aggregate Base Course Compaction
Moisten material as necessary to achieve compaction. Compact the base course aggregate by operating vibratory compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.
3.5 AGGREGATE WEIGHT TICKETS
Submit aggregate weight tickets . Weight tickets are required prior to payment.
3.6 EARTHWORK QUANTITIES
Quantities provided are cubic yards.
Site Cut Fill Net
Parking Lot 320 140 180
SECTION 31 00 00 Page 26
3.7 EXCESS MATERIAL DISPOSAL
Excess cut material shall be spread uniformly on site, at designated locations near the site work. Excess cut material shall not be removed from the work site.
3.8 FINISHING
Finish the surfaces to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Provide the degree of finish for graded areas within 0.2 foot of the grades and elevations indicated. Finish surfaces in a manner that will result in effective drainage, regardless of tolerance.
3.9 ROAD OBLITERATION AND RECLAMATION
Scarify, rip, and loosen the road's soil subgrade to a depth of 12 inches. Place clearing and grubbing material on the road in accordance with section 31 11 00 .
SECTION 31 00 00 Page 27
SECTION 31 00 50
ROAD CONSTRUCTION, RECONSTRUCTION, AND RECONDITIONING
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
Construct, reconstruct, and recondition existing road. Rebuild and reshape the; traveled way, turnouts, shoulders, ditches, waterbars, and rolling dips.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 ROADWAY SHAPING AND GRADING
3.1.1 SCARIFY
Prior to shaping, scarify the roadway to a depth greater than existing ruts, washboards, potholes, or other surface irregularities.
3.1.2 SHAPING AND GRADING
Shape the roadway in a manner that will conserve usable material; usable material shall not be graded into ditches and/or over the shoulders of the road.
Provide a cross slope that will drain water across the roadway. Maintain an inslope, outslope, or crown.
3.1.3 TURNOUTS AND INTERSECTIONS
Turnouts shall be maintained to the same requirements as the roadway.
Provide smooth transitions at all intersections.
3.1.4 SUBGRADE
Finish the road subgrade to be reasonably smooth, uniform, and shaped to conform to the typical sections as shown on the drawings.
Remove from the road subgrade surface any rock larger than 3 inches in its greatest dimension.
Vegetation and organic material larger than 12 inches in length, or larger than 2 inches in diameter, shall be removed from the roadway.
Compact subgrade in accordance with section 31 00 00 EARTHWORK.
3.2 AGGREGATE BASE COURSE
Place and compact aggregate base course in accordance with section 31 00 00
EARTHWORK.
SECTION 31 00 50 Page 28
3.3 ROLLING DIPS AND WATERBARS
Where rolling dips and waterbars exist, they shall be cleaned and restored as nearly as possible to their original dimensions.
3.4 DITCH CONSTRUCTION AND MAINTENANCE
Construct ditches were needed, in accordance with the drawings.
Clean existing ditches, and leadoff ditches, of obstructions that impede or hinder the flow of water. Reshape existing ditches and leadoff ditches, to the configuration typical to the roadway or as shown on the drawings.
Debris and organic material accumulated during ditch maintenance shall be removed and spread outside the ditch limits, and shall not be placed on the roadway.
Slough material removed from the ditches may be used to rebuild the shoulders of the road. Material in excess of that needed to rebuild the shoulders shall not be placed on the traveled way.
SECTION 31 00 50 Page 29
SECTION 31 11 00
CLEARING AND GRUBBING
PART 1 GENERAL
Not Used.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 SURVEY STAKE OUT
Prior to clearing and grubbing, the contractor shall stake out the roads and parking areas as detailed on the drawings. The Contracting Officer's Representative and the Canyons of the Ancients National Monument (CANM) archaeologist will review the layout as staked and may make minor modifications to the layout in order to minimize the damage to archeological sites or existing vegetation. The contractor shall receive approval of the stakeout prior to clearing and grubbing.
3.2 CLEARING AND GRUBBING LIMITS
Clearing and grubbing limits shall be within the road and parking areas, including the ditches.
3.3 PROTECTION
Protect trees and vegetation from damage incident to clearing, grubbing, and construction operations.
3.4 CLEARING
Clearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Trees, stumps, roots, brush, and other vegetation in areas to be cleared shall be cut off flush with or below the original ground surface.
3.5 GRUBBING
Grubbing consists of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas.
Remove material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, to a depth of not less than 12 inches below the original surface level of the ground in the area of new road construction. Fill depressions made by grubbing with suitable material and compact to make the surface conform with the original adjacent surface of the ground.
SECTION 31 11 00 Page 30
3.6 DISPOSAL OF CLEARING AND GRUBBING VEGETATION
Vegetation shall be placed along the existing road, location shown on the drawings, where the existing road width exceeds 24 feet. Place vegetation to discourage future road width expansion. Do not narrow the existing road to less than 20 feet width.
Excess vegetation, not needed along the existing road, shall be disposed in the road obliteration and reclamation locations.
SECTION 31 11 00 Page 31
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 00 - SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 PROJECT DESCRIPTION |
| 1.2 LOCATION |
| 1.3 WORK SCHEDULE |
| 1.4 PUBLIC ACCESS DURING CONSTRUCTION |
| 1.5 SPECIAL COORDINATION |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 20 00 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 MOBILIZATION AND DEMOBILIZATION |
| 1.1.1 Payment |
| 1.1.2 Unit of Measure |
| 1.2 SURVEY - STAKE OUT |
| 1.2.1 Payment |
| 1.2.2 Unit of Measure |
| 1.3 CLEARING AND GRUBBING |
| 1.3.1 Payment |
| 1.3.2 Unit of Measure |
| 1.4 ROAD CONSTRUCTION AND RECONSTRUCTION |
| 1.4.1 Payment |
| 1.4.2 Unit of Measure |
| 1.5 SITE GRADING |
| 1.5.1 Payment |
| 1.5.2 Unit of Measure |
| 1.6 AGGREGATE BASE COURSE |
| 1.6.1 Payment |
| 1.6.2 Unit of Measure |
| 1.7 MOISTURE CONDITIONING AND COMPACTION |
| 1.7.1 Payment |
| 1.7.2 Unit of Measure |
| 1.8 PRECAST CONCRETE TOILET BUILDING |
| 1.8.1 Payment |
| 1.8.2 Unit of Measure |
| 1.9 STEEL PARKING DELINEATOR |
| 1.9.1 Payment |
| 1.9.2 Unit of Measure |
| 1.10 CONCRETE PARKING STOP |
| 1.10.1 Payment |
| 1.10.2 Unit of Measure |
| 1.11 PICNIC TABLE |
| 1.11.1 Payment |
| 1.11.2 Unit of Measure |
| 1.12 GAZEBO |
| 1.12.1 Payment |
| 1.12.2 Unit of Measure |
| 1.13 KIOSK |
| 1.13.1 Payment |
| 1.13.2 Unit of Measure |
| 1.14 TRAFFIC SIGN |
| 1.14.1 Payment |
| 1.14.2 Unit of Measure |
| 1.15 STEEL POST AND CABLE FENCE |
| 1.15.1 Payment |
| 1.15.2 Unit of Measure |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 32 01 - PROJECT SCHEDULE |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS |
| 3.2.1 Level of Detail Required |
| 3.2.2 Mandatory Tasks |
| 3.2.3 Government Activities |
| 3.3 WEEKLY PROGRESS MEETINGS |
| 3.4 FAILURE TO ACHIEVE PROGRESS |
| 3.4.1 Failure to Perform |
| 3.4.2 Recovery Schedule |
| 01 33 00 - SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 INFORMATION ONLY SUBMITTALS |
| 1.3 GOVERNMENT APPROVING AUTHORITY |
| 1.3.1 Review Notations |
| 1.4 DISAPPROVED SUBMITTALS |
| 1.5 APPROVED SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 57 60 - SUPPLEMENTAL ENVIRONMENTAL CONTROLS |
| PART 1 GENERAL |
| 1.1 DEFINITIONS |
| 1.2 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 EROSION CONTROL |
| 3.2 FIRE PREVENTION |
| 3.3 EQUIPMENT CLEANING AND MAINTENANCE |
| 3.4 SPILL PREVENTION |
| 3.5 WASTE CONTROL |
| DIVISION 05 - METALS |
| 05 50 13 - STEEL POST AND CABLE FENCE |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| PART 2 PRODUCTS |
| 2.1 STEEL PIPE |
| 2.2 PAINTING |
| 2.3 WIRE ROPE |
| PART 3 EXECUTION |
| 3.1 GENERAL INSTALLATION REQUIREMENTS |
| 3.1.1 DRILLED HOLES |
| 3.2 WELDING |
| 3.3 WIRE ROPE |
| 3.4 GAPS IN THE FENCE - ACCESS |
| 05 50 20 - GAZEBO |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 GAZEBO |
| PART 3 EXECUTION |
| 3.1 FOUNDATION |
| 3.2 ERECTION |
| DIVISION 09 - FINISHES |
| 09 90 10 - PAINTING |
| PART 1 GENERAL |
| 1.1 DESCRIPTION OF WORK |
| 1.2 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 PAINT |
| 2.2 PAINT COLORS |
| PART 3 EXECUTION |
| 3.1 SURFACE PREPARATION |
| 3.2 APPLICATION |
| DIVISION 12 - FURNISHINGS |
| 12 60 00 - PRECAST CONCRETE TOILET BUILDING |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 PRECAST TOILET BUILDING |
| 2.1.1 MODEL |
| 2.1.2 TEXTURES AND COLORS |
| 2.1.3 WALL VENT LOCATION |
| 2.1.4 ADDITIONAL BUILDING REQUIREMENTS |
| 2.2 PRODUCT REQUIREMENTS |
| 2.2.1 Manufacturer Criteria |
| 2.2.2 Design Criteria |
| 2.2.2.1 Roof Snow Load |
| 2.2.2.2 Floor Load |
| 2.2.2.3 Wind Load |
| 2.2.2.4 Earthquake |
| 2.2.2.5 Sweet Smelling Technology SST |
| 2.2.2.6 Additional Design Standards |
| 2.2.2.7 Concrete - Colored |
| 2.2.2.8 Doors - Steel |
| 2.2.2.9 Grab Bars |
| 2.2.2.10 Riser |
| 2.2.2.11 Toilet Paper Dispenser |
| 2.2.2.12 Polyethylene Vault Liner |
2.3 CONTRACTOR PROPOSED SUBSITUTIONS
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Finish Floor Elevation and Slope |
| 3.1.2 Backfill and Compaction |
| 12 93 00 - SITE FURNISHINGS |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 PICNIC TABLES |
| 2.2 KIOSK |
| 2.3 TRAFFIC SIGNS |
| 2.4 STEEL PARKING DELINEATORS |
| 2.5 CONCRETE PARKING STOPS |
| PART 3 EXECUTION |
| 3.1 PICNIC TABLES |
| 3.2 KIOSK |
| 3.3 TRAFFIC SIGN |
| 3.4 STEEL PARKING DELINEATORS |
| 3.5 CONCRETE PARKING STOPS |
| DIVISION 31 - EARTHWORK |
| 31 00 00 - EARTHWORK |
| PART 1 GENERAL |
| 1.1 CRITERIA FOR BIDDING |
| 1.2 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 AGGREGATE BASE COURSE |
| PART 3 EXECUTION |
| 3.1 UNDERGROUND UTILITIES |
| 3.2 GENERAL EXCAVATION |
| 3.2.1 Differing Site Condition - Excavation for Precast Toilet |
| 3.3 GROUND SURFACE PREPARATION |
| 3.4 AGGREGATE PLACEMENT LOCATIONS |
| 3.4.1 Subgrade |
| 3.4.2 Subgrade Compaction |
| 3.4.3 Aggregate Base Course |
| 3.4.4 Aggregate Base Course Compaction |
| 3.5 AGGREGATE WEIGHT TICKETS |
| 3.6 EARTHWORK QUANTITIES |
| 3.7 EXCESS MATERIAL DISPOSAL |
| 3.8 FINISHING |
| 3.9 ROAD OBLITERATION AND RECLAMATION |
| 31 00 50 - ROAD CONSTRUCTION, RECONSTRUCTION, AND RECONDITIONING |
| PART 1 GENERAL |
| 1.1 DESCRIPTION OF WORK |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 ROADWAY SHAPING AND GRADING |
| 3.1.1 SCARIFY |
| 3.1.2 SHAPING AND GRADING |
| 3.1.3 TURNOUTS AND INTERSECTIONS |
| 3.1.4 SUBGRADE |
| 3.2 AGGREGATE BASE COURSE |
| 3.3 ROLLING DIPS AND WATERBARS |
| 3.4 DITCH CONSTRUCTION AND MAINTENANCE |
| 31 11 00 - CLEARING AND GRUBBING |
| PART 1 GENERAL |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 SURVEY STAKE OUT |
| 3.2 CLEARING AND GRUBBING LIMITS |
| 3.3 PROTECTION |
| 3.4 CLEARING |
| 3.5 GRUBBING |
| 3.6 DISPOSAL OF CLEARING AND GRUBBING VEGETATION |
File details come from the government source that posted it. Updated .