Montrose Building Removals UFOBUILDINGDEMO

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 20 00 PRICE AND PAYMENT PROCEDURES

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 10 DEMOLITION

02 82 10 ASBESTOS – SURVEY AND REMOVAL

02 84 50 HAZARDOUS MATERIAL REMOVAL

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 31 10 CHAIN LINK FENCING

DI VI SI ON 33 - UTI LI TI ES

33 70 00 RESTORE ELECTRIC SERVICE TO GATES

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUMMARY OF WORK

The work includes, but is not limited to; demolition and deconstruction of two buildings, hazardous material removal, fencing construction, and site restoration.

1.2 ORDER OF WORK

Step 1

Inspection of buildings by a certified Colorado asbestos building inspector.

Step 2

Remove asbestos containing materials, ozone depleting controlled substances, and any other hazardous materials.

Step 3

Obtain a Colorado Department of Public Health and Environment (CDPHE) Demolition permit.

Step 4

Locate utilities. Disconnect all utilities servicing the buildings to be removed.

Step 5

Complete remaining work.

1.3 LOCATION

The work will occur at the Montrose Public Lands Center:

2465 South Townsend Ave

Montrose, CO 81401

1.4 OCCUPANCY OF PREMISES

The public land center will be open while work is to take place. There will be employees and the public accessing and occupying all of the buildings not designated to be removed.

1.5 PROJECT DURATION

The project shall be complete within 120 days of issuance of the Notice to Proceed. Demolition, or removal of hazardous material, can not start before October 1st, 2021. Asbestos containing material survey may take place anytime.

1.6 WORK HOURS

Work hours shall be between 7am and 5pm, Monday - Friday, excluding Federal Holidays.

SECTION 01 11 00 Page 2

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 3

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

Payment items for the work of this contract for which contract payments will be made are listed in the

SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job are included in the listed job item most closely associated with the work involved.

The price and payment made for each item listed constitutes full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.1 MOBILIZATION AND DEMOBILIZATION

1.1.1 Payment

Payment will be made for costs associated with mobilization and demobilization.

When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.

When 15% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 8% of the original Contract amount, whichever is lesser, will be paid.

Upon completion of work for the project, payment of the amount bid for mobilization in excess of 8% of the original Contract amount, will be paid.

1.1.2 Unit of Measure

Unit of measure: job.

1.2 ASBESTOS INSPECTION - FIRE BUILDING

1.2.1 Payment

Payment will be made for all costs associated with surveying the fire building for asbestos and creating an inspection report.

1.2.2 Unit of Measure

Unit of measure: job.

SECTION 01 20 00 Page 4

1.3 ASBESTOS REMOVAL - FIRE BUILDING

1.3.1 Payment

Payment will be made for all costs associated with removing asbestos from the fire building.

1.3.2 Unit of Measure

Unit of measure: Job.

1.4 ASBESTOS INSPECTION - SHOP BUILDING

1.4.1 Payment

Payment will be made for all costs associated with surveying the shop building for asbestos and creating an inspection report.

1.4.2 Unit of Measure

Unit of measure: job.

1.5 ASBESTOS REMOVAL - SHOP BUILDING

1.5.1 Payment

Payment will be made for all costs associated with removing asbestos from the shop building.

1.5.2 Unit of Measure

Unit of measure: Job.

1.6 CDPHE DEMOLITION PERMITS

1.6.1 Payment

Payment will be made for all costs associated with obtaining Colorado Department of Public Health and

Environment (CDPHE) Demolition permits.

1.6.2 Unit of Measure

Unit of measure: Job.

SECTION 01 20 00 Page 5

1.7 DEMOLITION - FIRE BUILDING

1.7.1 Payment

Payment will be made for all costs associated with demolishing and completely removing the fire building and appurtenances, including the foundation, sidewalks, radio tower, and radio tower foundation.

1.7.2 Unit of Measure

Unit of measure: Job.

1.8 DEMOLITION - SHOP BUILDING

1.8.1 Payment

Payment will be made for all costs associated with demolishing and completely removing the shop building and appurtenances, including the foundation, sidewalks, radio tower, and radio tower foundation.

1.8.2 Unit of Measure

Unit of measure: Job.

1.9 FENCING - FIRE BUILDING

1.9.1 Payment

Payment will be made for all costs associated with constructing fencing near the location of the fire building removal.

1.9.2 Unit of Measure

Unit of measure: Job.

1.10 FENCING - SHOP BUILDING

1.10.1 Payment

Payment will be made for all costs associated with constructing fencing near the location of the shop building removal.

1.10.2 Unit of Measure

Unit of measure: Job.

SECTION 01 20 00 Page 6

1.11 RESTORE ELECTRIC SERVICE TO GATES

1.11.1 Payment

Payment will be made for all costs associated with providing electric service to gates and relay switch.

1.11.2 Unit of Measure

Unit of measure: Job.

1.12 SITE GRADING

1.12.1 Payment

Payment will be made for all costs associated with site grading.

1.12.2 Unit of Measure

Unit of measure: Job.

1.13 IMPORTED FILL MATERIAL

1.13.1 Payment

Payment will be made for all costs associated with importing fill material, moisture conditioning, and compaction.

1.13.2 Unit of Measure

Unit of measure: cubic yard

1.14 AGGREGATE

1.14.1 Payment

Payment will be made for all costs associated with providing aggregate, moisture conditioning, and compaction.

1.14.2 Unit of Measure

Unit of measure: ton

SECTION 01 20 00 Page 7

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 20 00 Page 8

SECTION 01 32 01

PROJECT SCHEDULE

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Initial Project Schedule; G

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

Prepare for approval a Project Schedule, as specified herein, and pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required.

3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS

3.2.1 Level of Detail Required

Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution.

3.2.2 Mandatory Tasks

Include the following activities/tasks in the initial project schedule and all updates.

a. Submission, review and acceptance of submittals.

b. Long procurement activities

c. Contractor's pre-final inspection.

d. Government's pre-final inspection.

e. Final inspection.

SECTION 01 32 01 Page 9

3.2.3 Government Activities

Include Government activities that could impact progress. These activities include, but are not limited to:

Government inspections of work, Government approval of submittals.

3.3 WEEKLY PROGRESS MEETINGS

Conduct a weekly meeting with the Government for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress and to review planned activities.

3.4 FAILURE TO ACHIEVE PROGRESS

Should the progress fall behind the approved project schedule, the Contracting Officer may require provision of a written recovery plan for approval. The plan must detail how progress will be made-up to include which activities will be accelerated by adding additional crews, longer work hours, extra work days, etc.

3.4.1 Failure to Perform

Failure to perform work and maintain progress in accordance with the supplemental recovery plan may result in an interim and final unsatisfactory performance rating and may result in corrective action directed by the

Contracting Officer pursuant to FAR 52.236-15 Schedules for Construction Contracts, FAR 52.249-10 Default

(Fixed-Price Construction), and other contract provisions.

3.4.2 Recovery Schedule

Should the Contracting Officer find it necessary, submit a recovery schedule pursuant to FAR 52.236-15

Schedules for Construction Contracts.

SECTION 01 32 01 Page 10

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only.

1.2 INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the Contracting Officer's

Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the

Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the

Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

1.3 GOVERNMENT APPROVING AUTHORITY

The Contracting Officer's Representative will:

a. Note the date on which the submittal was received.

b. Review submittals for approval within 10 days of receipt.

c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.

Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the

Contractor.

1.3.1 Review Notations

Submittals will be returned to the Contractor with the following notations:

a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.

b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.

c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.

d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is

SECTION 01 33 00 Page 11 not required, does not have evidence of being reviewed and approved by Contractor, or is not complete.

A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed.

Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.

e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the

Government. This applies only to "information-only submittals" as previously defined.

1.4 DISAPPROVED SUBMITTALS

Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting

Officer.

If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

1.5 APPROVED SUBMITTALS

The Contracting Officer's approval of submittals is not to be construed as a complete check.

Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 33 00 Page 12

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES

Montrose Building Removals

01 32 01 SD-01 Preconstruction Submittals

GInitial Project Schedule

02 41 10 SD-01 Preconstruction Submittals

1.4Colorado Department Of Public

Health And Environment (Cdphe)

Demolition Permit

3.1 GDemolition Plan

02 82 10 SD-01 Preconstruction Submittals

1.3Asbestos Survey And Inspection

Report

3.1Asbestos Removal Work Plan

02 84 50 SD-07 Certificates

3.1Certification Of Qualifications

31 00 00 SD-03 Product Data

2.1 GAggregate Base Course

SD-07 Certificates

3.4Weight Tickets

33 70 00 SD-01 Preconstruction Submittals

3.1Electric Service Design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SECTION 02 41 10

DEMOLITION

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

Demolition and removal of buildings, including the building's appurtenances. There may be loose items inside the buildings, those loose items will be part of the demolition. Conditions existing at time of the pre-bid site visit inspection will be maintained by the Government as far as practical.

1.2 ITEMS TO BE DEMOLISHED

1.2.1 Fire Building

The building is approximately 6,200 square feet. It has a concrete foundation, steel frame structure. The building was constructed around 1979.

1.2.2 Shop Building

The building is approximately 3,200 square feet. It has a concrete foundation, steel frame structure. The building was constructed around 1961.

1.2.3 Other Items

Asphalt, concrete slabs, sidewalks, fencing, and other items shall be removed as shown on the drawings.

1.3 UTILITIES

The BLM will have the electricity and gas disconnected prior starting work. The Contractor will be responsible for properly shutting off and caping the remaining utilities, which include; water, sewer, telephone, fiber optic and irrigation.

1.4 COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT (CDPHE) DEMOLITION PERMIT

Obtain a Colorado Department of Public Health and Environment (CDPHE) Demolition permit prior to beginning work. Submit a copy the approved permit to the Contracting Officer's Representative before beginning work.

1.5 HAZARDOUS MATERIALS

All hazardous materials must be properly removed prior to demolition. See section 02 84 50 for details.

1.6 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Colorado Department Of Public Health And Environment (Cdphe) Demolition Permit

SECTION 02 41 10 Page 13

Demolition Plan; G

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 DEMOLITION PLAN

Submit a demolition plan that details the how the work will be accomplished. The plan shall include:

Sequence of work, Removal of hazardous materials, Traffic flow and control, Disposal plan, Waste control and cleanup.

3.2 UTILITY DISCONNECTION

The existing utilities serving the buildings to be demolished shall be disconnected. Locate, identify, disconnect, and seal or cap off utilities serving buildings and structures to be demolished. Record the location, depth, and size of the utility at the point of disconnection.

Cut off pipe or conduit as deep as practical, and not less than the elevation of the incoming utility service. Cap, valve, or plug and seal remaining portion of pipe or conduit according to requirements of authorities having jurisdiction.

3.3 SECURITY - PUBLIC LANDS CENTER

The Contractor shall maintain public lands center site security at all times during demolition.

3.4 EXISTING FACILITIES

Buildings immediately adjacent to demolition area will be occupied. Conduct demolition so operations of occupied buildings will not be disrupted.

Provide not less than 72 hours' notice of activities that will affect operations of adjacent occupied buildings.

Maintain access to existing walkways, exits, and other facilities used by occupants of adjacent buildings.

Conduct building demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

3.5 INSPECTION

Perform an inspection of the buildings to determine whether removing any element might result in an unplanned collapse of any portion of the buildings during demolition operations.

3.6 BUILDING DEMOLITION AND REMOVAL

The buildings shall be demolished and removed completely. Including the foundation, sidewalks, radio tower, radio tower foundation, and appurtenances.

3.6.1 Below Grade Removal

Remove below-grade construction, including concrete slabs, foundation walls, and footings, a minimum 48

SECTION 02 41 10 Page 14 inches below grade.

Completely fill below-grade areas and voids resulting from demolition operations with satisfactory soil materials in accordance with section 31 00 00

3.6.2 Explosives

Use of explosives is not permitted.

3.7 DEMOLISHED MATERIALS

All materials designated to be demolished shall become the property of the Contractor, including the structural steel. The Contractor may salvage any of the materials removed.

3.8 DISPOSAL OF MATERIALS

All materials designated to be demolished shall become the property of the Contractor. Dispose of all materials resulting from demolition in accordance with all applicable federal, state and local regulations.

SECTION 02 41 10 Page 15

SECTION 02 82 10

ASBESTOS – SURVEY AND REMOVAL

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

Asbestos is present in both buildings. The asbestos must be removed in accordance with all Federal, State, and

Local requirements.

1.2 CRITERIA FOR BIDDING

The BLM has asbestos survey and inspection reports from February 2010. The Contractor shall assume that no additional asbestos will be found that was not already identified in the existing asbestos survey and inspection reports. If additional asbestos containing materials are found, and those materials require remediation, then an equitable adjustment to the contract will be made by the Contracting Officer.

1.3 ASBESTOS SURVEY AND INSPECTION

An asbestos survey and inspection must be conducted on each building by an inspector, certified by the State of

Colorado. The state of Colorado notified the BLM that they will not accept the existing reports from February

2010 in the issuance of their demolition permit. Submit the asbestos survey and inspection report, along with the certifications of the inspector, to the Contracting Officer's Representative.

1.4 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1926.1101 Asbestos

40 CFR 61-SUBPART M National Emission Standard for Asbestos

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Asbestos Survey And Inspection Report

Asbestos Removal Work Plan

PART 2 PRODUCTS

Not Used.

SECTION 02 82 10 Page 16

PART 3 EXECUTION

3.1 ASBESTOS REMOVAL

Perform all work in accordance 40 CFR 61-SUBPART M and 29 CFR 1926.1101. Asbestos must be removed by an asbestos removal contractor, certified by the State of Colorado. Submit an asbestos removal work plan that details all aspects of the removal and required safety precautions. Include in the work plan the certification(s) of the person(s) creating the work plan and of the person(s) performing the removal.

SECTION 02 82 10 Page 17

SECTION 02 84 50

HAZARDOUS MATERIAL REMOVAL

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

All hazardous materials must be properly removed prior to demolition. Hazardous materials include, but are not limited to: asbestos, ozone depleting controlled substances (refrigerants), Polychlorinated Biphenyls

(fluorescent light ballasts).

1.2 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 82 Protection of Stratospheric Ozone

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-07 Certificates

Certification Of Qualifications

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 OZONE DEPLETING CONTROLLED SUBSTANCES (REFRIGERANTS, COOLANTS, AND HEAT TRANSFER FLUIDS)

Class 1 and class 2 ozone depleting controlled substances must be removed, and disposed of, in accordance with 40 CFR 82. The removal must be completed by someone certified to complete the removal in accordance with 40 CFR 82 and with the state of Colorado. Submit the certification of qualifications certification of the person performing the removal and disposal.

3.2 ASBESTOS

See section 02 82 10 for asbestos removal requirements.

3.3 POLYCHLORINATED BIPHENYLS (PCBS) IN FLUORESCENT LIGHT BALLASTS

The old fluorescent light ballasts, which contain Polychlorinated Biphenyls (PCBs), should have been replaced in both buildings, however the Contractor shall verify the presence or absence of Polychlorinated Biphenyls

(PCBs) prior to removal. Fluorescent light ballasts have PCBs unless they are labeled "NO PCBS" or they are

SECTION 02 84 50 Page 18 manufactured after 1998. Any fluorescent light ballasts containing Polychlorinated Biphenyls (PCBs) shall be disposed of in accordance with Federal, State, and Local requirements.

3.4 LEAD PAINT

This contract does not require lead paint to be remediated. However, the Contractor shall follow any Federal, State, or Local requirements for handling and proper disposal of the materials covered with lead paint. The buildings were not tested for lead paint. The shop building likely has lead paint, the fire building may, or may not, have lead paint.

3.5 OTHER HAZARDOUS MATERIALS

The BLM is not aware of any other hazardous materials in the buildings. The Contractor shall notify the BLM if any other hazardous materials, requiring special disposal are encountered prior to demolition.

SECTION 02 84 50 Page 19

SECTION 31 00 00

EARTHWORK

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D2487 (2017; E 2020) Standard Practice for Classification of Soils for

Engineering Purposes (Unified Soil Classification System)

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Aggregate Base Course; G

SD-07 Certificates

Weight Tickets

PART 2 PRODUCTS

2.1 AGGREGATE BASE COURSE

Aggregate base course shall meet the requirements of Colorado Department of Transportation Standard

Specifications for Road and Bridge Construction 2019, section 703 AGGREGATES. Aggregate base course gradation shall meet the gradation shown in Table 703-2, Class 6.

PART 3 EXECUTION

3.1 UNDERGROUND UTILITIES

The Contractor is responsible for locating underground utilities, and disconnecting in accordance with section

02 41 10, prior to demolition.

3.2 GRADING

The Contractor shall grade the area of demolished construction to a smooth surface, free from irregular surface changes. Import material, as necessary, to provide a smooth transition between adjacent existing grades.

Provide positive drainage.

SECTION 31 00 00 Page 20

3.2.1 IMPORTED FILL MATERIAL

Import fill material, as needed, to reestablish grades. Imported fill material shall be any material classified by

ASTM D2487 as GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, SM, SC, ML, CL, MH. And comprise stones less than 3 inches in any dimension. Organic soils, and highly plastic, fat clay soils are not acceptable.

There may be excess material after restoring grades at the fire building. If there is excess material, that material may be used to restore grades at the shop building.

3.3 SUBGRADE COMPACTION

Moisten material as necessary to achieve compaction. Compact the subgrade by operating compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.

3.4 BASE COURSE AGGREGATE

Contractor shall receive approval of the subgrade prior to placing base course aggregate. Place base course aggregate, 2 inches thickness, in the areas disturbed by demolition and grading, and in the ware yard area identified on the plans.

Submit weight tickets. Weight tickets will be used as basis for payment.

3.5 BASE COURSE AGGREGATE COMPACTION

Moisten material as necessary to achieve compaction. Compact the base course aggregate by operating compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.

3.6 FINISHING

Finish the surfaces to a smooth and compact surface. Provide a smooth transition between adjacent existing grades.

SECTION 31 00 00 Page 21

SECTION 32 31 10

CHAIN LINK FENCING

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A116 (2011) Standard Specification for Metallic-Coated, Steel Woven

Wire Fence Fabric

ASTM A121 (2013) Standard Specification for Metallic-Coated Carbon Steel

Barbed Wire

ASTM C94/C94M (2020) Standard Specification for Ready-Mixed Concrete

ASTM F626 (2014) Standard Specification for Fence Fittings

1.2 DESCRIPTION OF WORK

Provide fencing, and perform related work, to provide continuous site security.

PART 2 PRODUCTS

2.1 Fabric

Provide fabric consisting of No. 9-gage wires woven into a 2 inch diamond mesh, with dimensions of fabric and wire conforming to ASTM A116, with 1.20 ounces per square foot zinc galvanizing.

2.2 Line Posts

Line posts shall be 2.375 inch O.D. pipe weighing 3.12 pounds per linear foot.

2.3 End, Corner, and Pull Posts

End, corner, and pull posts shall be 4 inch O.D. pipe weighing 9.11pounds per linear foot.

2.4 Top Rail

Provide top rails with a minimum of 1.660 inches O.D. pipe rails, weighing 2.27 pounds per linear foot. Provide expansion couplings 6 inches long at each joint in top rails.

2.5 Post-Brace Assembly

Provide bracing consisting of 1.660 inches O.D. pipe weighing 2.27 pounds per linear foot and 3/8 inch adjustable truss rods and turnbuckles.

SECTION 32 31 10 Page 22

2.6 Stretcher Bars

Provide bars that have one-piece lengths equal to the full height of the fabric with a minimum cross section of

3/16 by 3/4 inch, in accordance with ASTM F626.

2.7 Stretcher Bar Bands

Provide bar bands for securing stretcher bars to posts that are steel, wrought iron, or malleable iron spaced not over 15 inches on center. Bands may also be used in conjunction with special fittings for securing rails to posts.

Provide bands with projecting edges chamfered or eased.

2.8 Post Tops

Provide tops that are steel, wrought iron, or malleable iron designed as a weathertight closure cap. Provide one cap for each post, unless equal protection is provided by a combination post-cap and wire supporting arm.

Provide caps with an opening to permit through passage of the top rail.

2.9 Tension Wire

Provide galvanized, coiled spring wire, No. 7-gage. Provide zinc coating that weighs not less than 1.2 ounces per square foot.

2.10 Barbed Wire

Provide barbed wire conforming to ASTM A121 zinc-coated, Type Z, Class 3, or aluminum-coated, Type A, with

12.5 gauge wire with 14 gauge, round, 4-point barbs spaced no more than 5 inches apart.

2.11 Concrete

Provide concrete conforming to ASTM C94/C94M, and obtaining a minimum 28-day compressive strength of

3,000 psi.

PART 3 EXECUTION

3.1 POST SPACING

Provide line posts spaced equidistantly apart, not exceeding 10 feet on center Provide corner or pull posts, with bracing in both directions, for changes in direction of 15 degrees or more, or for abrupt changes in grade.

3.2 EXCAVATION

Locate utilities prior to excavation. Provide excavations for post footings, in virgin or compacted soil, of minimum sizes as indicated.

Space footings for line posts 10 feet on center maximum and at closer intervals when indicated, with bottoms of the holes approximately 3 inches below the bottoms of the posts. Set bottom of each post not less than 36 inches below finished grade when in firm, undisturbed soil. Set posts deeper, as required, in soft and problem soils and for heavy, lateral loads.

3.3 SETTING POSTS

Remove loose and foreign materials from holes and moisten the soil prior to placing concrete. Compact

SECTION 32 31 10 Page 23 concrete to eliminate voids. Provide tops of footings that are trowel finished and sloped or domed to shed water away from posts. Maintain vertical alignment of posts in concrete construction until concrete has set.

3.4 CONCRETE STRENGTH

Do not stretch fabric and wires or place rails until the concrete has attained its full design strength and no sooner than 7 calendar days after placement.

3.5 TOP RAILS

Provide top rails that run continuously through post caps. Provide expansion couplings as necessary.

3.6 BRACE ASSEMBLY

Provide bracing assemblies at end and gate posts and at both sides of corner and pull posts, with the horizontal brace located at midheight of the fabric.

Install brace assemblies so posts are plumb when the diagonal rod is under proper tension.

Provide two complete brace assemblies at corner and pull posts.

3.7 TENSION WIRE INSTALLATION

Install tension wire by weaving through the fabric and tying them to each post with not less than 7-gage galvanized wire or by securing the wire to the fabric with 10-gage ties or clips spaced 24 inches on centre. Place tension wire within 4 inches of respective fabric line.

3.8 FABRIC INSTALLATION

Provide fabric in single lengths between stretch bars with bottom barbs placed approximately 1-1/2 inches above the ground line. Pull fabric taut and tied to posts, rails, and tension wire with wire ties and bands.

Ensure fabric remains under tension after the pulling force is released.

3.9 STRETCHER BAR INSTALLATION

Thread stretcher bars through fabric and secure to posts with metal bands spaced 15 inches on center.

3.10 TIE WIRES

Provide tie wires that are U-shaped to the pipe diameters to which attached. Twist ends of tie wires not less than two full turns and bent so as not to present a hazard.

3.11 SUPPORTING ARMS

Install barbed wire supporting arms and barbed wire as indicated on the drawings. Anchor supporting arms to the posts in a manner to prevent easy removal with hand tools. Pull barbed wire taut and attach to the arms with clips or other means that will prevent easy removal.

SECTION 32 31 10 Page 24

SECTION 33 70 00

RESTORE ELECTRIC SERVICE TO GATES

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

Provide electric service to gates and relay switch. Gates are operational, however the electrical service to the gates and relay switch are provided through the fire building, which will be demolished.

1.2 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety

Code

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Electric Service Design

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 DESIGN AND CONSTRUCTION

Contractor shall determine the electric demand of the gate motors and relay switch. Contractor shall size the wires, circuit breaker, and accessories in accordance with IEEE C2, state, and local requirements. The design must be completed by a State of Colorado certified, Master Electrician. Contractor shall submit the electric service design prior to construction.

3.2 WIRE

Wire may be direct burial. Wire must be of a type identified for direct burial.

3.3 GATE OPERATION

Demonstrate gates are operational after electrical service is restored.

SECTION 33 70 00 Page 25

PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 - SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY OF WORK
1.2 ORDER OF WORK
1.3 LOCATION
1.4 OCCUPANCY OF PREMISES
1.5 PROJECT DURATION
1.6 WORK HOURS
PART 2 PRODUCTS
PART 3 EXECUTION
01 20 00 - PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 MOBILIZATION AND DEMOBILIZATION
1.1.1 Payment
1.1.2 Unit of Measure
1.2 ASBESTOS INSPECTION - FIRE BUILDING
1.2.1 Payment
1.2.2 Unit of Measure
1.3 ASBESTOS REMOVAL - FIRE BUILDING
1.3.1 Payment
1.3.2 Unit of Measure
1.4 ASBESTOS INSPECTION - SHOP BUILDING
1.4.1 Payment
1.4.2 Unit of Measure
1.5 ASBESTOS REMOVAL - SHOP BUILDING
1.5.1 Payment
1.5.2 Unit of Measure
1.6 CDPHE DEMOLITION PERMITS
1.6.1 Payment
1.6.2 Unit of Measure
1.7 DEMOLITION - FIRE BUILDING
1.7.1 Payment
1.7.2 Unit of Measure
1.8 DEMOLITION - SHOP BUILDING
1.8.1 Payment
1.8.2 Unit of Measure
1.9 FENCING - FIRE BUILDING
1.9.1 Payment
1.9.2 Unit of Measure
1.10 FENCING - SHOP BUILDING
1.10.1 Payment
1.10.2 Unit of Measure
1.11 RESTORE ELECTRIC SERVICE TO GATES
1.11.1 Payment
1.11.2 Unit of Measure
1.12 SITE GRADING
1.12.1 Payment
1.12.2 Unit of Measure
1.13 IMPORTED FILL MATERIAL
1.13.1 Payment
1.13.2 Unit of Measure
1.14 AGGREGATE
1.14.1 Payment
1.14.2 Unit of Measure
PART 2 PRODUCTS
PART 3 EXECUTION
01 32 01 - PROJECT SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.2.1 Level of Detail Required
3.2.2 Mandatory Tasks
3.2.3 Government Activities
3.3 WEEKLY PROGRESS MEETINGS
3.4 FAILURE TO ACHIEVE PROGRESS
3.4.1 Failure to Perform
3.4.2 Recovery Schedule
01 33 00 - SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
1.2 INFORMATION ONLY SUBMITTALS
1.3 GOVERNMENT APPROVING AUTHORITY
1.3.1 Review Notations
1.4 DISAPPROVED SUBMITTALS
1.5 APPROVED SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
DIVISION 02 - EXISTING CONDITIONS
02 41 10 - DEMOLITION
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.2 ITEMS TO BE DEMOLISHED
1.2.1 Fire Building
1.2.2 Shop Building
1.2.3 Other Items
1.3 UTILITIES
1.4 COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT CDPHE DEMOLITION PERMIT
1.5 HAZARDOUS MATERIALS
1.6 SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 DEMOLITION PLAN
3.2 UTILITY DISCONNECTION
3.3 SECURITY - PUBLIC LANDS CENTER
3.4 EXISTING FACILITIES
3.5 INSPECTION
3.6 BUILDING DEMOLITION AND REMOVAL
3.6.1 Below Grade Removal
3.6.2 Explosives
3.7 DEMOLISHED MATERIALS
3.8 DISPOSAL OF MATERIALS
02 82 10 - ASBESTOS Œ SURVEY AND REMOVAL
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.2 CRITERIA FOR BIDDING
1.3 ASBESTOS SURVEY AND INSPECTION
1.4 REFERENCES
1.5 SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 ASBESTOS REMOVAL
02 84 50 - HAZARDOUS MATERIAL REMOVAL
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.2 REFERENCES
1.3 SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 OZONE DEPLETING CONTROLLED SUBSTANCES REFRIGERANTS, COOLANTS, AND HEAT TRANSFER FLUIDS
3.2 ASBESTOS
3.3 POLYCHLORINATED BIPHENYLS PCBS IN FLUORESCENT LIGHT BALLASTS
3.4 LEAD PAINT
3.5 OTHER HAZARDOUS MATERIALS
DIVISION 31 - EARTHWORK
31 00 00 - EARTHWORK
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
PART 2 PRODUCTS
2.1 AGGREGATE BASE COURSE
PART 3 EXECUTION
3.1 UNDERGROUND UTILITIES
3.2 GRADING
3.2.1 IMPORTED FILL MATERIAL
3.3 SUBGRADE COMPACTION
3.4 BASE COURSE AGGREGATE
3.5 BASE COURSE AGGREGATE COMPACTION
3.6 FINISHING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 31 10 - CHAIN LINK FENCING
PART 1 GENERAL
1.1 REFERENCES
1.2 DESCRIPTION OF WORK
PART 2 PRODUCTS
2.1 Fabric
2.2 Line Posts
2.3 End, Corner, and Pull Posts
2.4 Top Rail
2.5 Post-Brace Assembly
2.6 Stretcher Bars
2.7 Stretcher Bar Bands
2.8 Post Tops
2.9 Tension Wire
2.10 Barbed Wire
2.11 Concrete
PART 3 EXECUTION
3.1 POST SPACING
3.2 EXCAVATION
3.3 SETTING POSTS
3.4 CONCRETE STRENGTH
3.5 TOP RAILS
3.6 BRACE ASSEMBLY
3.7 TENSION WIRE INSTALLATION
3.8 FABRIC INSTALLATION
3.9 STRETCHER BAR INSTALLATION
3.10 TIE WIRES
3.11 SUPPORTING ARMS
DIVISION 33 - UTILITIES
33 70 00 - RESTORE ELECTRIC SERVICE TO GATES
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.2 REFERENCES
1.3 SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 DESIGN AND CONSTRUCTION
3.2 WIRE
3.3 GATE OPERATION