Montrose Building Removals UFOBUILDINGDEMO
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 20 00 PRICE AND PAYMENT PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 10 DEMOLITION
02 82 10 ASBESTOS – SURVEY AND REMOVAL
02 84 50 HAZARDOUS MATERIAL REMOVAL
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 31 10 CHAIN LINK FENCING
DI VI SI ON 33 - UTI LI TI ES
33 70 00 RESTORE ELECTRIC SERVICE TO GATES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY OF WORK
The work includes, but is not limited to; demolition and deconstruction of two buildings, hazardous material removal, fencing construction, and site restoration.
1.2 ORDER OF WORK
Step 1
Inspection of buildings by a certified Colorado asbestos building inspector.
Step 2
Remove asbestos containing materials, ozone depleting controlled substances, and any other hazardous materials.
Step 3
Obtain a Colorado Department of Public Health and Environment (CDPHE) Demolition permit.
Step 4
Locate utilities. Disconnect all utilities servicing the buildings to be removed.
Step 5
Complete remaining work.
1.3 LOCATION
The work will occur at the Montrose Public Lands Center:
2465 South Townsend Ave
Montrose, CO 81401
1.4 OCCUPANCY OF PREMISES
The public land center will be open while work is to take place. There will be employees and the public accessing and occupying all of the buildings not designated to be removed.
1.5 PROJECT DURATION
The project shall be complete within 120 days of issuance of the Notice to Proceed. Demolition, or removal of hazardous material, can not start before October 1st, 2021. Asbestos containing material survey may take place anytime.
1.6 WORK HOURS
Work hours shall be between 7am and 5pm, Monday - Friday, excluding Federal Holidays.
SECTION 01 11 00 Page 2
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 3
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
Payment items for the work of this contract for which contract payments will be made are listed in the
SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job are included in the listed job item most closely associated with the work involved.
The price and payment made for each item listed constitutes full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1 MOBILIZATION AND DEMOBILIZATION
1.1.1 Payment
Payment will be made for costs associated with mobilization and demobilization.
When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.
When 15% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 8% of the original Contract amount, whichever is lesser, will be paid.
Upon completion of work for the project, payment of the amount bid for mobilization in excess of 8% of the original Contract amount, will be paid.
1.1.2 Unit of Measure
Unit of measure: job.
1.2 ASBESTOS INSPECTION - FIRE BUILDING
1.2.1 Payment
Payment will be made for all costs associated with surveying the fire building for asbestos and creating an inspection report.
1.2.2 Unit of Measure
Unit of measure: job.
SECTION 01 20 00 Page 4
1.3 ASBESTOS REMOVAL - FIRE BUILDING
1.3.1 Payment
Payment will be made for all costs associated with removing asbestos from the fire building.
1.3.2 Unit of Measure
Unit of measure: Job.
1.4 ASBESTOS INSPECTION - SHOP BUILDING
1.4.1 Payment
Payment will be made for all costs associated with surveying the shop building for asbestos and creating an inspection report.
1.4.2 Unit of Measure
Unit of measure: job.
1.5 ASBESTOS REMOVAL - SHOP BUILDING
1.5.1 Payment
Payment will be made for all costs associated with removing asbestos from the shop building.
1.5.2 Unit of Measure
Unit of measure: Job.
1.6 CDPHE DEMOLITION PERMITS
1.6.1 Payment
Payment will be made for all costs associated with obtaining Colorado Department of Public Health and
Environment (CDPHE) Demolition permits.
1.6.2 Unit of Measure
Unit of measure: Job.
SECTION 01 20 00 Page 5
1.7 DEMOLITION - FIRE BUILDING
1.7.1 Payment
Payment will be made for all costs associated with demolishing and completely removing the fire building and appurtenances, including the foundation, sidewalks, radio tower, and radio tower foundation.
1.7.2 Unit of Measure
Unit of measure: Job.
1.8 DEMOLITION - SHOP BUILDING
1.8.1 Payment
Payment will be made for all costs associated with demolishing and completely removing the shop building and appurtenances, including the foundation, sidewalks, radio tower, and radio tower foundation.
1.8.2 Unit of Measure
Unit of measure: Job.
1.9 FENCING - FIRE BUILDING
1.9.1 Payment
Payment will be made for all costs associated with constructing fencing near the location of the fire building removal.
1.9.2 Unit of Measure
Unit of measure: Job.
1.10 FENCING - SHOP BUILDING
1.10.1 Payment
Payment will be made for all costs associated with constructing fencing near the location of the shop building removal.
1.10.2 Unit of Measure
Unit of measure: Job.
SECTION 01 20 00 Page 6
1.11 RESTORE ELECTRIC SERVICE TO GATES
1.11.1 Payment
Payment will be made for all costs associated with providing electric service to gates and relay switch.
1.11.2 Unit of Measure
Unit of measure: Job.
1.12 SITE GRADING
1.12.1 Payment
Payment will be made for all costs associated with site grading.
1.12.2 Unit of Measure
Unit of measure: Job.
1.13 IMPORTED FILL MATERIAL
1.13.1 Payment
Payment will be made for all costs associated with importing fill material, moisture conditioning, and compaction.
1.13.2 Unit of Measure
Unit of measure: cubic yard
1.14 AGGREGATE
1.14.1 Payment
Payment will be made for all costs associated with providing aggregate, moisture conditioning, and compaction.
1.14.2 Unit of Measure
Unit of measure: ton
SECTION 01 20 00 Page 7
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 20 00 Page 8
SECTION 01 32 01
PROJECT SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Initial Project Schedule; G
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, and pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required.
3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.2.1 Level of Detail Required
Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution.
3.2.2 Mandatory Tasks
Include the following activities/tasks in the initial project schedule and all updates.
a. Submission, review and acceptance of submittals.
b. Long procurement activities
c. Contractor's pre-final inspection.
d. Government's pre-final inspection.
e. Final inspection.
SECTION 01 32 01 Page 9
3.2.3 Government Activities
Include Government activities that could impact progress. These activities include, but are not limited to:
Government inspections of work, Government approval of submittals.
3.3 WEEKLY PROGRESS MEETINGS
Conduct a weekly meeting with the Government for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress and to review planned activities.
3.4 FAILURE TO ACHIEVE PROGRESS
Should the progress fall behind the approved project schedule, the Contracting Officer may require provision of a written recovery plan for approval. The plan must detail how progress will be made-up to include which activities will be accelerated by adding additional crews, longer work hours, extra work days, etc.
3.4.1 Failure to Perform
Failure to perform work and maintain progress in accordance with the supplemental recovery plan may result in an interim and final unsatisfactory performance rating and may result in corrective action directed by the
Contracting Officer pursuant to FAR 52.236-15 Schedules for Construction Contracts, FAR 52.249-10 Default
(Fixed-Price Construction), and other contract provisions.
3.4.2 Recovery Schedule
Should the Contracting Officer find it necessary, submit a recovery schedule pursuant to FAR 52.236-15
Schedules for Construction Contracts.
SECTION 01 32 01 Page 10
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only.
1.2 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer's
Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the
Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the
Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.3 GOVERNMENT APPROVING AUTHORITY
The Contracting Officer's Representative will:
a. Note the date on which the submittal was received.
b. Review submittals for approval within 10 days of receipt.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the
Contractor.
1.3.1 Review Notations
Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is
SECTION 01 33 00 Page 11 not required, does not have evidence of being reviewed and approved by Contractor, or is not complete.
A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed.
Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the
Government. This applies only to "information-only submittals" as previously defined.
1.4 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting
Officer.
If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.5 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals is not to be construed as a complete check.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 12
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES
Montrose Building Removals
01 32 01 SD-01 Preconstruction Submittals
GInitial Project Schedule
02 41 10 SD-01 Preconstruction Submittals
1.4Colorado Department Of Public
Health And Environment (Cdphe)
Demolition Permit
3.1 GDemolition Plan
02 82 10 SD-01 Preconstruction Submittals
1.3Asbestos Survey And Inspection
Report
3.1Asbestos Removal Work Plan
02 84 50 SD-07 Certificates
3.1Certification Of Qualifications
31 00 00 SD-03 Product Data
2.1 GAggregate Base Course
SD-07 Certificates
3.4Weight Tickets
33 70 00 SD-01 Preconstruction Submittals
3.1Electric Service Design
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SECTION 02 41 10
DEMOLITION
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
Demolition and removal of buildings, including the building's appurtenances. There may be loose items inside the buildings, those loose items will be part of the demolition. Conditions existing at time of the pre-bid site visit inspection will be maintained by the Government as far as practical.
1.2 ITEMS TO BE DEMOLISHED
1.2.1 Fire Building
The building is approximately 6,200 square feet. It has a concrete foundation, steel frame structure. The building was constructed around 1979.
1.2.2 Shop Building
The building is approximately 3,200 square feet. It has a concrete foundation, steel frame structure. The building was constructed around 1961.
1.2.3 Other Items
Asphalt, concrete slabs, sidewalks, fencing, and other items shall be removed as shown on the drawings.
1.3 UTILITIES
The BLM will have the electricity and gas disconnected prior starting work. The Contractor will be responsible for properly shutting off and caping the remaining utilities, which include; water, sewer, telephone, fiber optic and irrigation.
1.4 COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT (CDPHE) DEMOLITION PERMIT
Obtain a Colorado Department of Public Health and Environment (CDPHE) Demolition permit prior to beginning work. Submit a copy the approved permit to the Contracting Officer's Representative before beginning work.
1.5 HAZARDOUS MATERIALS
All hazardous materials must be properly removed prior to demolition. See section 02 84 50 for details.
1.6 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Colorado Department Of Public Health And Environment (Cdphe) Demolition Permit
SECTION 02 41 10 Page 13
Demolition Plan; G
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 DEMOLITION PLAN
Submit a demolition plan that details the how the work will be accomplished. The plan shall include:
Sequence of work, Removal of hazardous materials, Traffic flow and control, Disposal plan, Waste control and cleanup.
3.2 UTILITY DISCONNECTION
The existing utilities serving the buildings to be demolished shall be disconnected. Locate, identify, disconnect, and seal or cap off utilities serving buildings and structures to be demolished. Record the location, depth, and size of the utility at the point of disconnection.
Cut off pipe or conduit as deep as practical, and not less than the elevation of the incoming utility service. Cap, valve, or plug and seal remaining portion of pipe or conduit according to requirements of authorities having jurisdiction.
3.3 SECURITY - PUBLIC LANDS CENTER
The Contractor shall maintain public lands center site security at all times during demolition.
3.4 EXISTING FACILITIES
Buildings immediately adjacent to demolition area will be occupied. Conduct demolition so operations of occupied buildings will not be disrupted.
Provide not less than 72 hours' notice of activities that will affect operations of adjacent occupied buildings.
Maintain access to existing walkways, exits, and other facilities used by occupants of adjacent buildings.
Conduct building demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
3.5 INSPECTION
Perform an inspection of the buildings to determine whether removing any element might result in an unplanned collapse of any portion of the buildings during demolition operations.
3.6 BUILDING DEMOLITION AND REMOVAL
The buildings shall be demolished and removed completely. Including the foundation, sidewalks, radio tower, radio tower foundation, and appurtenances.
3.6.1 Below Grade Removal
Remove below-grade construction, including concrete slabs, foundation walls, and footings, a minimum 48
SECTION 02 41 10 Page 14 inches below grade.
Completely fill below-grade areas and voids resulting from demolition operations with satisfactory soil materials in accordance with section 31 00 00
3.6.2 Explosives
Use of explosives is not permitted.
3.7 DEMOLISHED MATERIALS
All materials designated to be demolished shall become the property of the Contractor, including the structural steel. The Contractor may salvage any of the materials removed.
3.8 DISPOSAL OF MATERIALS
All materials designated to be demolished shall become the property of the Contractor. Dispose of all materials resulting from demolition in accordance with all applicable federal, state and local regulations.
SECTION 02 41 10 Page 15
SECTION 02 82 10
ASBESTOS – SURVEY AND REMOVAL
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
Asbestos is present in both buildings. The asbestos must be removed in accordance with all Federal, State, and
Local requirements.
1.2 CRITERIA FOR BIDDING
The BLM has asbestos survey and inspection reports from February 2010. The Contractor shall assume that no additional asbestos will be found that was not already identified in the existing asbestos survey and inspection reports. If additional asbestos containing materials are found, and those materials require remediation, then an equitable adjustment to the contract will be made by the Contracting Officer.
1.3 ASBESTOS SURVEY AND INSPECTION
An asbestos survey and inspection must be conducted on each building by an inspector, certified by the State of
Colorado. The state of Colorado notified the BLM that they will not accept the existing reports from February
2010 in the issuance of their demolition permit. Submit the asbestos survey and inspection report, along with the certifications of the inspector, to the Contracting Officer's Representative.
1.4 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.1101 Asbestos
40 CFR 61-SUBPART M National Emission Standard for Asbestos
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Asbestos Survey And Inspection Report
Asbestos Removal Work Plan
PART 2 PRODUCTS
Not Used.
SECTION 02 82 10 Page 16
PART 3 EXECUTION
3.1 ASBESTOS REMOVAL
Perform all work in accordance 40 CFR 61-SUBPART M and 29 CFR 1926.1101. Asbestos must be removed by an asbestos removal contractor, certified by the State of Colorado. Submit an asbestos removal work plan that details all aspects of the removal and required safety precautions. Include in the work plan the certification(s) of the person(s) creating the work plan and of the person(s) performing the removal.
SECTION 02 82 10 Page 17
SECTION 02 84 50
HAZARDOUS MATERIAL REMOVAL
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
All hazardous materials must be properly removed prior to demolition. Hazardous materials include, but are not limited to: asbestos, ozone depleting controlled substances (refrigerants), Polychlorinated Biphenyls
(fluorescent light ballasts).
1.2 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 82 Protection of Stratospheric Ozone
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-07 Certificates
Certification Of Qualifications
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 OZONE DEPLETING CONTROLLED SUBSTANCES (REFRIGERANTS, COOLANTS, AND HEAT TRANSFER FLUIDS)
Class 1 and class 2 ozone depleting controlled substances must be removed, and disposed of, in accordance with 40 CFR 82. The removal must be completed by someone certified to complete the removal in accordance with 40 CFR 82 and with the state of Colorado. Submit the certification of qualifications certification of the person performing the removal and disposal.
3.2 ASBESTOS
See section 02 82 10 for asbestos removal requirements.
3.3 POLYCHLORINATED BIPHENYLS (PCBS) IN FLUORESCENT LIGHT BALLASTS
The old fluorescent light ballasts, which contain Polychlorinated Biphenyls (PCBs), should have been replaced in both buildings, however the Contractor shall verify the presence or absence of Polychlorinated Biphenyls
(PCBs) prior to removal. Fluorescent light ballasts have PCBs unless they are labeled "NO PCBS" or they are
SECTION 02 84 50 Page 18 manufactured after 1998. Any fluorescent light ballasts containing Polychlorinated Biphenyls (PCBs) shall be disposed of in accordance with Federal, State, and Local requirements.
3.4 LEAD PAINT
This contract does not require lead paint to be remediated. However, the Contractor shall follow any Federal, State, or Local requirements for handling and proper disposal of the materials covered with lead paint. The buildings were not tested for lead paint. The shop building likely has lead paint, the fire building may, or may not, have lead paint.
3.5 OTHER HAZARDOUS MATERIALS
The BLM is not aware of any other hazardous materials in the buildings. The Contractor shall notify the BLM if any other hazardous materials, requiring special disposal are encountered prior to demolition.
SECTION 02 84 50 Page 19
SECTION 31 00 00
EARTHWORK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D2487 (2017; E 2020) Standard Practice for Classification of Soils for
Engineering Purposes (Unified Soil Classification System)
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Aggregate Base Course; G
SD-07 Certificates
Weight Tickets
PART 2 PRODUCTS
2.1 AGGREGATE BASE COURSE
Aggregate base course shall meet the requirements of Colorado Department of Transportation Standard
Specifications for Road and Bridge Construction 2019, section 703 AGGREGATES. Aggregate base course gradation shall meet the gradation shown in Table 703-2, Class 6.
PART 3 EXECUTION
3.1 UNDERGROUND UTILITIES
The Contractor is responsible for locating underground utilities, and disconnecting in accordance with section
02 41 10, prior to demolition.
3.2 GRADING
The Contractor shall grade the area of demolished construction to a smooth surface, free from irregular surface changes. Import material, as necessary, to provide a smooth transition between adjacent existing grades.
Provide positive drainage.
SECTION 31 00 00 Page 20
3.2.1 IMPORTED FILL MATERIAL
Import fill material, as needed, to reestablish grades. Imported fill material shall be any material classified by
ASTM D2487 as GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, SM, SC, ML, CL, MH. And comprise stones less than 3 inches in any dimension. Organic soils, and highly plastic, fat clay soils are not acceptable.
There may be excess material after restoring grades at the fire building. If there is excess material, that material may be used to restore grades at the shop building.
3.3 SUBGRADE COMPACTION
Moisten material as necessary to achieve compaction. Compact the subgrade by operating compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.
3.4 BASE COURSE AGGREGATE
Contractor shall receive approval of the subgrade prior to placing base course aggregate. Place base course aggregate, 2 inches thickness, in the areas disturbed by demolition and grading, and in the ware yard area identified on the plans.
Submit weight tickets. Weight tickets will be used as basis for payment.
3.5 BASE COURSE AGGREGATE COMPACTION
Moisten material as necessary to achieve compaction. Compact the base course aggregate by operating compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.
3.6 FINISHING
Finish the surfaces to a smooth and compact surface. Provide a smooth transition between adjacent existing grades.
SECTION 31 00 00 Page 21
SECTION 32 31 10
CHAIN LINK FENCING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A116 (2011) Standard Specification for Metallic-Coated, Steel Woven
Wire Fence Fabric
ASTM A121 (2013) Standard Specification for Metallic-Coated Carbon Steel
Barbed Wire
ASTM C94/C94M (2020) Standard Specification for Ready-Mixed Concrete
ASTM F626 (2014) Standard Specification for Fence Fittings
1.2 DESCRIPTION OF WORK
Provide fencing, and perform related work, to provide continuous site security.
PART 2 PRODUCTS
2.1 Fabric
Provide fabric consisting of No. 9-gage wires woven into a 2 inch diamond mesh, with dimensions of fabric and wire conforming to ASTM A116, with 1.20 ounces per square foot zinc galvanizing.
2.2 Line Posts
Line posts shall be 2.375 inch O.D. pipe weighing 3.12 pounds per linear foot.
2.3 End, Corner, and Pull Posts
End, corner, and pull posts shall be 4 inch O.D. pipe weighing 9.11pounds per linear foot.
2.4 Top Rail
Provide top rails with a minimum of 1.660 inches O.D. pipe rails, weighing 2.27 pounds per linear foot. Provide expansion couplings 6 inches long at each joint in top rails.
2.5 Post-Brace Assembly
Provide bracing consisting of 1.660 inches O.D. pipe weighing 2.27 pounds per linear foot and 3/8 inch adjustable truss rods and turnbuckles.
SECTION 32 31 10 Page 22
2.6 Stretcher Bars
Provide bars that have one-piece lengths equal to the full height of the fabric with a minimum cross section of
3/16 by 3/4 inch, in accordance with ASTM F626.
2.7 Stretcher Bar Bands
Provide bar bands for securing stretcher bars to posts that are steel, wrought iron, or malleable iron spaced not over 15 inches on center. Bands may also be used in conjunction with special fittings for securing rails to posts.
Provide bands with projecting edges chamfered or eased.
2.8 Post Tops
Provide tops that are steel, wrought iron, or malleable iron designed as a weathertight closure cap. Provide one cap for each post, unless equal protection is provided by a combination post-cap and wire supporting arm.
Provide caps with an opening to permit through passage of the top rail.
2.9 Tension Wire
Provide galvanized, coiled spring wire, No. 7-gage. Provide zinc coating that weighs not less than 1.2 ounces per square foot.
2.10 Barbed Wire
Provide barbed wire conforming to ASTM A121 zinc-coated, Type Z, Class 3, or aluminum-coated, Type A, with
12.5 gauge wire with 14 gauge, round, 4-point barbs spaced no more than 5 inches apart.
2.11 Concrete
Provide concrete conforming to ASTM C94/C94M, and obtaining a minimum 28-day compressive strength of
3,000 psi.
PART 3 EXECUTION
3.1 POST SPACING
Provide line posts spaced equidistantly apart, not exceeding 10 feet on center Provide corner or pull posts, with bracing in both directions, for changes in direction of 15 degrees or more, or for abrupt changes in grade.
3.2 EXCAVATION
Locate utilities prior to excavation. Provide excavations for post footings, in virgin or compacted soil, of minimum sizes as indicated.
Space footings for line posts 10 feet on center maximum and at closer intervals when indicated, with bottoms of the holes approximately 3 inches below the bottoms of the posts. Set bottom of each post not less than 36 inches below finished grade when in firm, undisturbed soil. Set posts deeper, as required, in soft and problem soils and for heavy, lateral loads.
3.3 SETTING POSTS
Remove loose and foreign materials from holes and moisten the soil prior to placing concrete. Compact
SECTION 32 31 10 Page 23 concrete to eliminate voids. Provide tops of footings that are trowel finished and sloped or domed to shed water away from posts. Maintain vertical alignment of posts in concrete construction until concrete has set.
3.4 CONCRETE STRENGTH
Do not stretch fabric and wires or place rails until the concrete has attained its full design strength and no sooner than 7 calendar days after placement.
3.5 TOP RAILS
Provide top rails that run continuously through post caps. Provide expansion couplings as necessary.
3.6 BRACE ASSEMBLY
Provide bracing assemblies at end and gate posts and at both sides of corner and pull posts, with the horizontal brace located at midheight of the fabric.
Install brace assemblies so posts are plumb when the diagonal rod is under proper tension.
Provide two complete brace assemblies at corner and pull posts.
3.7 TENSION WIRE INSTALLATION
Install tension wire by weaving through the fabric and tying them to each post with not less than 7-gage galvanized wire or by securing the wire to the fabric with 10-gage ties or clips spaced 24 inches on centre. Place tension wire within 4 inches of respective fabric line.
3.8 FABRIC INSTALLATION
Provide fabric in single lengths between stretch bars with bottom barbs placed approximately 1-1/2 inches above the ground line. Pull fabric taut and tied to posts, rails, and tension wire with wire ties and bands.
Ensure fabric remains under tension after the pulling force is released.
3.9 STRETCHER BAR INSTALLATION
Thread stretcher bars through fabric and secure to posts with metal bands spaced 15 inches on center.
3.10 TIE WIRES
Provide tie wires that are U-shaped to the pipe diameters to which attached. Twist ends of tie wires not less than two full turns and bent so as not to present a hazard.
3.11 SUPPORTING ARMS
Install barbed wire supporting arms and barbed wire as indicated on the drawings. Anchor supporting arms to the posts in a manner to prevent easy removal with hand tools. Pull barbed wire taut and attach to the arms with clips or other means that will prevent easy removal.
SECTION 32 31 10 Page 24
SECTION 33 70 00
RESTORE ELECTRIC SERVICE TO GATES
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
Provide electric service to gates and relay switch. Gates are operational, however the electrical service to the gates and relay switch are provided through the fire building, which will be demolished.
1.2 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety
Code
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Electric Service Design
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 DESIGN AND CONSTRUCTION
Contractor shall determine the electric demand of the gate motors and relay switch. Contractor shall size the wires, circuit breaker, and accessories in accordance with IEEE C2, state, and local requirements. The design must be completed by a State of Colorado certified, Master Electrician. Contractor shall submit the electric service design prior to construction.
3.2 WIRE
Wire may be direct burial. Wire must be of a type identified for direct burial.
3.3 GATE OPERATION
Demonstrate gates are operational after electrical service is restored.
SECTION 33 70 00 Page 25
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 00 - SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 SUMMARY OF WORK |
| 1.2 ORDER OF WORK |
| 1.3 LOCATION |
| 1.4 OCCUPANCY OF PREMISES |
| 1.5 PROJECT DURATION |
| 1.6 WORK HOURS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 20 00 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 MOBILIZATION AND DEMOBILIZATION |
| 1.1.1 Payment |
| 1.1.2 Unit of Measure |
| 1.2 ASBESTOS INSPECTION - FIRE BUILDING |
| 1.2.1 Payment |
| 1.2.2 Unit of Measure |
| 1.3 ASBESTOS REMOVAL - FIRE BUILDING |
| 1.3.1 Payment |
| 1.3.2 Unit of Measure |
| 1.4 ASBESTOS INSPECTION - SHOP BUILDING |
| 1.4.1 Payment |
| 1.4.2 Unit of Measure |
| 1.5 ASBESTOS REMOVAL - SHOP BUILDING |
| 1.5.1 Payment |
| 1.5.2 Unit of Measure |
| 1.6 CDPHE DEMOLITION PERMITS |
| 1.6.1 Payment |
| 1.6.2 Unit of Measure |
| 1.7 DEMOLITION - FIRE BUILDING |
| 1.7.1 Payment |
| 1.7.2 Unit of Measure |
| 1.8 DEMOLITION - SHOP BUILDING |
| 1.8.1 Payment |
| 1.8.2 Unit of Measure |
| 1.9 FENCING - FIRE BUILDING |
| 1.9.1 Payment |
| 1.9.2 Unit of Measure |
| 1.10 FENCING - SHOP BUILDING |
| 1.10.1 Payment |
| 1.10.2 Unit of Measure |
| 1.11 RESTORE ELECTRIC SERVICE TO GATES |
| 1.11.1 Payment |
| 1.11.2 Unit of Measure |
| 1.12 SITE GRADING |
| 1.12.1 Payment |
| 1.12.2 Unit of Measure |
| 1.13 IMPORTED FILL MATERIAL |
| 1.13.1 Payment |
| 1.13.2 Unit of Measure |
| 1.14 AGGREGATE |
| 1.14.1 Payment |
| 1.14.2 Unit of Measure |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 32 01 - PROJECT SCHEDULE |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS |
| 3.2.1 Level of Detail Required |
| 3.2.2 Mandatory Tasks |
| 3.2.3 Government Activities |
| 3.3 WEEKLY PROGRESS MEETINGS |
| 3.4 FAILURE TO ACHIEVE PROGRESS |
| 3.4.1 Failure to Perform |
| 3.4.2 Recovery Schedule |
| 01 33 00 - SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 INFORMATION ONLY SUBMITTALS |
| 1.3 GOVERNMENT APPROVING AUTHORITY |
| 1.3.1 Review Notations |
| 1.4 DISAPPROVED SUBMITTALS |
| 1.5 APPROVED SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| DIVISION 02 - EXISTING CONDITIONS |
| 02 41 10 - DEMOLITION |
| PART 1 GENERAL |
| 1.1 DESCRIPTION OF WORK |
| 1.2 ITEMS TO BE DEMOLISHED |
| 1.2.1 Fire Building |
| 1.2.2 Shop Building |
| 1.2.3 Other Items |
| 1.3 UTILITIES |
| 1.4 COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT CDPHE DEMOLITION PERMIT |
| 1.5 HAZARDOUS MATERIALS |
| 1.6 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 DEMOLITION PLAN |
| 3.2 UTILITY DISCONNECTION |
| 3.3 SECURITY - PUBLIC LANDS CENTER |
| 3.4 EXISTING FACILITIES |
| 3.5 INSPECTION |
| 3.6 BUILDING DEMOLITION AND REMOVAL |
| 3.6.1 Below Grade Removal |
| 3.6.2 Explosives |
| 3.7 DEMOLISHED MATERIALS |
| 3.8 DISPOSAL OF MATERIALS |
| 02 82 10 - ASBESTOS Œ SURVEY AND REMOVAL |
| PART 1 GENERAL |
| 1.1 DESCRIPTION OF WORK |
| 1.2 CRITERIA FOR BIDDING |
| 1.3 ASBESTOS SURVEY AND INSPECTION |
| 1.4 REFERENCES |
| 1.5 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 ASBESTOS REMOVAL |
| 02 84 50 - HAZARDOUS MATERIAL REMOVAL |
| PART 1 GENERAL |
| 1.1 DESCRIPTION OF WORK |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 OZONE DEPLETING CONTROLLED SUBSTANCES REFRIGERANTS, COOLANTS, AND HEAT TRANSFER FLUIDS |
| 3.2 ASBESTOS |
| 3.3 POLYCHLORINATED BIPHENYLS PCBS IN FLUORESCENT LIGHT BALLASTS |
| 3.4 LEAD PAINT |
| 3.5 OTHER HAZARDOUS MATERIALS |
| DIVISION 31 - EARTHWORK |
| 31 00 00 - EARTHWORK |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 AGGREGATE BASE COURSE |
| PART 3 EXECUTION |
| 3.1 UNDERGROUND UTILITIES |
| 3.2 GRADING |
| 3.2.1 IMPORTED FILL MATERIAL |
| 3.3 SUBGRADE COMPACTION |
| 3.4 BASE COURSE AGGREGATE |
| 3.5 BASE COURSE AGGREGATE COMPACTION |
| 3.6 FINISHING |
| DIVISION 32 - EXTERIOR IMPROVEMENTS |
| 32 31 10 - CHAIN LINK FENCING |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DESCRIPTION OF WORK |
| PART 2 PRODUCTS |
| 2.1 Fabric |
| 2.2 Line Posts |
| 2.3 End, Corner, and Pull Posts |
| 2.4 Top Rail |
| 2.5 Post-Brace Assembly |
| 2.6 Stretcher Bars |
| 2.7 Stretcher Bar Bands |
| 2.8 Post Tops |
| 2.9 Tension Wire |
| 2.10 Barbed Wire |
| 2.11 Concrete |
| PART 3 EXECUTION |
| 3.1 POST SPACING |
| 3.2 EXCAVATION |
| 3.3 SETTING POSTS |
| 3.4 CONCRETE STRENGTH |
| 3.5 TOP RAILS |
| 3.6 BRACE ASSEMBLY |
| 3.7 TENSION WIRE INSTALLATION |
| 3.8 FABRIC INSTALLATION |
| 3.9 STRETCHER BAR INSTALLATION |
| 3.10 TIE WIRES |
| 3.11 SUPPORTING ARMS |
| DIVISION 33 - UTILITIES |
| 33 70 00 - RESTORE ELECTRIC SERVICE TO GATES |
| PART 1 GENERAL |
| 1.1 DESCRIPTION OF WORK |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 DESIGN AND CONSTRUCTION |
| 3.2 WIRE |
| 3.3 GATE OPERATION |