Big South Fork National River and Recreation Area Oneida, TN

Specifications of Supplies Purchase/ Delivery

Culvert & GRAVEL January 27, 2022

NATIONAL PARK SERVICE

INTERIOR REGION 2, SOUTH ATLANTIC GULF

1. PLACE OF DELIVERY (GRAVEL): Mt. Helen Trailhead (see attached map 1, page 3) GPS Coordinates: 36.429388, -84.707490

PLACE OF DELIVERY (CULVERT): Joe’s Branch Road (see attached map 2, page 4) GPS Coordinates: 36.382681, -84.707874

(This Space Left Intentionally Blank)

MAP 1 ABOVE

MAP 2 ABOVE

2. PERIOD OF PERFORMANCE:

The contractor shall have no more than 30 calendar days to deliver Gravel and Culvert once the offeror receives the notice to proceed, with the only exceptions being unforeseen events beyond the contractor's control and/or delays that are caused by the National Park Service.

Additional Information:

Joe Branch is a small, remote tributary to the Clear Fork in the southern area of BISO. Joe Branch Road provides sole access to a day use area and the Joe Branch Loop Horse Drawn Wagon Trail. Joe Branch flows under Joe Branch Road, traveling through a large culvert. The existing culvert is too small to accommodate the volume of water displaced during high water events. It has subsequently failed and collapsed causing the road to be un-passable and introducing a potential hazard to the surrounding critical habitat. This project will serve to replace the dilapidated and failed culvert with a larger more substantially designed culvert. The surrounding area and roadbed will be re stabilized allowing access to the area and further protecting the critical habitat.

This requirements is for the purchase of various sized limestone aggregate and a 96’’ x 44’ CMP culvert. The limestone aggregate will be delivered to, and stockpiled at the Mt. Helen Trailhead and the culvert to Joe’s Branch Road in accordance to the above GPS coordinates and maps.

The COR will approve final site prior to delivery.

4. MINIMUM REQUIRED SPECIFICATIONS

GRAVEL

• Deliver 327 tons of “Shot Rock” limestone aggregate, consisting of aggregate from 6’’ up to 8’’ with additional fines.

• Deliver 56.7 tons of “Rip Rap” limestone aggregate, consisting of aggregate sized from 8’’ up to 12’’

• Deliver 38.7 tons of “Crusher Run” limestone aggregate, consisting of aggregate sized from .75” down to silt.

• Aggregate shall be stockpiled, classified, and separated by size upon delivery.

• A sample of the various sized limestone aggregate shall be submitted to park management for approval prior to delivery.

• All material shall be limestone aggregate free of dirt, wood, sand, and/or invasive material so as not to establish unwanted flora/fauna within the park.

• Contractor shall establish exact stockpile location with COR prior to unloading, in order to maintain full access to the site.

• Delivered aggregate will only be stored and/or staged within areas determined to be previously disturbed located at the Mt. Helen Trailhead Equestrian Area

• There is no requirement for additional equipment to push the aggregate into a stockpile.

The stockpile location has ample space for one pile. If space becomes limited, the NPS will push the delivered aggregate into a tighter pile, allowing for additional delivery space.

CULVERT

• The culvert shall be 96 inches in diameter

• The culvert shall be 44 feet in length

• The culvert shall be comprised of 14-gauge galvanized steel

GENERAL

• Equipment: All vehicles and equipment to be used in National Park shall be thoroughly pressure washed prior to arrival. Particular attention must be shown to the under carriage and any surface where soil containing exotic weed seeds may exist. All loaded trucks and trailers shall be covered (tarped) when loaded. These efforts are critical to prevent the introduction and establishment of non-native plant species into the park.

• All delivery equipment must be washed when contaminated or potentially contaminated between trips. If the equipment is washed and remains clean, not encountering contaminates, between trips, a thorough visual inspections shall be adequate as long as the contractor is making a conscience effort to ensure vehicles and/or equipment is free of potential contaminates

• All equipment used in the work shall be of the proper type, of a sufficient size, in good operating condition, and otherwise meet the equipment specifications for each type of maintenance work. The Contracting Officer may order removal and/or replacement of any unsatisfactory equipment at the Contractor's expense. All equipment must meet all Federal and State licensing and safety requirements.

• Safety: The Contractor shall exercise due caution and care when working to prevent undue conflict with public users of roads. Roads shall remain passable to traffic during the Contractor's operations. The Point of Contact has authority to have deliveries stopped when weather or road conditions are unsuitable for the hauling of aggregate. If operations are stopped for any reason, the Contractor will be notified by the Point of Contact twenty- four (24) hours prior to resuming operations.

• Damage to Property: The Contractor shall be responsible for any damage caused by his/her personnel or equipment to any existing structures such as culverts, signs, cattle guards, and riprap protecting culvert inlets and/or outlets. Damaged items shall be repaired or replaced by the Contractor at no additional cost to the Government.

• Pollution and Erosion Control: During all operations under this contract, the

Will be unloaded by the park staff

Contractor shall take reasonable measures to prevent or minimize soil erosion and pollution of water and other resources. All refuse, including garbage, rubbish, and solid or liquid wastes, from the Contractor's operations, shall be stored, collected, and disposed of in a sanitary and nuisance-free manner. Refuse shall be disposed of in State-approved landfills or as approved by the COR.

• Base Aggregate: Furnish gravel meeting the size and quality requirements for crushed aggregate material normally used locally in the construction and maintenance of highways by Federal or State agencies. Furnish crushed quarry aggregate with the following gradation that is free of organic matter, lumps or balls of clay and other deleterious substances. It shall be of such nature that it can be compacted readily under watering and rolling to form a firm and stable surface. The crushed quarry rock shall be inspected by a representative of the contracting agency prior to delivery to the worksite to ensure material quality.

• Aggregate Base: Crushed aggregate will be the tons of material placed and accepted.

Weight receipts will be required on aggregate deliveries.

• Basis of Payment: The accepted quantities will be paid for at the contract unit price(s) quoted. Will collect load delivery tickets from driver.

• Material delivery shall begin delivery no later than 7 days after notice to proceed is issued