Text version

National Park Service

U.S. Department of the Interior

NATIONAL CAPITAL AREA

Facilities, Design and Construction

Facilities Management Branch

WASHINGTON, DC

STATEMENT OF WORK

3/15/2021 Page 1 of 6

REPLACE FOUR CANNON CARRIAGES AT

LAFAYETTE SQUARE (WHHO)

National Park Service

White House (WHHO)

Washington DC

PMIS No. 310782

STATEMENT OF WORK FOR CONSTRUCTION SERVICES

PART 1: GENERAL

1.1 BACKGROUND

The Jackson statue, cast by sculptor Clark Mills, and unveiled on January 8, 1853, was the first equestrian statue designed, cast and erected in the United States, at a foundry located nearby, at 15th and Pennsylvania Ave. NW. The statue of President Andrew Jackson, mounted on a horse rearing on his hind legs, is set on a high stone base, with four cannons located at each corner of the base.

Jackson captured these four cannons from the Spanish in the Battle of Pensacola in 1818. Josephus

Barnola cast all four at the Spanish royal foundry in Madrid. The two northern cannons were cast in

1748 and are named for Visigoth kings: El Witiza and El Egica. The southern two were cast in 1773 and are named for Greek gods: El Apolo and El Aristeo. All these elements contribute to the

Lafayette Square National Historic Landmark District. In June 2020 protestors damaged the 20-year-old wood cannon carriages that supported the four historic cannons, and the NPS is seeking their replacements in aluminum.

1.2 DESCRIPTION OF WORK

Statement of Work (SOW) is constructing four new cannon carriages off site and delivering them to an NPS facility within 10 miles of Washington DC.

The contract work includes:

1. Mobilization, providing all labor, equipment, and materials necessary to perform the work of this SOW.

2. Gathering all information needed to produce cannon carriages for four different, historic cannons.

Replace Four Cannon Carriages at Lafayette Square (WHHO)

STATEMENT OF WORK

3/31/2021 Page 2 of 6

3. Producing four cannon carriages capable of securely supporting the four cannons.

4. Delivering the four cannon carriages to an NPS facility. The delivery of the carriages to

Lafayette Square, and the installation of the cannons is to be handled by others and is

NOT in this scope.

Production

1. The four cannons require split trail gun carriages, fitting a circa 1750 British Light 6-pounder gun, without ammunition boxes.

2. The contractor shall cast the four carriages from aluminum. All component elements used on the carriages shall be evaluated for their appropriateness, durability and their ability to resist galvanic action.

3. The finished carriages shall be capable of supporting each of the four bronze cannons.

4. The finished cannon carriages will fit into the inset wheel-locks currently on site. See

Attachment 3 for more information on these elements.

5. All fittings, attachment points, and tool brackets shall be functional for their intended use and resistant to vandalism or theft. The contractor’s written proposal will address the approach for this requirement.

6. The design of the new carriages shall prioritize the protection of the antique brass cannons in all respects. The contractor’s written proposal will address the approach for this requirement.

7. The contractor shall provide a safety device to prevent the cannon tubes from being depressed or elevated which will prevent accidents to visitors while on public display. The contractor’s written proposal will address the approach for this requirement.

8. All surfaces shall be smooth and free of casting marks, burrs, voids, and other imperfections. The contractor shall ensure that the carriages are ground and sanded so that no seams are present from the casting method.

9. No markers, manufacturers, vendors or contractors, etc., stamps, medallions, markings, or engravings shall be placed or affixed to the carriages.

10. In order to withstand extreme and harsh weather conditions, the four carriages shall be etched to improve paint adherence, then primed and painted with a two-part epoxy industrial paint followed with two coats of an acrylic rust inhibitor and two coats of 100% acrylic exterior paint in a grey color to match Sherwin Williams HGSW3363 Storm Cloud.

Contractor shall supply paint information, including MSDS sheets, for COR approval prior to painting.

11. Proposed substitution of materials or modification of any carriage element shall be submitted for COR review and approval prior to fabrication.

3/31/2021 Page 3 of 6

12. The government will have the option to perform an inspection at the contractor’s facility during and upon the completion of fabrication of the carriage.

13. The contractor shall warranty all parts and labor for a period of one year from the date of acceptance of delivery of the carriages and shall replace, without cost to the government, any part of the carriages that fail due to manufacturing or materials defect during the warranty period. All costs of transportation of the carriages for repair covered by the warranty will be at the expense of the contractor.

Attachments

1. Evaluation Criteria

2. Relevant Photos

3. Dimension Drawings and Photos

1.3 LOCATIONS AND ACCESS

Cannon Access: The four cannons are currently stored in an off-site facility in the Washington

DC area. The winning bidder will be allowed to visit the facility and review the character and condition of the cannons, if desired. The time and travel expenses of that trip are to be included in the proposal.

Delivery – The Contractor shall deliver the carriages to a NPS facility within 10 miles of

Washington DC.

1. The delivery location is a facility well-suited for loading and unloading.

1.4 PERSONNEL QUALIFICATIONS

All personnel performing work shall be fully qualified and experienced in the type of work to be executed in this contract. When applicable, personnel shall be certified in the necessary work which is being performed by that person. The proposal shall include relevant training and experience of principal members of the team.

1.5 CONTRACTOR-FURNISHED ITEMS

All necessary supervision, personnel, equipment, tools, transportation, supplies, materials and incidentals required to perform the work of the contract in a safe, professional manner.

1.6 WORK CONDITIONS AND LIMITATIONS

Project Officers and Inspection

1. The Contracting Officer (CO) is the only person with authority to enter into, administer, modify and/or terminate the contract.

3/31/2021 Page 4 of 6

2. The Contracting Officer’s Representative (COR) is a program official designated by the

CO to assist in administering technical aspects of the contract. The COR cannot modify the contract.

3. The Construction Management Representative (CMR) is a program official designated by the CO to assist the COR with day-to-day documentation of contract activities and other contract administration activities. The CMR cannot modify the contract.

Required Performance Period

1. Work performance period anticipated to begin on June 1, 2021 with the cannon carriages to be delivered on or before September 30, 2021. If it is not possible to meet that deadline, include an alternate schedule in the proposal.

2. Delivery must occur between the hours of 6:30 AM and 3:30 PM Monday through Friday.

3. Delivery is not allowed on Federal holidays or weekends.

4. Delivery is to be scheduled two weeks in advance with NPS.

Quality Control Development and Monitoring

1. Develop and implement a construction quality process to ensure work conforms to the requirements of the contract.

2. Assign a competent and experienced person to oversee the construction of this project with the authority to stop or correct work due to unsatisfactory materials or workmanship.

3. Perform quality control inspection, documentation, process control sampling and testing as required by applicable standards.

4. The Contractor shall notify the COR of any significant deviation in measurements and quantities that will affect the intended outcome of the project or result in a change of cost or time to complete the work.

Park-Specific Conditions and Limitations

1. The Park will handle compliance documentation for the National Environmental Policy

Act and National Historic Preservation Act.

1.7 QUALITY ASSURANCE

All materials and methods used for this contract must meet or exceed the current local, State and Federal codes, standards and regulations applicable to the contract work.

All personnel performing work under this contract shall be trained and skilled in the trades required to complete the contract requirements.

3/31/2021 Page 5 of 6

1.8 REFERENCE STANDARDS: Perform all work in accordance with the most recent edition of the following standards unless otherwise instructed.

ASTM American Society for Testing and Materials

OSHA Occupational Safety and Health Administration

1.9 SUBMITTAL PROCEDURES

Contractor is responsible for additional submittals that may be required. Electronic forms are available.

Until the Contractor receives approval from the CO, no construction material or other items requiring the CO’s approval may be ordered, delivered, or used for the purposes of this SOW.

Unless otherwise instructed by the CO, send items requiring approval to the CO. Provide one

(1) electronic copy of each submittal unless otherwise specified. Forward related material as a package. Reference the section number of this SOW on each submittal. Allow 14 days for review and approval.

The CO will indicate in writing the approval or disapproval of each submittal, the reason for any disapproval, and any resubmission requirements.

There will be no waiver of any required submittal unless authorized by the CO. The CO may request submittals other than those specified in this document.

Prior to production, Contractor is to provide Shop Drawings and material specifications for

COR review and approval.

Any proposed change by the Contractor to the specified construction methods must be submitted in writing to the CO along with the justification for the proposed change.

PART 2: SUBMITTALS

Shop Drawings

Specifications for metal framing

Specification for metal attachments

Specification for paint systems

PART 3: PROJECT CLOSEOUT

3.1 Cleanup

3/31/2021 Page 6 of 6

Legally dispose of trash, debris and all excess and unusable materials at authorized facilities off Government property.

Restore or refinish any surfaces damaged during delivery.

Remove grease, dirt, stains, foreign materials, and labels from finished surfaces.

3.2 Final Inspection and Acceptance of Work

The COR will be on site at delivery and will perform an initial inspection while the

Contractor is present. This will be followed up with a more thorough, final inspection prior to the relocation of the carriages to Lafayette Park.

The final inspection will be finalized by the COR within five (5) working days after delivery.

The Contractor will be notified of any deficiencies found during the final inspection.

After all deficiencies have been corrected and all required closeout submittals have been forwarded to the COR, the CO will issue a letter of final acceptance and request the release of claims, as required.

3.3 Closeout Submittals

Provide operation and maintenance documentation

1. One hardcopy binder with the following components:

a. Table of Contents

b. Cut sheets of all installed materials and equipment

c. As-built drawings (See previous applicable requirements in this SOW)

d. USB thumb drive with PDF of all documentation and project photos

2. Provide one draft electronic copy (pdf) of all documentation for approval by COR prior to printing final version.

END OF STATEMENT OF WORK

Blank page

Figure 1: Andrew Jackson Statue from the southeast, with cannons and carriages in place

(WHHO, 2000).

Figure 2: Setting cannon on previous carriages. (WHHO, 2007).

Replace Four Cannon Carriages at Lafayette Square (WHHO)

ATTACHMENT 2: RELEVANT PHOTOS

Figure 3: Setting cannon on previous carriages.

(WHHO, 2007).

Figure 4: Wheel locks at the Northeast corner of the statue. All are similar. See Attachment 3 for Dimen-sions. (WHHO, 2021).

Figure 5: Detail of one wheel lock (WHHO, 2021).

2’8”

3-1/4”

5’4-3/4””

Figure 6: Th e pair of 1748 cannons with critical dimensions.

Figure 7: Th e pair of 1773 cannons with critical dimensions.

5’ 10-1/2” 3’-0”

3-1/4”

WHHO Cannon Carriages - SOW.pdf
Attachment 1 Evaluation Criteria.pdf
Attachments 2-3.pdf
Attachments 2 and 3
Cannon Dimensions
BASE MEASUREMENTS Layout1