Stones River National Battlefield 3501 Old Nashville Hwy Murfreesboro TN. 37129 Rehabilitate and Paint Iron Cannon Carriages and Caisons

The vendor will provide the labor, equipment, materials, parts and supplies to rehabilitate a total of Two (2) Civil War Era cannon carriages and Two (2) Civil War Era Caisons for Stones River National Battlefield at Murfreesboro, Tennessee.

GENERAL INFORMATION

1.0 Purpose

1.1 Stones River National Battlefield intends to have two Civil War Era cannon carriages and Two Civil War Era Caisons rehabilitated for the purpose of displaying an accurate portrayal of field artillery as it would have been seen at the Battle of Stones River.

1.2 Stones River National Battlefield will award to a single source vendor a fixed price payment to rehabilitate the above mentioned cannon carriages.

1.3 The vendor will provide the labor, equipment, materials, parts and supplies as well as a facility in which to do the work.

2.0 Details

2.1 Vendor must be qualified to restore and rehabilitate Civil War Era field artillery and related supply equipment.

2.2 Disassemble carriage, sandblast with Walnut shells all metal parts; treat all bare metal with Sherwin Williams Zinc Clad IV Zinc-rich epoxy primer and Macropoxy High Solids Epoxy; apply two coats of Hi-Solids Polyurethane on all metal parts.

2.3 Paint colors are olive drab and black

2.4 Vendor must comply with all pertinent OSHA requirements and EPA guidelines.

2.5 Cannon carriages will need to be picked up from the park and delivered back to the park by the vendor when the work has been completed.

2.6 Paint Job shall be free of defects such as runs, drips or thin spots.

3.0 Submittals

3.1 Contractor shall provide paint numbers and spec sheets for all primmer and paints used and provide a paint index card for each

4.0 Payment

4.1 Payment will be one lump sum