This is a Statement of Work for a condition assessment of the north basement foundation wall (Room B14) at Thomas Edison's historic home, Glenmont, located at 12 Honeysuckle Avenue, West Orange, New Jersey. The National Park Service project (PMIS #246236) requires a comprehensive survey and assessment report addressing deterioration of a circa 1880 brown sandstone foundation wall caused by water penetration from a malfunctioning gutter.

The scope of work requires the contractor to conduct a thorough visual inspection documenting deterioration signs including cracking, spalling, water intrusion, and biological growth; perform moisture testing using meters; conduct mortar and stone analysis testing with specific mortar formulas for in-kind replacement recommendations; and conduct cleaning tests to determine appropriate non-invasive surface preparation methods. Deliverables include detailed photographic documentation, CAD drawings indicating damage percentages and repair locations, a comprehensive written assessment report including findings from all testing, and recommended methodology adhering to National Park Service and Department of Interior Standards for historic preservation. The report must also address moisture management, crack and joint repair approaches using lime-based mortar, and structural stabilization recommendations. The contractor must submit four bound paper copies (8.5" x 11") and one PDF electronic copy on flash drive. The contract is firm-fixed price with an eight-month completion timeframe from award. On-site work is restricted to 9:00 a.m. to 3:30 p.m., Monday through Thursday, excluding holidays, by advanced appointment only. Contractors require $1 million liability insurance, must be escorted at all times by NPS staff, and are responsible for all damages. Proposals are evaluated on experience with NPS preservation standards, relevant past performance (requiring two examples of historic stone foundation assessment reports and one mortar analysis example from National Register-listed structures), and price. Proposers are strongly encouraged to conduct site visits. Questions must be submitted in writing to the Contracting Officer five days prior to the solicitation closing date. Contact: Beth Miller, Curator, at 973-809-4360 or beth_miller@nps.gov.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Overview

Thomas Edison National Historical Park is a National Park Service site located in West Orange, New Jersey. The park consists of two separate sites, approximately one mile apart.

Thomas Edison’s home, Glenmont, is located in a private residential community known as Llewellyn Park. Built in 1880, Glenmont is a 29 room Victorian mansion which remains intact, complete with interior furnishings and finishes that reflect the rich historic decorative period during the years when Thomas Edison and his family resided in the home. This historic residence is currently operated as a functioning museum. Glenmont is a property of national significance that is listed on the National Register of Historic Places.

Glenmont, a prime example of Queen Anne style architecture, is a balloon framed structure which includes a circa 1880 stone foundation at the basement level with walls made of brown sandstone. This Scope of Work produces an assessment report which outlines the requirements for preservation maintenance of the north exterior stone foundation wall in basement room B14 of the Glenmont mansion. The goal is to ensure the long-term integrity and appearance of the historic structure while addressing any immediate preservation needs. A condition survey of this wall will help the park to achieve these goals.

Objectives

To survey, assess, and produce an existing conditions assessment which outlines specific steps that need to be undertaken in order to repair and/or maintain the exterior B14 north foundation wall at the Glenmont Mansion. The goal of this report is to make recommendations which will stabilize the wall as well as prevent further deterioration and water intrusion while preserving the historical significance and aesthetic character of the structure. As per National Park Service standards for historic properties, the assessment will focus on maintaining as much of the original historic fabric as is possible and only replacing in-kind any select historic materials that require upgrade in order to stabilize this deteriorating wall. To the greatest extent possible, the

Scope of Work for the Survey of the B14 Stone Basement

Foundation Wall at Thomas Edison’s Home, Glenmont

PMIS Project #246236 Thomas Edison National Historical Park

12 Honeysuckle Avenue West Orange, NJ 07052 tasks associated with implementing the findings of this report will be completed, using similar historic methods and techniques that were originally used to create the stone foundation wall. As a whole, completion of this design document (assessment and evaluation) will provide a road map that will be used to further preserve this historic home and improve the condition of its building envelope.

Existing Conditions

Stabilization and erosion issues of the north brownstone wall of Basement Room B14 have occurred due to water penetration issues as a result of a malfunctioning gutter.

Because the gutter above this location was malfunctioning, rain water penetrated the earth outside of the north wall of this basement room, creating a sinkhole which caused water to seep directly into the ground outside of this foundation wall. Consequently, water has permeated the wall on a regular basis, likely for several years.

Addressing these erosion and stability issues on this foundation wall in a timely manner is recommended in Glenmont’s Historic Structure Report: Part 2 (September of 2017) which specifically recommends that these repairs be undertaken to “minimize dampness” and to “prevent further corrosion of the dry valve and back-flow preventer equipment” as this condition issue is contributing to the “corrosion of the fittings, surfaces, and supports”. In total, this work will prevent damage to important HVAC, fire protection, and plumbing equipment located in this basement area.

Site records indicate that the Rockwell Newman Company previously undertook foundation repair work at Glenmont in the early 1970s. It is unclear whether or not those repairs included work on the north wall in the B14 basement area.

Project Location

Thomas Edison's Historic 1880 Mansion, Glenmont

Location: Llewellyn Park: 12 Honeysuckle Avenue West Orange, NJ 07052

Scope of Work

Assessment:

Visual Inspection: Conduct a thorough visual assessment/survey of the exterior B14 north stone foundation wall to identify signs of deterioration, such as:

Cracking or spalling of stones or mortar

Signs of water intrusion or moisture damage

Efflorescence or biological growth (mold, moss)

Structural concerns affecting stability

Moisture Testing: Utilize moisture meters to gauge the extent of moisture present in the stone and mortar. Make specific recommendations for repair/maintenance of the wall, based upon these findings.

Mortar and Stone Analysis: Conduct mortar and stone analysis testing to make specific recommendations for replacing these materials in-kind, as required. The mortar analysis must provide a specific formula for recreating the mortar that is currently being used for the B14 stone foundation wall.

Conduct Cleaning Tests: As required, to determine the appropriate non-invasive methods for surface preparation. The report shall detail the appropriate methods to remove dirt, debris, and biological growth and also for removing loose mortar and efflorescence without damaging the stones.

Documentation

Photographic Record: Document current conditions with detailed photographs of the stone wall foundation

Submittals: The assessment report for repairing and stabilizing the B14 basement wall at Glenmont. Submit technical information and recommendations for materials as part of the project deliverable, inclusive of mortar technical specifications and/or stone repairs.

Comprehensive Written Report: The written condition assessment for the repair and stabilization of this basement Foundation wall will include all of the associated data that was compiled during the vendor’s visual assessment of the B14 wall and its surrounding area, documenting the existing conditions. This report will summarize the findings of the visual assessment, including identified issues and recommended repairs.

The report will also include the culled data from the associated mortar and stone analysis testing, the cleaning tests for surface preparation recommendations, and the moisture testing. The report will summarize the findings of these forms of analysis.

Vendor will also produce CAD drawings of the wall as part of the written assessment: These architectural drawings will provide a percentage of how much of the wall is damaged and what exactly requires repair and/or replacement with the identified locations/areas that are specifically outlined on this diagram. These measured drawings will identify areas where stone replacement is required, where mortar upgrades/replacements are required, and also highlight the specifically identified locations of any other necessary repairs or stabilization.

Recommended Methodology: Vendor will also include in the written assessment, the recommended methodology for treatment, which must adhere to National Park Service and Department of Interior Standards for historic preservation. The recommended methodology that is outlined in the assessment of the foundation wall will include recommendations for addressing the specific issues/tasks that are outlined below.

Additionally, the assessment will make recommendations for future monitoring and cyclical maintenance for the B14 basement wall.

Repair Work

Moisture Management: Identify methodology and approach for addressing any sources of water intrusion, such as:

Improving drainage around the foundation (ensuring proper grading and functioning gutters).

Considering the installation of a French drain if necessary.

Identifying any potential recommendations for the addition of any sealant in order to enhance the area's ability to remain watertight.

Identify Methodology and Approach for Repairing Cracks and Joints:

For identified cracks, repoint using lime-based mortar compatible with historic masonry.

Fill minor voids with hydraulic cement where necessary, ensuring compatibility with existing materials.

Identify Methodology and Approach for Stabilization: Recommendations for addressing any structural concerns by consulting with a professional mason specializing in historic preservation to discuss appropriate methods of stabilization if significant issues are found.

Deliverables

The deliverable is a comprehensive assessment report of the B14 basement foundation wall at Thomas Edison’s 1880 mansion, Glenmont, containing all of the associated information that is identified in this statement of work. Four bound paper copies of the report on 8 1/2 x 11 paper, and one electronic copy of the report in PDF format on a flash drive must be submitted to the COR for this project as part of the project’s required deliverables.

Project Timeline and Work Schedule

Duration: The Contractor shall be required to commence work under this contract within

10 calendar days after the date of the award to the Contractor, execute the work diligently and complete the entire project within an eight month timeframe which begins on the date of award.

Work will be scheduled to minimize disruption to Glenmont Mansion visitors and activities.

On-site work/pick up/drop off/packing may only be done between the hours of 9:00 am and 3:30 pm, Monday through Thursday, excluding holidays. On-site work is subject to weather conditions, other state of emergency conditions, or government shutdown. Access is by advanced appointment only. Please note that on-site work hours are non-negotiable and the contractor must consider the hours of availability of the resource when formulating their fixed cost estimate for this project.

Safety and Compliance

Ensure all work complies with applicable NEPA 106 compliance and OSHA regulations and local safety standards. The offeror’s equipment, tools, and supplies must be of a size and configuration capable of safely accommodating such work and must be equipped with the necessary fire and safety capabilities. Selected vendor must provide a form of egress in the event of fire during the course of the project.

For safety, security, and preservation reasons, family, friends, or pets are not permitted to accompany the contractor’s staff to the job site at Thomas Edison’s home, Glenmont. This includes, but is not limited to, underage children. The park reserves the right to request that the Contractor produce documentation for any person on-site which provides evidence that they are legitimate and approved project personnel assigned to work on the project.

Protect-in-place measures are the responsibility of the Contractor and also include protecting-in-place areas and objects along the path of travel, as required, if deemed necessary to prevent damage to any aspect of the historic/non historic components of the cultural landscape and/or the historic buildings/the historic building interiors/artifacts, as well as any other aspect of the park-related components (such as roadways, walkways, planters, birdfeeders, basement bulkhead doors, porches, parking lots, etc.) during the course of the project. The selected vendor will also be required to adhere to all park safety and security policies which will be further detailed in this document.

Selected vendor is responsible for any damage that occurs during the course of their work while working on site. This includes, but is not limited to, damage to historic finishes and features, damage to historic staircases and steps, damage to historic walls and ceilings, damage to historic floors and historic light fixtures, damage to any historic artifacts, damage to any buildings, damage to any building systems or estate areas, etc. This includes, but is not limited to, during the installation of project equipment or supplies, and during the time of de-installation of any project equipment or supplies, or during any other on-site work. Deliveries will be arranged by advanced appointment only.

Background materials attached to the scope of work include a copy of Rules for Contractors in Historic Buildings (Attachment B) which identifies specific guidelines that must be followed by Contractors when they work on-site. In general, no food, drink, or smoking is permitted within site work areas.

Contractor must refrain from storing project equipment on-site during the course of the project. The Contractor is responsible for the cost and acquisition of all project related materials, labor, and services necessary to complete the work of this contract. The government will not provide any materials, labor, and services necessary to complete the work of this contract.

Project related expenses of any kind are the responsibility of the Contractor.

Safety and Security

Contractors and their team shall be escorted at all times by a National Park Service staff member while they are working on-site. This means that contractors shall not be left unattended, even for short periods of time, and an NPS staff member shall be continually monitoring them as they work, in the immediate vicinity. Please note that there should be no expectation of a contractor working independently, without staff monitoring or staff supervision, in any NPS facility. For more details, please refer to the Contractor Monitoring SOP that is attached to this solicitation.

Backpacks and bags are subject to inspection. Contractor team members may be required to wear an identification badge while on-site and use a sign in sheet to log their on-site hours. Selected vendor shall be required to submit a roster supplying the names of participating team members prior to the start of any on-site work. Parking location is subject to security issues and shall be handled on a case by case basis.

Insurance Requirements

The selected vendor shall present a certificate of insurance in the coverage amount of $1 million dollars for work performed during on-site tasks which include, but are not limited to, coverage for when the contractor is completing installation/re-installation of project equipment and supplies, and to cover any damages accrued to the foundation wall or any other historic or non-historic aspect of the Glenmont estate and its outbuildings, including its cultural landscape, that occurred during the course of the project work. Within ten days of the award and prior to the commencement of on-site work, a Certificate of Insurance must be provided to the NPS.

Contractor must provide proof of liability insurance in the amount of $1 million dollars as well as standard insurance and bonding which covers the company and its employees against neglect, accident, theft and damage. This shall be provided to the CO. Contractor will also carry insurance to cover injuries to his workmen and damage caused by the workmen.

The Vendor must provide a certificate of insurance within ten days of the contract award for the full amount of insurance requested. Contractor shall be responsible for all damages to persons or property that occurs as a result of Contractor’s fault or negligence. The contractor shall take proper safety and health precautions to protect work, workers, the public, and property of others. Selected contractor must be present on-site for these activities as well as for all on-site deliveries.

Project Management

Project Manager: Beth Miller, Museum Curator of the Edison home, Glenmont

Preservation Specialists: David Vago, Cultural Resource Manager; Timothy Stauffer, Facility Manager

Stakeholders Involved: Thomas Edison National Historical Park Management and Staff, Historic Preservation Officers, NPS HACE Division

Bidding Proposal Requirements

The bidder must submit the following information as part of their bidding proposal:

Evaluation of Solicitation Proposals (Selection criteria):

Award of the contract to complete this project will be made on the basis of technical qualifications of the Proposer and on the basis of the Proposal offering the best value to the government with technical and price factor being approximately equal. Proposals will be evaluated based on the following Factors and Sub-factors:

Factor 1: Experience

Applicant must demonstrate familiarity with the NPS conservation and preservation standards and the Secretary of the Interior Standards for the Treatment of Historic Properties (See NPS Museum Handbook at https://www.doi.gov/museum/nps-handbooks and https://www.nps.gov/tps/standards.htm for more information).

Factor 2: Relevant Past Performance

Comparable past work must also include two examples of a survey report or an assessment of repairs required to structurally stabilize a historic stone foundation wall and one example which demonstrates mortar analysis for a historic stone foundation wall. These examples must be associated with a structure that is listed on the National Register of

Historic Places/or equivalent, and are also projects of similar scope, complexity, and historic resource value to that required by this solicitation.

https://www.doi.gov/museum/nps-handbooks https://www.nps.gov/tps/standards.htm

Bids will also be evaluated on the bidder’s knowledge of in-kind materials and techniques to complete project work and their emphasis on recommending the least invasive approach to accomplish the work while adhering to NPS preservation and safety standards.

Factor 3: Price

A price evaluation will be performed to determine the reasonableness of the proposed price. Reasonableness will be determined considering other competitive prices received and comparison to the Independent Government Estimate.

Any proposal containing suggestions, approaches, options, or ideas that do not conform with National Park Service, the Secretary of the Interior, and AIC preservation standards will not be considered.

For project examples cited as part of the bidding package requirements:

Please include:

*Point of Contact (with verifiable telephone number and email address) *Company Name and Address *Company Telephone Number and Email Address (verifiable) *Identification of Historic Resource Treated *Brief Description of the Project with Illustrations which demonstrates similarity in scope and complexity to this project *Dates Work Was Performed

Cost proposal:

Contract Type

The government anticipates awarding a firm-fixed price contract.

SAM Registration

Contractor shall be registered in SAM.gov prior to contract award.

B. Pre-Proposal meeting:

All Proposers are strongly encouraged to visit the site in preparation for submitting a proposal to view the north foundation wall of the basement B14 area of Glenmont to assess the foundation wall and also to assess the spacial constraints that must be safely navigated in order to perform the work. Failure to do so shall not relieve the Contractor from responsibility for having estimated properly the difficulty or cost of successfully performing the work.

The Contractor must arrange a site visit at a date and time to be determined. Please contact Beth

Miller should you plan to attend a site visit. Any questions that a Proposer has regarding the project must be submitted in writing to the Contracting Officer assigned to this project no later than five days prior to the closing date for this solicitation.

Beth Miller

Curator of Thomas Edison’s Home, Glenmont

973-809-4360 beth_miller@nps.gov

C. Limitations of Liability:

The Government assumes no responsibility and no liability for costs incurred by Proposers in responding to this RFP.

Modern Images of the B14 Basement Area and the North Stone Foundation Wall at Glenmont

File details come from the government source that posted it. Updated .