UNITED STATES DEPARTMENT OF THE INTERIOR

FWS MS Sandhill Crane NWR

7200 CRANE LANE

GAUTIER MS 39553-2500

Repaint Cache Trailer

STATEMENT OF WORK

Repaint Cache Trailer

4/14/2023

1. Statement of Work: This Statement of (“Work”) work consists of all labor, equipment, and materials required for refurbishing, painting, and removal of current vinyl decals the painting of the side wall, trim skirting, bottom boxes, and swing doors on the trailer. All chrome will be left unpainted. Picture of the trailer provided at the end of this document.

1.2 Period of Performance: All work shall start within 30 days after awarding the contract and completed within 30 days of the start date.

1.3 Materials and Services to be provided by the Government:

No government furnished property will be furnished.

1.4 Channels for Obtaining Information: All information passing from the

Government to the contractor must be sent through the Contracting Officer (CI).

Coordination with the Contracting Officer (CO) is a must to avoid any type of conflicts.

1.5 Delivery: Trailer will be delivered to the vendor and picked up by USFWS personnel within a 50-mile radius from Gautier, Mississippi.

2. Specific Requirements to be performed:

2.1 The contractor shall provide all knowledge, materials, labor, and installation including any prior trouble shooting for all contracted work.

2.2 The contractor shall provide all the following:

1. Remove current vinyl decals.

2. Prepare surface according to industry standards.

3. Paint with a standard white finish: Trailer sides, lower boxes, trim skirting, swing doors, front nose panel refrigerator unit.

3. Guarantee: The contractor shall warrant all workmanship for one year after final acceptance of contract work. Warranty for materials shall be in accordance with manufacturer’s written standard warranty period. Equipment and material, which do not achieve requirements after installation, shall be replaced or modified by the manufacturer to attain compliance, at no additional cost to the government.

4. Codes and Standards: The paint shall comply with all Federal, state, and local codes, standards, regulations, and ordinances.