A04_STATEMENT_OF_WORK_Dumpsters.pdf
PDF 451 KB Posted
- Attached to
- DUMPSTERS NEEDED FOR FWS BOMBAY HOOK NWR
- Solicitation number
- 140FS326Q0179
About this file
This is a Statement of Work for dumpster rental and disposal services for the U.S. Department of the Interior's FWS Bombay Hook National Wildlife Refuge located at 1360 Donas Landing Road, Dover, Delaware 19901.
The contractor must provide approximately 21 dumpsters (quantity subject to fund availability and potential reduction) to facilitate disposal of demolition debris from a single structure. All dumpsters will be 30-yard capacity units designated for general demolition debris materials. The structures have been tested and contain no known hazardous materials. Pricing must include three fee components: initial delivery fee (if applicable), per haul fee (covering full removal and empty return/swap out), and per ton disposal fee. All fees and charges associated with dumpster handling, hauling, disposal, and permitting (if necessary) must be included in the pricing. The contractor must maintain a minimum of three dumpsters per material type on-site at one time as needed. The project timeline runs from November 1, 2026 to December 1, 2026, with removal tasks expected to be completed during a two-week phase within this window. The awarded vendor must be capable of swapping up to 8 dumpsters per day during select phases, with possible no-work periods due to operational needs or weather. Coordination of all deliveries and pickups occurs through refuge staff during general hours of 7:00 AM to 4:00 PM, Monday through Friday. Documentation includes written tickets for each dumpster arrival and departure to ensure accurate load counts. Disposal weights will be provided to refuge staff within 24 hours of disposal. Materials will be recycled to the maximum extent possible. All local and state transportation regulations apply, and all materials become contract property upon pickup. Interested contractors should contact David Miller, GAOA Project Coordinator, at 973-417-9550 or David_j_miller@fws.gov for additional information or site-specific requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A06_Steamboat_Map_0001.pdf | ||
| A06_Fisher_Tract_Map_0001.pdf | ||
| Sol_140FS326Q0179_Amd_0001.pdf | ||
| A21_Bid_Schedule_Dumpster_0001.pdf | ||
| Sol_Clauses_Q4.pdf | ||
| Sol_140FS326Q0179.pdf | ||
| B03_-_WD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
FWS BOMBAY HOOK NWR
1360 Donas Landing Rd
Dover, Delaware 19901
STATEMENT OF WORK
DUMPSTER RENTAL AND DISPOSAL FOR
PART A – GENERAL INFORMATION AND INSTRUCTIONS
GENERAL DESCRIPTION OF WORK: Provide approximately 21 dumpsters (This quantity is subject to availability of funds and can be reduced)to aid in the disposal of demolition debris from a single structure at the addresses listed above. The dumpsters will be provided for two different types of material to be separated by refuge staff. The type of material is general demolition debris. The structures have been tested and no known hazardous materials were located.
PART B – PERFORMANCE REQUIREMENTS
Dumpsters by material type:
General Demolition Debris (30 yds dumpsters)
Pricing provided based on the following for General Construction Debris Materials:
1. Initial Delivery Fee (if applicable)
2. Per Haul Fee (Fee to include full removal and empty return – ie. swap out)
3. Per Ton Disposal Fee
Dumpsters will be provided on an as needed basis, with no less than three dumpsters per material type (if needed) on the site(s) at one time. Pricing will include all fees and charges associated with dumpster handling - ie. hauling, disposal, permitting (if necessary), etc. The expectation is that all dumpsters necessary to complete the project will be coordinated and completed from Nov 1, 2026 to Dec 1, 2026. The expectation is that the removal tasks will be completed during a two-week phase within this operational window. The awarded vendor will be responsible for swapping up to 8 cans per day during select phases with possible no work periods due to operational needs or weather.
The material types (concrete or construction debris) are subject to change based on site needs.
Coordination of deliveries and pickup will be done through refuge staff while the job is being completed. General refuge hours are 7AM – 4PM Monday – Friday. The demolition task is expected to take two weeks or less.
PART C – OTHER PERFORMANCE REQUIREMENTS AND INFORMATION
DOCUMENTATION AND REPORTING: A written ticket will be provided to refuge staff as dumpsters arrive and exit to ensure load counts are accurate. The weights for disposal for general debris will not be known at the time of departure; however, refuge staff will be notified within 24 hours of disposal weights. Sorted materials will be recycled to the maximum extent possible to divert as much waste from landfills. All local and state transportation regulations apply. All materials are considered property of the contract upon pickup.
CONTACT INFORMATION: Possible contractors are encouraged to contact David Miller, GAOA Project Coordinator at 973-417-9550 or David_j_miller@fws.gov for additional information or site-specific requirements.
mailto:David_j_miller@fws.gov
File details come from the government source that posted it. Updated .