This statement of work outlines a gravel delivery contract for the Dale Bumpers White River National Wildlife Refuge. The U.S. Fish and Wildlife Service requires the delivery of 28,390 tons of granite base SB-2 1-inch minus gravel with fines to various locations on the refuge by September 30, 2021. The contractor must deliver between 40 to 50 loads per day and spread the gravel tailgate. Eleven thousand three hundred eighty-nine tons shall be delivered to the Levee Loop area, and seventeen thousand one tons shall be delivered to various spots as indicated on the attached map. Weight tickets are required upon each delivery. The contracting officer is Justine Pasiecnik and the technical point of contact is David McCaghren.

View the file

Other files

File Type Posted
Price_Schedule.pdf PDF
Site_Visit_Instructions.pdf PDF
Sol_140F0821Q0001.pdf PDF
Gravel_Sites.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for Granite Base SB-2 Gravel Delivery at the Dale Bumpers White River National Wildlife Refuge

South Atlantic-Gulf & Mississippi Basin Region April 14, 2021

1. BACKGROUND

The U.S. Fish & Wildlife Service would like to procure Granite Base (SB-2) 1 ½” gravel for multiple projects for the Dale Dumpers White River National Wildlife Refuge to support the Great American Outdoors Act (GAOA).

2. GENERAL INFORMATION

All Material must be delivered to the Dale Bumpers White River National Wildlife Refuge (NWR) at various location on the west side of the refuge. (See Maps). Contractor is responsible for meeting the daily requirement of delivering 40 to 50 load and have all gravel delivered by no later than 9/30/2021.

Specs for Materials:

Granite Base (SB-2) 1 ½” minus with fines. Materials samples must approved before delivery.

Total tons delivered: 28,390 tons. Gravel must be tail gate spread.

State certified scales are in the area and weight tickets are required upon each delivery.

Project areas are on gravel roads and access requires dry weather.

11,389 tons shall be delivered to the Levee Loop area (east side of map).

17,001 tons shall be delivered to various spots (as indicated on the map) on the west side of the refuge.

3. POINTS OF CONTACT

Contracting Officer:

Justine Pasiecnik Email: Justine_pasiecnik@fws.gov Phone: (413)253-8287

Technical Point of Contact:

David McCaghren, MAT Project Coordinator Phone: (256) 642-5417 Email: David_mcCaghren@fws.gov