This Statement of Work (SOW) details the removal and replacement of two commercial grade insulated overhead doors at the Chase Lake WMD: Woodworth Station in Woodworth, North Dakota. The project requires the contractor to furnish and install two 16' 2" x 14' 0" white insulated flush doors, each with four 24" x 12" windows, 10,000 cycle torsion springs, white angle-mounted side seals, and top cap seals. The contractor must connect the new doors to existing operators and legally dispose of the old doors and hardware offsite.
The project must be completed within 6 weeks of contract award, during standard business hours (Monday-Friday, 8:00 a.m.-4:00 p.m.). The government will ensure the installation site is accessible and provide single-phase power to the operators. The contractor is responsible for providing all necessary labor, equipment, and materials, and must notify the government point of contact of any unforeseen structural conditions or hazards. The primary points of contact are Scott Baker and Paul Halko, with mobile numbers provided for each.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FGA25Q0052_Amd_0001.pdf | ||
| A06_-_Drawings_(Door_photo_2).pdf | ||
| Sol_140FGA25Q0052.pdf | ||
| A06_-_Drawings_(Door_photo_1).pdf | ||
| B08_-_Solicitation__(140FGA25Q0052).pdf | ||
| B08_-_Solicitation_(Cover_Page_SF1442).pdf | ||
| A06_-_Drawings_(Door_photo_3).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Project Title:
Removal and Replacement of Two Commercial Grade Insulated Overhead Doors on Cold Storage Building
Location:
Chase Lake WMD: Woodworth Station
5924 19th St. SE
Woodworth, ND 58496
Project Points of Contact:
Scott Baker
Paul Halko
(701)650-1381 (mobile)
(701)649-0122 (mobile)
1. Purpose:
Removal and offsite disposal of existing overhead doors. Furnish and install two new overhead commercial grade insulated overhead doors. Reconnect new doors to existing openers.
2. Scope of Work:
The contractor shall:
- Furnish and install the following two overhead doors:
- Two 16’ 2” X 14’ 0”, 2” Insulated Flush doors, white
- Containing four windows per door, 24” X 12”, Windows in Section #3 Panels 1,2,4,5
- 2” Angle mounted in on wood with 15” radius
- 10,00 Cycle Torsion Springs
- 28’ per door white angle mounted side seal
- 16’ per door top cap seal
- Connect new doors to existing operators
- Legally dispose of old doors and hardware offsite
3. Government Responsibilities:
- Ensure the installation site is accessible and clear of obstructions during the entire installation period.
- Provide single-phase power to the operators prior to installation.
4. Contractor Responsibilities:
- Complete installation during standard business hours: Monday–Friday, 8:00 a.m.–4:00 p.m.
- Provide all labor, equipment, and materials necessary for the scope outlined.
- Notify the Government POC if unforeseen structural conditions or hazards are encountered.
5. Deliverables:
- Two properly installed and functioning overhead insulated commercial doors
6. Period of Performance:
Work must be completed within 6 weeks from the date of contract award or purchase order receipt, depending on material lead time.
| Statement of Work (SOW) |
| Project Title: |
| Location: |
| Project Points of Contact: |
| 1. Purpose: |
| 2. Scope of Work: |
| 3. Government Responsibilities: |
| 4. Contractor Responsibilities: |
| 5. Deliverables: |
| 6. Period of Performance: |
File details come from the government source that posted it. Updated .