This document is a Performance Work Statement (PWS) for felling and removing designated hazard trees at Crater Lake National Park. The contractor shall provide all personnel, equipment, and other items necessary to fell and flush-cut hazard trees in specified areas around administrative buildings, roads, and other locations within the park. The work shall be performed during daylight hours, Monday through Friday, between August 19, 2024 and October 31, 2025, with a possible extension to August 18, 2025 - October 31, 2025 if inclement weather conditions prohibit completion. The contractor must adhere to strict safety requirements and environmental compliance standards. Quality assurance will be conducted through on-site inspections, with 90% of trees required to be felled and flush-cut as specified, and 100% without injury or property damage. The preliminary list of hazard trees to be removed covers approximately 1,741 acres across several locations within the park.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B11_Site_Visit_Sign_In_Sheet_02_CRLA_Haz_Trees_2024_0002.pdf | ||
| Sol_140P8424Q0089_Amd_0002.pdf | ||
| B12_Miscellanious_Correspondence_Questions_and_Answers_CRLA_Hazard_Trees_0002.pdf | ||
| B11_Site_Visit_Sign_In_Sheet_CRLA_Haz_Trees_2024_0001.pdf | ||
| A04_Statement_of_Work_CRLA_Haz_Trees_2024_-_REVISED_0001.pdf | ||
| Sol_140P8424Q0089_Amd_0001.pdf | ||
| B03_DOL_Wage_Determination_CRLA_Haz_Trees_2024.pdf | ||
| B08_Attachment_5_140P8423Q0089_Key_Personnel_Form.pdf | ||
| B08_Attachment_4_140P8424Q0089_52_212-3_Full_Text_(Sep_2023).pdf | ||
| Sol_140P8424Q0089.pdf | ||
| B08_Solicitation_ATT_1_140P8424Q0089_Quote_Sheet.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
Crater Lake National Park
Hazard Tree Felling
Solicitation #140P8424Q0089
SECTION 1 – GENERAL INFORMATION
1.1 Scope of Work
The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to fell designated hazard trees that are felled as specified in this performance work statement. The contractor shall perform to the standards in this contract. The estimated quantity of work is presented in Technical Exhibit 2 –
Preliminary List of Hazard Trees areas where trees are to be felled, actual quantity of work may vary from that shown in Technical Exhibits 2, by ± 10%. NPS may pull trees from the listed treatment areas prior to the work being started.
1.2 Contractor Personnel
1.2.1 Project Manager
The contractor shall provide a project manager who shall be responsible for the performance of the work. The name of this person, and an alternate or alternates, who shall act for the contractor when the manager is absent, must be designated in writing to the contracting officer.
1.2.1.1 The project manager or alternate must have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.2.1.2 The project manager or alternate must be available during normal work hours to meet in the park with government personnel (designated by the contracting officer) to discuss problem areas.
1.2.2 Employee Training
The contractor shall ensure that employees performing tree work are fully trained to current arboricultural industry standards for each task they undertake. Contractor employees engaged in felling, climbing, and rigging of trees must have current International Society of Arboriculture, Tree Care Industry Association, or equivalent professional certification in those activities before starting work under this contract. Contractor employees operating winches, power tools and heavy machinery must be fully trained and proficient in the use of this equipment.
1.3 Commencement
Period of performance shall begin on August 19th , 2024th and continue until November 1st, 2024.
It is recognized that seasonal climatic conditions regularly occur in some of the National Park Service areas that restrict and in some cases prohibit normal activities. Should environmental conditions (such as large amounts of snow fall) prohibit continuing operations prior to completion of the project, the period of performance can be extended with an additional time frame for completion of August 18th, 2025 to October 31st, 2025. The performance of tree work must be coordinated with NPS personnel who shall provide debris cleanup support.
These dates will be agreed upon between the NPS and the contractor. The contractor is expected to adhere to this schedule, excepting for postponement and subsequent rescheduling of work activities due to inclement conditions described in section 1.5. All work under this contract, including any modifications, shall be completed by October 31th , 2025.
1.4 Hours of Operation
All work performed under this contract shall occur during daylight hours, Monday through Friday. No work shall be allowed on Saturdays, Sundays, and federal holidays. Ideally, work will be performed around the administration buildings and main road corridors first but will depend on snow pack and accessibility.
1.5 Working Conditions
Felling and topping of trees shall not be performed in wind conditions that will interfere with the feller’s ability to control the direction of a tree’s fall. No work activities under this contract shall be performed in sustained winds greater than 25 mph, in whiteout conditions, in an area under active flood warning, or when snow depth or avalanche conditions prohibit safe access to the work site.
1.6 Safety
1.6.1 All operations under this contract shall be conducted in accordance with ANSI Z133.1-2006 Tree Care
Safety Standards, and all federal OSHA, state and local safety requirements. Where OSHA regulations and
ANSI standards conflict, OSHA regulations will take precedence.
1.6.2 The contractor shall provide sufficient personnel such that a minimum of 2 employees serve as safety spotters during each individual tree topping and falling procedure, the NPS representative on-site may act as a safety spotter. These employees shall be trained to serve in this role, which shall be their primary function during the work of this project. Safety spotters shall be deployed such that they maintain an exclusion zone of a diameter that is 2 times the length of the tree being topped or felled, into which unauthorized persons (park employees not associated with the operation, and the public) cannot enter. Employees shall be equipped with radios or other means of signaling one another during the cutting procedures. If the safety zone is breached during the felling procedure, work shall be stopped until the unauthorized person(s) leave(s) the exclusion zone.
If necessary, the project inspector, COR, or designated park representative will escort the unauthorized person(s) from the exclusion zone so that the procedure may continue.
1.6.3 The contractor shall ensure the use by its employees of all required personal protective equipment including hard hats, work boots, safety glasses or goggles, hearing protection, gloves, chaps, ropes, harnesses, etc. Contractor employees shall wear ANSI 107-2004 Class 2 high visibility vests while conducting operations in or adjacent to roadways or parking areas.
1.6.4 No one except the operator shall be within 10 feet of a power saw. All gasoline and diesel powered equipment, including but not limited to trucks and chainsaws, shall be equipped with spark arresters.
1.6.5 If at any time the COR or designated park representative determines that the work is being conducted in an unsafe manner, the contractor will be notified and shall immediately cease all work activities.
1.7 Environmental Compliance
1.7.1 The contractor shall be responsible for the immediate cleanup of any spillage or leakage of fuel, oil, or any other substance and spill area will be restored to its original condition. All spills or leaks shall be reported to
COR or designated park representative immediately.
1.7.2 All equipment intended for use on this project must be cleaned prior to its arrival in the park and free of all plant materials (plant parts and propagules) upon entry.
1.7.3 The contractor shall repair all ground disturbances within reason, with the exception of those resulting from woody debris falling into undeveloped vegetated areas.
1.8 Quality Assurance
According to the Inspection of Services Clause (FAR52.246-4), the government will evaluate the contractor’s performance under this contract. For those tasks listed in the Performance Requirements Summary (Attachment
1), the COR or a designated government inspector will follow the method of surveillance specified in this contract, and will record all surveillance observations. When an observation indicates deficient performance, the
COR or designated government inspector will require the project manager or representative at the site to initial the observation. The initialing of the observation does not necessarily constitute concurrence with the observation, only that he or she has been made aware of the deficient performance. Government surveillance of tasks not listed in the PRS or by methods other than those listed in the PRS (such as provided for by the
Inspection of Services clause) may occur during the performance period of this contract. Such surveillance will be done according to standard inspection procedures or other contract provisions. Any action taken by the contracting officer as a result of surveillance will be in accordance with the terms of this contract.
1.8.1 Performance Evaluation Meetings
The contracting officer may require the project manager to meet with the contracting officer, contract administrator, COR, and other government personnel as deemed necessary. The contractor may request a meeting with the contracting officer when he or she believes such a meeting is necessary.
1.8.2 Pre-bid Site Visit
The site visit will begin at 9:00 am in the park headquarters office at Crater Lake National Park on August 14, 2024. Prospective bidders shall follow designated Park Service employees to the various treatment sites in the park to view trees included in the felling treatment lists. Please note that the Government will not be responsible for providing transportation, or reimbursement for travel or other expenses, to prospective bidders or other attendees of the site visit. (42°53'49.64"N, 122° 8'1.52"W – 1 Sager Building, Crater Lake, OR 97604) This site is located next to the Steel Visitors Center.
1.9 Travel, Lodging and Meals
The contractor shall be responsible for all travel, lodging, and meal expenditures for all personnel under their employ involved in the work under this contract.
SECTION 2 - DEFINITIONS
2.1 General Definitions
2.1.1 Deficient Service
A service output that does not meet the standard of performance requirement specified in the contract for that service.
2.1.2 Performance Requirements Summary
A listing of the service outputs under the contract that are to be evaluated by the COR or designated park representative on a regular basis, the surveillance methods to be used for these outputs, and the performance requirements of the listed outputs.
2.1.3 Quality Assurance
A planned and systematic pattern of all government actions necessary to provide confidence that adequate technical requirements are established; products and services conform to established technical requirements;
and satisfactory performance is achieved. Quality assurance refers to actions by the government assurance functions for a contracted service.
2.1.4 Quality Control
Those actions taken by a contractor to control the production of outputs to ensure that they conform to the contract requirements.
2.2 Technical Definitions
2.2.1 DBH (Diameter at Breast Height)
A tree stem’s width at a height of at 1.4 m (4.6 ft.) above the ground; on sloped ground, this reference point is applied to the uphill side of the stem.
2.2.2 Debris (also: treatment debris, woody debris)
Includes all downed material resulting from hazard tree treatments: limbs, twigs, foliage, bark, fragmented pieces of a tree, and logs.
2.2.3 Fell
To remove all of the vertical structure of a tree, leaving a flush-cut stump.
2.2.4 Flush-cut
To cut a stump as close as possible to mineral soil following the slope angle of the ground (taking into account stumps not on flat ground). This may require raking back the mulch/litter layer to allow for a lower cut and then raking the material back up against the stump. Trees less than 36 inches DBH shall be cut to a 1-3 inch above-soil height. Trees that are 36 inches DBH or greater may be cut to a 6-inch above-soil height.
2.2.5 Tree Work
Felling, limbing, climbing and rigging, and other treatment activities.
SECTION 3 – CONTRACTOR-FURNISHED ITEMS AND SERVICES
3.1 General Information
Except for those items or services specifically stated as government furnished, the contractor must furnish everything needed to perform this contract according to all its terms.
SECTION 4 – SPECIFIC TASKS
4.1 General Information
The contractor must provide all personnel, equipment, tools, materials, supervision, and other items necessary to fell designated hazard trees and treat stumps as specified in this performance work statement. The contractor must perform to the standards in this contract.
4.2 Fell Designated Hazard Trees
The contractor shall fell all trees for which this type of treatment is specified. Felling involves removing all of a tree’s vertical structure, leaving a flush-cut stump.
4.2.1 Trees shall be felled in a manner that causes no damage to tables, benches, signs, waste or recycling receptacles, vehicles, structures, roads, above-ground and subsurface utilities, or to any government, concessionaire or visitor property, and no injury to persons.
4.2.1.1 The contractor shall move tables, benches, signs, and waste/recycling receptacles out of the target area for a tree to be felled, if necessary to prevent damage to the items. With permission from the
COR, project inspector, or other designated park representative, the contractor may disassemble these items to the extent necessary for their movement, and without damage to or breakage of the items. Any items that are disassembled or moved shall be reassembled by the contractor and put back in place after the felling is completed. The contractor shall furnish tools and equipment for this purpose.
4.2.2 Trees may be felled by any means other than those involving explosives (park policy does not permit the use of explosives by non-government personnel).
4.2.3 Trees designated for felling shall be flush-cut to the specifications described in 2.2.4. The only exceptions shall be negotiated on a tree by tree basis during the performance of this contract.
TECHNICAL EXHIBITS
Technical Exhibit 1 – Performance Requirements Summary
Required Service Performance Indicator Performance Standard Acceptable Quality Level Method of Surveillance
Fell designated hazard trees
Quality of work
Trees are felled and flush-cut to specifications described in sections 2.2.3 and 2.2.4.
90% of designated trees are felled and flush-cut as specified.
Damage to other trees is limited to removal of limbs.
On-site inspection
Trees are felled and flush-cut without injury to personnel or damage to items or property identified in section 4.2.1.
Damage to other trees is limited to removal of limbs.
100% of designated trees are felled and flush-cut without injury to personnel or damage to items and property specified in section
4.2.1.
Completion of work as scheduled
Contractor provides COR with the task completion schedule 5 business days prior to start of work.
100% of work is completed as scheduled.
Contractor adheres to task completion schedule, excepting for postponement and rescheduling due to inclement conditions described in section
1.5.
100% of work is completed within the specified period of performance.
Technical Exhibit 2 – Preliminary List of Hazard Trees areas where trees are to be felled
Steel Vistors Center, Sager Bldg., Historic District, Canfield Bldg, Maintenance
Bldg. Steel Circle, Sleep Hollow Housing and all parking areas associated with these sites
Location Species Height DBH
Prescribed
Treatment Approx. Acreage of Area
Area around all administration sites within Munson
Valley
Mainly Lodgepole Pine, Ponderosa Pine, Douglas Fir Up to 200 ft
Approx
Range:
6”- 36”
Fell, flush cut and removal 114
Crater Lake HWY (West 62 & South 62)
Location Species Height DBH
Prescribed
Treatment Approx. Acreage of Area
Entire corridor of West & South 62 from western park border to eastern park border
Mainly Lodgepole Pine, Ponderosa Pine, Douglas Fir Up to 200 ft
Approx
Range:
6”- 36”
Fell and flush cut 810
Munson Valley Road (from Rim to South
Entrance)
Location Species Height DBH
Prescribed
Treatment Approx. Acreage of Area
Entire corridor of Munson Valley Road – Lake Rim to
South Entrance
Mainly Lodgepole Pine, Ponderosa Pine, Douglas Fir Up to 200 ft
Approx
Range:
6”- 36”
Fell and flush cut 245
Options: Additional Areas
Location Species Height DBH
Prescribed
Treatment Approx. Acreage of Area
West Rim Drive
Mainly Lodgepole/ Ponderosa
Pine Up to 100 ft
Approx
Range:
6”- 36”
Fell, flush cut and removal 115
East Rim Drive (what is accessible due to road construction) Douglas Fir, Hemlock Up to 100 ft
Approx
Range:
6”- 36”
Fell, flush cut and removal 304
North Entrance Road Mainly Lodgepole Pine Up to 100 ft
Approx
Range:
6”- 36”
Fell, flush cut and removal 153
Technical Exhibit 3 – Site Map