A04-Statement_of_work_airboat_motor_replacement_11_13_2024.pdf
PDF 84 KB Posted
- Attached to
- REPAIR OF A 2007 RANGER AIRBOAT ENGINE
- Solicitation number
- 140FS325Q0039
About this file
This Statement of Work from the Department of Interior Fish and Wildlife Service outlines requirements for replacing an engine in a 2007 Diamondback/Air Ranger airboat at the Bayou Sauvage National Wildlife Refuge in Louisiana. The contractor must provide all parts and labor to remove the old engine and install a new Marine 7.4 liter LSX Big Block 525HP engine with specific performance requirements including 525HP at 5600 RPM and 550 torque at 4000 RPM.
The scope includes installing new hoses, wiring harness, gauges, high performance flywheel, heavy duty radiator with oil cooler, custom headers, upgraded motor mounts, and LSX lower drive unit shaft. The contractor must be within 100 miles of Lacombe, LA or handle transportation costs beyond that radius. The performance period is 90 calendar days from award, with a 3-year/200-hour warranty required. The contractor must have specialized airboat expertise and appropriate licenses/credentials, with final validation requiring fully functional operation free of water and oil leaks.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B03_-_WD.pdf | ||
| Sol_140FS325Q0039.pdf | ||
| Sol_ClausesQ1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
FWS BAYOU SAUVAGE NWR
C/O SOUTHEAST LOUISIANA REFUGES
61389 HIGHWAY 434
LACOMBE LA 70445-2667
STATEMENT OF WORK
REPLACE ENGINE IN A 2007 DIAMONDBACK AIRBOAT
February 14, 2024
SCOPE OF WORK:
Contractor shall provide all required parts and labor to replace engine in a 2007 Air
Ranger airboat. The contractor will be required to remove old engine from the boat and install new engine and fine tune the engine and the propeller. Contractor will be required to provide new hoses, wiring harness and other associated parts so the motor is fully functional and compatible with boat. All new equipment and work shall be compliant with industry standards.
PROJECT LOCATION:
Boat will be delivered to the prospective contractor’s shop within 100 miles of
Lacombe Louisiana. Contractor is responsible for pick and delivery if further than 100 miles from Lacombe, Louisiana.
PERFORMANCE PERIOD:
This contract will have an initial period of performance of 90 calendar days from time of award.
CONTRACTOR PERSONNEL
The services shall be performed by contractor with appropriate license(s) and credentials.
TECHNICAL REQUIREMENTS
Airboats are highly specialized and must meet specific performance parameters. The contractor must have an extensive knowledge of how airboats function and have the ability to fine tune engines and propellers. Motor will be fully functional
MINIMUM SPECIFICATIONS
• Marine 7.4 liter LSX Big Block 525HP engine
• Horsepower 525 @5600
• Torque 550 @4000
• Emissions Certified
• Multiport EFI
• High amperage alternator
• New gauges and wiring harness to meet engine specifications
• High Performance flywheel
• Heavy duty radiator with maximum cooling capacity with built-in oil cooler
• Custom built headers, tuned and balanced for best performance
• Upgraded motor mounts
• LSX lower drive unit shaft
• Three (3) year/200 hour warrantee
GENERAL DEFINITIONS
QUALITY ASSURANCE. Actions taken by the Government to assure services meet contract requirements.
QUALITY CONTROL. Those actions taken by a Contractor to control the performance of services to ensure services meet the requirements of the SOW.
GENERAL INFORMATION
The Contractor shall furnish all labor, materials and equipment necessary to complete the scope of work.
CERTIFICATES/CREDENTIALS
Certifications/Credentials at a minimum should include all pertinent state and federal certifications held by the contracting company and individual technicians who will perform the work onsite.
Capability/Capacity at a minimum should describe the number and credentials of all credentialed employees involved in all aspects of the project.
PERFORMANCE REQUIREMENTS SUMMARY
The final product shall be validated once everything is fully functioning and free of water and oil leaks.
File details come from the government source that posted it. Updated .