A04_Statement_of_Work_7_HVAC_Systems.docx

DOCX document 24 KB Posted

Attached to
REPLACE HVAC SYSTEMS Federal contract opportunity
Solicitation number
140P5223R0015
Issued by
Department of the Interior National Park Service Southeast Region

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE HVAC SYSTEMS, newest first.
File Type Posted
Questions_0001.docx DOCX document
Sol_140P5223R0015_Amd_0001.pdf PDF
B09_QUESTIONNAIRE.pdf PDF
Sol_140P5223R0015.pdf PDF
B03_SOL_Wage_Rates.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Replace Fresh Air Machine HQ Big Cypress National Preserve

1. Background:

a. Big Cypress National Preserve (BICY) is a United States National Preserve located in South Florida, about 45 miles west of Miami on the Atlantic coastal plain. The 720,000-acre Big Cypress, along with Big Thicket National Preserve in Texas, became the first national preserves in the United States National Park System when they were established on October 11, 1974.

b. Big Cypress manages water flow coming out of Central Florida through Lake Okeechobee over the land as sheet flow through what is know as a River of Grass. The canals build in the 1950’s and 60’s divert this sheet flow through diversion canals and road canals. During periods of high-water volume, Big Cypress, due to the canals, diverts an extremely high volume of water to the city of Everglades City. Traditionally, man made structure know as ditch plugs, act to slow the volume of water down to prevent flooding in Everglades City. This water management technique is crucial to the homes and business in Everglades City and has become a major part in reducing the Service’s Liability risk in the local community.

2. Objectives:

a. Big Cypress Headquarters has 6 HAVC systems that are near or have exceeded their 10 year life expectancy that need to be removed and replaced with the same or equivalent to the existing air conditioners.

3. Place of Performance:

a. Big Cypress National Preserve (BICY) 33100 Tamiami Trail E. Ochopee, Fl 34141 Building A51, A54, A67

b. BICY Loop road Ranger Station Building A96

c. BICY Swamp Education Center Birdon Road Building A61

4. Period of Performance:

The period of performance is estimated to be 30 calendar days. Site Visit Date and Time is posted within the Solicitation Clauses.

5. Scope:

The planned HVAC units are highly energy efficient (20 SEER). Each unit will be equipped with a programmable smart thermostat.

The HVAC systems are near or have exceeded their life expectancy and are due for replacement. Increased unscheduled repairs coupled with the ever-increasing cost of electricity have created an economical burden on the limited resources available to the Preserve. The additional down time has had a negative impact on the employees, volunteers, and visitor’s satisfaction. Frequent extreme room temperature changes limit the use of sensitive equipment hindering the most basic operations Estimated annual energy savings of 20% or 28,000 Kw

6. Tasks: Under this contract, the contractor shall complete the following tasks and requirements:

· Work shall be completed within 30 days of contract award, and shall be performed Monday through Friday, between the hours of 7:00 AM and 3:30 PM, excluding Government Holidays.

· The contractor shall coordinate with BICY electrician and maintenance supervisor.

· Remove and properly dispose of all old air conditioners.

· Install four new Lennox XC20 V/S 3-ton units at specified locations, and one Lennox XC 20 V/S 5 ton and 2 ton at one specific location. All new air conditioners will have electric heat.

· NEW SUPPLY PLENUM. ➢ NEW RETURN PLENUM. ➢ NEW AIR HANDLER STAND if applicable. ➢ NEW WATER SAFETY SITCHES. ➢ ALL NECESSARY DUCT WORK TO HOOK TO EXISTING DUCT SYSTEM. ➢ ALL NEW DUCT WORK TO BE SEALED PER CODE. ➢ ALL NECESSARY REFRIGERANT PIPING TO HOOK TO EXISTING PIPING. ➢ NEW ARMA FLEX INSULATION ON OUTSIDE SUCTION LINE. ➢ ALL NECESSARY REFRIGERANT PIPING. ➢ NEW REFRIGERANT FILTER DRIER. ➢ LENNOX S-30 ICOMFORT THERMOSTAT. ➢ ALL NECESSARY CONDENSATE PIPING TO HOOK TO EXISTING DRAIN. ➢ NEW SECONDARY DRAIN PAN (If applicable) AND INLINE FLOAT SAFETY SWITCH. ➢ ALL NECESSARY LINE VOLTAGE WIRING TO PROPER ADJACENT DISCONNECT. ➢ WEATHER RESISTANT VIBRATION PROOF ISOLATION PADS FOR CONDENSING UNIT. ➢ ALL WORK TO BE PERFORMED IN A PROFESSIONAL MANNER.

7. Government-Furnished Property, Material, Equipment, or Information:

N/A

8. Safety:

The contractor is to follow at a minimum all OSHA rules and procedures.

9. Security:

N/A 10.Travel:

Contractor shall be responsible for all travel related expenses for this project (i.e. tools, materials, manpower, meals, per diem)

11. Special Material Requirements:

N/A

12. Quality Assurance Requirement:

The Government will periodically evaluate the contractor’s performance in accordance with the statement of work.